Loading...
CORRESPONDENCE The City 01 Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 Ad03 }'H~ www.boynton-beach.org June 26, 2007 Mr. Oscar Tazoe, P.E. Kimley-Horn & Associates 4431 Embarcadero Drive West Palm Beach, FL 33407 Re: Boynton Village SMU MMSP 07-011 Dear Mr. Tazoe: In response to your request dated December 8, 2006 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: . Modification of Building D - Linens n Things - to accommodate a trash compactor next to the loading dock (as depicted on the attached plan) . . Addition of compactor and loading zone on the south side of Building F (as depicted on the attached plan) . . Addition of parking spaces along the NE corner of Target (as depicted on the attached plan) . . Removal of the dumpster enclosure at the SW corner of Building G (as depicted on the attached plan) . . Modification of loading area behind Building E (as depicted on the attached plan) . . Re-arrangement of handicap parking locations (as depicted on the attached plan) . . Modification of the main drive aisle behind Building J and shifting of the parking field (as depicted on the attached plan) . . Revisions to utility and paving, grading and drainage plans associated with slight building footprint adjustments (as depicted on the attached plan) . . Modification of photometric plans (as depicted on the attached plan) . . Modification of easternmost intersection on Mainstreet to incorporate a roundabout and the associated parking changes (as depicted on the attached plan) . . Page 2 June 26, 2007 Please be informed that the proposed changes on the revised date stamped 5/22/07 are "minor" as defined within the Development Regulations, Chapter 4 Si te Plan Review. project may continue to be processed by the Building Division permit application, subject to the following conditions: plan Land This as a 1. While the location of the new trash compactor and loading area at the southeast corner of Building "F" will be accepted, it is being noted that the approach to the compactor enclosure overlaps the loading area and may impact the ability of Solid Waste to pick up if the loading zone is in use, which may inconvenience your tenant. 2. Rotate the dumpster enclosure northeast of Building "J" so that it is opens to and is approached from the southeast. As currently depicted solid waste trucks may be required to back into the main drive between Buildings "H" and "J". 3. Several areas of potential conflict have been noted on the partial set of landscape plans provided. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees must be planted outside of the easement so that roots and branches will not impact utilities within the easement. Conflicts were noted in the landscape island northeast of Building "L" (Live Oak v. water main), third landscape island, north of the northeast corner of Building "H-1" (Tibouchina v. water main), and long island north of Buildings "F" and "G" ((Tibouchina v. sewer main.). Submi t revised plans for the City Forester and Senior Engineer review at time of permitting. 4. The lift station will require landscape screening, planted a minimum of one-half the wall height, at the time of planting. 5. A separate Minor Site Plan Modification approval will be required for Building H and the 16 dwelling units. Approval of this Minor Modification in no way implies the City's approval of the areas encompassed by Building H, the area north of the roundabout and the building proposed to contain the 16 dwelling units. 6. please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the minor site plan modification review process does not ensure that additional comments may not be generated at permit review. Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer Kevin Hallahan, City forester ~'_.'\"1"'.",.,.,..,C-.'..-...:...'.. .~, (5)(.' J.....1: o (; J. I( "1, ,- . '3'" ON DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 07-075 TO: Michael W. Rumpf, Director, Planning and Zoning laurinda logan, P.E., Senior Engineer l\' --....-. June 25, 2007 ( \ Review Comments,,- / "--- . Minor Site Plan Modification - 2nd Review" Boynton Village & Town Center SMU Building "0", "F", "G", "I", "J", and "K" File No. NWSP 07-011 FROM: DATE: RE: The above referenced Site Plans, received on 6/05/07, were reviewed against the 1st Review Comments provided to the P&Z Dept.12/18/06. Following are our revised comments: PUBLIC WORKS - SOLID WASTE 1. While the location of the new trash compactor and loading area at the southeast corner of Building "F" will be accepted it is being noted that the approach to the compactor enclosure overlaps the loading area and may impact the ability of Solid Waste to pick up if the loading zone is in use. No further action required. 2. Rotate the dumpster enclosure northeast of Building "J" so that it is opens to and is approached from the southeast. As currently depicted solid waste trucks may be required to back into the main drive between Buildings "H" and "J". Action required. PUBLIC WORKS - FORESTRY & GROUNDS 3. Several areas of potential conflict have been noted on the partial set of landscape plans provided. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees must be planted outside of the easement so that roots and branches will not impact utilities within the easement. Conflicts were noted in the landscape island northeast of Building "l" (Live Oak v. water main), third landscape island north of the northeast corner of Building "H-1" (Tibouchina v. water main), and long island north of Buildings "F" and "G" ((Tibouchina v. sewer main.) Action required. PUBLIC WORKS - TRAFFIC No comments at this time. ENGINEERING No comments at this time. UTILITIES No comments at this time. Oept. of Public Works, Engineering Division Memo No. 07-075 RE: Boynton Town Center & Village - SMU Buildings "0", "F", "G", "I", "J" and "K" Minor Site Plan Modification -1st Review, NWSP 07-011 June 25, 2006 Page 2 Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\Logan\TRC\Boynton Village MMSP 07-011 121806.doc ~=r~ ,. ,.,." Kimley-Hom and Associates, Inc. May 15,2007 . 4431 Embarcadero Drive West Palm Beach, Florida 33407 Mr. Ed Breese City of Boynton Beach Planning and Zoning Department 100 East Boynton Beach Blvd Boynton Beach, FL 33425-0310 Re: Boynton Village - SMU - Minor Modifications Buildings "D, F, G, I, J and K" SMU Parcel submittal MMSP 07-011 Dear Mr. Breese: As per our previous discussions, we are submitting our responses to comments to the SMU Parcel for the above referenced submittal. The previous SMU and C3 parcel submittals were filed under the same MMSP No 07-011. We have already submitted a separate application for the C3 parcel. For the SMU parcel, we will maintain the same applications number. Our responses to comments are as follows: 1. With respect to the new trash compactor and loading area at the southeast corner of Building "F" - the approach to the compactor enclosure overlaps the loading area. Please be advised this may impact the ability of Solid Waste to pick up if the loading zone is in use. It is recommended that there be no overlap of the two uses to resolve this conflict. The proposed configuration for the compactor and loading area was discussed with Staff prior to implementation. Due to several restrictions as to the placement of the loading area and compactor, it was determined this would be the best alternative. The parking calculations at the time also indicated that we could not afford to loose additional spaces or we would fall below the City's parking requirements. Several other alternatives were looked at prior to arriving at the current configuration. Loading zone was originally proposed on the eastern side of building F, but was rejected. We then relocated the loading zone to the current location, but with the compactor opening to the SE and parallel parking spaces east of the building, but that configuration was rejected. Finally, after discussions between City staff and Mr. Brad Jacobs with Sembler, parallel . TEL 561 845 0665 FAX 561 863 8175 ". parking spaces east of the building were removed, compactor opening changed to the SW and loading zone located just west of the compactor. We ask the City to reconsider comment and allow configuration as show on plans. 2. Rotate the dumpster enclosure northeast of Building "J" so that it opens to and is approached from the southeast. Please, see response to comment No.1. As indicated by previous staff comments, the dumpster truck can not back-up into main driveways. That was the reason why we rotated the opening of the compactor from its original opening to the southeast, to the southwest. In order to make the suggested opening work, we would have to shift the dumpster enclosure to the west in order to allow for a 60' back-up distance for the truck, without encroaching on the main drive. This would push back the compactor enclosure and the loading zone to the west, were it would become an obstruction to the fayade of the building as well as reduce the number of parking spaces significantly. 3. Reduce the amount of lighting depicted on the north side parking lot of Linens-N- Things, as there are hot spots depicted on the photometric plan. Lighting in this area has been reduced as requested. Please, refer to sheet SL- I. 4. A lift station now appears along the spine road and no orientation or landscaping has been depicted with it. Please provide greater detail. The proposed lift station has always been part of the construction documents. Per coordination with the City's Engineering Division, Planning and Zoning Division and Utilities Department, the proposed lift station enclosure will consist of an 8' high CMU block wall. The lift station enclosure has been constructed as of this date, and has been approved by the Utilities Department. 5. The fountain depicted in the easternmost truffic circle will not be allowed due to utilities located beneath it. Staff recommends relocating the fountain to the westernmost traffic circle or re-adjusting the utility runs. Fountain has been relocated to the western roundabout. Gazebo previously proposed on the western roundabout is now proposed on the eastern roundabout. We provided gazebo details and proposed location information to the Utilities Department staff and the new location of gazebo has been approved. 6. As discussed previously, Staff is looking to create more of a gathering area/public plaza and outdoor dining experience along the common areas on the north side of the easternmost traffic circle. Rather than having covered walkways, Staff envisions enlarged pavered spaces both along the eastern side '- .; of Building Hand for a sizeable portion of the green space south of the townhouse units, meandering down to the waters edge. In these areas should be umbrella tables and chairs or some assortment of covered seating areas, perhaps designed to capture the theme of the public area and/or building fa~ade embellishments slated for the north side of Linens-N- Things. The public should be able to take advantage of these areas for outdoor dining, for entertainment purposes, or space to leisurely read the newspaper, people watch or enjoy the water feature in the lake. Building H, and the areas described in this comment, will be handled in a subsequent Minor Modification submittal. 7. No landscape plans were submitted so that they could be evaluated for potential conflicts with dumpster/compactor enclosure locations and utility (water & sewer) mains and easements. Landscaping plans have been included for review. 8. The submittal of revised landscape plans is a necessary part of the Minor Mod submittal in order to accurately depict the landscape situation based upon changes in building footprints and relocation of various site features. Per previous conversations between our landscaping architect, Mr. Thomas Lund and the City's Forester, Mr. Kevin Hallahan, and further information provided by Mr. Brad Jacobs with Sembler, it was our understanding that the City would not require any additional landscaping plans be submitted for Minor Modification review. Minor changes to the landscaping plans would be addressed via a "record drawing" set at the end ofthe project. We have now included landscaping plans with this Minor Modification review submittal. 9. Correspondence submitted with the minor modification plans indicates that the plans have been submitted and approved by the Deputy Director of Utilities, Peter Mazella. Please provide a copy of the written approvalfrom Mr. Mazzellafor the files. We have provided the back-up documentation to Miss Laurinda Logan with the Engineering Department as part of our response to comments for the C3 parcel. To this date, the Health Department has issued a release on the water and sewer system. Please, see attached Health Department release form and Utilities Department form indicating they have reviewed and approved the system. 10. Palm Beach County Health Department permits may be requiredfor the water and sewer system revisions. Per conversations on 12/07/06 with Miss Tish Fox (561-355-3070 ext: 1135) with Palm Beach County Health Department, the addition of grease traps to the system (as required for restaurant uses) would not required a formal permit modification request from the Health Department. Only requirement is to show their location on the "as-built" drawings to be submitted for sanitary sewer system certification. 11. The revision to any floor plans are not subject to Minor Mod review and therefore have not been reviewed of approved. Comment noted. 12. Although the submittal letter indicates color elevations were part of the package, they were not submitted as part of this Minor Mod application. We apologize for the confusion this statement may have caused. Building elevations have been submitted separately for each building and are not required for this submittal. Building H elevations will be submitted at the time of re- submittal for Building H Minor Modification comments. 13. All comments requiring changes and lor corrections to the plans shall be reflected on all appropriate sheets Comment noted. 14. Please note that changes or revisions to theses plans may generate additional comments. Acceptance of these plans during the Minor Site Plan Modification process does not ensure that additional comments may not be generated at permit review. Comment noted. As with previous submittals; we have only included those sheets affected by the changes to the buildings in question. Please, proceed with the minor modification review process and don't hesitate to contact us if you have any questions regarding the above mentioned site plan changes. Very truly yours, KIMLEY -HORN AND ASSOCIATES, INC. .. ~~ Oscar Tazoe, P .E. Project Engineer H:\047148007-Boynton Village\47148007\Permits\City of Boynton Beach\Minor Mod - SMU Buildings\2nd submittal- 07-0515 - SMU1SMU Blds_SMUsubmittalonly.doc Executed Health Department Form 62-604.300(8)(b) Indicates City of Boynton Beach Utilities Department has reviewed latest configuration of Utility Drawings ."' CITY OF BOYNTON BEACH OFFICE OF THE DIRECTOR OF UTILITIES 124 E. Woolbright Road Boynton Beach, FL 33435 561-742-6400 FAX 561-742-6298 LETTER OF TRANSMITTAL Date: April 17, 2007 TO: Kimley- Horn Steve Mills 561-309-8350 RE: Boynton Town Center TRANSMITTED HEREWITH ARE THE FOLLOWING ITEMS: Pages Description 1 set Request for Release Collection System Remarks: Copy to: File Brent Allen Signature: M _ Brent Allen Chief Field Inspector .... Florida Department of Environmental Protection Twin Towers Offiee Bldg., 2600 Blair Stone Road, Tallahassee, Florida 32399-2400 REQUEST FOR APPROVAL TO PLACE A DOMESTIC W ASTEW A TER COLLECTION/TRANSMISSION SYSTEM INTO OPERATION PART I - INSTRUCTIONS (I) This form shaH be completed and submitted to the appropriate DEP district office or delegated local program for all collection/transmission system projects required to obtain a construction permit in accordance with Chapter 62-604, F.A.C (2) Newly constructed or modified collection/transmission facilities shal1 not be placed into service until the Department has cleared the project for use. (3) All information shal1 be typed or printed in ink, and all blanks must be fil1ed. PART IT - PROJECT DOCUMENTATION (I) Collectionffransmission System Permittee Name Jeff Fuqua Company Name 1950 Congress Ave, LLC Address 1450 South Johnson Ferry Road, Suite 100 City Atlanta Telephone 404-847-1800 Fax 404-847-1818 Title Vice President 1 Assistant Secty State GA Email Zip Jeff.FuQua@Sembler.com 30319 (2) General Project Information Project Name Bovnton Town Center 1 Bovnton Villaoe Construction Permit No. 06-2438/06-2437 Dated 41612006 Is the entire project included under the collection/transmission system permit substantially complete? 0 Yes IiINo (If approval is being requested to place a portion of the project into operation, attaeh a copy of the site plan or sketch that was submitted with the application showing the portion of the project which is substantially complete and for which approval is bein!! reouested. ) Description of Portion of Project for Which Approval is Being Requested (including pipe length, total number of manholes and total number of pump stations) Please, refer to list of excluded items on page 3 Expected Date of Connection to Existing System or Treatment Plant Mav 2007 (3) Treatment Plant Serving Col1ection/Transmission System Name of Treatment Plant Serving Project County Palm Beach County DEP permit number FL 138271-324-DWC South Central Rellional Wastewater & Disposal Board City Delrav Beach Expiration Date 4/512011 For Department Use Only Date By l>EP Fonn 62-604.300(8)lb) ElTccti\'e November 6, 2003 Page 1 00 CLEARED FOR USE Noctbwcstl)ismcl 160 GoveMfJ\t'otal ("('oler NOf1hell$t Dimkt 7825 BaymeadoWl. Way Suite ~oou Ja-.:boll'fil1c. FlorKla 322S(). 7S90 904.107.3300 l'..:ntnlIOW!otri..:1 H 19 ~"llin: B l...d Suite 232 OrllUMlo. Florida 32RO).)161 407-1'94-7:555 SouthwCSl District 3804 CQwnul Palm Drive SotllhDistricl 229S Victoria Ave Suile 364 foo Myen. Florida ]]902-2549 239':\32-69" Soulhca~ District 400 North C'ongreu Ave Suite 200 Wcsl Palm Beach. Flurld. )]401 ~61.Mll.6600 Prnuco(a, florkb 32~02.3794 aSO.S9S.RlOO TJlmp.. Flurida 33619-8.311 Kt:\.744.filOO "'" PART m - CERTIFICATIONS (I) Collectionrrransmission System Pennittee I, the undersigned owner or authorized representative* of 19 SO Congress Avenue, LLC certify that the engineer has provided US a copy of the record drawings for this project and if there is not already an existing applicable operation and maintenance (O&M) manual, one has been prepared for the new or modified facilities. Also, I certity that, if we will not be the owner of this project after it is placed into service, we have provided a copy of the above mentioned record drawings and a copy of the above mentioned O&M manual, if applicable, to the person or system that will be the owner of this project after it is placed into service. }('Signed Name Je * Attach a letter (} Date Title :3. ?Ii), O~ Vice President / Assist. Secty. (2) Owner of CollectionITransmission System After it is Placed into Service I, the undersigned owner or authorized representative* of City of Boynton Beach Utilities Opt. certity that we accept the project as constructed and will be the owner of this project after it is placed into service. 1 agree to report any abnonnal events in accordance with Rule 62-604.550, F.A.C. and promptly notify the Department if we sell or legally transfer ownership of the collection/transmission system. Also I certify that we agree to operate and maintain the facilities in accordance with the provisions of Chapter 403 Florida Statutes (F.S.) and applicable Department rules and that we have received a copy ofthe record drawings and O&M manual for this project and that these record drawings and O&M manual are available at the following location which is within the boundaries of the district office or delegated local program penniuing the collection/transmission system: ~:: If ~~,~ Company Name C. f y "I he,... f,;., /;~. J2 Address /2.. 'I t:......,.. i U.i JI6 _ . , J. f J,.,..{ City fLy",- -Iv., /J ~..<J.. Telephone $&. 7.,.2.- (,"1" . Fax r"tl 7't2 - t ...'IY * Attach a letter of authorization. Date ~ ;; 7 /.. .., Title f) /J' 'f"'/'7 . no;.'tv,' State FL Email Zip 1 J' 'f J '.> - /1t"u "ft-'I;) Ii~ '-L. t , ~/O/^ - he, .t... II. (.-'1 (3) Wastewater Facility Serving Collectiontrransmission System I, the undersigned owner or authorized representative* ofthe_ City of Boynton Beach Utilities Wastewater facility hereby certity that the above referenced facility has adequate reserve capacity to accept the flow from this project and will provide the necessary treatment and disposal as required by Chapter 403, F.S., and applicable Department rules. Also, I certity that any connections associated with this project to the above referenced facility, which we operate and maintain, have been completed to our satisfaction and we have received a copy of the record drawings for this project. Signed I!r7 ~ Name 1:1t:e.- ~/ /70:'2.'7...-/1" Address .II, ~ 141... ('4 . .6 J.t. City Telephone Fax * Attach a letter of authorization. Date ~;;7/" 7 Title th/....fy LJ....~ . r,,;., . State Email Zip lor ~ By: 1950 CONGRESS AYE, u.c, . FIorlda limited IIabIIIly OO1IlpOIIy lis: ManaA MBnber Ilmhod ....,-; By: Sembler ~ Partncnhlp 135, W., . Ilorida lis: Genenl Partner By: Sembler RdaU, Ine., . Florida Corponllon Page 2 of 3 !lEI' Form 62.(.o4300(R){b) Effective Novl't'l1hcr 6, 2003 .... ... , (4) Professional Engineer Registered in Florida I, the undersigned professional engineer registered in Florida, certify the following: . that this project has been constructed in accordance with the construction permit and engineering plans and specifications or that, to the best of my knowledge and belief, any deviations from the construction permit and engineering plans and specifications willllil! prevent this project from functioning in compliance with Chapter 62-604, F.A.C.; . that the record drawings for this project arc adequate and include substantial deviations.. from the construction permit and engineering plans and specifications; . that a copy of the record drawings has been provided to the permittee and to the wastewater treatment facility serving the collection/transmission system; . that the O&M manual for this project has been prepared or examined by me, or by an individual(s) WIder my direct supervision, and that there is reasonable assurance, in my professional judgment, that the facilities, when properly maintained and operated in accordance with this manual, will function as intended; and . that, to the best of my knowledge and belief, appropriate leakage tests have been performed and the new or modified facilities met the specified requirements. This certification is based upon on-site observation of construction conducted by me or by a project representative WIder my direct supervision and upon a review of shop drawings, test results/records, and record drawings performed by me or by a project representative WIder my direct supervision. The following is a description and explanation of substantial deviations" from the construction permit and engineering plans and specifications for the substantially completed portion of this project. (Attach additional sheets ifnecessary.) Certify complete sanitary sewer sytem as indicated on the attached .As-B..... drawings (highligted areas). with the following exceptions: _ Lilt Station generator and associated infrastructure not present at current time. It will be installed in the following months (3-4 months) _ Permanent gates for the Lift Station enclosure not currently installed. They will be installed in the near future. _ Grease tlaps show on as-buih drawings are for information only and have not been installed as of this date, with the exception of Target, which have been installed. Name Oscar R. Tazoe. P.E. Company Name Kimley-Hom and Associates, Inc. Address 4431 Embarcadero Drive City West Palm Beach Telephone 561-845-0665 Fax 561-863-6392 Florida Registration No. 60472 Zip 33407 Oscar.Tazoe@Kimlev-Hom.com State FL Email U Substantial deviations are construction deviations greater than 10% from plans and specifications and any deviations whichfall below minimum standards established in Rule 62-604, F.A.C OCP funn 6H,04.30O(S)(b) Effective November 6, 2003 Pagc3 of 3 '-" Health Department Water and Sewer Release .......", Charlie Crist Governor Ana M. Via monte Ros, M.D., M.P.H. Secretary of Health April 20, 2007 Kofi Boateng City of 80ynton Beach Director of Utilities 124 E. Wootbr'tght Rd Boynton Beach, FL 33435 PROJECT: Boynton Town Center I Boynton Vilfage WATER PERMIT NO: 138271~323~DSGP SEWER PERMIT NO: 138271-324-DWC Dear Mr. Boeteng: The referenced project is hereby released for service to the extent indicated below. This release is based on certification by the engineer-of-record that the water and sewer systems have been constructed in substantial conformance with plans previously approved by this agency. X The system is released to the fun extent of the approved plans. The system is partisliy released and limited to: .. The system is released for construction water only_ Shouid you have any questions, please call me at (561) 355-3070, extension 1135. Sincerely, I~N TlSh Fox l/ Engineer II Plan Review and Permits Division of Environmental Health & Engineering cc: Engineer-of-record: John E. Potts, P.E. Post Office Box 29 I 826 Evemia Street, West Palm Beach, FL 33402 Jean M. Malecki, MD, MPH, FACPM. Director www.pbchd.com .... \'"", Page 1 of2 Tazoe, Oscar From: letitia_Fox@doh.state.fl.us Sent: Thursday, April 12, 20079:42 AM To: Tazoe, Oscar Subject: RE: Permit modifications Oscar, No formal notification is required since these are minor modifications. Have a great day, Tish --Original Message--- From: Oscar.Tazoe@kimley-horn,com fmailto:Oscar. Tazoe@kimley-hom.com] Sent: Thursday, April 12, 20079:02 AM To: Fox, letitia M Subject: RE: Permit modifications Tish, After reading through FAC section 62-555.536, J gather that the type of changes that we have performed on the site do not require a "construction permit modification". It seems though that we need to provide a written notification of the changes to your department. For your information, the changes performed where as follows: · Shifted water mains in a couple of locations to accommodate shift in driveway and other utilities - covered under FAC 62-555.520(1 )(c}3 and 62-555.536(1 )(a)2 · Shifted some valve locations due to conflicts in the field - covered under FAC 62-555.520(1 )(d)11 · Proposed grease traps for indiVidual services at restaurant locations - covered under FAC 62- 555.520(1 )(d)13 As per our previous conversations, these changes will be represented on the "as-built" drawings that will be submitted for review by the City of Boynton Beach Utilities Department and Health Department. Let me know if you need a "formal" written notification of the changes. Thanks tor all your help Oscar. KIMlEY-HORN AND ASSOCIATES, INC. Oscar R. Tazoe, P.E. Project Manager 4431 Embarcadero Drive West Palm Beach, FL 33407-3258 Direct: (561) 840-0821 OffICe: (561) 845-0665 Cell: (561) 308-8873 oscar.tazoe@kimley~om.com www.kimley-hom.com 4/12/2007 '" Page 2 of2 From: LetitlaJox@doh.state.f1.us [mailto:Letitict.Fox@doh.state.f1.us] Sent: Wednesday, AprIl 11, 2007 3:31 PM To: Tazoe, Oscar Subject: Permit modifications Oscar, I have attached a copy of the F .A.C. 62-555, refer to section 62-555.536 for modifications to permits. Please feel free to call or email if you have any further questions or comments. Best regards, Tish Fox Engineer II Plan Review & Permits Section (561)355-3070 Ext 1135 4/12/2007 Tb.e Citu 01 Bounton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVIsON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org January 8, 2007 Mr. Oscar Tazoe, P.E. Kimley-Horn and Associates, Inc. 4431 Embarcadero Drive West Palm Beach, Fl 33407 Re: Boynton Village & Town Center MMSP 07-011 Dear Mr. Tazoe: Staff has reviewed the revisions to the above-mentioned project, and as a result of our review, the following comments and questions are being forwarded to you for your review and response: SMU related comments: With respect to the new trash compactor and loading area at the southeast comer of Building "F" - the approach to the compactor enclosure overlaps the loading area. Please be advised this may impact the ability of Solid Waste to pick up if the loading zone is in use. It is recommended that there be no overlap of the two uses to resolve this conflict. Rotate the dumpster enclosure northeast of Building "J" so that it is opens to and is approached from the southeast. Reduce the amount of lighting depicted on the north side parking lot of Linens-N-Things, as there are hot spots depicted on the photometrics plan. A lift station now appears along the spine road and no orientation or landscaping has been depicted with it. Please provide greater detail. The fountain depicted in the easternmost traffic circle will not be allowed due to utilities located beneath it. Staff recommends relocating the fountain to the westernmost traffic circle or re-adjusting the utility runs. As discussed previously, Staff is looking to create more of a gathering area/public plaza and outdoor dining experience along the common areas on the north side of the easternmost traffic circle. Rather than having covered walkways, Staff envisions enlarged pavered spaces both along the eastern side of Building H and for a sizeable portion of the greenspace south of the townhouse units, meandering down to the waters edge. In these areas should be umbrella tables & chairs or some assortment of covered seating areas, perhaps designed to capture the theme of the public art and/or building fa9ade embellishments slated for the north side of Linens-N-Things. The public should be able to take advantage of these areas for outdoor dining, for entertainment purposes, or a space to leisurely read the newspaper, people watch or enjoy the water feature in the lake. . Page 2 January 8, 2007 C-3 related comments: Revise the yellow lane separator at the driveway adjacent to the northeast comer of Building "A" (Super Target) to line up with the roadway/aisle alignment. It may be necessary to extend the length of the separator and curve it to accurately "inform" the traveling public. Sheet C3 indicates (in two separate places) the total square footage at 246,506, while Sheet MSD depicts the total at 246,373. General comments: No landscape plans were submitted so that they could be evaluated for potential conflicts with dumpster/compactor enclosure locations and utility (water & sewer) mains and easements. The submittal of revised landscape plans is a necessary part of the Minor Mod submittal in order to accurately depict the landscape situation based upon changes in building footprints and relocation of various site features. Correspondence submitted with the minor modification plans indicates that the plans have been submitted and approved by the Deputy Director of Utilities, Peter Mazzella. Please provide a copy of the written approval from Mr. Mazzella for the files. Palm Beach County Health Department permits may be required for the water and sewer system revisions. The revision to any floorplans are not subject to Minor Mod review and therefore have not been reviewed or approved. Although the submittal letter indicates color elevations were part of the package, they were not submitted as part of this Minor Mod application. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Minor Site Plan Modification process does not ensure that additional comments may not be generated at permit review. Minor Mod 06-050 (Bid!!. H) comments: Consider rolling this older Minor Mod request into this latest request, as part of the responses/changes noted herein. Some portions of the previous request may now be outdated or superceded by this most recent application. As noted in the SMU comments, the new traffic circle (southeast of Building "H-I") is depicted (and labeled) with a fountain in the middle. No structural features will be allowed, as they will fall within a utility easement that contains water and sanitary sewer. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Palm Beach County Health Department permits may be required for the water and sewer system revisions. . Page 3 January 8, 2007 A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. The proposed "header" configuration for sanitary sewer laterals to the west of the eight townhomes will not be permitted. Provide sanitary sewer main along the front of the townhomes, with laterals properly tied into the main. Connect the new main to the sanitary sewer in the primary east-west roadway (at the traffic circle.) Delete the proposed sanitary sewer that runs from the mid-point of the proposed townhomes west and connects into the secondary roadway in front of Buildings "K", "L", and "M." Likewise, the sanitary sewer laterals for Buildings "J" and "K" will be re-evaluated at the time revised Utility plans are submitted for review and approval. Revise the water main loop around Building "H-1" and "H-2" so that the fire hydrant at the southeast comer of Building "H -1" comes off the main, instead of the main corning off the fire hydrant lead. A note for a 3-in. service line with a 2-in. meter is shown southeast of the eight townhomes but no line is shown. Please correct. Please identify whether townhomes will be 2- or 3-story. No fire line or meter(s) were shown for the proposed townhomes or Building "H-2." Please correct. The correspondence regarding this minor modification (dated 8/16/06) states that grease traps were added throughout the Boynton Town Center & Village site although only one of the utility sheets was included in the plan set. Is Sheet C13 the only sheet with new grease traps identified? Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. Building elevations were not provided for the townhomes or the garages north of Building H. It would appear as though all glass depicted on Building H is vision glass. If this is incorrect, please accurately depict areas of vision and non-vision glass. Originally, Building H appeared to have a good deal of what looked like brick fayade. Staff would prefer to retain some of that fayade element. Please submit revised plans reflecting the changes discussed above to continue the review of your request through the process. Staff will be happy to meet with you to discuss any of these issues or any potential plan revisions prior to your resubmittal. Do not hesitate to contact me with any questions or if there is anything I can do to assist you. Ed Breese Principal Planner Cc: Karen Main, Plans Review Analyst Laurinda Logan, Senior Engineer DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 07-xxx TO: Michael W. Rumpf, Director, Planning and Zoning FROM: Laurinda Logan, P.E., Senior Engineer DATE: December 18 2006 RE: Review Comments Minor Site Plan Modification - 1 st Review Boynton Village & Town Center SMU Building "0", "F", "G", "I", "J", and "K" File No. NWSP 07-011 The above referenced Site Plans, received on December 11, 2006, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced. PUBLIC WORKS - SOLID WASTE @ With respect to the new trash compactor and loading area at the southeast corner of Building "F" - the approach to the compactor enclosure overlaps the loading area. Please be advised this may impact the ability of Solid Waste to pick up if the loading zone is in use. It is recommended that there be no overlap of the two uses to resolve this conflict. (I) Rotate the dumpster enclosure northeast of Building "J" so that it is opens to and is approached from \V the southeast. PUBLIC WORKS - FORESTRY & GROUNDS @ No landscape plans were submitted so that they could be evaluated for potential conflicts with dumpster/compactor enclosure locations and utility (water & sewer) mains and easements. PUBLIC WORKS - TRAFFIC ~Revise the yellow lane separator at the driveway adjacent to the northeast corner of BUilding "A" (Super Target) to line up with the roadway/aisle alignment. It may be necessary to extend the length of the separator and curve it to accurately "inform" the traveling public. ENGINEERING (0/ All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Q Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. Dept. of Public Works, Engineering Division Memo No. 07-xxx RE: Boynton Town Center & Village - SMU Buildings "0", "F", "G", "I", "J" and ilK" Minor Site Plan Modification -1st Review, NWSP 07-011 December 18, 2006 Page 2 Ae to the change(s) in building sizes the area of impervious area may have increased. Please cA1~ovide information regarding the net change in impervious area and if 800 s.f. or greater provide any ~ necessary documentation regarding changes to the master drainage plan and SFWMD permit. ~ ~ UTILITIES ef'J",. , .........- /K( Correspondence submitted with the minor modification plans indicates that the plans have been P submitted and approved by the Deputy Director of Utilities, Peter Mazzella. Please provide a copy of the written approval from Mr. Mazzella for the files. , ()( Pal.~ Beach County Health Department permits may be required for the water and sewer system l)eI ~evlslons. Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E.I P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\Logan\TRC\Boynton Village MMSP 07-011 121806.doc ~ -_1nII Kimley-Hom ~ U and Associates, Inc. December 8, 2006 Mr. Ed Breese City of Boynton Beach Planning and Zoning Departmem 100 East Boynton Beach Blvd Boynton Beach, FL 33425-0310 .. ~ ~ tiP( ~fJN MP7l/~ 5P7 ~ t2eM;> {9(0 [Uvt&1, p~ (C") {~~ ~ 4f;m< J,S ~ (AF-r 5,wcW ) .. Re: Boynton Village - SMU - Minor Modifications Buildings "D, F, G, I, J and K" Permit No 06-050 We are submitting the following sets of drawings for Minor Modifications review under the City of Boynton Beach requirements, due to modifications to Buildings D, F, G, I, J and K; at the above referenced project. The changes to the plans are outlined below. ~ yV / The east face of building "D" (a.k.a. Linens and Things) has been modified in / ~ ~., order to accommodate a trash compactor next to the loading area. In order to do ~ so, the SE portion of the building was reduced to the West and the NE portion of 1)1 ~ \ the building was expanded to the East. Overall square footage of the building t# remained the same at 28,000 SF. ,/ II ~ The footprint for Building "F" was reduced in the East-West direction and ________ enlarged in the North-South direction. This resulted in an overall change in ________ square footage from 10,430 SF to 10,425 SF. 'I j / We have added a trash compactor and a loading space on the SE comer of ~ ~ {ZetIlscP Building "F". In order to regain some of the parking spaces lost in this area, we 0 ./ /J ~ fD fr;It.. 'f)I/,s ~ have also added parking spaces in the paved area at the NE comer of the Target LS ~ Building. / The footprint for Building "G" was modified slightly. This resulted in a change in square footage from 9,753 SF to 9,800 SF. ~ On the SW comer of Building "G", the dumpster enclosure was removed and q two regular parking spaces were changed to H/C spaces. The dumpster was ~ removed due to the proposed compactor at the SE comer of Building "F". / The loading area behind Building "E" was modified in order to accommodate a fJ trash compactor and a second loading area for Building "I". The new loading rztYt~ area for Building "I" is "at grade". v 1J111J~ ~ '(1#5 ~ v-t p~ Dear Mr. Breese: ./ ~ ~ ,; . TEL 561 845 0665 FAX 561 863 8175 l3J t.f7 ] o The footprint for Building "I" has been modified slightly. This resulted in a change in square footage from 12,495 SF to 13,316 SF. v< The H/C spaces to the north of Building "E" have been relocated to the West of @ Building "I" so as to be located closer to the entrance. v< The plaza area located to the north of Building "I" has been modified slightly due to the changes in the building footprint. ~ The footprint for Building "J" has been modified slightly. This resulted in a change in square footage from 8,100 SF to 8,075 SF. ~ The footprint for Building "K" has been modified slightly. This resulted in a change in square footage from 9,930 SF to 9,952 SF. The H/C spaces to the south of Building "J" have been relocated to the SW ~) ~ comer of Building "K" so as to be located closer to the Building entrance. 0 ~ The plaza area located to the south of Building "K" has been modified slightly ~ due to changes in the building footprint and hardscape patterns. vi ? The dumpster located just north of Building "J" has been relocated to the NE ~ /}~ f....[,. comer of Building "K". .VI9ft I ~ ___ /' The main drive aisle behind Building "J" that runs North-South, has been q\ V shifted so as not to encroach on SMU-Parcel 4. The parking field in this area l!J has also been modified to allow for the road shift. This shift has been coordinated with the other developer and their architects. ~ V' The eastern most parking spaces along the row of parking south of ~uilding "H" fJ) II ~ have been adjusted in order to incorporate a new round-about along Main Street. ~Ji!!:" e.t' The round-about modification was part of the previously submitted "Minor 11Jf9!P Sfi ~ IffP7V- Modifications - Building H" o Utility Plans have been updated to service new building configurations. We have also incorporated grease traps throughout the site at the locations of the proposed restaurants. These plans have already been submitted and approved by the Utilities Department Director, Mr. Peter Mazzella. Please, refer to utility sheets for information. Paving, grading and drainage plans have been updated to service new Building configurations. Please, refer to paving, grading and drainage plans for information. Photometric plan has been updated with the new building configuration. Updated Building floor plans have been prepared by Pieper, O'Brien Herr Architects. Please note that as of this submittal, the floor plans for Buildings "D" (Linens & Things) and Building "F" are still being worked on. There are some design issues that were brought up during building permit submittal which the architect and developer coordinating with City Staff to finalize. Color elevation renderings have been updated per new building configurations. ./ ~ ~ ~ ~ ~ vi ,/ V' ~ -/ tI ~ j"'l'" ~ ~ ~It' AA~~ tA ~ tw'rl' ~~ "~I' -..j" 8-vi(A.fr (~) -'Ii1J ;.. t"(_ 'p' j-lJ vfi. ~1'1Ue tdL-. U~-II-fH11Jtb8 JhU ~ )kJr ~. P:8ZI] [25J ~22. ] / v< The MSD and MOS sheets have been updated to reflect the building configurations. As with previous submittals; we have only included those sheets affected by the changes to the buildings in question. We have not included landscaping drawings with this submittal, as per discussions between Brad Jacobs with The Sembler Company and Planning and Zoning staff. Please, proceed with the minor modification review process and don't hesitate to contact us if you have any questions regarding the above mentioned site plan changes. li"a~~ @ -- Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. ~~cP Oscar Tazoe, P.E. Project Engineer H:I047148007.Boynton Villagel47I 48007\PermitsICity of Boynton Beach\Minor Mod. SMU Buildings\Minor Mod - SMU Buildings.doc A;UfL ~-3 ... I' - , ~6/ ~1~ &4J S/ee:r MSD - V$ - ~+" 5o~ I kJ ~ C3 / (2.~) ~ ~ ~ {Ze::vte.-o · ~$ ~ LL fZe;v~ _ ~ 0 t.L .sAUL ;~. ~ ~AJ IAJ ~~~ ~c 4~ ~ ~ --- ----- ---- .. /L( fLl5P ~(g - C) ~() ~~ /lJt) c~lf71b-tb-& ~ ~AJ~ I( I ( II ~ ~ An.e ~ l{)t~~ ~e;Pl ~ tMI ~ I+- V/$Uff1)' ~ - fhLt./ ~)J ~ .,., ~ Ii ~ IBk OF WH8r ~ 70 lJG bueu- ... ~. .s~W#J/U>ViKe''f()~AJ~~ TJhfr~~ - Jo ~ o-v-rv/Alt~ ~ ~ (?-O-(b JJ6Fl~@u~~ AtWJ /2..€zpUt:!i1l k ~.1 ~ ~use IZE"'~'- ni/~ ~~ vol..tuff ~ f,tf + ~ ~ tU/~A)(J i ~~~ 1U~4JUL~e JtS rr I~ ~ bF M.ar ~ ~~ ~ 1r7/-L.,) I Jk btS~ /'lUi:VrOU-$'1I J~~ l'<I ~ ~ 6P- ,f- ~~ ~~ Nr~ bf,A)il()r; ~eYlICkG ~ ~ ~'Maf-.s tW TJf& ~,rJ-et)6 ~~:~~- "/tuJS.r ~C- ~Ilet.€, ~ 1J./;trN IhtrJt#(s1 ~ ~~ '" .J ~@L;v/$~ ~~~ ~ ~ ~ ~ ~{}e bf- 6ut~CtP f.I- ~ ,&at.,. ~ $/~ ~ 6}Z. nit:. .-. Ma;;v~ b€noEl!:1J we ~ Nv/Vf5 ~ 'nI€ fku; "F i/l~ I ~/:Jt!J'uP-(p ~ YO 77f€. ~~ CAf#. (,J '72k$€ ~ ~ h: (/~t.L..4- ~ MJt) ~/~ ~ ~ 'f$.$~ tJF ~0t..QJ ~U'G ~ (~ ~((9AJ€l) 17; ~ae ~ ~ 6F '111€ ~~. NLr ~. t::v/U)ttl-.te ~ ~{.ljS~ ~ '1N€' ~ SIJ}~ or h.vt>>.s-AJ,...7Ht/..Jt4:J) 7J; ~ ~ .CF ~ l>t~~ I . ... / ~/~ ~ ~ ~ ta~ ~ )'0 6fT ~ wifrctf- 7lIt: Iuh~ ~ w ~ ~.iA1) Il8fIJ ~ N~ ~k " ~. ~l, __InI. Kimley-Horn IIr.J r ~ and Associates, Inc. DEe - 8 2005 : -.~-~--:".. :if, :~,f: [ L I' "'c",1 ~_. - J December 8, 2006 . 4431 Embarcadero Drive West Palm Beach, Florida 33407 Mr. Ed Breese City of Boynton Beach Planning and Zoning Department 100 East Boynton Beach Blvd Boynton Beach, FL 33425-0310 Re: Boynton Village - SMU - Minor Modifications Buildings "D, F, G, I, J and K" Permit No 06-050 Dear Mr. Breese: We are submitting the following sets of drawings for Minor Modifications review under the City of Boynton Beach requirements, due to modifications to Buildings D, F, G, I, J and K; at the above referenced project. The changes to the plans are outlined below. . The east face of building "D" (a.k.a. Linens and Things) has been modified in order to accommodate a trash compactor next to the loading area. In order to do so, the SE portion of the building was reduced to the West and the NE portion of the building was expanded to the East. Overall square footage of the building remained the same at 28,000 SF. . The footprint for Building "F" was reduced in the East-West direction and enlarged in the North-South direction. This resulted in an overall change in square footage from 1 0,430 SF to 1 0,425 SF. . We have added a trash compactor and a loading space on the SE corner of Building "F". In order to regain some ofthe parking spaces lost in this area, we have also added parking spaces in the paved area at the NE corner of the Target Building. . The footprint for Building "G" was modified slightly. This resulted in a change in square footage from 9,753 SF to 9,800 SF. . On the SW corner of Building "G", the dumpster enclosure was removed and two regular parking spaces were changed to HlC spaces. The dumpster was removed due to the proposed compactor at the SE corner of Building "F". . The 10ading area behind Building "E" was modified in order to accommodate a trash compactor and a second loading area for Building "I". The new loading area for Building "I" is "at grade". . TEL 561 845 0665 FAX 561 863 8175 9/1-f17 ? ff;6 '2SJ. . The footprint for Building "I" has been modified slightly. This resulted in a change in square footage from 12,495 SF to 13,316 SF. The H/C spaces to the north of Building "E" have been relocated to the West of Building "I" so as to be located closer to the entrance. The plaza area located to the north of Building "I" has been modified slightly due to the changes in the building footprint. The footprint for Building "J" has been modified slightly. This resulted in a change in square footage from 8,100 SF to 8,075 SF. The footprint for Building "K" has been modified slightly. This resulted in a change in square footage from 9,930 SF to 9,952 SF. The H/C spaces to the south of Building "J" have been relocated to the SW comer of Building "K" so as to be located closer to the Building entrance. The plaza area located to the south of Building "K" has been modified slightly due to changes in the building footprint and hardscape patterns. The dumpster located just north of Building "J" has been relocated to the NE comer of Building "K". The main drive aisle behind Building "J" that runs North-South, has been shifted so as not to encroach on SMU-ParceI4. The parking field in this area has also been modified to allow for the road shift. This shift has been coordinated with the other developer and their architects. The eastern most parking spaces along the row of parking south of Building "H" have been adjusted in order to incorporate a new round-about along Main Street. The round-about modification was part of the previously submitted "Minor Modifications - Building H" Utility Plans have been updated to service new building configurations. We have also incorporated grease traps throughout the site at the locations of the proposed restaurants. These plans have already been submitted and approved by the Utilities Department Director, Mr. Peter Mazzella. Please, refer to utility sheets for information. Paving, grading and drainage plans have been updated to service new Building configurations. Please, refer to paving, grading and drainage plans for information. Photometric plan has been updated with the new building configuration. Updated Building floor plans have been prepared by Pieper, O'Brien Herr Architects. Please note that as of this submittal, the floor plans for Buildings "D" (Linens & Things) and Building "F" are still being worked on. There are some design issues that were brought up during building permit submittal which the architect and developer coordinating with City Staff to finalize. Color elevation renderings have been updated per new building configurations. . . . . . . . . . . . . . . . PROJECT NAME: Boynton Village & Town Center LOCATION: North of Old Boynton Rd.; East of Congress Avenue PCN: I FILE NO.: MMSP 07-011 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: 1950 Congress Avenue LLC Oscar Tazoe ADDRESS: Kimley-Horn Associates, Inc. FAX: ADDRESS: 4431 Embarcadero Drive PHONE: West Palm Beach, FL 33407 FAX: 561-863-8175 PHONE: 561-845-0665 E-Mail: on file SUBMITTAL / RESUBMITT AL 12/8/06 1 ST REVIEW COMMENTS DUE: PUBLIC NOTICE/ SIGNS 30 days /10 days IP ARC: TART MEETING: LEGAL AD PLANNING & DEVELOPMENT BOARD MEETING: COMMUNITY REDEVELOPMENT AGENCY BOARD CITY COMMISSION MEETING: COMMENTS: S:\Planning\SHARED\WP\PROJECTS\Boynton Village-Boynton Town Center I\MMSP 07-011\2006 PROJECT TRACKING INFO.doc