LEGAL APPROVAL
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
~.boynton-beach.org
February 3, 2008
Mr. William Bloom
Holland & Knight
222 Lakeview Avenue - Ste 800
West Palm Beach, Florida 33401
RE:
File No.:
Location:
500 Ocean (fka The Arches)
SPTE 07-012
Southwest comer of Ocean Avenue and Federal Highway
Dear Mr. Bloom:
Enclosed is the Development Order granted by the City Commission on December 18, 2007 for a second one-year site plan
time extension. This approval extends the site plan approval granted on September 6,2005, from September 6,2007 to
September 6, 2008. In order to maintain vested status, a building permit must be secured or an extension granted within this
extension period.
To continue this project through the development process, please revise relevant pages of your approved site plan to
incorporate all conditions of approval as applicable. A copy of this new Development Order, including these conditions, must
accompany the submission of the fully amended site plan set, as well as the original Development Order and associated
conditions. The person managing your permit applications should be made aware of any additional documents and third party
letters listed in the conditions of approval that need to be submitted with your permit package.
The Building Division is committed to speedy and efficient completion of the building permit process for your project.
However, please note that failure to meet all applicable Development Order conditions in the submitted plan set may produce
unnecessary delays in permit issuance. A thorough review will be conducted by the Plan Review Analyst and if the necessary
documentation is not attached and/or the plans are not amended to reflect all of the approval conditions, the plans will be
returned to the applicant for correction and re-submittal before the permit is further processed. Feel free to contact any TART
member for additional clarification of comments.
Important: If you plan to introduce any changes to your approved site plan beyond those required by conditions of approval,
please contact our staff for a review before submitting a permit package to the Building Division.
A copy of the complete Development Order and Amended Site Plans reflecting the "Conditions of Approval" must be
submitted to the Building Department along with the first permit request to avoid any delays in the processing of your
permit.
Should you have any questions regarding this matter, please feel free to contact this office at (561) 742-6269.
~~11ee;eIrL
~~'~:RumPf
Director of Planning & Zoning
Enc. DO w/COA
S:\Planning\SHARED\WP\PROJECTS\ARCHES @ BB\SPTE 07-012\Approval Letter.doc
....;
DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA
Development
paz
Building .
Engineering
Occ. License
Deputy City Clerk
PROJECT NAME:
500 Ocean (fka The Arches)
APPLICANT:
Boynton Ventures I, LLC
JltN
2008
APPLICANT'S AGENT:
William Bloom with Holland & Knight
AGENT'S ADDRESS:
222 Lakeview Avenue, Suite 800 West Palm Beach, FL 33401
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION:
December 18, 2007
TYPE OF RELIEF SOUGHT: Request a one (1) year time extension of the major site plan
modification (MSPM 05-008) and height exception (HTEX 05-006) to
September 6, 2008
lOCATION OF PROPERTY: Southwest corner of the intersection of Federal Highway and East
Ocean Avenue
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
x THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1.
Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's land Development Regulations.
2.
The Appligmt
LHAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4. The Applicant's application for relief is hereby
/' GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
DATED:
la-.:J.I-07
'tn.A.
S:\Planning\SHARED\WP\PROJECTS\ARCHES @ BB\SPTE 07-012\DO.doc
EXHIBIT "C"
Conditions of Approval
Project name: 500 Ocean (fka The Arches)
File number: SPTE 07-012
Reference:
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: None X
PUBLIC WORKS - Traffic
Comments: None X
UTILITIES
Comments: None X
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments: None X
BUILDING DIVISION
Comments: None X
I
PARKS AND RECREATION ;
Comments: None X
FORESTER/ENVIRONMENT ALIST
Comments: None X
PLANNING AND ZONING
Comments:
1. The time extension is subject to the original Conditions of Approval. X
~
""-'"
500 Ocean (fka The Arches) SPTE 07-012
Conditions of Approval
P 2
age
DEPARTMENTS INCLUDE REJECT
ADDITIONAL COMMUNITY REDEVELOPMENT AGENCY BOARD
CONDITIONS
Comments:
None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
To be determined. ~
S:\Planning\SHARED\WP\PROJECTS\ARCHES@ BB\SPTE 07-012\COA.doc
Exnibit "A" · THE AFtC:HES
Location Map
110 55 0
110
220
330
440
I Feet
~~-
N
w+,
s
EXHIBIT B
November 6, 2007
The Arches
Time Extension
Additional Justification
The following statement provides additional justification to the City to support the
applicants need for a time extension for the project known as the "The Arches" located at
500 Ocean Avenue. The current market conditions are a major factor in the stalling of
the project. The applicant has been working on creative solutions to this problem in order
to make the project move forward and begin beginning construction. After some analysis
of current market conditions, the applicant is moving forward with a luxury rental project
instead of the previously proposed condominium units. There is a need for upscale
rental units within the City of Boynton Beach. With the potential conversion to rental
come minor mechanical, electrical, and plumbing modifications. The applicant has
currently put the construction plans out to bid for these modifications and intends on
beginning this modification process within the next several months. Below details the list
of proposed construction changes that the applicant is proposing:
Architectural Value EnQineerinq ChanQes:
.
Eliminated 1 floor of the parking gara~e
o Amenity deck is now on the 51 floor rather than the 61h
o 61h floor residential is now identical to floors ih _151h
o Exercise room and Party room are now located on 5th floor.
o Unit number will change from 356 to 362, addition of 6 units
.
Reduce size of Amenity deck
o Stair C-3 has been eliminated
o 'Storage room' to replace stair C-3 on roof deck to maintain symmetry
o Maximum occupancy for smaller roof deck: 625 occupants
o Maximum occupied area for smaller roof deck: 19,000 square feet
.
Eliminated building 'D' retail (2-Story)
o Northwest corner of parking garage was redesigned to accommodate two
loading docks. (151 floor)
o Northwest side of plaza where building '0' used to sit will require a new
landscape layout.
.
Trellis and associated planters on the 1 sl floor have been eliminated from parking
garage fac;ade
· Glass canopy has been removed from first floor at northeast and southeast
corners of retail
· Eliminated high ceiling and curtain wall system in corner units on 5th and 15th
floor.
o Roof slabs at both 51h and 15th floor are continuous all the way to corners.
o Slab still projects 2'-0" past parapet at corners
o Glass balcony guardrail sitting on concrete curb at corners where curtain
wall used to be.
Structural VE ChanQes:
Change foundation system from augercast piles to vibroflotation.
The applicant feels that progress continues to be made in order to keep the proposed
project moving forward in a market that is currently unfavorable towards residential
development. The applicant respectfully requests the approval of the requested time
extension.