REVIEW COMMENTS
7.D.l
BOYNTON MAUSOLEUM
(MSPM 07-006)
MAJOR SITE PLAN MODIFICATION
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 07-104
STAFF REPORT
FROM:
Chair and Members
Planning and Development Board
/, }U
Michael Rumpf J
, l
Planning and Zoning Director
Ed Breese ~
Principal Plan~;
TO:
THRU:
DATE:
November 6, 2007
PROJECT NAME/NO:
Boynton Mausoleum
MSPM 07-006
REQUEST:
Major Site Plan Modification
PROJECT DESCRIPTION
Property Owner:
City of Boynton Beach
Applicant:
Boynton Beach Mausoleum, Inc
Agent:
Jason Mankoff, Weiner & Aronson P.A.
Location:
1611 S. Seacrest Boulevard (see Exhibit "A" - Location Map)
Existing Land Use/Zoning:
Public & Private Governmental/Institutional (PPGI) / Public Use (PU)
Proposed Land Use/Zoning:
No change proposed
Proposed Use:
Request for major site plan modification approval for the addition of
an approximately 3,162 square foot mausoleum building, on a 0.93
acre parcel.
Acreage:
0.93 acre
Adjacent Uses:
North:
Previously constructed mausoleum buildings, then farther north right-of-way for
Woolbright Road, then farther north single-family residential homes, zoned Single-
Family (R1-AA);
South:
High Point Condominiums, zoned Multi-Family Residential (R-3);
East:
Cemetery property, then farther east right-of-way for Sea crest Boulevard; and
West:
Boynton Beach Little League Park, zoned Recreation (REC).
Staff Report - Boynton Mausoleum (MSPM 07-006)
Memorandum No PZ 07-104
Page 2
Project size:
The project consists of the construction of the last in a series of mausoleum
buildings, with this building consisting of approximately 3,162 square feet.
Site Characteristic: The subject lease parcel is a long narrow piece of land, approximately 40 feet in
width, oriented north/south from Woolbright Road on the north to High Point
Condominiums on the south, and located at the west boundary of the cemetery
property.
Proposal:
Concurrency:
Traffic:
Police & Fire:
Utilities:
Drainage:
School:
Driveways:
BACKGROUND
Boynton Beach Mausoleum, Inc. proposes to construct the last in a series of
mausoleum structures at Boynton Beach Memorial Park. Boynton Beach
Mausoleum, Inc. entered into a thirty (30) year lease agreement with the City in
1978 to construct and maintain mausoleum structures with crypts, niches and a
chapel along the west side of the cemetery. The applicant proposes to construct a
3,162 square foot mausoleum building in line with the previously constructed
mausoleum buildings, connected by covered walkways, at the south end of the site,
just north of the High Point Condominium property.
ANALYSIS
A traffic concurrency approval letter was received from Palm Beach County Traffic
Engineering on October 29, 2007, indicating the project meets the traffic
performance standards of Palm Beach County. No building permits are to be issued
after the build-out date of 2009.
Police and Fire have indicated there are no additional impacts associated with the
proposed project.
The Utilities Department indicates there would be no impacts to their operations
associated with this request.
Conceptual drainage information was provided for the City's review. The
Engineering Division has found the conceptual information for the subject property
to be adequate and is recommending that the review of specific drainage solutions
be deferred until time of permit review (see Exhibit "C" - Conditions of Approval).
This project is exempt from the school concurrency requirements of Palm Beach
County.
The subject property fronts on Woolbright Road, approximately 2,000 feet west of
Seacrest Boulevard. Existing on-site circulation consists of two (2) driveways east
of the leased parcel off of Woolbright Road, through the cemetery, and one (1)
driveway off of Sea crest Boulevard, also through the cemetery.
Staff Report - Boynton Mausoleum (MSPM 07-006)
Memorandum No PZ 07-104
Page 3
Parking Facility: Cemeteries/Mausoleums do not have speCific parking requirements listed within the
City's Land Development Regulations. Typically, cemeteries provide a limited
number of parking spaces associated with the office and maintenance components
of the operations. Visitors to the gravesites or places of interment normally park
near the gravesite, along the internal circulation drive, for a short duration. As a
result, few formal parking spaces are usually provided unless a funeral home is
located within the cemetery itself. As such, Chapter 2, Zoning, Section 11,
Supplemental Regulations, H.5. states, "No fewer than four (4) parking spaces shall
be provided for any nonresidential use". The cemetery provides space for six (6)
parking spaces at the office/maintenance building. Traffic circulation is provided
throughout the cemetery and to each of the existing and the proposed mausoleum
structures. The existing road system allows for ease of movement by emergency
and general service providers as well.
Landscaping: The addition of the last in a series mausoleum structures is designed to follow the
same landscape theme of the previous structures. The planting design involves the
placement of a hedge along the east side of the mausoleum building, adjacent to
the circulation drive.
Building and Site: The building design is proposed to match that of the previously approved
mausoleum structures. Sheet A4 provides an illustration of the proposed building
facades, with three (3) sides of the building consisting of polished marble, with
marble edging, limestone fascia and limestone columns. The fourth side (south
elevation), is proposed as a stucco finish, with marble edging and limestone fascia.
The building is designed at a height of approximately 16 feet - 6 inches, well within
the allowed height of 45 feet within the Public Usage (PU) zoning district. The
proposed mausoleum will be connected by covered walkway to the previously
constructed mausoleum buildings. It is proposed to be the southernmost building in
line, with a setback of approximately 32 feet from the south end of the site,
abutting High Point Condominiums.
The site plan was originally submitted showing the proposed mausoleum to
encroach across the west property line of the cemetery, though still within City-
owned property, generally similar to how a previous phase was approved and
constructed. Staff has found this design to be inconsistent with the agreement
governing the construction of mausoleum buildings in the cemetery, and therefore
requested that the building be relocated wholly onto the cemetery property. The
applicant relocated the mausoleum within the property line, but it appears as
though the building, as designed, will not fit completely within the 40-foot wide
lease area. As such, a comment remains requiring the building to be modified
and/or sited to avoid any encroachments and ensure placement within the lease
area as indicated within the agreement with the applicant (see Exhibit "C" -
Conditions of Approval).
Design:
The color on the mausoleum is proposed to match the existing pale pink marble
buildings to which it will be connected. The building style, materials and colors are
compatible with surrounding development.
Staff Report - Boynton Mausoleum (MSPM 07-006)
Memorandum No PZ 07-104
Page 4
Signage:
The applicant is not proposing any new signage in conjunction with these
improvements.
RECOMMENDATION:
The Technical Application Review Team (TART) has reviewed this request for major site plan modification
approval. Staff recommends approval, contingent upon all comments indicated in Exhibit "C" - Conditions
of Approval. Staff recommends that the deficiencies identified in this exhibit be corrected on the set of
plans submitted for building permit. Also, any additional conditions recommended by the Board or City
Commission shall be documented accordingly in the Conditions of Approval.
S:\Planning\SHARED\WP\PROJECTS\Boynton Mausoleum\MSPM 07-006\Staff Report.doc
iL 'f,,~,.
. 'I ;q,,~i;;;
~ e"
i; t 'I~'
'lif .,
,J' .
-, ~- n .~
0" ...;..... , ' t
. i
, ~ ' .."\
Y \
."_",,,',",i;~."';~ ~~;~~:::.~"""'~.~.:;; '1! ~E~
_ ~ ._-""" ,. "f'" . ,
,\~......__~ ~ ~ ,.,..t'-'~ it
. "J'I.. , ;,:'.~
;: ."....1'1;,;'.. .
*1'
~'. ..... ...~.,
J-l !
, ~ i l
~ i
?
,
J
'.
I
1\
.
Boynton Mausoleum 1611 S. Seacrest Blvd
EXHIBIT A
t>;l
~
:I:
H
tl:I
H
t-3
)I
)I
tn
o
C
t-3
l:"
H
Z
t>;l
o
..
~I'.
A].
H
Z.
OJ
, .
~
o
~) .
, "-'
.
tl:I
o
2i
t-3
o
Z
ttJ
t>;l
)I
()
:I:
s:
t>;l
:;:
o
lAl.
H"
)I
t""
'tl
)I
~
~
,:,
u ;,;
(jl U'
,.1 .
<!~
...,
.~
Jj
~,~,-_.,
--ifF''''.':::' < "
:;:-: :~ fl
........ ",-,;, &:T"Y
I' ~ f?iJ' -
"",.'
, .. ..
.,
.p.
I~.
:..i _
'I_I'~:'"
.-': ~,~
'1
__,)<wJ. ~- .....c:.c..o~Q\.w.~ ~ Q,'IO P::a.. 4 ,...., -e.c;.--......
. ,..-.c:.; -="t-""".... -r a..tZ --' -r"t:' _.
.' c."
I
_.JJ~"'r",...,JI"ooT...
. "..
-r.
.1.Ct7
1"-
-
.. 6"
~
'II
_.. _ ..f
, -s,"~ foOl " n'......
7"
IWl
'5
JO
"
~
'.
,;r,;
Il.
-'0;
'"
'.....
...
4S
~
~:
t;5
~",.~
~-j',;
'.; .:;::.:',;'.;>~
~ ",' ;11;;"""'" Wi '! ~
'tit: ~~ i' ';,V~"l ! ~
:.'[: : '.J .-:~, -I'*;.'..\~ ) t
~: 'I "1''h1oi I~ ~
J L ~:'~~I
I:"; ,i'~;:~;~
I ~~~"'i~~'.t'
~..c"_:"'"
- ".J ' T't.'
. I "T. . , ,.=.=.
;,,"\ ,'- .
'.. . ""' ,., .,. flI'Sf
- " ."
I 6\ ' ,
" -. -- - "",
. I. I', . "'"
, ..\. '..' 5' .- ~ ,I-,..
N. .' . I........
Pill' . I'~.:: ' ~.
... .~ 1 _, ~.
~ i{ I M r'l , ~
. : IV J . - ~I...
,. ,. 0 ..."
O.H.' . ....-. :.:~!us.:
",' "' ..>, -- . . . .
... .; Xl"". .'o.',
'''''' ~.,. ..".,
Iw.! '''..:
'1: hi . .- -'
I: !"J~ ';~_~:r) ~;i <
,.' n. ~~':'~1
'I ,. m
.~'i\'~,) "i'.;: f~r.
;"-~l:l'
''10:1
0;
IAOI
~
.u
lot!
,... , ~
,,~ ftI.Irt
- ... IoH.
...., ~ ~
!P%. I' 141"
'""" IS...
~. 1"'-
,~
~.
I"-.!
'.
2:r..
'"!iO
.,.
t"o!tt
J<.o
~
...
.....
"""
la~
1!RlI
I"!o
1641
~
In
....
lI..
-J!
~
t-;..
'5(,
,...
i....
~
<<
....
4'5
IfW
..,.
,.,.
''5
~
I-
l2Io
'50
1 kit
. 1M
.....
....
..~
16'
D
RlV E:...
11'I
In
r;;s.
IIC.
"'!I
11
..
..
"1I
1\5t
L.:II
I2u
,.&'5
...
'Sol
I'"
~
~...
~
" H"
,:.".
'~~I; ;f.
.. Iai
Ie.
~
~
~
...
..
1'h .
r"lIo
01
1"0. ..... yl"o,""
*,
~
t.....
.....
: ~I
Iooc
'"<!I
'-
Iii'
M
11!
"'s
50
I1ItI,
Ind
s'"
...."
"6
lit..
Is-
I....
~
~
~
_ 10
.....
....
--
~~
W;
-~
~7J
'-.!
)
'"
"0),
~""
"'-
~
"~~"-.,~:'f'i,"::i -22.
~
..
r:l!o
,..,
....
o ~
... C.
f'~ '1
17...~f"_ ~,
. '. ,. ~
o~,'-~~::."i,'~,:.'-~:5~J[H
, -'on '.51........,
iDl , I 1 .,~
I'~I'I. .
....., . :::a. ~9;
'5 . 1 .
,..,.,,-.0 ., _
~~~,~,,~
r~ ~. .. I ~
.. "I '," WOI ,....
'1 "'-"'.,- 1m I
~ I I I:'r< IZoO
t"JI r \'50...,....- nal 1
!ill - fil.'.......'.,' - .. I , -
',_ .., . ... "~.' ~. ~_ -;' hl5l
~;WIli:.'- '. .'.~... " --" .
~ .' ,'.. - 'fJ!! ~~~jR'J'<': rt5 . . f . 11<51 '2"10
. . low. ., .. :1-...1.'."... .. ..-
~;h,~~ loI!l ...
: r ';.lIiiiI '"
..., - ,.
... 1 . ,-, I....,
t:zsl
in' I I
r I'S.
~8-l,,<t
KZ
""I:i
"i: '')0
.....
-
~
I~
r 1
.-
'!Io I.
t-
l:!!if
nil
,s
.....
Ion
nr.:
~
Iml
,'"- ~lI:o
W4l ~ 1M<
15<<
.~
III" I
i I ~
'IS<
lei!
...
....
~,; ',I
~.I r "I'~~:'
jD:;~' I .T_I, :1;1 ...
~~d\":&1~{~~;ckJ~,'..~~~i~1f;_{;.~~. '~T__"'- -,.
-... _...~~..~:--:.~--; ...~.....~. --~.<<~:;:'l'='"-;J_C;::\:~' 'I ~ t.&-:S-..r-...:.1....
__.;.::...,~___~.~;~~ ..:: " ..::__~~~~-,,~~. .' ;J~ . - . '-
10
......
.....
.
",'
1.1'
"""
...
1 ~
md
...
'""
...
"!s
~
MIo
I!I!i
....
'.. .
'Il'I
....
':1; ,.;'_'; ~
~:I~!~t;:~ ..~~..
Of j,' " ""
j ".'f " . -N ~. bcol.
:1:il"l: X
;"i :;i/I\ ~
.,'
'"'" ......
.!) ~;." ': "": j~t., ~. ,,~. ..
.,.. '/'!i' I r.II 'I ,. :'.' Do .~..
'JI; ;. 1 .. IM'l ,~ .' ';'"
.< ,.-Im ...'''''_
1ro51, ~ .,,_ --'" IIiIo
... "' . ,,: iooo
I 'W; ""'.l
I,...
~
IIlIi
IZIo.l~
n'! ....,,1. A
.,;'
~..
'.' ::.- .J
., ~..,~
'- "u.
n IAI I...
I I.'&.
I ~ _.
"C-'
"~nill=--
".I
'"'
Q.
~
~
I
~
~.
iN
M ~~
12WI'W ... . ,... ...
ras
~
-
~; ,'. ';/
,""- ':;~':h;,':"~ ,,~/I co.'
". ,4'
\ "I':a '61 .... l fo., &I '!to ... lit IIZl "11141
~ iIw TI1 .-. I'" ..,
.......
1
, .}..
t~~". ~W;'.I1
~ ..' ',:'
) 'L..!ll;1,
,
....~.~~R l ~. Ei
t,-
..- .-
'2$ JlI~' ~,_ ""'= ~
, ....
~ I., ., 75 <l.~fIs.
I
, t.
-,
,
I
.--r
.. I
.,.cl ,I
;.. UH ~
~.li hn ~
l 6 n2~--i
~~~;l~m
ilt ~H~ 5
'e! 6,,~i ~
i ~ ~~i l
ijh Ih~
h$ Q~ ~
iil ii ~
.h h~
'-In In
iQ H~
l ~~ ~
J ~
ini~~O< ~
illllli lI)
iW1h ~
~..H~ 8 ~
d~r~ 5
nh!;li!I
uih~
W ~~
3 Ii
~ ~
!
I
I
-- - - -- -- .-
(,
I~
/
1olftcIM>~-"E
t'g,K_
~i
.. ~
?~ .
;0 i
~~
.~
~
Ii
R
- ! h
: ~ ~mj
r
[
;8.-
[- !
'"
\ r
1 [
~j ..
~
[l
I~-: _.~~,
r-r
~IU~ n!~UI
~~~u g~e"'RQ--i
~~g ~ ~ ~ n & Q
lSiiI~ 'm 1'\:1 n~
~~~ ~ ~ ~
~m! ~ >-
~tiI~.. ~
i~ ~
1I ~
~~ ~
~~ ~
a~
BOYNTON MAUSOLEUM ADDITION
BOYNTON BEACH MAUSOLEUM INC.
1611 SOlffil SEACREST BOULEVARD
BOYNTON BEACH FLORIDA 33435
_~==~~...-~___...-o=,.,~, '=.,."-'~ _.,~-~~,'~-'-~""~~ -- ._,-,-,~..-_._,..,--
W
-1-4-1-t=C!'~
~99~0I':"~
~~~~a~~
'~"
IJHJI \)J f1\ r-
~~! ~ G
*iH
iiI
f
"'....
.------------
-----:-
t-1<H'B'T B
\
i
~i
r
\
,.'->1"
[!
=~~JO<~:~(
c_ \ ~I
: ~
I .
, i
\
.-\
LI!I :
,...:...,..,.-.,.......:.:<,....,=:=-j
r., ....-
c. \
\
\
.- \
'. ,
c \
~-~,-~={~j
\
.- \
'. ,
- ~ \ I
...--111,\_________ n Li
o
',.~~~~~
.,~,~~~:""~S? "'t1?~~~~.
~:;::""s" ,~~~:..J,~~~ ,,",','-' --
..~~~~ ~~
~o(j~o t: Q
r~~~ ~~ m
..h~mi..g h ~
-ill ' ;ji r
P" r- 0
!j ~~ ~ ~
\) -t....... .. <P
i!\ ~g
~ ~~
~\:l
...
~
?
E
..
tI: Ii
~ t:l;! -0"
~o~:! ~~
I
tJ
tJj
oC
~:
~L
~~
oC
~Z~
~
Z
...-3
o
Z
td
tr:l
~
n
~
~l
"""lH:t""")
jf
w~
M~
~~
nC
;::Cu
C
~~t
o~tJ
~
aCe
~ UJ ~
o~
~r
~tIj~
()1et
~t
~
~
~
c
~ i
Z
n
.,
\ ~
t ' c
i
,
~
;n
Jl!
~
~
."l;: I
;. ~
;i i
~ ~ l~l
H~ ,gei
..c.......\SI....."'...-lo
~H~pu~~i
~~~~~~~u~~
~u~,h-~~~
~ Ui"~11 ~
~ ~~i ~(!j
~~ ~
t;
o,t,TE SUBMlnAlS I ~~
22 OCT 2007 RELEASE roR ESTIMA.TE/CUENT REVIEW
26 OCT 2007 REVIS[O PER cuOO CQMNENTS
29 OCT 2007 1DO 1llSlIlM" mDlIlllJ'-t II H YSII'D lWlI'! ClJIIlI5
RELEASE FOR BLDNG. OEP1. REVIEW
RELEASE roo CONSTRUCTION
U\RIf( B. Jusna:, ARCHITECT
, J 1 5 WEST UBERTY AVENUE
PITTSBURGH PENNSYLVANIA. 15225
412-511-5576
. atdlcwsintl.wm
f-
L
PREUW BY
DRAWN IJY
CHECKED I
ESTIMATED
~13J~~~~e
i
t
P w-I
i
r r Ii .
n -I
uh, ~
n~l~ ~
q ! ~
P ~ ~
5 ~ ~
i Pi!
Uii~~
nPi
~Ih\i
~~
",'_,q,"'"', ~'1't'lmh%~ ~
';:~
t'-~~ "~,,
~' ili~
'.' iol
'- h
r~ n
+'e .~ 0~
--1-- J~~, ~~;
~~l
i
,.--
ut-
f-t
f-
--I
0'"1-
>- f--
1 "
'1.... -,L I ;-,~
,~:<:t'frt. "~i.~l :F,j::.
--t- -- J
;
~'
"1 ".
~l..~ ~- .<.
- :.- 1- k
(:"
-- ~:~
-~J.c..-f--
~;.
-~ ~
,.
~_ .1;
<
,;
~~~
~"...,.,i":'.,JV,,<'.~ >;;,
"V
j
~llltt:D!'lXil!!
~\hll
~~
"
;':..'":."'<:;'~-~'\'
v-}l.- 'f" :f,;~"
-- ..
:':f.i~~<" :~t,,-;-:,~ f.t;AtY"J'r..,.~ ;'.
'.'. ~~:).'
~ -~_-- --'-----
~--
,;~~.'H;~ .' '~'1 ,~~::{(~...,: -'::,1<'"'
; . ,~'. -j.; :"..~;~, ~~~.,,~.. ~J:t.,;.;..; t. '-':F~<~':~
~--;
/'
T
21~
n
~~I
~
-----~
,
-~';,~.{1~ 'u;"': :",;':~;,?.:-~. ';~'.. ',-
--
~
."
. '.
m
nl
0~
-..-- p" .--.-.-
_"'e.--.---
;1~
1...-----
.,' . ~
----
).
2'
II
~~
~2.
21~
M
~3a
e~~
~I
I g
~ :c
\ ~
mr
. ~
~ -g
!i i
2 i
~
~
I
t
'\:--:'";: '}'"..'~l /,/<;,:<~~,~':!:~ ::~)~~,:I:,;X~..:;:"
---
-- -'--
"Y. ,~.'('f'. ,,~; :;/./';f~>"."":- ....:h .,;~\.,,:{-. }:
i" l"
il;~ 2~::'
ll~li i;~
il~~ i~~
mm
-I -I !In
~ ~ ,,:,:;;,.' "'ie,","",,. '-
~ ~ I I It
g /~""l'jjG;!.&t:flillilldl1t{:-3t:1~ 1
~ / ~~
<~ ~
~ I; ~~~~::~'~:'~;;fH:~1
~ '.:"~'<\>i'>::~";-"':;'''~~''_'' ,.',y~~
2 .-0>"'~ ~~. ',,,:';"':;':'-' "~-.:.:.::-,':l~~'.(-',:,~~~Y''''',
6 ~0-"?"~<~""~~?\~, :.~." "'z. .~~~ 0::.::>,'-.;,../(~,
1II ~S'~...., '.:-."....::::,:', ",:'S~,' ~""~""'...:V'
'" ~ :~~~~~~,~t~~~~;:~
i I" '1 BOYNTON MAUSOLEUM ADDITION
ijj~)>!'l BOYNTON BEACH MAUSOLEUM INC,
l'liir!..... i
l!ll 1~\1 sblJ1t.l SEACREST BOULEVARD
1!iI;wi;rti'1~ ....P.H "nRlnA ~'W!l!IJ
o.t.TE SU6NlTTALS I REVISIONS
22 OCT 2007 REl.(AS[ FOR ESTlMoloTE/CUENT ftEV\E'IiI
26 OCT 2007 Rf.'VlSfD PER CUENT CQMWENTS
2t OCT 2007 lIMllw.BlDlllll.GlJDill:rI-4JlHfA9IUaD1'S(DIIIlIS
RU.EASE FOR UNO. OEPT. REW:W
REl..EASEFORl:OksTRl.Itt'lO
lARR'1' e. JUSTICE, ARCHITECT
1.115 WEST 1I1ERlY "VENUE
PITTSBURGH P[NHSYlV~ 15226
."-S11'-5S71
_ _ _~'~c"~~--=-,-~~-,",,-=,=,,,,"_._..-.,-,-~~,"-'_-
E ~HIBIT B
}
~I:~ ~:
~2~11
ii:i
~~~\;:
i~
II
H
""''''"''-
" :';;< ," ~".t ;,;t~ -;:- ( ~-r,-,:"_",
~y; , ", ,-..:'~. :58'~: '. ,:J;:..P' \.~.~:;.:
-.......;
I.:'~ ---~ - ~'" ~
, 2"
. ;~
q
,,'"- '-c..,-- i~
nl
~ '. " 0~
, .';.~;,:r'1:~:' ""o?'~ ~. .<.; ,: '-'h,,,A ,,-~,~'~;.{~n-:" ,
, .-- .. I;
-- -- ,- - n
- -- f---- - U
" '::-~ ..'{ l:("~ 'i .~':. " >" ~~ .1:....
'e-
-- ,-~-
--
.~.~" ~ :.;~;i .....'5
---
"~boo
..
~ --- ----
,/
~ ~ -
21~ -
n
~~! i;t(.h:~ :Jt'5':j .'.A'.::/"';" . .::.~~,~ ;,Vx: ';.f}:-
'-- ,-~_.. ,-- ~
8
0 ,~
'----'- ~ ..
- C~
, ~:~.~. .< ....":',- .~".;-,;:
.
-~
f----- T -~
ly~_iTr:-:'~~J='-'-=: eel
"-....k~}~"..; :'_ ':;l,;;,/t!t.,~..:~~ ;,.~.r'1'<'~';"'-
L
I~II"'" ,,', " ,.:,{J
-1!&B1
~~i ~~~
;H~
er~
1m
~~
~O>
o
m
'-
m
.
m
~
--I
2
PREUM S'l':
ORAWN 8'1': lVL
CHECKED BY: ElS
ESTlMA,TED 8'(: JW
CERTIFlE08'(:
r ,'1.(7.1&1 ~4.. Z10<..'f'7ttt101
EXHIBIT "e"
Conditions of Approval
Project name: Boynton Mausoleum
File number: MSPM 07-006
Reference: 2nd review plans identified as a Major Site Plan Modification with an October 30, 2007 Planning &
d ki
Zoning ate stamp mar ng,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS- Solid Waste
Comments: None
PUBLIC WORKS - Forestry & Grounds
Comments: None
PUBLIC WORKS- Traffic
Comments: None
UTILITIES
Comments:
1. LDR Chap, 3, Art, IV, Sec. 3(0) requires Master Plans to show all utilities
on or adjacent to the property, The plan must therefore show the (any) point
of service for water, and the proposed off-site utilities construction needed
in order to service this project. This would include any irrigation systems
currently in use,
2. Any and all utility easements shall be shown on the rectified site plan and
any landscaping drawings so that we may determine which appurtenances,
trees or shrubbery may interfere with potential utilities, In general, palm
trees will be the only tree species allowed within utility easements, Canopy
trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future,
LDR Chap, 7,5, Art, I, See, 18,1 give public utilities the authority to remove
any trees that interfere with utility services, either in utility easements or
public rights-of-way.
FIRE
Comments: None
POLICE
Comments: None
Conditions of Approval
2
DEPARTMENTS INCLUDE REJECT
ENGINEERING DIVISION
Comments:
3, The proposed site plan is reflecting several drywells (on the west side of the
proposed building). Provide drainage calculations showing the amount of
rainfall to be retained on-site.
4, All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets,
5. Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review.
BUILDING DIVISION
Comments:
6, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TART (Technical
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
7, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph, Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2004 FBC, Section 1609 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
8. At time of permit review, submit signed and sealed working drawings of the
proposed construction,
9, Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building, Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A) The design professional-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _' _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD's surface water management
construction development regulations."
B) From the FIRM map, identify in the site data the title of the flood zone
that the building is located within, Where applicable, specify the base flood
elevation, If there is no base flood elevation, indicate that on the plans,
C) Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
'}"
DEPARTMENTS INCLUDE REJECT
drawings titled site plan, floor plan and paving/drainage (civil plans).
10, At time of permit review, submit separate surveys of each lot, parcel, or
tract.
11. Add a general note to the site plan that all plans submitted for permitting
shall meet the City's codes and the applicable building codes in effect at the
time of permit application,
12, Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
13, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. The addressing plan
shall be approved by the United States Post Office, the City of Boynton
Beach Fire Department, the City's GIS Division, and the Palm Beach
County Emergency 911.
A) Palm Beach County, Planning, Zoning, & Building Division, 100
Australian Avenue, West Palm Beach, Florida (Sean McDonald-561-
233-5013),
B) United States Post Office, Boynton Beach (Michelle Bullard-561-734-
0872),
14. Sheet Al - The bottom of all footings shall be a minimum of 12 inches
below grade per the FBC Sect 1805,1. Revise the note on Sheet AI.
PARKS AND RECREATION
Comments:
15. Plant sizes do meet minimum dimension requirements within the code.
Please correct.
16, Irrigation should have 110% coverage.
17, The use of cypress mulch is prohibited.
FORESTER/ENVIRONMENT ALIST
Comments: None
PLANNING AND ZONING
Comments:
18. H is the applicant's responsibility to ensure that the new site plan is publicly
advertised in accordance with Ordinance 04-007,
Conditions of Approval
4
DEPARTMENTS INCLUDE REJECT
19, The applicant is responsible for compliance with Ordinance 05-060, the" Art
in Public Places" program and must demonstrate their participation.
20, Modify the plans and/or the proposed mausoleum building to show the
placement of the building in the area described in Exhibit "A" of the 1978
Agreement between the City and Boynton Beach Mausoleum, Inc.
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
To be determined,
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
To be determined,
S :\Planning\SHARED\ WP\PROJECTS\Boynton Mausoleum\COA,doc
1 st REVIEW COMMENTS
Maior Site Plan Modification
MM 102-.
/O-.!o-O(
..
Project name: Boynton Mausoleum
File number: MSPM 07-006
Reference: 1 S(review plans identified as a Maior Site Plan Modification with an August 22, 2007 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments: NONE
PUBLIC WORKS - Forestry
Comments: NONE
PUBLIC WORKS-Traffic
Comments: NONE
ENGINEERING
Comments:
1. The existing one-story mausoleum building "U" was constructed some 8.2
feet over the property line, which makes this a non-conforming building,
This also includes the associated covered walk areas. NO proposed addition
should be considered that would perpetuate the construction error of /'
building "U", despite any argument to the contrary, The applicant's
application drawings include a partial area survey that acknowledges past
construction error. The proposed addition can be re-configured to conform
to the existing property line and needs to be reviewed in detail.
2, The proposed site plan is reflecting several drywells (on the west side of the
proposed building), Provide drainage calculations showing the amount of V
rainfall to be retained on-site.
3, All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets. V
4. Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the Technical Advisory V"
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review.
5, Sidewalks adjacent to driveways shall be continuous through all access
areas and shall be 6 in, thick within the perimeter of the proposed building V"
(LDR, Chapter 23, Article II, Section P),
6, Paving, drainage and site details will not be reviewed for construction
acceptability at this time, All engineering construction details shall be in ~
accordance with the applicable City of Boynton Beach Standard Drawings
and the "En2ineerin2 Desi2n Handbook and Construction Standards"
1 ST REVIEW COMMENTS
10/25/07
2
DEPARTMENTS INCLUDE REJECT
and will be reviewed at the time of the construction permit application,
UTILITIES
Comments:
7, LDR Chap, 3, Art, IV, Sec, 3(0) requires Master Plans to show all utilities
on or adjacent to the property, The plan must therefore show the (any) point
of service for water, and the proposed off-site utilities construction needed ~
in order to service this project. This would include any irrigation systems
currently in use,
8, Any and all utility easements shall be shown on the rectified site plan and
any landscaping drawings so that we may determine which appurtenances,
trees or shrubbery may interfere with potential utilities. In general, palm
trees will be the only tree species allowed within utility easements, Canopy /
trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future,
LDR Chap, 7.5, Art, I, Sec, 18,1 give public utilities the authority to remove
any trees that interfere with utility services, either in utility easements or
public rights-of-way,
FIRE
Comments: NONE V'
POLICE
Comments: NONE V'
BUILDING DIVISION
Comments:
9, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TART (Technical V'
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
10, Indicate within the site data the type of construction of the building as
defined in 2004 FBC, Chapter 6. /
11. Indicate within the site data the occupancy type of the building as defined in V
2004 FBC, Chapter 3,
12, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph, Wind forces on every building or ~
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
1 ST REVIEW COMMENTS
10/25/07
3
DEPARTMENTS
the provisions of 2004 FBC, Section 1609 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
INCLUDE REJECT
13. Add to all plan view drawings of the site a labeled symbol that represents
the location and perimeter of the limits of construction proposed with the
subject request.
14, At time of permit review, submit signed and sealed working drawings of the
proposed construction,
15, Identify within the site data the finish floOi elevation (lowest floor elevation)
that is proposed for the building. Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A) The design professional-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _' _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD' s surface water management
construction development regulations."
B) From the FIRM map, identify in the site data the title of the flood zone
that the building is located within. Where applicable, specify the base flood
elevation, If there is no base flood elevation, indicate that on the plans,
C) Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans).
16. At time of permit review, submit separate surveys of each lot, parcel, or
tract.
17, Add a general note to the site plan that all plans submitted for permitting
shall meet the City's codes and the applicable building codes in effect at the
time of permit application,
18. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
19,
The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. The addressing plan
shall be approved by the United States Post Office, the City of Boynton
Beach Fire Department, the City's GIS Division, and the Palm Beach
County Emergency 911,
A) Palm Beach County, Planning, Zoning, & Building Division, 100
Australian Avenue, West Palm Beach, Florida (Sean McDonald-561-
233-5013),
B) United States Post Office, Boynton Beach (Michelle Bullard-561-734-
II
V'
v
v
v
v
~
/
1 ST REVIEW COMMENTS
10/25/07
4
DEPARTMENTS INCLUDE REJECT
0872),
20, Sheet Al - The bottom of all footings shall be a minimum of 12 inches
below grade per the FBC Sect 1805,1, Revise the note on Sheet AI, V
21. The occupancy of the building shall be classified as S2, low hazard storage
occupancy per the FBC See, 430,2, V
22. The type of construction of the building shall be classified as Type I
Unsprinklered, Type II Unsprinklered, or Type II B Unsprinklered V
construction.
23, Sheet A 1 shows the west property line running through the existing & new
mausoleum, Please clarify as construction cannot occur beyond the V
parameters of the owner's property.
PARKS AND RECREATION
Comments:
24, The landscape plan does not adhere to the City's LDR's, ~
Nl/j,//j\(~ 1>1ft4f)N~I~
25, Plant sizes do meet requirements(A>ll14',.l me; c.~. p{.eM' CMcA6q". V'
JI
26, Irrigation should have 110% coverage. v'
27, The use of cypress mulch is prohibited. V
FORESTER/ENVIRONMENT ALIST
Comments: NONE
PLANNING AND ZONING
Comments:
28. Provide City authorization signature on the application, V
29, What is to become of the dirt storage compound currently located between /
the existing mausoleum building and the High Point community?
30. Provide a notice of concurrency (Traffic Performance Standards Review) ,/'
from Palm Beach County Traffic Engineering,
31. Provide a completed Art in Public Places form, ,/"
MWR/sc
S:\Planning\SHARED\WP\PROJECTS\Boynton Mausoleum\1ST REVIEW COMMENTS,doc
1 st REVIEW COMMENT ~
Maior Site Plan Modification
"~
'..~
\
\ .;
,
,-"
,\
Project name: Boynton Mausoleum
File number: MSPM 07-006
Reference: 1 streview plans identified as a Maior Site Plan Modification with an August 22, 2007 Planning and
Zoning Department date stamp marking
DEP ARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments: NONE
PUBLIC WORKS - Forestry
Comments: NONE
I
PUBLIC WORKS-Traffic
Comments: NONE
ENGINEERING
Comments:
1. The existing one-story mausoleum building "U" was constructed some 8,2 .
feet over the property line, which makes this a non-conforming building, RUo~ ./
This also includes the associated covered walk areas. NO proposed addition ~~~J J
should be considered that would perpetuate the construction error of
building "U", despite any argument to the contrary. The applicant's .
application drawings include a partial area survey that acknowledges past --
construction error, The proposed addition can be re-configured to conform ,"
to the existing property line and needs to be reviewed in detail.
2, The proposed site plan is reflecting several drywells (on the west side of the /.'0 ea.!.
proposed building). Provide drainage calculations showing the amount of
rainfall to be retained on-site,
3. All comments requiring changes and/or corrections to the plans shall be l tJO~
reflected on all appropriate sheets,
4. Please note that changes or revisions to these plans may generate additional IJo ~
comments. Acceptance of these plans during the Technical Advisory I
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review,
5, Sidewalks adjacent to driveways shall be continuous through all access 1\1 Ip i
areas and shall be 6 in, thick within the perimeter of the proposed building "
, .
(LDR, Chapter 23, Article II, Section P), ,-.. /.."
, I '
6. Paving, drainage and site details will not be reviewed for construction J:, I
acceptability at this time, All engineering construction details shall be in fVo~ "
accordance with the applicable City of Boynton Beach Standard Drawings ." ~,~
, ,-
and the "En2"ineerin2" Desi2"n Handbook and Construction Standards" ,
'.
1ST REVIEW COMMENTS
10/25/07
2
I
DEPARTMENTS INCLUDE REJECT
and will be reviewed at the time of the construction permit application, ,..)
UTILITIES
Comments:
7. LDR Chap, 3, Art. IV, Sec. 3(0) requires Master Plans to show all utilities
on or adjacent to the property. The plan must therefore show the (any) point Ld
of service for water, and the proposed off-site utilities construction needed NcJ
in order to service this project. This would include any irrigation systems
currently in use,
~
8. Any and all utility easements shall be shown on the rectified site plan and
any landscaping drawings so that we may determine which appurtenances,
trees or shrubbery may interfere with potential utilities, In general, palm
trees will be the only tree species allowed within utility easements. Canopy No~ ~
trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future.
LDR Chap, 7.5, Art. I, Sec. 18.1 give public utilities the authority to remove
any trees that interfere with utility services, either in utility easements or
public rights-of-way,
FIRE
Comments: NONE
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
9. Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TART (Technical No~ ~
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
10, Indicate within the site data the type of construction of the building as
defined in 2004 FBC, Chapter 6, o al --t
11. Indicate within the site data the occupancy type of the building as defined in DD \..l
2004 FBC, Chapter 3,
12, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or De rt
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
"
f!Ju~~ ~I //VI wtzc( &-eut~)tZn'v
1st REVIE~oKfMENTS cy ~
Maior Site Plan Modification "I. I /
/1~1(J7
Project name: Boynton Mausoleum
File number: MSPM 07-006
Reference: I st review plans identified as a Major Site Plan Modification with an August 22, 2007 Planning and
Zoning Department date stamp marking,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments: NONE
PUBLIC WORKS - Forestry
Comments: NONE
PUBLIC WORKS-Traffic
Comments: NONE
ENGINEERING
Comments:
1. The existing one-story mausoleum building "U" was constructed some 8,2
feet over the property line, which makes this a non-conforming building,
This also includes the associated covered walk areas, NO proposed addition
should be considered that would perpetuate the construction error of
building "U", despite any argument to the contrary, The applicant's
application drawings include a partial area survey that acknowledges past
construction error, The proposed addition can be re-configured to conform
to the existing property line and needs to be reviewed in detail.
2, The proposed site plan is reflecting several drywells (on the west side of the
proposed building), Provide drainage calculations showing the amount of
rainfall to be retained on-site,
3, All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
4, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review,
5. Sidewalks adjacent to driveways shall be continuous through all access
areas and shall be 6 in, thick within the perimeter of the proposed building
(LDR, Chapter 23, Article II, Section P),
6, Paving, drainage and site details will not be reviewed for construction
acceptability at this time, All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "En2ineerin2 Desi2n Handbook and Construction Standards"
1ST REVIEW COMMENTS
10/25/07
2
DEPARTMENTS INCLUDE REJECT
and will be reviewed at the time of the construction permit application,
UTILITIES
Comments:
7, LDR Chap, 3, Art, IV, Sec, 3(0) requires Master Plans to show all utilities
on or adjacent to the property. The plan must therefore show the (any) point
of service for water, and the proposed off-site utilities construction needed
in order to service this project. This would include any irrigation systems
currently in use,
8, Any and all utility easements shall be shown on the rectified site plan and
any landscaping drawings so that we may determine which appurtenances,
trees or shrubbery may interfere with potential utilities, In general, palm
trees will be the only tree species allowed within utility easements, Canopy
trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future,
LDR Chap, 7,5, Art, I, Sec, 18,1 give public utilities the authority to remove
any trees that interfere with utility services, either in utility easements or
public rights-of-way.
FIRE
Comments: NONE
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
9, Please note that changes or revisions to these plans may generate additional /
comments, Acceptance of these plans during the TART (Technical
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
10, Indicate within the site data the type of construction of the building as ~~
defined in 2004 FBC, Chapter 6,
11. Indicate within the site data the occupancy type of the building as defined in 1/
2004 FBC, Chapter 3, 1/
12, Buildings, structures and parts thereof shall be designed to withstand the /
minimum wind loads of 140 mph, Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
.
1 ST REVIEW COMMENTS
10/25/07
3
DEPARTMENTS
the provisions of 2004 FBC, Section 1609 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
13, Add to all plan view drawings of the site a labeled symbol that represents
the location and perimeter of the limits of construction proposed with the
subject request.
14, At time of permit review, submit signed and sealed working drawings of the
proposed construction,
rc
IS, Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building, Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A) The design professional-of-record for the project shall add the following
text to the site data, "The proposed finish floor elevation _' _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD' s surface water management
construction development regulations."
B) From the FIRM map, identify in the site data the title of the flood zone
that the building is located within, Where applicable, specify the base flood
elevation, If there is no base flood elevation, indicate that on the plans,
C) Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans).
16, At time of permit review, submit separate surveys of each lot, parcel, or
tract.
1
17, Add a general note to the site plan that all plans submitted for permitting
shall meet the City's codes and the applicable building codes in effect at the
time of permit application,
~
18, Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission,
19. The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. The addressing plan
shall be approved by the United States Post Office, the City of Boynton
Beach Fire Department, the City's GIS Division, and the Palm Beach
County Emergency 911,
A) Palm Beach County, Planning, Zoning, & Building Division, 100
Australian Avenue, West Palm Beach, Florida (Sean McDonald-S61-
233-S013),
B) United States Post Office, Bovnton Beach (Michelle Bullard-S61-734-
INCLUDE REJECT
t/
//
/
,
/
/
,//
v
1 ST REVIEW COMMENTS
10/25/07
4
, II
DEPARTMENTS INCLUDE REJECT
0872),
20, Sheet Al - The bottom of all footings shall be a minimum of 12 inches ,/
below grade per the FBC Sect 1805,1, Revise the note on Sheet AI,
21. The occupancy of the building shall be classified as S2, low hazard storage V
occupancy per the FBC Sec, 430,2,
22, The type of construction of the building shall be classified as Type I V
Unsprinklered, Type II Unsprinklered, or Type II B Unsprinklered
construction,
23, Sheet A 1 shows the west property line running through the existing & new / ,/
mausoleum, Please clarify as construction cannot occur beyond the
parameters of the owner's property.
PARKS AND RECREATION
Comments:
24. The landscape plan does not adhere to the City's LDR's,
25, Plant sizes do meet requirements,
26, Irrigation should have 110% coverage,
27, The use of cypress mulch is prohibited,
FORESTER/ENVIRONMENTALIST
Comments: NONE
PLANNING AND ZONING
Comments:
28, Provide City authorization signature on the application,
29, What is to become of the dirt storage compound currently located between
the existing mausoleum building and the High Point community?
30, Provide a notice of concurrency (Traffic Performance Standards Review)
from Palm Beach County Traffic Engineering,
31. Provide a completed Art in Public Places form,
MWR/sc
S:\Planning\SHARED\WP\PROJECTS\Boynton Mausoleum\1 ST REVIEW COMMENTS,doc
...
1 st REVIEW COMMENT~
Maior Site Plan Modification
Project name: Boynton Mausoleum
File number: MSPM 07-006
Reference: I slreview plans identified as a Major Site Plan Modification with an August 22, 2007 Planning and
Zoning Department date stamp marking,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments: NONE
PUBLIC WORKS - Forestry
Comments: NONE
PUBLIC WORKS-Traffic
Comments: NONE
ENGINEERING
Comments:
1. The existing one-story mausoleum building "U" was constructed some 8.2
feet over the property line, which makes this a non-conforming building, RUo~~
This also includes the associated covered walk areas. NO proposed addition ~~~/{~
should be considered that would perpetuate the construction error of
building "U", despite any argument to the contrary, The applicant's
application drawings include a partial area survey that acknowledges past
construction error, The proposed addition can be re-configured to conform
to the existing property line and needs to be reviewed in detail.
2, The proposed site plan is reflecting several drywells (on the west side of the Ueal.
proposed building). Provide drainage calculations showing the amount of
rainfall to be retained on-site,
3. All comments requiring changes and/or corrections to the plans shall be tJ(j ~ ~
reflected on all appropriate sheets,
4, Please note that changes or revisions to these plans may generate additional IVa LPll
comments, Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments ~
may not be generated by the Commission and at permit review,
5, Sidewalks adjacent to driveways shall be continuous through all access tJ Ip
areas and shall be 6 in, thick within the perimeter of the proposed building
(LDR, Chapter 23, Article II, Section P),
6, Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in No\ ~
accordance with the applicable City of Boynton Beach Standard Drawings
and the "En2ineering Design Handbook and Construction Standards"
1ST REVIEW COMMENTS
10/25/07
2
,
DEPARTMENTS INCLUDE REJECT
and will be reviewed at the time of the construction permit application,
UTILITIES
Comments:
7, LDR Chap. 3, Art, IV, See, 3(0) requires Master Plans to show all utilities
on or adjacent to the property, The plan must therefore show the (any) point ~
of service for water, and the proposed off-site utilities construction needed No+
in order to service this project. This would include any irrigation systems
currently in use.
I
8, Any and all utility easements shall be shown on the rectified site plan and
any landscaping drawings so that we may determine which appurtenances,
trees or shrubbery may interfere with potential utilities, In general, palm
trees will be the only tree species allowed within utility easements, Canopy Na~ ~
trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future,
LDR Chap. 7,5, Art, I, Sec. 18.1 give public utilities the authority to remove
any trees that interfere with utility services, either in utility easements or
public rights-of-way,
FIRE
Comments: NONE
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
9, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TART (Technical No~ ~
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
10, Indicate within the site data the type of construction of the building as
defined in 2004 FBC, Chapter 6, o Of --t
11. Indicate within the site data the occupancy type of the building as defined in 00
2004 FBC, Chapter 3. \.t.
12, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph, Wind forces on every building or De ;l-t
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
1ST REVIEW COMMENTS
10/25/07
3
DEPARTMENTS
the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
13, Add to all plan view drawings of the site a labeled symbol that represents
the location and perimeter of the limits of construction proposed with the
subject request.
14, At time of permit review, submit signed and sealed working drawings of the
proposed construction,
15. Identify within the site data the finish floor elevation (lowest floDi elevation)
that is proposed for the building, Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A) The design professional-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _' _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD' s surface water management
construction development regulations."
B) From the FIRM map, identify in the site data the title of the flood zone
that the building is located within, Where applicable, specify the base flood
elevation. If there is no base flood elevation, indicate that on the plans.
C) Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans).
16. At time of permit review, submit separate surveys of each lot, parcel, or
tract.
17, Add a general note to the site plan that all plans submitted for permitting
shall meet the City's codes and the applicable building codes in effect at the
time of permit application.
18. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission,
19. The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. The addressing plan
shall be approved by the United States Post Office, the City of Boynton
Beach Fire Department, the City's GIS Division, and the Palm Beach
County Emergency 911.
A) Palm Beach County, Planning, Zoning, & Building Division, 100
Australian Avenue, West Palm Beach, Florida (Sean McDonald-561-
233-5013).
B) United States Post Office, Boynton Beach (Michelle Bullard-561-734-
INCLUDE REJECT
N .QQ1k.\-a \
0-<llJ\
N ()\t~
tJw\
.~
d&J~
tV\J~
rJo~
~o~~
1 ST REVIEW COMMENTS
10/25/07
4
?bJ
10 - 'Or;" 01
,
DEPARTMENTS INCLUDE REJECT
0872),
20, Sheet Al - The bottom of all footings shall be a minimum of 12 inches p~
below grade per the FBC Sect 1805,1, Revise the note on Sheet AI,
21. The occupancy of the building shall be classified as S2, low hazard storage ~;&Z
occupancy per the FBC Sec. 430.2,
22, The type of construction of the building shall be classified as Type I
Unsprinklered, Type II Unsprinklered, or Type II B Unsprinklered O~
constructi on,
23. Sheet Al shows the west property line running through the existing & new 1k ~o! vi^-,
mausoleum. Please clarify as construction cannot occur beyond the
parameters of the owner's property. k~ 1 u." N~J
PARKS AND RECREATION
r",",""rrlents:
L/ "24. ~s n\.t " theC" '_r.nR'~~ 1l.J--- ,.~
e rle~ (1(.\ \~
25. Plant sizes do meet requirements. ~OK ,
26. Irrigation should have 110% coverage, ,/' ok
27. The use of cypress mulch is prohibited. V NukJ
FORESTER/ENVIRONMENT ALIST
Comments: NONE
PLANNING AND ZONING
Comments:
28, Provide City authorization signature on the application. (/~
29. What is to become of the dirt storage compound currently located between 0~~
the existing mausoleum building and the High Point community? ~ /It~L
30, Provide a notice of concurrency (Traffic Performance Standards Review) Pi dv\ d ~~
from Palm Beach County Traffic Engineering,
31. Provide a completed Art in Public Places form, kt~fo 6~ 'lM~
MWR/sc
S:\Planning\SHARED\WP\PROJECTS\Boynton Mausoleum\ 1 ST REVIEW COMMENTS.doc
Page 1 of 1
Coale, Sherie
From: Mazzella, Pete
Sent: Friday, September 07,20073:43 PM
To: Quinn, Angelena; Livergood, Jeffrey; Logan, Laurinda; Hall, Glenda; Coale, Sherie; Breese, Ed
Subject: RE: 07-103 KELLEY -TART- Review Boynton Mausoleum 90707
I agree with Dave's comments, but please recall that the existing mausoleum lies within zones 1, 2, and 3 of the
eastern wellfield protection zone, Special restrictions, enforced by Palm Beach County Environmental Resources
Management, therefore apply to the sewer and stormwater design,
Pete/" tI. !fane,ffa
Deputy Director of Utilities
City of Boynton Beach
561- 742-6404
Fax 561-742-6298
From: Quinn, Angelena
Sent: Friday, September 07, 2007 3:21 PM
To: Livergood, Jeffrey; Mazzella, Pete; Logan, Laurinda; Hall, Glenda; Quinn, Angelena; Coale, Sherie; Breese, Ed
Subject: 07-103 KELLEY -TART- Review Boynton Mausoleum 90707
9/712007
Page 1 of 1
Coale, Sherie
From: Rivers, Jody
Sent: Friday, September 07,2007 1 :06 PM
To: Breese, Ed; Coale, Sherie
Subject: Site Plan Review - Boynton Mausoleum
Project:
File No,:
Boynton Mausoleum
MSPM 07-006
1,
2,
3,
4,
The landscape plan does not adhere to the City's LDR's,
Plant sizes do meet requirements
Irrigation should have 110% coverage,
The use of cypress mulch is prohibited.
~~
Parks Superintendent
City of Boynton Beach
100 E. Boynton Beach, FL 33425
(561) 742-6226
(561) 742-6233 Fax
1,000 new residents a day! With that kind of population growth, people need a place to connect and form new
relationships, to learn about Florida's heritage and its natural treasures - a place to become FLoridians. Florida's
parks are the place where it all comes together - a sense of community, an appreciation of history and place,
respect for nature. How do you weave strangers into citizens? It Starts In Parks.
9/7 /2007
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 07-103
TO:
FROM:
Michael W. Rumpf, Director
Planning and Zoning Division ,
H, David Kelley, Jr., PE/PSM ~
City Engineer
DATE:
September 7, 2007
RE:
Review Comments
New Site Plan - 1 st Review
BOYNTON MAUSOLEUM
File No. MSPM 07-006
The above referenced Site Plan, received on August 27, 2007, was reviewed for Public Works,
Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of
Ordinances, Following are our comments with the appropriate Code and Land Development Regulations
(LDR) referenced,
PUBLIC WORKS - SOLID WASTE
1. No comments at this time.
PUBLIC WORKS - FORESTRY & GROUNDS
2, No comments at this time,
PUBLIC WORKS - TRAFFIC
3. No comments at this time.
ENGINEERING
4. The existing one-story mausoleum building "un was constructed some 8.2 feet over the property line,
which makes this a non-conformina building, This also includes the associated covered walk areas,
NO proposed addition should be considered that would perpetuate the construction error of building
"un, despite any argument to the contrary. The applicant's application drawings include a partial area
survey that acknowledges past construction error, The proposed addition can be re-configured to
conform to the existing property line and needs to reviewed in detail.
5. The proposed site plan is reflecting several drywells (on the west side of the proposed building),
Provide drainage calculations showing the amount of rainfall to be retained on-site,
6, All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets,
7, Please note that changes or revIsions to these plans may generate additional comments.
Acceptance of these plans during the Technical Advisory Review Team (TART) process does not
ensure that additional comments may not be generated by the Commission and at permit review,
Dept. of Public Works, Engineering Division Memo No. 07-103
RE: Boynton Mausoleum, New Site Plan - 1 st Review, MSPM 07-006
September 7, 2007
Page 2
8, Sidewalks adjacent to driveways shall be continuous through all access areas and shall be 6 in, thick
within the perimeter of the proposed building (LDR, Chapter 23, Article II, Section P),
9, Paving, drainage and site details will not be reviewed for construction acceptability at this time. All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of the construction permit application.
UTILITIES
10, LDR Chap. 3, Art. IV, Sec. 3(0) requires Master Plans to show all utilities on or adjacent to the
property, The plan must therefore show the (any) point of service for water, and the proposed off-site
utilities construction needed in order to service this project. This would include any irrigation systems
currently in use,
11, Any and all utility easements shall be shown on the rectified site plan and any landscaping drawings
so that we may determine which appurtenances, trees or shrubbery may interfere with potential
utilities, In general, palm trees will be the only tree species allowed within utility easements, Canopy
trees may be planted outside of the easement so that roots and branches will not impact those
utilities within the easement in the foreseeable future. LDR Chap. 7.5, Art. I, Sec, 18,1 give public
utilities the authority to remove any trees that interfere with utility services, either in utility easements
or public rights-of-way,
xc: Jeffrey R. Livergood, PE, Director, Public Works Dept.
Peter V. Ma;zzella, Deputy Utility Director, Utilities Dept.
Laurinda Logan, PE, Senior Engineer, Public Works/Engineering
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
File
www.bbfrd.org
FIRE & LIFE SAFETY DIVISION
TO: Ed Breese, Principal Planner
FROM: Deputy Chief Rodger W. Kemmer, Fire Marshal
DATE: September 5, 2007
SUBJECT: Boynton Mausoleum
The Fire Rescue Department expects to be able to provide an adequate level
of service for this project with current or expected infrastructure and/or
staffing levels.
------
TO:
Ed Breese
Principal Planner
Timothy K. Large~~
TART Member/Building Division
~, .;ftiI
List of Acronyms/Abbreviations:
ANSI - American National Standards Institute
ASCE - American Society of Civil
Engineers
CBB - City of Boynton Beach
CBBA - Boynton Beach Amendments
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensiye Plan Policy
CFR - Code of Federal Regulations
EPA - Environment Protection Agency
FBC - Florida Building Code
FFHA - Federal Fair Housing Act
FFPC - Florida Fire Prevention Code
FIRM - Flood Insurance Rate Map
F ,S, - Florida Statutes
LDR - Land Development Regulations
NEC - National Electric Code
NFPA - National Fire Prevention Assn
NGVD - National Geodetic Vertical
Datum of 1929
SFWMD - South Florida Water
Management District
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 07-092
FROM:
DATE:
September 5, 2007
SUBJECT:
Project - Boynton Mausoleum
File No. MSPM 07-006 1st review
Buildina Division (Site Specific and Permit Comments) - Timothy K. Larae (561) 742-6352
1 Please note that changes or revisions to these plans may generate additional comments,
Acceptance of these plans during the TART (Technical Advisory Review Team) process
does not ensure that additional comments may not be generated by the commission and at
permit review,
2 Indicate within the site data the type of construction of the building as defined in 2004 FBC,
Chapter 6.
3 Indicate within the site data the occupancy type of the building as defined in 2004 FBC,
Chapter 3.
4 Buildings, structures and parts thereof shall be designed to withstand the minimum wind
loads of 140 mph, Wind forces on every building or structure shall be determined by the
provisions of ASCE 7, Chapter 6, and the provisions of 2004 FBC, Section 1609 (Wind
Loads). Calculations that are signed and sealed by a design professional registered in the
state of Florida shall be submitted for review at the time of permit application.
5 Add to all plan view drawings of the site a labeled symbol that represents the location and
perimeter of the limits of construction proposed with the subject request.
6 At time of permit review, submit signed and sealed working drawings of the proposed
construction,
7 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed
for the building, Verify that the proposed elevation is in compliance with regulations of the
code by adding specifications to the site data that address the following issues:
A) The design professional-of-record for the project shall add the following text to the site
data. "The proposed finish floor elevation _' _ NGVD is above the highest 100-year
base flood elevation applicable to the building site, as determined by the SFWMD's
surface water management construction development regulations."
S:IDevelopmentIBUILDINGITARnTART 20071Boynton Mausoleum MSPM 07-006 1st rev,doc
Page 1 of 2
l.
B) From the FIRM map, identify in the site data the title of the flood zone that the building is
located within, Where applicable, specify the base flood elevation. If there is no base
flood elevation, indicate that on the plans.
C) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the drawings titled site plan, floor
plan and paving/drainage (civil plans).
8 At time of permit review, submit separate surveys of each lot, parcel, or tract.
9 Add a general note to the site plan that all plans submitted for permitting shall meet the
City's codes and the applicable building codes in effect at the time of permit application,
10 Pursuant to approval by the City Commission and all other outside agencies, the plans for
this project must be submitted to the Building Division for review at the time of permit
application submittal. The plans must incorporate all the conditions of approval as listed in
the development order and approved by the City Commission.
11 The full address of the project shall be submitted with the construction documents at the
time of permit application submittal. The addressing plan shall be approved by the United
States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and
the Palm Beach County Emergency 911.
A) Palm Beach County, Planning, Zoning, & Building Division, 100 Australian Avenue,
West Palm Beach, Florida (Sean McDonald-561-233-5013),
B) United States Post Office, Boynton Beach (Michelle Bullard-561-734-0872),
12 Sht. A 1- The bottom of all footings shall be a minimum of 12 inches below grade per the
FBC Sect 1805.1, Revise the note on Sht A 1,
13 The occupancy of the building shall be classified as S2, low hazard storage occupancy per
the FBC Sec. 430.2,
14 The type of construction of the building shall be classified as Type I Unsprinklered, Type II
Unsprinklered" or Type II B Unsprinklered construction.
15 Sht A 1 shows the west property line running through the existing & new mausoleum,
Please clarify as construction cannot occur beyond the parameters of the owner's property.
TKLcr
S:IDevelopmentIBUILDINGITARnTART 20071Boynton Mausoleum MSPM 07-006 1st rev,doc
Page 2 of 2
CITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO:
Ed Breese,
Principal Planner
DATE:
September 4, 2007
FILE: MSPM 07-006
FROM:
Off. John Huntington
Police Department
CPTED Practitioner
SUBJECT: Boynton Mausoleum
REFERENCES: Site Plan
ENCLOSURES:
I have viewed the above building plans and have the following comments:
No Comments.
TRC Memorandum
Page 1 of 1
Coale, Sherie
From: Hallahan; Kevin
Sent: Tuesday, September 04,2007 11 :21 AM
To: Coale, Sherie
Cc: Breese, Ed
Subject: Boynton Mausoleum- TART comments
Planning Memorandum: Forester / Environmentalist
To:
Ed Breese, Principal Planner
From:
Kevin J. Hallahan, Forester / Environmentalist
Subject:
Boynton Mausoleum
Major Site Plan Modification - 1 st Review
MSPM 07-006
Date:
September 4, 2007
I have no comments on the above project.
9/412007
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
To:
Cc:
From:
Date:
Re:
www,boynton-beach,org
Peter Mazzella, Assistant Director, Utilities
Kofi Boatang, Director of Utilities
Matthew Immler, Police Chief
Rodger Kemmer, Deputy Chief / Fire Marshal
Jody Rivers, Parks Superintendent
William Bingham, Fire Chief
Wally Majors, Parks Director
Laurinda Logan, Civil Engineer
Rick Lee, Fire Protection Analyst
John Huntington, Police Officer
Ed Breese, Principal Planner49)
8/24/07
Impacts of proposed site plan upon City facilities and services
Project: Boynton Mausoleum
MEMORANDUM
As part of the City's concurrency requirements, the City Commission directed the Planning & Zoning
Division to report whether or not the City could maintain an adequate level of service with current
infrastructure and / or staffing levels in order to support the proposed development.
Plans for the above-mentioned project have been forwarded to your department's representative
for their technical review and comment. We are requesting that you review the proposed project for
anticipated impacts to your department's level of service (as requested by the City Commission) and
provide us with your comments for direct insertion into our staff report. In the past, you have sent
us something that indicates your current staff / infrastructure would either be able to support the
proposed project or what would be required to meet the adopted level of service. Please respond
no later than 2 weeks from today. Also, any recommendations that you believe that would
enhance the project are certainly welcomed. I thank you for your assistance in this matter. Should
you have any questions regarding the requested information, please do not hesitate to call me at
742-6260.
5: \Planning\SHARED\ WP\PROJECTS\Boynton Mausoleum \Impact Analysis,doc
~
[f
~
~
G5
-.I
Lw
~
f--
-
-.I
(3
W
OJ
<:
2
~
~
-r:
.
.
.
,
,
,
,
.
,
,
,
,
.
.
.
... ,
C)'
~~
.
.
.
,
.
.
,
.
,
,
.
.
.
.
Ci WOOLBRIGHT ROAD
SOUTH RIGHT OF WA Y LIte
~
o~\8
.. ~~~
l<i~ ~~~
~~ ~e~
~~ @~~
1I1(() ~~~
~~~
~~~
~
0;;;:..
~~
~Q:
usaaN \Q
.
0.9' 0.9'
~ ~ ~ ~
0Ci 8,2' 32. 7' 0Ci Qj ~
-+- +
+19.94
QJ CO VER D CONC. WALK ~
Pi + 19.82 $ll ~~
+ ... Q
17.2'
~Q: lu
\Q ::..
.
~
Q.
.. ~~
..
~ ~~
. Q:
\Q
~ .. .
~(.) ..
~
;t;
f-- ~~
(.)
~ (j~
!-: ()~
0
0::::!-
S -.I ....
Ct) g
~
~~
~~
~~
~~
~
-
III
...
~
c:s
BElICH MARK: TCP
OF NAIL & WASfER
ELEVA TlON +18.03
" " N.89056'1O"E.
TRACT C
fJ~
.\"
N.9000000"w.
400,06'
a
c:s
't
P A V E D +18,03
r---------7-------
I LlMTS OF
V--GRAVE ST()(IES
I
I
I
BLOCK "w"
(LOTS NOT SHOWN)
I
I
I
I
I
I
I
I
I
~ LlMTS OF
I GRA VE STOfIES ~
L_ c:s
+ .
SOUTH LINE OF BOYNTON BEACH
A6O?lAL PARK AWTION NO. 1
(PLAT BOOK 30, PAGES 154 & 155)
HIGH POINT WEST NO. 2 CONDOMINIUM
';OPYRIGHT 2007 O'BRIEN. SUITER de O'BRIEN. INC,
\. NCRTH LM;; -
SEG. 33/45/43
>-
O::<.:l
OZ
1---
\ . VlO
f' ..J
\ II'" w-
. Z:J
~ om
.....
.
(, \ I ~ >-
..... ~
Ii. ID
I. ..J ~
'. W I-- ~~tO ..J
. ~
(\ 0 ~ 0::: ."-
0 uOow a
o:::!Z<.:l
.... ..Jw < w
m:::!z a:::
0 on. w
. X-a >
.... Ul--~ a
0 ~O~ u
VJ
moo
z<o
o~ro
1-0::1-
z<<
6n...J
lD n. ..,.
to,
~
'ORY
NG
..J ..,.
~-tO
0:: ."-
OOw
:::!Z<.:l
W <
n.:::!Zn.
o
~X-a
UUI-~
0<-
..JWo~
mmoo
z<o
o~m
1-0:::1-
Z<<
>-n...J
g n.
w
()
ZZ
-w
~IL.
()~
Z
Q
lD -1
>-
~~
1---
VlO
..J
w-
Z~
OlD
Lei
I
I
~<.:ll
oz
1--
VlO
..J
w-
Z~
Om
w
()
Z
W
li.
~
..J ..,.
~-tO
0::: .-
OOw
~Z<.:l
W <
>~Zn.
o
~X-o
UUI--r<1
0<-
..JWo~
mLDoo
z<O
o~m
1-0::1--
Z<<
>-n.-J
g n.
w
. U
lD ZZ
--- -w
:Eli.
U~
Z
lD..J
------
,
1/'" ,
.....
. . . . . . . ...--1 a . . .. . or .
...
TRACT B
BOYNTON BEACH MEMORIAL
PARK ADDITION NO.1
PLAT BOOK 30 PAGE 154
TRACT C
BOYNTON BEACH MEMORIAL
PARK ADDITION NO.1
PLAT BOOK 30 PAGE 154
;~:~~~.~'t"'"
.. ..t...d:?~'
~:r; ::' :-.
:'1:~l~11iia~:~8,F . PLAT aOOK;~~: PAGE 154:.
/ ASPHAL T
1-, .
<
..J
n.
w
>
0::
o
BlOC~ 0
BOYNTON BEACi MEMORIAL
PARK ADDI T!ON NO. 1
PLAT BOOK 3f. PAGE 154
BLOCK N
BOYNTON BEACH MEMORIAL
PARK ADDITION NO.1
PLAT BOOK 30 PAGE 154
~
cr
-4
n
~
cr
C
:::i
u..
:::!
:I
1L.t.:
0<<1
u..
wa:
Z
~~
I-
1-2
Vl)-
~~
,22' DRIVE.PLAT
CHi
VAl
CONCRE
W
<.:l
<,.
n.
o
r<1
~
o
o
lD
1-,
<""
-J
n.,
w,",
>..,'
0::
o
BLOCK S
BOYNTON BEACH MEMORIAL
PARK ADD I T I ON NO. ,
PLAT BOOK 30 PAGE 154
BLOCK R
BOYNTON BEACH MEMORIAL
PARK ADDITION NO, 1
PLAT BOOK 30 PAGE 154
lD
--
-" I. 1/
.....; J .
i '
t~,',::o,~)'~:~:~ : P.LA,~?,?~~~'.t;~W?r,P AGE:tf;!j~~)','J:~';~: ;;;;~ '
h.::f:~~r/\:~:;~;/}E;/:
..Of....... .. H
~ SOO
V I r)
, ,"} !,~,
f't. .' ,r
. ,:. ./
"
BLOCK W
BOYNTON BEACH ME~ORIAL
PARK ADD I T I ON NO, 1
PLAT BOOK 30 PAGE 154
BLOCK Y
BOYNTON BEACH MEMORIAL
PARK ADDITION NO.1
PLAT BOOK 30 PAGE 154
-~----
. I, r', f'/"
~~ I U
S89. 56 · 41.W 400.05 · .
6' CHAIN LINK FENCE
0.2' SOUTH OF PROPERTY LINE
;;~~'~~i~l:;~I~i~I;;~:~J~ ·
LOT 6
SECTION 33 TOWNSHIP
45 S RANGE 43 E
01 AT onnv 1 DA~~ A
~
[f
~
()
G5
--J
lw
~
I-
-
--J
23
W
OJ
6
I--
~
@
-r;
~
WOOLBRIGHT ROAD
- -
N.90.00'OO"w,
400,06'
,
.
.
.
.
.
.
.
.
.
.
.
.
.
.
;.. .
C).
~~
.
.
.
.
.
.
.
.
.
.
.
.
.
.
a
Ci
't
SOUTH RIGHT or WA Y LI/IC
~
~~~
.. ~~~
l<i~ ~~~
B~ ~a~
~~ @"l:,;
111(() ~~~
~~~
~~~
~ ~
"=-
~~
~l\:
USa..E1N \Q
, .
0.9' f o.g'
;. T ~ lSl :g
~ 8,2' --J2~7' --..2=lQ.! ~
;. +-
+19.94
Q;) co VER 0 C ONC. WALK ti!i
I2i + 19.82 $!i ~~
+- ;. Cl
17.2'
~l\: l..J
\Q ::,.
.
"l:
Q
.. ~~
..
~ ?=~
\Q
~ :: . fJ~9
::()
~ ~
:it: P A V E 0 +18,03
I- ~~
()
~ ()~
J...::: ()12
C) BE/IK:H MARK: TCP
<:::::!.
g --J .... OF NAIL &' WASfER r---------~-------
CO g ELEVA T70N +18.0.3 I LlUTS OF
~ GRA VE STOf\ES
~
~~
~~
li:1rI
~~
:!:~
~
(LOTS NOT SHOWN)
I
I
I
I
I
I
I
I
I
~ LlUTS OF
I G?A V[ STOfES i-,
L Ci
+ ,
....
Q.!
;.
BLOCK
" W "
i-,
Ci
" " N.8g.56'IO't.
TRACT C
SOUTH LINE" OF BOYNTON BEAOI
A-CAORIAL PARK AOOT/ON /IKJ. 1
(PLA T BOOK .30, PAGES 154 &' 155)
HIGH POINT WEST NO.2 CONDOMINIUM
';OPYRIGHT 2007 O'BRIEN, SUITER & O'BRIEN, INC.
\. /lKRTH LI'VE ~ -
SEe. .3.3/45/4.3