Loading...
CORRESPONDENCE The City of BoyJTlon Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org July 25, 2007 Mr. Jason Mankoff Weiner & Aronson, P.A. 102 North Swinton Avenue Delray Beach, Florida 33444 Re: Boynton Bay MMSP 07-060 Dear Mr. Mankoff: In response to your request dated July II, 2007 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: . Modification of Guardhouse, dumpster, wall and signage (as depicted on the attached plan) . . Fayade improvements to existing rental unit buildings (as depicted on the attached plan) . . Addition of storage area at clubhouse, as well as, sidewalk and fayade improvements (as depicted on the attached plan) . Please be informed that the proposed changes on the revised date stamped 7/11/07 are "minor" as defined within the Development Regulations, Chapter 4 Si te Plan Review. project may continue to be processed by the Building Division permit application, subject to the following conditions: plan Land This as a 1. A new dumpster enclosure has been proposed on the west side of the development in addition to the existing compactor/recycling site on the east side of the development. Discussions with the Solid Waste Manager show that sufficient capacity exists in the compactor to adequately handle the waste stream generated at the current pickup frequency. Additionally, any increases in density to the development could use the existing compactor at an increased frequency of pickup (eg: two times per week vs. the current pickup of one time per week) without adding other dumpsters or compactors to the development. The developer should be advised that there will be additional costs to the development by the addition of the dumpster, while there would be no increase in cost to increase pickup of the compactor to twice weekly. . Page 2 July 25, 2007 2. If the dumpster is to be left in it will need to be relocated slightly to the north to allow the truck to make a straight approach for pickup. Solid waste trucks need a minimum turning radius of 60 ft. to approach dumpsters and a minimum backing clearance of 60 ft. (measured from the front edge of the dumpster pad.) (LDR, Chapter 2, Section 11.J.2.b.) 3. This Minor Site Plan Modification approval is improvements only and does not provide any approvals depicted on any of the drawings, which are responsibility of the Building Department during review process. 4. Acceptance of these plans during the minor site plan modification review process does not ensure that additional comments may not be generated at permit review. for external of floorplans the review their permit Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Planner Cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 07-087 FROM: Ed Breese, Principal Planner, Planning and Zoning Laurinda Logan, P.E., Senior Engineer J-- July 25,2007 '. ",,- Review Comments Minor Site Plan Modification -1st Review Boynton Bay File No. MMSP 07-160 TO: DATE: RE: The above referenced Site Plans, received on 7/11/07, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LOR) referenced. The following comments may be addressed by the applicant during permitting. We have no objections to the proposed plan modification. PUBLIC WORKS - SOLID WASTE 1. A new dumpster enclosure has been proposed on the west side of the development in addition to the existing compactor/recycling site on the east side of the development. Discussions with the Solid Waste Manager show that sufficient capacity exists in the compactor to adequately handle the waste stream generated at the current pickup frequency. Additionally any increases in density to the development could use the existing compactor at an increased frequency of pickup (eg: two times per week v. the current pickup of one time per week) without adding other dumpsters or compactors to the development. The developer should be advised that there will be additional costs to the development by the addition of the dumpster, while there would be no increase in cost to increase pickup of the compactor to twice weekly. 2. If the dumpster is to be left in it will need to be relocated slightly to the north to allow the truck to make a straight approach for pickup. Solid waste trucks need a minimum turning radius of 60 ft. to approach dumpsters and a minimum backing clearance of 60 ft. (measured from the front edge of the dumpster pad.) (LOR, Chapter 2, Section 11.J.2.b.) PUBLIC WORKS - FORESTRY & GROUNDS No comments at thi.s time. PUBLIC WORKS - TRAFFIC No comments at this time. ENGINEERING 3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Dept. of Public Works, Engineellf1g Division Memo No. 07-087 RE: Boynton Bay, Minor Site Plan Modification -1st Review, MMSP 07-160 July 25, 2007 Page 2 4. Please note that changes or reVISions to these plans may generate additional comments. Acceptance of these plans cluring the administrative review process does not ensure that additional comments maynot be generated at the time of permitting. UTILITIES No comments at this time. Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E.! P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\ Memorandums\Memorandums 2007\07-087 LOGAN - MMSP 07-160 Boynton Bay Minor Mod (Dumpsters Guardhouse) 072507.doc WEINER & ARONSON, P.A. ATTORNEYS AT LAW The Clark House 102 North Swinton Avenue Delray Beach, FL 33444 Telephone: (561) 265-2666 Telecopier: (561) 272-6831 E-mail:jmankoff@zonelaw.com MICHAEL S. WEINER CAROLE J. ARONSON JASON S. MANKOFF KERRY D. SAFIER SHA YNA M. REITMAN July 11, 2007 Via Hand Deliverv Mr. Michael W. Rumpf Director of Planning & Zoning City of Boynton Beach 100 East Boynton Beach Blvd. Boynton Beach, Florida 33425 Re: Modification to Existing Boynton Bay Development Our File No.: AUBM023 Dear Mike: Enclosed are the items you requested with respect to the improvements to the existing Boynton Bay Development. 1. Four (4) revised signed and sealed sets of the proposed improvements to the existing buildings, guardhouse/signage/dumpster, and clubroom area along with three (3) reduced 11 "x17" colored elevations of each; and 2. A check in the amount of One Hundred Fifty Dollars ($150.00) made payable to the City of Boynton Beach. As you are aware, this is a separate matter than the additional units being proposed for the Boynton Bay project, which is going before the Planning and Development Board on July 24, 2007. The following are the proposed changes to the existing Boynton Bay project: Existina Buildinas 1. Add decorative shutter to exterior. 2. Add banding to windows. 3. New hand railing. 4. Decorative metal grill work. 5. Decorative balconies to be added to exterior. W ~ -.-, - . .---- '.'--'...-.. D I"" ,'" r~:-" ! r f JUL, I' (IIJ;! I ----.T'i"., ...~~! '''-, 0:\AUBM023\Letter to Mike Rumpf. July 11. 2oo7.doc Mr. Michael Rumpf July 11, 2007 Page 2 of 2 Guardhouse. Dumpster. and Sianage 1. New Hardi-plank siding metal gates to be added to dumpster and recycling area. 2. New 4" banding to be added to dumpster enclosure and recycling area. 3. Railing to be added to existing perimeter wall. 4. Piers @ perimeter wall increased to 6' in most areas. 5. New sign wI rustication added to the entry. 6. Up lighting to be added to the site to illuminate perimeter wall. Wall mount fixtures will also be added. Please refer to signage elevations. 7. New windows and doors added to guardhouse. 8. 5-V crimp metal roof to be added. There will be new pre-engineered wood trusses at an 8:12 pitch. 9. Outriggers, brackets, light fixtures, 5' high entry gates, fountain, and a rusticated stucco base added to the guardhouse building. 10. The interior plumbing fixtures and existing countertop of the guardhouse will be removed and replaced. Clubhouse 1. New storage area added to clubhouse. The existing structures and the new storage area will be connected with new exterior columns. 2. 5-V crimp metal roof with be added to the building. 3. New banding, shutters, outriggers, and metal grill work added to the clubhouse facade. 4. New sidewalk added in certain areas to tie into the existing sidewalk. Please see Clubhouse plans. I am confirming with you that this matter can be approved administratively. Mr. Dan Carter has coordinated the landscaping revisions separately with the City Forester. The landscaping revisions have been approved. Please contact me upon the approval of these plans. If you should have any questions or should need any further information, please let me know. Very truly yours, ~~ /' Jason ;- Mankoff JSM: ek Enclosure cc: Mr. Cito Beguristain (w/o enclosures) Mr. Dan Carter (w/o enclosures) Mr. Richard Jones (w/o enclosures) Ms. Jennifer Snyder (w/o enclosures) Michael S. Weiner, Esquire (w/o enclosures) 0:\AUBM023\Letter to Mike Rumpf. July 11. 2007.doc ~.", PROJECT NAME: Boynton Bay LOCATION: 499 Boynton Bay Circle PCN: 00. 4'?J~L/.s';, If.... ()3 .-tJao- D2..-<J2.--- I FILE NO.: MMSP 07-060 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: The Hamlet Jason. S. Mankoff ADDRESS: Weiner & Aronson, P .A. FAX: ADDRESS: 102 N. Swinton Avenue PHONE: Delray Beach, FL 33444 FAX: 561-272-6831 PHONE: 561-265-2666 SUBMITTAL / RESUBMITTAL 7/11/07 1 ST REVIEW COMMENTS DUE: PUBLIC NOTICE/ SIGNS 30 days / 10 days IP ARC: TART MEETING: LEGAL AD PLANNING & DEVELOPMENT BOARD MEETING: COMMUNITY REDEVELOPMENT AGENCY BOARD CITY COMMISSION MEETING: COMMENTS: S:\Planning\SHARED\WP\PROJECTS\Boynton Bay\MMSP 07-060\2007 PROJECT TRACKING lNFO.doc