March 26, 2007
Mr. Oscar Tazoe, P.E.
Kimley-Horn & Associates
4431 Embarcadero Drive
West Palm Beach, FL 33407
Re: Boynton Village SMU (Total Wine)
MMSP 07-029
Dear Mr. Tazoe:
In response to your request dated-stamped March 13, 2007 for the
administrative review and approval of the modifications proposed to
the above-referenced approved site plan, depicting the following:
· Modification of building fa9ades for Building E - Total Wine (as
depicted on the attached plan) .
· Modification of entry sidewalk and drive aisle on the east side
of Building E - Total Wine (as depicted on the attached plan) .
Please be informed that the proposed changes on the revised
date stamped 3/13/07 are "minor" as defined within the
Development Regulations, Chapter 4 Si te Plan Review.
project may continue to be processed by the Building Division
permit application, subject to the following conditions:
plan
Land
This
as a
1. Staff recommends providing a minimum of one accessible opening/ramp
from the parking area onto the sidewalk along the north side of
Building "E."
2. Staff recommends relocating one of the handicap accessible parking
stalls from the west side of Building "I" to the north side of
Building "E."
3. Sign #2, Sheet C9, is in conflict with the accessible route for
wheelchairs using the ramp adjacent to it (northeast corner of
Building "E.")
4. Changes in the site layout may require a re-plat to redefine lots
and parcels. Contact PW/Engineering regarding platting
requirements.
5. Please note that changes or revisions to these plans may generate
additional comments. Acceptance of these plans during the minor
site plan modification review process does not ensure that
additional comments may not be generated at permit review.
e. Page 2
March 26, 2007
Be advised that the proposed changes may require a modification to
the building permit. Please contact me at (561) 742-6260 if you
have additional questions.
Sincerely,
~;--
Principal Planner
Cc: Karen Main, Plan Review Analyst
Laurinda Logan, Senior Engineer
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 07-037
FROM:
Ed Breese, Principal Planner, Planning and Zoning
Laurinda Logan, P.E., Senior Engineer l,.Q\\
TO:
DATE:
March 26, 2007
\
)
/
RE:
Review Comments
Minor Site Plan Modification - 1 st Review
Boynton Town Center & Village - Total Wine
File No. MMSP 07-029
The above referenced Site Plans, received on 3/15/07, were reviewed for Public Works, Engineering,
and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances.
Following are our comments with the appropriate Code and Land Development Regulations (LOR)
referenced.
These comments may be addressed by the applicant during permitting. We have no objections
to the proposed plan modification.
PUBLIC WORKS - SOLID WASTE
No comments at this time.
PUBLIC WORKS - FORESTRY & GROUNDS
No comments at this time.
PUBLIC WORKS - TRAFFIC
1. Staff recommends providing a minimum of one accessible opening/ramp from the parking area onto
the sidewalk along the north side of Building "E."
2. Staff recommends relocating one of the handicap accessible parking stalls from the west side of
Building "I" to the north side of Building "E."
3. Sign #2, Sheet C9, is in conflict with the accessible route for wheelchairs using the ramp adjacent to
it (northeast corner of Building "E.")
ENGINEERING
4. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
5. Please note that changes or revIsions to these plans may generate additional comments.
Acceptance of these plans during the minor site plan modification review process does not ensure
that additional comments may not be generated at permit review.
6. Changes in the site layout may require a replat to redefine lots and parcels. Contact PW/Engineering
regarding platting requirements.
Dept. of Public Works, Enginet:ring Division Memo No. 07-037
RE: Boynton Town Center & Village - Total Wine, Minor Site Plan Modification- 1 st Review,
MMSP 07-029
March 26, 2007
Page 2
UTILITIES
No comments at this time.
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
File
S:\Engineering\ Memorandums\Memorandums 2007\07-037 LOGAN MMSP 07-029 BTCV-Total Wine 032607.doc
11M ~ IAJ/Jfc.tTd)
J.f~ f2.IHUI's 77J -r rrnu-
UJrAJE ~.
.y2-zj87 @ ~:5z.
,r
"
,
""""-1, -_ r1I. Kimley-Hom
~ r ., and Associates, Inc.
March 13,2007
.
4431 Embarcadero Drive
West Palm Beach, Florida
33407
Mr. Ed Breese
City of Boynton Beach Planning and Zoning Department
100 East Boynton Beach Blvd
Boynton Beach, FL 33425-0310
Re: Boynton Village - SMU
Minor Modification - Total Wine
Permit No 06-2437
Dear Mr. Breese:
We are submitting the following sets of drawings for Minor Modifications review under the
City of Boynton Beach requirements, due to modifications to the Total Wine building. The
changes included in this Minor Modification submittal are outlined below:
· The main entrance to the Building along the eastern elevation shifted approximately 90
feet to the south. This shift required the widening of the adjacent sidewalk, so as to
provide the minimum required width for accessible routes.
· The minimum required width for the drive aisles in the project is 25 feet. In order to
maintain the minimum driveway width and accommodate the wider sidewalk, the
driveway was shifted slightly to the east.
· Building elevations have also been revised. Please, refer to elevation drawings provided
by architect.
As with previous submittals; we have only included those sheets affected by the changes in
question.
Please, proceed with the minor modification review process and don't hesitate to contact us
if you have any questions regarding the above mentioned site plan changes.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Oscar Tazoe, P.E.
Project Engineer
.
TEL 561 845 0665
FAX 561 863 8175
~=~
Kimley-Horn
and Associates, Inc.
4431 Embarcadero Drive
West Palm Beach, Florida
33407
TEL 561 845 0665
FAX 5618638175
Transmittal
Date: March 13, 2007
Job. No: 047148007.2700
To: Mr. Ed Breese
City of Boynton Beach /P1anning and Zoning Department
100 East Boynton Beach Blvd
Boynton Beach, FL 33428-0310
Re: Boynton Town Center - Minor Mod submittal - Total Wine
We are sending you
IZI Attached
D Shop Drawings
IZI Under separate cover via
Hand Delivered
the following items:
D PrintslPlans
D Samples
D Specifications D Change Orders
D Other:
Copies
Description
Date
No.
4 3/13/07 1 24"x36" S&S Minor Mod Submitta1- Total Wine
1 3/13/07 2 Minor Mod Letter Reauest
1 3/13/07 3 Annlication Check for $500
These are transmitted as checked below:
D For your use D Approved as submitted D Resubmit _ copies for approval
D As requested 0 Approved as noted D Submit _ copies for distribution
IZI For review and comment D Returned for corrections D Return _ corrected prints
Remarks
Ed,
Please, accept this minor modification submittal for the Total Wine modifications
Thanks
Oscar
C-~
- ,
Copy to:
Signed:
Oscar Tazoe, P.E.
Horne New Window
~Uppfat
Payment Due Selection
Project number: 04 42000004
Project description: BOYNTON TOWN CENTER 1
Project type: LAND USE PLAN AMEND/REZONING
Hnlp
..iba.01..U-!t Tr31J..::actl.C'lJ. D
:::e1e':1: Eal81J.,:e I'lJ.e Fee De,;-crl.:ptl.01J.
To ..u..pplV ..U.m01Ult
O. 00 .!.9..9.g~.9.gJS~~.:~~MQ~.!!l!E!:!". CHG .Q!<~~.!'yISON I~!Q.QO. O.QJ
:;
.00
PROJECT NAME: Boynton Village SMU ' ,;
Total Wine BLDG E
LOCATION: North of Old Boynton Rd; East of Congress Avenue
PCN:
I FILE NO.: MMSP 07-029 II TYPE OF APPLICATION: I
AGENT/CONTACT PERSON: OWNER: Sembler Company
Oscar Tazoe, P.E. ADDRESS:
Kimley-Horn & Associates, Inc. FAX:
ADDRESS: 4431 Embarcadero Drive PHONE:
West Palm Beach, FL 33407
FAX: 561-863-8175
PHONE: 561-845-0665
SUBMITT AL / RESUBMITT AL 3/13/07
1 ST REVIEW COMMENTS DUE:
PUBLIC NOTICE/ SIGNS 30 days / 10 days
IPARC:
TART MEETING:
LEGAL AD
PLANNING & DEVELOPMENT BOARD
MEETING:
COMMUNITY REDEVELOPMENT
AGENCY BOARD
CITY COMMISSION MEETING:
COMMENTS:
S:\Planning\SHARED\WP\PROJECTS\Boynton Village-Boynton Town Center l\Boynton Village SMU NWSP 05-004\MMSP 07-029 Total Wine\2007
PROJECT TRACKING INFO.doc