Loading...
PLANS (REDUCED WITH NOTES) tJe..u Oll1 /' A-n ...... _ WA-n.-n... !:" w~ - ~~.s !C V'MiIlJbU) - UJ/u f2 r/ 14()t...r. ~~.vr; ---- AUn-ht;:u -----., Totalwine Boynton Page 1 of2 Breese, Ed From: Breese, Ed Sent: Wednesday, January 24, 2007 11 :01 AM To: 'Brad Jacobs' Subject: RE: Totalwine Boynton Brad, The elevations portray exactly what we discussed and looks good! What did you find out from Total Wine about what they plan to do with their fixture plan/box storage in the area of this new vision glass? Also, you still need to forward the pedestrian/handicap access revisions to the parking lot for our and Engineering's review with the entry shift. Once it is determined it is okay, a Minor Mod will need to be submitted covering these changes. Again, if you want to combine it with something else, feel free or submit it on its own. Thanks, Ed -----Original Message----- From: Brad Jacobs [mailto:Brad.Jacobs@sembler.com] Sent: Tuesday, January 23, 2007 5:06 PM To: Breese, Ed Subject: FW: Totalwine Boynton Ed: Thank you for the time this morning to discuss Total Wine. Attached is a rendered elevation to reflect the comments made during the discussion. We look forward to hearing your comments / concerns and if none, proceeding with the changes. Thank you, BRAD JACOBS SEMBLER I PROJECT MANAGER 404.847.1800 I FAX 404.847.1818 From: Jeff W. Loman [mailto:jeff.loman@poharchitects.com] Sent: Tuesday, January 23, 2007 11:07 AM To: Richard Foreman; Brad Jacobs Cc: Anthony Frey; Tom Williams Subject: Totalwine Boynton Here are revised elevations per our discussions with the city this a.m. <<G-BOYNTON_BUILDING E_1-23-07.pdf>> Jeffrey W. Loman, AlA Pieper O'Brien Herr Architects 3000 Royal Boulevard South Alpharetta, GA 30022 770.569.1706 www.poharchitects.com ** PLEASE NOTE: POHATLANTA IS NOW POHARCHITECTS ** 1/2412007 Page 1 of2 Breese, Ed From: Breese, Ed Sent: Wednesday, January 17, 20078:00 AM To: 'Brad Jacobs' Subject: RE: Total Wine - Boynton Town Center Brad, Thank you for forwarding the proposed revisions to the Total Wine elevations. We have a few questions/comments. With the re-arranged fixture plan, are the restrooms still in the northeast corner of the store? If not, we would like the window graphics to disappear and go back to vision glass at this corner, both on mainstreet and on the east facade. Secondly, we do not favor the blank wall section north of the of the new entry point. Again, with trying to encourage foot traffic to come off of mainstreet, via window shopping or things of visual interest, this blank wall is detrimental to that effort. As you might guess, our preference is to create more vision glass in this blank wall space. Short of that, we prefer the approved entry location over what has been submitted for our review here. Let me know if you have any questions or thoughts. Thanks, Ed -----Original Message----- From: Brad Jacobs [mailto:BradJacobs@sembler.com] Sent: Tuesday, January 16, 2007 4:47 PM To: Breese, Ed Cc: Richard Foreman Subject: Total Wine - Boynton Town Center Ed: Recent discussions with representatives from Total Wine have involved a tenant driven request to rearrange the interior layout of their store, and the corresponding repercussions to the exterior elevations. As a result of this proposed change to the interior, the current layout of the east elevation would have to be modified; no other elevations would be affected. To summarize, the proposed modification to the east elevation involves shifting the entry feature southward, and rearranging the remaining features, please see attached color rendering. The overall appearance remains very similar to the east elevation as recently approved through the minor modification process, i.e. same number and size of bays of vision glass, glass w/ graphics, EIFS, etc. but just in a different arrangement. Before going too far into this discussion with the tenant, we wanted to present this change to Staff. This tenant request comes at a crucial time, as we have recently received Building Permit and are ready to commence construction, but cannot get very far until it is determined if this proposed change will eventually receive Staff approval, and the process we must go through to receive it. Please expect a call from Richard / myself to discuss today or most likely tomorrow to discuss, please advise on a preferred time. Thank you, BRAD JACOBS PROJECT MANAGER 404.847.1800 I FAX 404.847.1818 BRAD.JACOBS@SEMBLER.COM @! ~._..~ rxI I . I Visit us online at: www.sembler.com 1122/2007 ~ <!i z !. !ii!~ :I:Z ~Q rn5 !!.UJ UJrn ~ ~ c ~. 3;~ i5 ~ ~ i ~ ~ to i!i !!! i~ i: ~ !~ i ~!fl ~ ~ i .. ~ il5 U5 so :E: o <( w ~m .sZ .- 0 ~.... ~Z -0> ~~ - I ~<i! €> oZ Za:: -0<( Q)O rnW &0 ~ ~ ~ !.1t!5 I~ !i ~S1 ~ :z ;: ~ a. en C5 ~ :I: z 0 ;: ~ <( en i5 W en m c z 0 ~ ..- 0 .- :z co .... ;: ~ 0 Z a. t+= en >- C5 .- "'C 0 0 ~ m - I - CO ...I S ~ ..- en - CO Z w D:: ~. "'C <( t~ ;, Q) 0 ,~ ,.' en ,. 0 W h' , a. 0 ~;! ,. co e :I: 9 T"" I a.. en N T"" 900l/t/ll 'Japuas a41 Aq pa:mpoJd uaaq a^e4 IOU AeW sluaw4:>ene AUe JO a5essaw S141)0 slualuo:> a41)0 lie JO awos 'a5essaw JO!Jd e 01 AldaJ e Sl JO a5essaw papJeMJo) e sUleluo:> a5essaw 1!ew-a SI41)! le41 alou aseald 'a5essaw S!41 alalap pue 0009-trBf:-LZL Ie aU04dalal Aq JO 1!ew-a UJnlaJ Aq Alale!paWW! sn AJIlOU aseald 'JOJJa UI 1!ew-a S!41 pa^la:>aJ a^e4 nOA )1 '1101 Sluaw4:>ene Aue JO 1!ew-a sl41 aleU!WaSs!p JO asn 'Ado:> 'Ado:> pJe4 oljJa^Uo:> '1lWSUeJlaJ 'MalMJ IOU lsnw nOA 'IUa!dl:>aJ papUalU! a4110u aJe nOA)1 'pa5al!^!Jd Alle5al aq Aew le41 UO!leWJO)UI le!IUaPI)Uo:> sUlelUO:> a5essaw I!ew-a Sl41 01luaw4:>ene Aue pue a5essaw I!ew-a S!4.L :3~1.10N WO~'JalqwaS'MMM :lB aU!luo sn l!S!^ ~ -. L::JI L^JO~nj318L^J3S S808Vr'OV~81 B~~H'LvB'vOv xv.::! I OOB~'LvB'vOv ~38VNVL^J 183rO~d S80~"ra~8 'nOA >lue4.1 '>laaM S!4l JO AepSaUpaM Aq s5upapuaJ aZ!S IInJ l!wqns II!M aM alqelda:xle J! 'pa4::>ene a4l uo luawwo::> pue Ma!AaJ aseald 'luawdolaAap a4l JO Japu!ewaJ a4l 4l!M lUalS!Suo::> aq II!M 4::>!4M JO adAl 'ssel5 laJpueds aJe seaJe Ja4l0 a4.1 'AllUa u!ew a4l JO ijal a4l olsAeq (l) a4l uo alqeO!ldde S! sselD UO!S!A 'laAal puooas a4l UQ 'SAelds!p O!4deJD 4l!M laJpueds Jeap 5u!aq Japu!ewaJ a4l 4l!M 'aJnleaJ AllUa u!ew a4l 5u!>lelJ ssel5 UO!S!A JO sAeq (9) JO lno (8) JO lelol e MOU S! aJa4.l 'alqeo!ldde aJa4M pappe aJaM SAelds!p ::>!4deJ5 pue ssel5 UO!S!A 'passn::>s!p S\;/ 'leAoJdde leWJoJu! JnOA JOJ pan!wqns 'UOneAala paJapuaJ a4l PU!J II!M nOA pa4oen\;/ 'UO!leO!J!poW JOU!W luaJJnO a4l uo sluawwoo AJSnes Ol aU!M lelo.l JO UO!leAala lse3 a4l OlSUO!S!AaJ apew aAe4 aM '~/l~ AepP::I uo Uo!ssn::>s!p olluensJnd :P3 45!H :a:>>uelJodwl SUO!S!AaJ uO!leAala lse3 - aU!M lelO.l :~:>>arqns uewaJo::l PJe4o!Cl ~uewol 'M J.Jar ::>>~ P3 'aSaaJ8 :0.1 VIId VS:8 900l 'VO Jaqwa::>aa 'AepuoVII :~uas [WO::>'Jalqwas@sqo::>er'peJ8] sqo::>er peJ8 :WOJ::I P3 'aSaaJ8 1 JO 1 :;)gud !ij <!i z ! ~~ ffi i:5 "'1= ~lil wen ~ ~ c ~~ ~ E == ~ . Cl~ ~ (5- ~~ ~ili Oa. ~ ~ c ~~ i5 ~ ~ i ~ ~ i!i '" so Qt!5 11= i:~ !~ ~ ~fE ~ ~ ~ 11 ~ i5 '" SO :E: o <( W mm c: .sz .- 0 ~1- ~z '0> 00 ~m - . ctI..J ~<( .r:> t::- oZ za:: '0<( Q)O ~w c..ol\l 2:E:,,;, a.. (I) ~ Sol Ii ~ii! Cl~ ~!E "'tl ::u o "'tl o en m o r- Z -i Z o ~ :J: m r- m ~ o z - - ~ '1J en '1J )> Z o :::c m r G) r f:j en ...... ...... I ~ o I o 0> cn-c :t:a 0-0 mO en OCD )>0- ::am zm _en <r-+ )>~ 1m I m~ O[ -<~ z -. -I@ o Z m m )> o ::I: -. r-+ o ::J en c en " ~ ~ ~ c en " ~ ;;s z c ~ c en ~ ::E Z 8 ::;; := en "tI ,(,::E:-' ~o.g m~ OCD >a. :;;aZ Zo -~ <:::r ~~ ms:: 00 -<9: z::::!! -10 o ~. z5 miiJ m ~ :E: ~!<J ,~ !il m r- ~ ~~ ~~ !l1 ~~ ~ i o ~ ~ ~ ~ ~ I iSi ~ rR~ ; <!1 ~~ o "'0 m r- ~~ ~11i 5151 ~~ ;;: -i :I: ~ s '" ~ ~ ~ ~ ~ I ~~ -<en 2~ ~~ , i z .C'l m .' . .' . ., '". I ..'..,: :"0': ,:,'t3:..,. . .' .' . '. . . ..:"..." ".." ". '.. :" '". . .... .: .'. ,':', ".,D....:...'. ":. ...... ". '.' .... . . , ' . ....: : ;". .:: .:.... ".~ I en (') ::J: m :s:: m )> I ~ en m en ~ ~ m -i ...... ~ .' Ej'." . . .'" ':' '. .... . . .' . " . . .' : .. . .... .."." "." . .... .' . . . " . . . , . ".... " , . . . .:.:.' . '. . ..... ., ."' . '.: . .' ., . . ". ".' , .. "..".. . " . " " .': ., .:- . , ' . ." .... , '. .. '. ..... ~en::J: ~G)~ oZ(') "Tl~::J: ......zm o:!oO J,.' )> = m :;0 enmm -en)> ~-i- mZ ~c:g :z-<- oen~ . G) m zen @'"U :;0 ......0 "2'"U J,.O = Ii/) -m eno ;,'.r,', .. ""'~~'rFCJ~<;I.:' .. '. ..'.: .,.. ',[21EJ ,'., "',l.< . ,:',;;,~',' : ,ix'\,\.U";, \ ';f," .; n ' , { '\:~,' ';>. >" .I,~ }:';,.:\-~; '~~. ';,>:' ~;J ':\. '" ~~. . ':''<''', "<;:'>\<;\'~;:" . '. ~.. ~. ". ... .... ~.. :;.:': ,;, .:.<,/\..:\.. ;,::'.\ ;;,; .~. i . '. ~ ~ en =-n '. ....: :,;' /'.>~~ ,.~.~:: I~ ':'~ ',. . ~ OJ OJ :>m oen =,,--i G)OJ :::OC 0-< ~ Zo Cl=" m --i I\,) w I\,) en =-n II 0'1 o ;:$!, Cl o "T1 Page 1 of 1 Breese, Ed From: Richard Foreman [Richard,Foreman@sembler.com] Sent: Monday, November 20,200612:50 PM To: Breese, Ed; Main, Karen Subject: Best Buy signage Ed and Karen - Please see the attached. First is Best Buy as currendy drawn, Second is Jeff Loman's revision whereby he increased the parapet height a litde and centered the sign to alleviate the "cramping", Since the ticket is angled, he used the center as an average for the vertical dimension, Is this acceptable? Please let me know, Thank you for your time to review as always, RICHARD FOREMAN SENIOR DEVELOPMENT MANAGER 404,847,1800 I FAX 404,255.4187 RICHARD,FOREMAN@SEMBLER,COM 1_rx1 I Visit us online at: www.sembler.com NOTICE: This e-mail message and any attachment to this e-mail message contains confidential information that may be legally privileged, If you are not the intended recipient, you must not review, retransmit, convert to hard copy, copy, use or disseminate this e-mail or any attachments to it. If you have received this e-mail in error, please notify us immediately by return e-mail or by telephone at 727-384-6000 and delete this message, Please note that if this e-mail message contains a forwarded message or is a reply to a prior message, some or all of the contents of this message or any attachments may not have been produced by the sender, 11/2012006 Page 1 of 1 Breese, Ed From: Brad Jacobs [Brad,Jacobs@sembler.com] Sent: Monday, November 20, 2006 11 :26 AM To: Breese, Ed Cc: Richard Foreman; Jeff W, Loman Subject: shoe carnival Importance: High Ed: Please see the attached proposed elevations for Building F, Shoe Carnival. Below is a brief description of the revisions to the previous elevations: East Elevation: Architect has incorporated the revisions staff desired i.e, display windows flanking a center raised section, containing flush display windows (all (4) displays open from the front), Enhanced the cornice features over the display windows on each end, Added awning over center displays to match North elevation, Meter bank has been moved to south elevation, Lights have also been relocated, North Elevation: Per discussion with staff, raised the awnings to allow for partial vision glass to the level of the interior ceiling height (please see wall section as part of attachment), Please expect a follow up call in the early afternoon to discuss from Richard or I, do you have a preferred time? We look forward to speaking with you about this and your review of the recently submitted minor modification, Thank you, BRAD JACOBS PROJECT MANAGER 404,847,1800 I FAX 404,847,1818 BRAD,JACOBS SEMBLER.COM [Xl Visit us online at: www.sembler.com NOTICE: This e-mail message and any attachment to this e-mail message contains confidential information that may be legally privileged, If you are not the intended recipient, you must not review, retransmit, convert to hard copy, copy, use or disseminate this e-mail or any attachments to it. If you have received this e-mail in error, please notify us immediately by return e-mail or by telephone at 727-384-6000 and delete this message. Please note that if this e-mail message contains a forwarded message or is a reply to a prior message, some or all of the contents of this message or any attachments may not have been produced by the sender, 11/20/2006 Page 1 of 1 Breese, Ed From: Brad Jacobs [Brad,Jacobs@sembler.com] Sent: Friday, October 13, 2006 5:27 PM To: Breese, Ed Cc: Richard Foreman Subject: Linens 'N Things - Boynton Town Center Ed: Per our conversation this morning regarding changes to Linens 'N Things, I have attached elevations and plan views for your review, From the attached files you will be able to compare between what has been approved by staff / commission, permit documents and current proposals, Please review for a determination on the necessity for a minor modification for the subject building, If you have any questions / concerns, please do not hesitate to contact either Richard or myself, Thank you, BRAD JACOBS PROJECT MANAGER 404,847,1800 I FAX 404,847,1818 BRAD,JACOBS SEMBLER.COM rxI Visit us online at: www.sembler.com NOTICE: This e-mail message and any attachment to this e-mail message contains confidential information that may be legally privileged, If you are not the intended recipient, you must not review, retransmit, convert to hard copy, copy, use or disseminate this e-mail or any attachments to it. If you have received this e-mail in error, please notify us immediately by return e-mail or by telephone at 727-384-6000 and delete this message. Please note that if this e-mail message contains a forwarded message or is a reply to a prior message, some or all of the contents of this message or any attachments may not have been produced by the sender. 10/18/2006 m )> <.n ... ~ -& t ~ ~ ~ ,s \J\ e, ~':::~:. ',;: ("(,,.., '., ";. .,~..~~ ,,:;.~ " tI~. t.... \"t -~V\~ ~~: ~ ~ - Y\ ~ t t'" ~ \ =al- \'~' . ~'- ~ ~ , ~~ ~ ~ ~~ \ ). ~ ~ \ l- ~ - ~ ~ ~ 1 \\"\ r w \I) "0 ~ "0 g m CI ~ ~ ~ ~ I , , , , ~~ \ ~ \ ~ I) "0 II ~ r~ "0 II g II l:9 II z 'I --l fr ~ II mil .- II ~ II is II ZII I \\ ~\~. . ~\ ~ ~ - ~\ t\~ t~ ~ 1f ~ ~ ~ \t -,; -() ~ "") ~ =\- \f\ .;~ ~ ;s- o ~ G c:; ----- # ~ -;i w j 3- tt- ~ r- ~ 71 ~~ ~ ~ ~ ~ ?- ~ ~ > -~~-i1I'~:' , .~ /II... lXl CIi · 5 ~ ~ I I I; I I I I ~ I I I I I I \ I I I I. I I I; I I I I, I: / I I I ,-.._.._,' I.: I I / I \ / / \ '-------- / \ . '" l . . . ,. " ;;o~ ~mo ");!!'l fl - . nr"lJ . "'!_ ''3 \. ; . \, ~. 11'[ IJ__~,\.~. '. )..' rnTTTlf \,P ~.. ~. \ ~ ~ ~ , , Rj'" ." .. . . ,. no ~~ril !:jii:jZ o;oG> (0)>)> ;';0;0 , ~~ I ..LL, ~ , - r-- ~ I ---1 L I ," . . " " " '. [ , '~.. " " ,,',... " :: .:' Ii:...,' : '.. :" " .....,.... . " [Ii: .' _ :' '.'. ':' ''':''1' ~ I' ..:" .t:j'.. ...~ .:>..... ... .... t. , '=:=. ".. ...., .. II., .. ',", .< , '. .. O.::~. V ~ '. r.I J:" l;jj '1 IT] ~.: ~ - -:- tIll ~ = ,', ~ r-: IL n ~ ., , ~ l t'- ~- -.. q II ....DLl lAJ.!,. ~ -&u ", .... . f-.,-' - . . a a - - - a a fi.. 1. :'... ,..; ~.1.. ,:..;.. . C. a a . - a a - a ~ a . ~ . . a a - - ~ ..J :.....- -';-'-; ::rr 01 ~ I a a I /1 ~I ~. 0 ~ ~\J .~ p:- I/'- .~ ':=:":...:: .....: :;,,:v/ ~ - .. . . - . - ... ... -. - .. - . I .;"']J ',' -i:.. '. ., ..'-_~,<~,,:,:~,~,~.~. .' , ~ .1 I'~,.. -- t .. . . .1;;:;;; .. ;:;:ffY 7 __ ~ -- ~ - ~ " a a .:....,' -, - - ...;...c. :""": a a - ,~ .~... ,'I .....::'._ ....:I,:'~." = I I il~~~ .-.... .ro ~~.",!,:~._,._" ~;.:... ~~~...~" OJ C j= o Z Gl I$.:l. l;. -<. I . I I I I I I I I I I I , " , " " " " " , , ~ 0"...... ~ z".o;Uj= mm""mo en. ~-I_ -I...... ~z O:l"'?>r=Gl ;Ul\.l" = r . U1'~ "\ : ~ ~V':-: r-~ - ()->- f - ~ ~ o ..... ~ \ t !, ~7 C). > ~ ~ i ~ ~ f rntmrrn ~ <q "il 000 . Ow ...:lo. I 1J W3:1J:c W3:)>)> )>m:::oC/) O:::OOm :::oom_ m-r C/)~c.n ~ - ~ ~ :;, '~ '\ '~ f 1111111\ I ~ ~ t~ ~~~~~~ ~r~~&~ \ \ m:I: cU .9<C .- w ~m l+= .- z '80 ~I- _Z -> roo 3=m ..c:::, 'Ew zz '03: Q)..J ~<C a.1-~ eo~ a.. I- ~ i~'! r~~"'. ~ f. ~ ~ 1 ~ !~ f ~ ~ 1 3 i l s dJ I \ 1 ~ ~ J i J t ~i ~ 1 ~ ~ ~ ~ ~ ; ~ I i~ . m:E: cO .9<( .- w ~m lj: .- z -go :::2:.... _z -> COo ~m ..c. "Ew zz '03: Q)..J ~<( c......~ eOi: a.. I- ~ Totalwine - Boynton Page 1 of 1 Breese, Ed From: Jeff W, Loman Deff.loman@poharchitects,com] Sent: Thursday, October 19, 2006 2:42 PM To: R_Foreman-Sembler; Breese, Ed Cc: Brad Jacobs; Chris Holley Subject: Totalwine - Boynton Ed and Richard, Here is the revised Totalwine elevation, I have recapped the decisions below, Let me know your thoughts, 1 - Keep the vision glass with openings in the tilt panel at the center architectural element - add some type of weather protection - tenant wants a wainscot at the 3-4' level to place low shelves against. (this is a new item that came up today) 2 - add vision glass with graphics across the entire North wall on either side of the Arch element. The tilt panel will NOT have an opening in it at this level as the store shelves have a solid backing and no light will get in the store 3 - Add vision glass under all the awnings (except the book ends) with openings in the tilt panel. 4 - the bookend will have spandrel glass under the awning as this is above the ceiling in the toilets, <<10-19-06 - totalwine revised north waII.PDF>> Jeffrey W. Loman, AlA Pieper O'Brien Herr Architects 3000 Royal Boulevard South Alpharetta, GA 30022 770,569,1706 www.poharchitects.com ** PLEASE NOTE: POHATLANTA IS NOW POHARCHITECTS ** This email and its contents are confidential and privileged communications, If you have received this message in error, or are not the intended recipient, please contact Jeff Loman at the address and/or phone number listed above, 10/19/2006 "I LNT - Boynton Page 1 of2 Breese, Ed From: Jeff W, Loman Oeff,loman@poharchitects,com] Sent: Thursday, October 19, 2006 4:00 PM To: R_Foreman-Sembler; Breese, Ed Cc: Brad Jacobs; Chris Holley Subject: LNT - Boynton Ed and Richard - based on our conversations yesterday regarding the re-design of LNT here is what we are proposing, I have re-capped our comments below: NORTH WALL 1 - Add 3-display windows in lieu of spandrel glass on either side of the center Architectural element. These display windows would be approx, 2' deep and accessed from the exterior of the building, They will have a roof and vision glass, (lights will be added to the interior of the display), There will be a solid tilt-up panel behind the displays, 2 - Add 3-display windows under the central Arch element. ED - we looked at this and were not able to add the displays in this location due to the free standing columns in the middle, If we bump a display out, we have no way of accessing it from the side, We opted to leave the spandrel in this location in hope that you can understand the dilemma, 3 - Deleted the two arbors in lieu of the display windows 4 - Removed the "hat" from the central Arch element. 5 - We opted not to show an awning over the display windows but instead provided an overhang/roof, WEST WALL 1 - Added back more detailing on the central canopy to more closely resemble the city approved color elevation, 2 - Although not shown, we will add the same detailing to the back side of the parapet on the central gable as shown on the front. <<Revised Elevation 10-19-06,pdf>> Jeffrey W. Loman, AlA Pieper O'Brien Herr Architects 3000 Royal Boulevard South Alpharetta, GA 30022 770,569,1706 www.poharchitects.com ** PLEASE NOTE: POHATLANTA IS NOW POHARCHITECTS ** 10/19/2006 ~ ~ ~ ~~ \ :: ?~~ /I ~ '" Xl ,~ II ~\V,,-\- \J\~ V '^ ~, ';( ~t~j MV\ 9 II II II II II II II II II II II II II II II II II II II II ~~\ II \l II ~\-.1" 1 <,.~ ~\. b ")~ ---- ------ Z i> J~ ~' 't--~ .:, c ~ ~4 '- " 0 '-- ~ v \.~\ :;!~ 1 ~ I C ~ ~ ~ ~~~ i~~~~ !~~ ~:s~~~ _ ~ Q'~ ~1 i~~~l t ~ ~ ~ ~ ~~l~i \ \ \ o [] ~ ~~ . ..y ~~ "I ~ ~ \) -~~ ~ ~~~ 4-::- \ ~ () ~.J\ ~~ ~ ':& ~ '4: -.:J\ \ ~ "- \G~~ .s .s"" b .:/ " ~i5 ~~ ~tu "'~ :5 ~~ ~ i5 !/2 > <.> - i5 I~ ~~ e>;a! ~~ 'll () ~ ~ c- -. ~ ~C ~ ~~' ,--- '~ a ~ _" :I: (.) <C cnW r;::m .9Z 'co 0 ~I- ._ Z '0> 00 ::2:m - . ~~ ..c:> 1:::- oZ za: 'O<C (1)(.) ~W c.o~ e:I:~ a. (I) ~ .:.;.....1. :;'.,' ~ ~ :~ -! 'c"'( ~ ~./' ~. . '0/' .... .to ",: ,..' :~!) . ..; ). ....: ". .~, q '! : : ~ '.' .'. ~: ~ .:. 1: ;, " . ...' - - CO...l $<( ..-> en- coZ wD:: -0<( 0>0 en oW 0.0 e:I: Cl.en ~ ~ q Y'~~ cJ <J ;; \ I --:/ J), (I ~ ~ ~ ;.) ~ ~~ ~ ~ I~ ~c ~:l ,.J ~ J \ ..... ::' ~~ d.:::,. ~"::J i' ',j "-.) /) ;;: '" ~ c.. -> ,-' \J". ~~ ~ ~ CJ:t ~~ ~g; -V ~ -..J ~ d r-- ~ ~~ ~ 5~ ' ~ -..1' J\ J <.y . 0>'.::'Y (~ ---..I ~ ...) - A ~~ \) '\ _ G? o .;:) '---7 '<cb ~~~. 3- ~~ n \ .... '& \j"), ":J ~ " ~, O~CA ~ \~ '-~.~ ~ "-J '\J\ c......::x- \.\ \ ~,a ~~ ~ \ '--' ,~j\ ~"\. m::E: cO .9<( .- w ~m l;::: .- z '80 ~I- _z ctl> :5:0 .em t' oW zz '03: ~....I 0<( a.l-lS eo~ a.. I- ~ ,'-:"j f ~ x.,,~ ~ ~~ ~ ~ ~ ~ L ~~ .,... ~~ ~i " -II ~I '!I z II G a !; i I .- ~ ~ . - t. " ~ ~ c. o .- . .-" ~ . ~~ I!I!II >~ LlNENSaNaTHINGS I I ; .. Q"'a l~~~ 1111 n ::t: a:; - IlJii llin! :1"1"1_1"1"1 ~; Boynton Village I' r I -I:::IICJI - """'CII U Ii Nri~.4\Wl11ll .= I!ili I I ~_1"1"11"1"1 &,.Ibt lIid,liIriIlI ~~ I I ~ ~; !~ .1 ~~ ~i z II ; ~ ~ ,< i ; ,: " "- ( ~ 11m LlNENSaNaTHINGS .~~ Boynton Village Hanft ""'_...... .~ Bo,ItIollBicd, FIortJa ~ I L ~ ~ '- @J ~ '- --.. I I!!m I'll' !1'Hi III'" 1'1 IIII1 I I : I' r I I I ~~ ,. t::) ""'CII n:2::~_ ::c ri-I ri-I - ::ell -i;::ll;ll - ---.:::II ~ ::ell ri-I ri-I ~~ I Breese, Ed From: Sent: To: Subject: Jeff W, Loman Deff.loman@poharchitects,com] Wednesday, September 27,20062:28 PM Richard Foreman; Breese, Ed RE: LNT Boynton -m -m bb-LNT-A2,2,PDF bb-LNT-A2.1-A2.1. PDF Here they are. -----Original Message----- From: Richard Foreman [mailto:Richard.Foreman@sembler.com] Sent: Wednesday, September 27, 2006 2:25 PM To: Breese, Ed; Jeff W. Loman Subject: FW: LNT Boynton Importance: High Ed - see below. Jeff - by copy of this e-mail, will you please scan and email pdf's of the new working drawing elevations to me and Ed? Ed would like to study before we make an official minor mod submittal Thanks From: Jeff W. Loman [mailto:jeff.loman@poharchitects.com] Sent: Wed 9/27/2006 8:35 AM To: Richard Foreman Subject: RE: LNT Boynton Here is the comparison. This is based on the color elevation that was originally submitted to the city prior to LNT comments and subsequent elevation changes (for lease signing). My assumption is the city never saw the revised elevations. North Elevation: CD's: 1 - the gable was removed from the top of the Architectural element and the detailing was simplified 2 - Red tile background for the sign was added to the Architectural Element 3 - The diagonal joints in the EIFS on the side wall of the entrance gable were deleted (shown the background) 4 - six panels of spandrel glass were removed and replaced with textured paint (either side of arch element) 5 - the three panels of spandrel glass were removed from the architectural element and replaced with textured paint 6 - the depth of the entrance gable metal roof (in the background) was reduced East Elevation: (this is the rear elevation that was covered with lots of trees) CD's 1- added pilaster detailing across the entire rear fa9ade 2 - deleted the roof of the gable for the side arch element on the North elevation - see note #1 (North Elevation) 3 - deleted the detailing for the back of the gable on the West fa9ade since it won't be seen due to depth of bldg West Elevation: 1 CD's 1 - deleted the vent in the gable 2 - added the red tile background for the LNT sign area and deleted the diagonal score joints in the EIFS 3 - deleted one column within the gable structure (LNT wanted more storefront visible) South Elevation: CD's 1 - two bays of arbor were added (continuous arbor instead of two separate arbors) 2 - loading dock area and dumpster are now shown on this side -----Original Message----- From: Richard Foreman [mailto:Richard.Foreman@sembler.com] Sent: Wednesday, September 27, 2006 7:45 AM To: Jeff W. Loman Subject: LNT Boynton Jeff - can you compare the city commission approved elevations from last year to the working drawings and tell me the differences? That is P&Z's only comment towards a permit thanks NOTICE: This e-mail message and any attachment to this e-mail message contains confidential information that may be legally privileged. If you are not the intended recipient, you must not review, retransmit, convert to hard copy, copy, use or disseminate this e-mail or any attachments to it. If you have received this e-mail in error, please notify us immediately by return e-mail or by telephone at 727-384-6000 and delete this message. Please note that if this e-mail message contains a forwarded message or is a reply to a prior message, some or all of the contents of this message or any attachments may not have been produced by the sender. 2