Loading...
REVIEW COMMENTS 7.B.l ESTATES AT HERITAGE CLUB (MPMD 07-002) MASTER PLAN MODIFICATION TO: THRU: FROM: DATE: PROJECT NAME/NO: REQUEST: DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 07-011 STAFF REPORT Chair and Members Planning and Development Board and City Commission Michael W. RumpK~ Director of Planning and Zoning Kathleen Zeitler ~Z- Planner February 20, 2007 The Estates at Heritage Club (fka Boynton Dixie) MPMD 07-002 Master Plan modification to The Estates at Heritage Club PUD to revise the type of housing approved from 82 fee-simple townhouse units to 25 fee- simple townhouse units and 56 single-family zero lot line units (a net reduction of one unit). PROJECT DESCRIPTION Property Owner: New Century Boynton One Development, LLLP Location: The Estate at Heritage Club PUD (fka Boynton Dixie) located west of the FEC Railroad on the north side of Gulfstream Blvd. (see Exhibit "A"- Location Map) Existing Land Use/Zoning: Medium Density Residential (MDR)/ Planned Unit Development (PUD) Proposed Land Use/Zoning: No changes proposed Proposed Use: 56 Single-Family Zero Lot Line Units and 25 Multi-Family Townhouse Units Acreage: 8.6 Acres (entire PUD Master Plan) Adjacent Uses: North: South: East: Developed property within the City of Boynton Beach, the northeastern half of the abutting property classified MeDR Medium Density Residential and zoned R-2 Duplex Residential; the northwestern half classified LDR Low Density Residential and zoned R-1A Single Family Residential; The right-of-way of Gulfstream Boulevard, then property within the City of Delray Beach classified (from the southeast to southwest) Commerce (Industrial), Transitional Commercial, and LD (Low Density Residential [5 du/ac]); The rights-of-way of the FEC railroad and Old Dixie Highway, then property Staff Report Memorandum No PZ 07-011 Page 2 classified Special High Density Residential-SHDR (20 du/ac) and zoned PUD Planned Unit Development; and West: Developed single-family residential neighborhood classified LDR Low Density Residential and zoned R-1A Single-Family Residential. BACKGROUND Mr. Jason Mankoff with Weiner & Aronson, P.A., agent for the property owner, is requesting that the Master Plan for The Estates at Heritage Club PUD (formerly known as Boynton-Dixie) be modified to revise the type of housing proposed from 82 fee-simple townhouse units to 56 single-family zero lot line units and 25 fee-simple townhouse units (a reduction of one unit). According to the original site plan staff report, the proposed Boynton Dixie project is a Planned Unit Development approved for 82 fee-simple townhouse dwelling units. The PUD is located on the west side of the FEC Railway, on the north side of Gulfstream Boulevard (see Exhibit "A" - Location Map). To date, the project has been approved for the following: an annexation (ANEX 05-003); a future land use map amendment (LUAR 05-007) from Medium Density Residential (PBC MDR) with a density of 5 du/ac to Medium Density Residential (MeDR)with a density of 9.68 du/ac; a rezoning (LUAR 05-007) from Single Family Residential (PBC RS) to Planned Unit Development (PUD); a new site plan (NWSP 05-024); and a site plan time extension (SPTE 06-008), which extended site plan approval to September 20, 2007. Building records indicate that a master building permit was issued for the 3-unit townhouse buildings in August, 2006, therefore this project is considered to be vested. The Land Development Regulations require approval of a master plan concurrent with approval of a rezoning to the Planned Unit Development (PUD) district. If the project is to be constructed in one (1) phase, a site plan may take the place of the master plan, as was done in this case, and fulfill the requirements of both a site plan and master plan. Chapter 2.5, Planned Unit Development, of the City Land Development Regulations states that changes in Planned Unit Developments shall be processed through the Planning and Development Board and the City Commission. The applicant explains that market conditions for multi-family housing have recently changed, and the property owner therefore requests to revise the approved master plan / site plan from 82 fee-simple townhouse units to 25 fee-simple townhouse units and 56 single-family zero lot line units, for a total of 81 units (one unit less than originally approved). A revised plat for the project has been submitted to the Engineering Division for their review and approval. ANALYSIS The purpose and intent of a Planned Unit Development (PUD) district is to promote efficient and economical land use, improved amenities, appropriate and harmonious variety in physical development, creative design, improved living environment, orderly and economical development in the city, and the protection of adjacent development. This request for Master Plan modification to revise the type of housing proposed from 82 fee-simple townhouse units to 56 single-family zero lot line units and 25 fee- simple townhouse units will comply with the PUD requirements including unified control, consistency of development characteristics, compatibility with adjacent development, and provision for the private maintenance of common areas. This request was reviewed for consistency with the PUD development standards in the Land Development Regulations, Chapter 2.5, Planned Unit Developments. Also, staff reviewed the subject request and found it to be consistent with adjacent single-family residential lots as well as other PUD's throughout the City. Staff Report Memorandum No PZ 07-011 Page 3 The proposed overall layout of the project is very similar to the previously approved master / site plan. Exhibit "B" depicts the previously approved plan for 82 fee-simple townhouse units and amenity area. The 82 units were proposed within sixteen (16) separate buildings with each townhouse building varying in size between three (3) and twelve (12) units. Each unit proposed was within a two (2) story townhouse building. A recreation area with a cabana and a swimming pool would be located at the south-eastern portion of the development near the sole entrance, while a children's playground is planned at a more central location within the project area. Exhibit "C" depicts the proposed plan for 56 zero-lot line units and 25 townhouse units and amenity area. The single-family detached zero-lot line units are proposed adjacent to existing single-family residential subdivisions to the north and west. Each two-story single-family unit would have either a premium lot (50 feet by 72 feet), or a typical lot (50 feet by 62 feet). Premium lots would be large enough to accommodate a swimming pool, and typical lots would be large enough to accommodate a spa. Three (3) different models of the single-family units offer a variety in unit size and design. The 25 fee-simple townhouse units would consist of five (5) buildings with five (5) units each, and are proposed on a typical lot of 25 feet by 65 feet. The multi-family units would be located along the eastern portion of the property adjacent to the FEC Railway to the east. The recreation area with pool and cabana, and the children's playground are as previously proposed and in the same locations. The proposed street system, utilities locations, and overall layout of the project is very similar to the previously approved master / site plan. The 25 foot rear setback for units along the north and west property lines of the subject property remain as previously approved, and mirror the required rear setback of adjacent single-family developments. In addition, the perimeter landscape buffer widths, screening, and materials are as previously approved. A total of two (2) parking spaces per unit plus parking for the amenity area is proposed. Each of the 56 zero-lot line units would have a two (2)-car garage. Parking for each of the 25 townhouse units would consist of a one (l)-car garage plus a parking space in the driveway, rather than a two (2)-car garage as previously approved. Lastly, the colors, materials, and design features of the facades for the zero-lot line units are compatible with the townhouse colors, materials, and design features, and are appropriate for the single-family nature of the area. RECOMMENDATION It is staff's opinion that this request for master plan modification is non-substantial and consists of relatively minor revisions to the previously approved plan, and is more consistent with the surrounding single-family development to the north and west. Per master plan amendment procedures, staff has determined that the requested master plan modification is consistent with all current regulations as well as the intent and purpose of the comprehensive plan. Therefore, staff recommends approval of this Master Plan amendment, subject to the conditions listed in Exhibit "D" - Conditions of Approval. Additional comments recommended by the Board or Commission would also be included in the Conditions of Approval. S:\Planning\SHARED\WP\PROJECTS\Boynton Dixie\MPMD 07-002\Staff Report.doc Exhibit ..A.. - The Estates at Heritage Club PUD Location Map I I I I I I I LU ~ NOTN-CITY-GULFSTREAM DR ! NIT IN flTY CARDINAl: C/R 380 190 I o 380 760 1,140 N 1,520--L Ire~E 5 . . 0 fj ~ U 5 ;;11 ~Ii r--iI I M ~ .. i~'^. iF 3. CD r- - lIIr OJ 55 9 9 gig ~~: 65 I g~ g~ ~: = -, -, ~ Ii ~ ~~ "VIe: 0-1 C7!: "'N "'fI.;J ...., (II I iO I "" :i~~:t..l C Qll.ol Qlt<.) CD-'- '-l 'il 0 :~ i~: r~ :.IV.... I lJ i "' 637.52' ~ '/.AT) I _ · i i ) Jig : ~'44'32'W 63 77' (l/EAS) ,. " .., '" . ~ ~ L"'-~ La.[:' Ij-.La,.!. ~ r FI_. I... .... l -J" Q ~Jr Jr-1- 1--1- Jr -1- JrJr-lnJii ' 'I :~ ~ I ~ ~ , " t=J.. In. ~ ~." --. .=J. .Ff"1 I I~ I-=,.=-~~ Ir~ ' . I ,...... Ir.iIII. r" i ~ . I Uf- Y Lrl.--l" L--I ...u,,::: ~ I I ~11:: IDr ~ II ~, I ~'l i: ~ ~ I i i.., I II ~ I.; Ii [1::: I · ~""'! n "'i 1 t ,..j... 10-- .. -I. A I ~ ~ I I II " ~i~ 't _ . T -I - -' Ii ~ l ~ i!! ill ~ 1LI ::: ---- ::: -J::: II " 11 ~!~f::!1 ~ '"llrn.~th-~ ~/.: ~ ,~1 )tll; ~f~~i'~ 'I~I\~ ,......~~~ 15"': :~~~~! 'I :::. If.l I ~ ;: ~" :::. ~ I: ~~ ~ --' ~--' i i~_,~ I ~ dl"': Ft a 11 i." 'I 8 ~- J::: ~-Sr ~ I~" ~.. 1- --Ii - & ~ Q ~ ~ ,I ~ II i I . T -os ~ ... 1i. ~ Ii .. ~ i (; k II ~ .~ ~ ~ U 1.1 I fl;: r ~ I H ~ ~ ~=,.. - l' ~ mi._.r"""' hi- n...... rl-.r 11M .1: i 1 : s . 7 y'" i1l i"~ '--- ~"r i; I : i _ : · - ~--:; - .,.1 . .. I H: r j~, L I :; , "~h' ~::II I 1 \ ; ~~ 'f!! E: ;: l,. ~' I I ~ ~ I ~ ~ I~..: ~ ..:l f1. f'" Ii Ii" ~ "':E ';-r1.T iJI'~ l'I'.,J~ "i~L~I,.1i Ilr" - I -" ~ '-1' L -J" - = I 1... Ii II. it ~ I 1,- Ii I : kr-";."4,.!J'9 ir:1 i, :!;-Jt" }L:T,~~ I DC & I' ~ Ii . - .!i I L.J 1 I . i; ~ j g I I I . J~ tl h NIJB'36'5B"c .-r '\:;- !. bo= r. . I ~ II l'g", U - ~ 647.9()~4,Sl' ("'€As) -... =\J. ill '......,.....!!! l ~ !~. ~ . (PlAT) . ./ ._.-........ IF. II .. ~ ~ FI.. S' ~ S; ~~ - ---=-~~~8T~ i : I ~Ig ;H I \'l 'L ~ _ ----_ f ~. =-==-=~=-~~; ~ ~ ;;P~i!l - · ~. _ iI~~ ~i. -- .(..-1 ~ I r -=--- a~~ ":1 ,.. ---g 11----i Ii ~ I I~ ~~~ I~R- . I ! -;1-f----_.____ ( --1L d II~ I 1-_ I. II ~~I 5 --"- -4f-- ~~ ii~ . . . . ~i i ~~ I !UI ~ I :: II ;11 ~p !I ; I Inl . iiiqd ~~ I ~I ~ ~~ ~ ~ ~I /1;1 /1;1; ~I ~ lii~ Id~ !Ii: ~ UI ~I--..i ~ . . ~ :1; I; :1 ~Id~ r; . N ~ Ii: I~ ~ ~ .a ~ . . i ~..,. I ~U~( I :! ' .. I .I ~ r~ ~ , I I , I fir , I i1 "r :> 0 ~ I . ~'!'f .1'. ~n51 I' : I " ! .I:t-\ L!_ Lr ) I !I~' J~ :~~ ~ I II~ EXH IBIT B GULF STREAM ~ >tAT NO, 2 (PB 13, PG 51) GRAYSON ,<TS (PS 23, PG 220) o X ;;; ~~ C ." .~ . ~.~ . ..~~ I I; Pi l .~ 1." .~.J ~ I 'I' i J -". I ~ Uli~i ~ ~ I ~:~llil~ I I '~I<~~ I i ~ ili! ;r~ I I ~ i ~ ~;~ ~ P ~9\'t~Pto e E ,.. =.",0 ~.~n ! li;U~~ II I n ~ ~~~~~~ ~ ~ Ii ~ ~ I~ ~ ! ~ ~ 'H- SW IS.... aa ! (':)::: ~" IV l ~:::I I I ~ g' ... ~"!.~"'l. ~ . = '---.... :~ '''... - ~.~.P~ ~ ~lI.~ii. !il ?l~ ~ BOYNTON - DIXIE ~ I ~ ~ I cn"'\.A SHAH 1__ ~ ;;! T01fNHOIlES ~ ~ ~ ~ ~ DA.Aa. DROTOS SUIM'IIlG i "' l1Y OF BOYNTON BEAl>i, P.... 1!EAl:H COUNlY, FlORIDA ~ 11 11 11 ~ a: Ass 0 C I ATE S - . iI ........ p........ 'U i ~ Certfflcat. of AuthorIzatIon No. L.B6456 ~ gJ."'. ~ 3410 ....... Andrews Avenae Ed. . PaInpano hoeII. Fl. no&4 ~ 154-t43-te3- FAX: ts.I 713-047S4 IEVI.IOII. -- EXHIBIT "C" If Ii ~'- t j. p'r II lln Ilil' i~i; 1m It ff'''l "'"' r'. ~ 1 ,... t"~ U ) '*" i r ~ W Illf f[ii IIII! ~ . ". "...1.", ..", , i .. , ; ~ ' Ii'! mr' ~ ,,,' .... , '\' I ! ! r n () tT1 Z Oz ~-1~ _C ~-< . o I~ IJ :(g :3 = m. , E ~ ~ If , ~''I. : I -, \ "1 "! Hi nl ~~~ ------- FLORIDA EAST ,; , -'- _ _, COAST RAJ.'LRO !Il,t , . '__, I4D Ii -------------------- -------- --------------. -- ------------ -------- - O~~E.'!Ir:~A y " i ./ ---------------- ~."./ ------- ~TI- ~:zi.~~,,~~~~ D 11: ~ Overall Landscape Plan ..C~IT'CTU"' 'if d~; " .... ..,. LA"OSCAH UC~IHCTU"~ \S 1 '0 J ',' ~ 0 ! The Estates at The Heritage Club ~. v; i ~ ~ ~ i' OOVlUII(NHL'.OCI$S!HO \ f~ g~ 1~t Gulfstrefltn BouLevard A ReI-! ITECTU RAL ALUAN CE - Boynton R~ftch, Floridn h........, ~ot.. IlJS....fOJlITH._uE.'Olt1....I.CK.lloI.i..E.fl.DIlIblJlJ'S '--- 1Ur{_l__ '''''(I:I4j7,,-o13\ '.....L'_...-,_,_ -" EXHIBIT "D" - CONDITIONS OF APPROVAL Master Plan Modification "i~'" Project name: Estates of Heritage Club File number: MPMD 07-002 Reference: 2nd review plans identified as a Master Plan Modification with a January 30,2007 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: l. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). PUBLIC WORKS - Forestry Comments: 2. Revise plans to relocate canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. PUBLIC WORKS-Traffic Comments: None ENGINEERING Comments: 3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 4. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 5. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. 6. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 7. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in Estates at Heritage Club MPMD 07-002 Conditions of Approval Page 2 DEPARTMENTS INCLUDE REJECT accordance with the applicable City of Boynton Beach Standard Drawings and and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. UTILITIES Comments: 8. Please provide a timeline that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. 9. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. 10. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). 11. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). 12. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. 13. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 14. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Estates at Heritage Club MPMD 07-002 Conditions of Approval P 3 age DEPARTMENTS INCLUDE REJECT Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. FIRE Comments: 15. All buildings, except freestanding private homes, that are over 30 feet high must have a fire sprinkler system per NFP A l3R. 16. Entrance gates and all roadways must be a minimum of 20 feet wide for two- way traffic and 12 feet wide for one-way traffic. 17. Entrance gates must have a KNOX key override installed for Fire and Emergency Forces entry. 18. Fire hydrants shall be spaced a maximum of 400 feet of road travel apart with no part of any building further than 250 feet from a hydrant. 19. A flow test shall be conducted within six months of submittal of this proj ect that shows 1500 gpm at 20 psi available above normal domestic use for Fire Department operations. POLICE Comments: None BUILDING DIVISION Comments: 20. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. 21. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 22, At time of permit review, submit signed and sealed working drawings of the proposed construction. Estates at Heritage Club MPMD 07-002 Conditions of Approval Page 4 DEPARTMENTS INCLUDE REJECT 23. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. 24. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 25. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: . The full name of the project as it appears on the Development Order and the Commission-approved site plan. . If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. . The number of dwelling units in each building. . The number of bedrooms in each dwelling unit. . The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 26. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. 27. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: . A legal description of the land. . The full name of the project as it appears on the Development Order and the Commission-approved site plan. . If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. . The number of dwelling units in each building. . The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) Estates at Heritage Club MPMD 07-002 Conditions of Approval Page 5 DEPARTMENTS INCLUDE REJECT 28. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 29. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. . Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561-233-5013) . United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) PARKS AND RECREATION Comments: 30. Park Impact Fees total $105, 533 (25 Single Family Attached x $1,045/unit = $26,125.00 and 56 Single Family Detached x $1,418/unit = $79,408.00). The remainder of unpaid portion will be due at time of permitting. FORESTER/ENVIRONMENT ALIST Comments: 31. Revise plans to depict an elevation cross-section detail (similar to sheet AO 1 0) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) to visually buffer the proposed buildings and parking areas from the Gulfstream Estates single family residences, and from the Gulfstream Boulevard and Old Dixie Highway road rights-of- way. PLANNING AND ZONING Comments: 32. Label On site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. 33. Revise typical single-family lot layout / setbacks On site plan and landscape plan to match. Estates at Heritage Club MPMD 07-002 Conditions of Approval Page 6 DEPARTMENTS INCLUDE REJECT 34. Revise plans to indicate easements, including five (5) foot utility easement in front and rear of each unit, on all landscape plans (LP-l thru LP-8). 35. The removal/relocation of landscape material are subject to review and approval of the City Forester / Environmentalist. 36. The trees proposed around the townhouse buildings must be installed at Yz the building height of the building (Chapter 7.5, Article II, Section S.M.). 37. Revise detail (sheet LC-l) of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., to include material and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd. 38. Revise detail of the decorative posts (sheet LC-2) proposed on each side of the entry drive (west of mail kiosk), to include materials and colors. 39. Revise detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior finish, materials used (i.e. concrete or aluminum) and color(s). 40. Revise site plan (sheet CE-2) to indicate locations of proposed entrance signs. Revise sign detail (sheet LC-2) to include the colors of all exterior finishes (Chapter 4, Section 7.D.). 41. Revise site plan (sheet CE-2) by adding a note to address location of screen enclosures allowed in rear yards of lots adjacent to Gulfstream Blvd to read "screen enclosures will be limited to the underside of roofed porches. No exterior screen enclosures will be allowed". 42. Revise site plan (sheet CE-2) note 6. and note on typical for premIUm homesite re: height of screen enclosures to one-story. 43. Revise site plan (sheet CE-2) graphic for premium homesite typical lot layout from 6 feet to 8 feet on the non-zero side setback for screen enclosure, to match tabular data. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 1. None ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. S:\Planning\SHARED\ WP\PROJECTS\Boynlon Dixie\MPMD 07 -002\COA.doc FIRE & LIFE SAFETY DIVISION TO: Ed Breese, Principal Planner FROM: Rodger W. Kemmer, Deputy Chief/Fire Marshal DATE: January 4,2007 SUBJECT: Estates of Heritage Club Dr. Mote's Physical Therapy Facility The Fire Rescue Department expects to be able to provide an adequate level of service for these projects with current or expected infrastructure and/or staffing levels. THE SCHOOLDISTRlCT OF PALM BEACH COUmY, FLORIDA PlANNING DEPARTMENT 3300 FOREST HILL BLVD,. C-110 WEST PALM BEACH, FL 33406-5813 (561) 434-8020 FAX: {561} 434-8187 ARTHUR C. JOHNSON. Ph.D. SUPERINTENDENT August 11, 2005 Mr. Dick Hudson, Senior Planner Planning and Zoning City of Boynton Beach 100 E. Boynton Beach Blvd. Boynton Beach, FL 33435 RE: CONCURRENCY DETERMINATION - CASE NUMBER #05072601C - BOYNTON DIXIE TOWN HOMES Dear Mr. Hudson: The Palm Beach County School District has reviewed the request for a Concurrency Determination on the above referenced project for 82 multi~family units. Attached please find the approved Palm Beach County School District Concurrency Application and Service Provider Form for Boynton Dixie Townhomes. This Concurrency Determination is valid for one (1) year from the date of issuance. Once a Development Order has been issued for the project, the concurrency determination will be valid for the life of the Development Order. If you have any questions regarding this determination, please feel free to contact me at (561) 434-8876. Tonya Deal Senior Planner cc: Weiner & Aronson, P.A. enc. L:\Planning\PlIbl ic\INTERGOV\ConCllITcncyIConcuTTcncy Deteon ination LctlerslConcuTTcncy\20051C0507260 I,doc AN EQUAL OPPORTUNITY EMPLOYER The School Dh.Uit;: 4>r P03lm Bc",ch County PJannjng Dep;irtmcnt 3320 Foresl Hill Blvd. C.ll0 We.l Palm Beach. Fl 33405-5813 Phon.. (561) '134-8800 or (561) 963-3877 F~.. (561) "34-lll87 or 15611 '134-llB15 Attc:nUon: COOl:\Jrrcncy The School District of Palm Beach County School Concurrency Application & Service Provider Form Instruction.: Submit one copy of th.. completed application and fees for oach now rosidonlial project requiring a dct..nnlnalion of concurrency for schools. A determination will be provided within fifteen (15) working days of receipt of a complete application. A determination is noltransferable and is valid for one year from date of issuance. Once the Development Order is issued. lhe concurrency determination shan be valid for the life of Ihe Development Order, Pleas.. check (") type of application (one only): [)(I Concurlency Determinalion [ ] Concurrency Exemption [ ] Concurrency Equivalency [ I Adequate School Facililies Delermination [ J leller of No Impact [ ] Time Extension Fees: Concurrency DatcrmlnaHon OT Adequate SChoof F.u::i1ilic5 DctennlnaUon (5200.00 for more than 20 units 120 unlls or less 5100.00); Equivalency (5125,00); Exemption or Loller of No Impact ($25,00); Timo Exlenslon ($75,001 <"':""f\ C --. Q 2 '-"\' L 0 li~;,'Ci'i?"'f';:=;~;i..,jC;.:.:ii;,.i,.;},":::;: PART;J"PROJECTc;INFORMATJON;.,:i.::';.:\\;:.".'~f';';:;;;;I'j~i;if~ii:i:;:i,j.;:.1 Please attach OJ copy cf rh~ sUe/subdlvis/Dn plan, last recorded wammfy deed and consont form Project N.mo: ' i?9..Y.'//IlD,,,) (). '7<.IcE ,7a..u(l~"1C> Municipality; (0)i V T'.'J ~ 13t: It <;..Ir Property Control Number (PCN): DO - (t 3 - Y ft/ .- 0 V - 0 5 - 00 ,., 00 10 Location/Addres. of Subject Prop arty: jlIDt-rNtN2ST (oLMe,e.. c"l;:= c;-u~ F>7''2r,:"/--.''l'1 61- ""/0. ('!,l,( C<-~' ",',,<IE' tf'6-N"1.-'~ y Q,'/. '''/'it; ..L 8. , -~~.l,.; ~,.., 0' ;;,:-,:~ j'; ::~s U arplicable, p'e~e OlttJdl 0 Ptmsir'9 Plan !OhO'Mng tho number and type of units to receive certmcale of ot::O.Jp;tnc:y yeart)'. A RcslndlVO COVGf\3rlt is rcqured fer ;J"e-rasttld~ comm.milics OWNERSHIP / AGENT INFO Owner's N.me: Agent's Name: Mailing Addres.: Tell!phone Number. ; I htHllby certify lho 5bt~ml!nts Of rnfDrm..Uon made in any pa r my knowledgf!. J .'i:;;;~~~i; .., ~~.:~~,,~-~Jr:,:: ,_. D.te Application Filed: Reviewed By: Petition Number. ~~~'!r~~7 Tltla: ~A"'''''-~ D YES (Pl.,"". ottoch ploot 01 poymonl) I2J 0 (If no, the app~(:.)~ must pay the School Ol!l.tflct. Tho ?,Oo.l District wi~ not re'ilewwithoul payment). ~~:;;2:""' '""' .".,.., Governm7fnt R"prasanlaUve Signature Dale & Time Received: ., . -., ." PARTllbTO.BE,COMPLETEDBY.SCHOOL DISTRICT";:':';,!:;;:,;""'.';;";'"",..., '7 /26/05(~1\ aseNumber: (:/70 72"cl C ~ I verify (hal the project comPlies'wilh the adopled Level or Servjce ILOS) for SChOO!: I verify that the projeC1 will oomply wilh Ihl! adopled ~Uuched conditions 1 cannol v.nly thallhe C wliI ::PIY wllh Ih . PTC Transportation Consultants 5114 Okeechobee Boulevard, Suite 210 West Palm Beach, FL 33417-3405 (561) 296-9698 Fax 296-9699 ptc@pindertroutman.com May 11, 2005 Revised January 10, 2007 Mr. Michael Rumpf Planning & Zoning Director City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach, FL 33425 Re: Estates at Heritage Club (fka Boynton Dixie Residential) - #PTC05-081 Concurrency Traffic Statement Dear Mr. Rumpf: The purpose of this letter is to provide a traffic impact analysis for a proposed residential development located in the City of Boynton Beach. The site is located on the north side of Gulfstream Boulevard west of Old Dixie Highway as shown on Exhibit 1. It is proposed to develop 56 single family homes and 25 townhomes. The purpose of this letter is to determine if the requirements of Article 12, Traffic Performance Standards, of the Palm Beach County Unified Land Development Code (ULDC) have been met. Exhibit 2 provides the daily, AM and PM peak hour trip generation for the proposed project. The proposed residential project is located in the Coastal Residential Exception Area and is therefore excepted from the standards. Therefore, the requirements ofthe Traffic Performance Standards have been met. Exhibit 3 provides the driveway volumes. A preliminary site plan is also attached for your use. 2incerel , 2 ~------ An rea M.T!!fl.~/07 FI rida Registration #45409 AMT/ldr Attachment cc: Masoud Atefi (County #050525) Robert Mathias Ashlee Vargo Letter Rumpf 05-081 1-10-07 Pinder Troutman Consulting, Inc. itii o ~ GULFSTREAM BLVD o ~ cc f- IJJ w ~ U <( w IJJ SITE .)... I G :r "-' ~ i5 a -.J o ESTATES AT HERITAGE CLUB EXHIBIT 1 PROJECT LOCATION o N.T.S. ~ 01/10/07 05-081 ~ " 0 ..- 8 ~o ",9 '0 ~ s?" ~ I -..-.! ""-58:. ..- ct:J o J., o c ~ 0... "5 .0 ~ U Q) 0.0 .rg l:: 'i:: 0 Q) 0';:; re I .... .... Q) N re l:: ..... tf:l Q) :0 E:l t;> ~I ..c:: .rg c.. X tf:l Oi:: ~ w L.U I- 0 Ltj Ltj '-0 f".- M Ltj ,.... f".- - III ~ .g ..... ..... ~ c .al & l:: :J :J 0 0 0 ~ --- --- .... 0 f".- Q) ,.... c: Q) CJ 0.. .;:: ..... '" '" '" .e- ::J :J ::J 0 0 0 C/'l c: '-0 Ltj ,.... .al Ltj N co .= Q) 0 0 UJ "'C !::: 0 ,.... M U N N '" Q) E Q) 0 III Q) ..c :J c: Q!: S "'C c: 0 c: Vl ..... re I , -l "'@ "'@ '';:; '';:; Vl c: c: -l Q) Q) ~ "'C U .Vi .Vi Q) Q) 0 ~ ~ ..... .... ~ o I ..::.!. re OJ c... 0"> f".- '-0 is ~ ,.... '-0 0 ..... III c.. f".- ~ ,.... .;:: .... M ,.... Ltj ..... ::J ~ 0 ..... N M Ltj ,.... ,.... c: - M co ~ --- f".- C Ltj ,.... f".- ~ .al --- Ltj r"o! & ~ 0 M + l:: ~ 0 8 :c 0"> ~ + c: Q) X -l c: a 0 Q) co CJ f".- 0 c.. 0 II 0;:: II ..... ..... E c: -l '" '" '" g ::J :J ::J 0 0 0 III c: '-0 Ltj ,.... .al Ltj N co .= Q) 0 0 UJ "'C !::: 0 ,.... M U N N '" Q) E Q) 0 III Q) ..c :J c: Qi: S u c: 0 l:: Vl ..... re ....!.. , -l <tl "'@ '';:; .';:; V'l c: c: -l Q) Q) ~ "'C U 'Vi .Vi Q) Q) 0 ~ ~ ..... ~ .... ~ o I ..::.!. re OJ c... ~ c... ~ 0"> M is '-0 ,.... co 0 ..... III 0.. ~ '-0 0 .;:: .... N M ..... ::J is 0 0 ..... 0 M M ~ ,.... Ltj c: - ;::- M M M ~ --- --- M f".- C ~ ~ ~ M N Ltj M 0 0 c: + + 0 ~ ~ o~ .... c: c: Q) -l -l c: 0 N Q) 0"> co CJ 0 0 0.. II II .;:: ..... E t:. c: c: -l -l '" '" '" .~ ::J :J ::J 0 0 0 III c: '-0 Ltj ,.... .al Ltj N co .= Q) 0 0 UJ "'C !::: 0 ,.... M U N N III Q) E Q) 0 III Q) ..c :J c: ~ S "'C c: 0 c: Vl ..... <tl , , -l "'@ "'@ .';:; .';:; Vl c: c: -l Q) Q) ~ U "'C '" .Vi 0 Q) Q) ~ ~ ..... G o -l 2 Q) u o U .... c: Q) E 0.. o ~ > Q) o "'C c: <tl -l "'C Q) ~ c: :J C c: ::J o U ..J:: U <tl Q) co E "'@ 0.. Q) ..c .... -- o Ill' Q) Q) u- ti re 0.. E M Q) u o-e <( Q) ~ ::J o Vl c c::::J ~1El ULtJ ----J+- :q z V"J Li.J ~ ::) .....J 0 J > M>- ~I 1-<( t ~ CO$ (v(;) lv - Li.J (9) 0 l. I> x- Li.J~ W 0 l- I- - U C/) Li.J ~ ---, 0 ~ Q... co :) 0 ~d Cl<: ~ UJ ....J c:.:::c:.::: fj)U-J :J ::::l::::l 0 00 ~lJ co ~ II -< ~~ ~~ L.U 0<< Cl<: I- :z: LJ.J LJ.J Vl u..J 0... 0... ... fj) - u.. ....J C,;) L: L: 0 U-JO:::: :J ~ i'7i LJ U-J ~~I I "'-'<I"rt) '<I"2!.f'o.-. c::::J , . X:\Cad\Eng\0725 The Estates at Hem:ar' Club\site plan\0725 SITE1.DWG, 12/15/2006 1:21:12 PM, bjagovino, llX17 print fx,pc3 10 I I' ,- ' I g; n i ;.;' ;-- - ,! -L' n.. f$ I I----r" --:1!!!~ I !~r--___ \ I : ~ -- - __ f~ -- l: f5 ------. ~! \ 1 ".~ ,,~, " -"- I ! . ---n--- - -- - H ~~~ f;;. - ('~\I"--i:~8"' I ii --~~_ ~ ~ I ~@~ ~~!:: ----- r-D:.i.1./f< ~r; g~ --__ I ;".";:r-.. ~li1..,. -"i---I -~ -"'''v._ i 8 ----_____t~..."""-tI"e-...... f ~ f.~ . - - -:-:::::- -":::::~.~ -=" . --'" "'- il,-,lo,:'. i.~.;~~];.. --- - -- - ~ c)' S""r've:=::...!:>: eo.. ::: ~ r ~----- -I ~ ~ !I', i~ ~.}_~ f_~ ~~ o i 5' ~;~ . - -I :::: , ~ ..;J ,., G: g ~~i~6 U~'PI < - ~ ~ ."""r~ ~ :~~i '.'1 ;~! ~ i;~~ ::~\::: ----- - ..!- - ~ !~!m~ Willi r ",.~ q:~~ I' -b ~.~:. l. ~ l ~~.~ ;.~';: ; ~ i.~~. ~ . ~ . 't:'" ... ai; ? tl~~i ~ ~\,~ii i' 1"11"" ..: \- t; EST1TES AT HERITAGE ; CLUB, PUD em" 0; 60~"Wl(lNi BE.l.CH. P.t.LU e(f.o. couwn. fU)?ID.I, ! SITE PLAN o-..! "A SHAH I-=- OJ...AC. DROTOS I """"'~ &: Ass 0 C I I, T E 5 l'UUIl\NG. C.,.tl(lc:oie 01 Aufho,..l:::afion Ho. LBlS451S 3410 North .l."d,~ "un..~ [>It. hmpgAQ Bco~h. rI. J3D6t PH: g5,,-g~;;-g433 . [,l.X: g~-783-.I75.l . I " I ~ , c .. ~ N~_T_ UlF STFIEA"'~ ESTATES PL.A' NO. (PS 13, PC 51) GRA,YSQN HE1Gl-Ti'S (PE 23. PC :20; -n:i,\l'-[;i ~e ~~ r- -JlI~ ~. ~: o ~~ p ~ .' l;! !I v.;~ ~ II" ~ ,,~ ~~ ~S " ~N T.~ ; =N ~- -::g~ ~ = " 0 : ~E ~ ;t ~l;! ~~ ;; 9 0 ~ - 0 ~ ~ i~ " .. ,. .. " ~ ,~ !. ~. It. I " _ . "~'. 'I i . i . i n-J~, I~ , "' ~~ s ~! ~ f c' o ~ > ~ ~ ~ = s ~ !H~:i ~:;~~R~ ~"i~" 2 E ~~ ~ ~i~!l:1 ~ ~ i:~ E ~2f}~~ I 2 ~~~ !..~;; , · ,. "r ~ :~; -", r ' ~: ~ { ~~; L ~ ~ ~ ! . "I :: 1 ,.,. -........ - " ~]~ .~ nE~ ~~~ ' e.-~ p E i~~ ~;~ 2~~ E ... ~;;~ r. "i' ~ ~7i .. " ~ i~ ~ ~~E ~ ::E~ ~ ~ F. h.i T.i~. ~.I c. ~, "" .. c: " ~ ~ s 2 '". ; m r"' S ~".! t r. ~~~ ~~~ P. ;l~;~..i PTC Transportation Consultants May 11, 2005 Revised January 10, 2007 5114 Okeechobee Boulevard, Suite 210 West Palm Beach, FL 33417-3405 (561) 296-9698 Fax 296-9699 ptc@pindertroutman.com Mr. Michael Rumpf Planning & Zoning Director City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach, FL 33425 Re: Estates at Heritage Club (fka Boynton Dixie Residential) - #PTC05-081 Concurrency Traffic Statement Dear Mr. Rumpf: The purpose of this letter is to provide a traffic impact analysis for a proposed residential development located in the City of Boynton Beach. The site is located on the north side of Gulfstream Boulevard west of Old Dixie Highway as shown on Exhibit 1. It is proposed to develop 56 single family homes and 25 town homes. The purpose of this letter is to determine if the requirements of Article 12, Traffic Performance Standards, of the Palm Beach County Unified Land Development Code (ULDC) have been met. Exhibit 2 provides the daily, AM and PM peak hour trip generation for the proposed project. The proposed residential project is located in the Coastal Residential Exception Area and is therefore excepted from the standards. Therefore, the requirements ofthe Traffic Performance Standards have been met. Exhibit 3 provides the driveway volumes. A preliminary site plan is also attached for your use. Sincere' AMT/ldr Attachment cc: Masoud Atefi (County #050525) Robert Mathias Ashlee Vargo letter Rumpf 05-081 1-10-07 Pinder Troutman Consulting, Inc. fmj o ~ GULFSTREAM BLVD o ~ co f- (/) L.I.J 0<:: U <( L.I.J (/) SITE ;:... I :J: (J ~ I.J..J ~ is a -..J o ESTATES AT HERITAGE CLUB EXHIBIT 1 PROJECT LOCATION o N.T.S. ~ 01/10/07 05-081 ~ "-0..- 13 ~b N9 '00 -t::r;"&t, ~58!. ;;:; o J, o c &0 0... ~ ...., .0 :::::l U Q) 0.0 19 c: ";:: 0 Q) ",p I te .... ..... Q) N te c: ..... III Q) :0 .fB c..:> ~I ..c: {j! 0- X ";:: I..Ll u.J I- 0 Lrl l.(') <.0 r--.. (V) l.(') ,.... r--.. ~ CIl 0- .;:: l- I- ~ C ~ c: :J :J 0 0 0 ~ --. --. 0 r--.. Q) ,.... c: Q) 0 0- .;:: I- <J'l <J'l <J'l .,q ::J :J ::J 0 0 0 CIl c: <.0 l.(') ,.... .E:l l.(') N 00 c: - LU Q) 0 0 "'0 !:: 0 ,.... (V) U N N <J'l Q) E Q) 0 CIl ..r:: :J Q) c: ~ 3': ""0 c: 0 c: V( f-;" ~ ....l ~ ~ ".0 ".0 V'l c: c: ....l Q) Q) ~ "'0 U "Vi 'Vi Q) Q) 0 ~ ~ I- .... :::::l o I ..:.t!. te Q) 0.. 0"1 r--.. <.0 .rs '<t ,.... <.0 0 I- CIl 0- r--.. '<t ,.... ";:: .... (V) ,.... l.(') I- ::J ~ 0 l- N (V) Lrl ,.... ,.... -= (V) 00 ~ --. r--.. C l.(') ,.... r--.. ;:0 .E:l --. l.(') C"'j ~ !:::! 0 (V) + c: ""': 0 ($. ~ 0"1 ~ + c: .... Q) X ....l c: (5 0 Q) 00 0 r--.. 0 0- 0 II .;:: II l- I- E c: ....l <J'l <J'l <J'l .,q ::J :J ::J 0 0 0 CIl c: <.0 l.(') ,.... .E:l Lrl N 00 c: - LU Q) 0 0 "'0 !:: 0 ro- (V) U N N <J'l Q) E Q) 0 <J'l Q) ..r:: :J c: ~ 3': u c: 0 c: V'l I- ~ I I ....l -;:e ~ ".0 ".0 V'l c: c: ....l Q) Q) ~ ""0 ""0 "Vi "Vi Q) Q) 8 ~ ~ ~ .... :::::l o I ..:.t!. cO Q) 0.. ~ 0.. '<t 0"1 (V) ~ <.0 ,.... 00 I- CIl 0- '<t <.0 0 ";:: .... N M I- ::J .rs 0 ~ 0 (V) (V) '<t ,.... l.(') -= r:::- (V) (V) (V) ~ --. --. (V) r--.. C ~ ~ .E:l (V) N Lrl (V) ~ 0 0 c: + + 0 8: 8: ~ ~ c: c: .... Q) ....l ....l c: 0 N Q) 0; 00 0 0 0 0- Il II .;:: l- E E c: c: ....l ....l <J'l <J'l CIl .,q ::J :J ::J 0 0 0 CIl c: <.0 l.(') ,.... .E:l Lrl N 00 -= LU Q) 0 0 !:: -g ,.... (V) U N N <J'l Q) E Q) 0 '" Q) ..r:: :J c: ~ 3': ""0 0 c: (.i) I- ~ I I ....l ~ -;:e ".0 '.0 V'l c: c: ....l Q) Q) ~ ""0 U 'Vi "Vi 0 Q) Q) ~ ~ I- o o ....l ;2 Q) ""0 o U .... c: Q) E 0- o a3 > Q) o ""0 c: rn ....l ""0 Q) <i= "c :J .c c: ::J o U ..r:: u rn Q) c:c E -;:e CI... Q) -:5 -- o Vl~ Q) Q) u.. tl rn 0- E (V) ,.... Q) u "-2 < Q) ~ ::J o V'l c r:::::J h[t] ------.J+- ~ z (f) w ~ 1 => -.J ~I 0 > (tT(;) ltT t ~ M>- f-<C (9)QT1 co~ -w W I> ~ ..... x- - w~ en 0 f- U w ---- 0 ~ CL c:::J o ~ 5 UJ -J ::l o co ~ <( UJ ~ t;; LL -' ::l o I I CO :) ~...J U ~UJ ~lJ ~~ U') - UJ~ UJ I I- I ,....~11'l1 '1"NM ~ '" X:\Cad\Eng\0725 The Estates at Heritar' e Club\site plan\0725 5ITE1.DWG, 12/15/2006 1:21:12 PM, bjagovino, llX17 print fx.pc3 .""'(1: I .._.i hUlF STREAI.l ESTATES Pt.Ai NO. m~i (P' lJ. PC ,,) Q-""'.'" ~ ~ LH]:~. ;<. - " :: , , ~ ~ \ GRA.Y50N HEIGhTS (PB 23. Pi; 220} ~. ~9 ~~ ,..- - 11'" ~. ~: ~~ ~~ ~~ ~N ~Q ~~ ~ 5 =c 0 " N=! ToN ~ ,." Q ~- < Ii'" ! gl ~~- ~ i;~~ ;~l: .!! .~ NOCN4'J2'"W ~J7.77' ~ . rJ~~ ~hJ. ~~ n! ~ ~ ~ ~ " ~ ~ o 12 l; \ I ---!i \~ ---ii----_ r -- ~l i ,I,', I II r IY:~~ HI s _ ~~~*"t It-r ~ ~,:','Im~ :,I:;: u:;li ~ P" ~:2l~ , ":'. ~ .~f;l ~j ~ p~ -.!';l~ .., ~ g~-----: rl! (;~ "'S; ,. !i m . !-'!- - ~ ; II lill 1 r , . ~. ~;:" ~:f~.' ~ t~t ;.t.;::. .~. i.- ~~ 't :=; ar: ~~ ~~ .. L ~ ~ f · "I --, .... -...~!::; ~ .. . ~ ~~U~~ .. ~~i* i ~ ~ !~~ i E!j~~ i g i~~ ! ~~9~~ 15 1. ::i,,",l> ~ ~ i 0 ~!~ ~. r E~ G~' ~ :~~ ~ ~ € ~ ~ r. ~~~~~~ a~i 5 ... ~.~ ' 'jE ~ a7i -. 7"f "nil. ~if i-'" ~ ~ ); - ~i j j~g j ~~I~ ~ ~ D lJ U .c:: e F. ~ ~~ i ~. "; ~ ~ I " ~ '," e"l(" ~ J o !ai ~~~ ~,:- ~: ~-i~'.[I' k I::, !l:: \ ~ ~~;G~~ FlORI04 ~A SHAH I""'"""'"" Q.LAC:J.. DROTOS ''''''''''' &. ASSOCIJ\lES PLUkllllG C.rtlflcQ11il 01 AuthQ,-I~Cltlon No. l.B6455 3'10 Norih Andreo<:: .he-nue [01. . Pompa"" Sooach, fl. 3306:. PH~ ~~"-'H.1 'HJ,} . r,l.l(; S'~..-7B}-.j7f1" SITE PLAN _a . .. ...... SHAH :-...... . = =:~ ~.LC1 DROTOS Engineering Surveying Planning &ASSOCIATES 341 0 N. Andrews Ave Ext Pompano Beach, FL 33064 PH: (954) 943-9433 FAX: (954) 783-4754 DRAINAGE STATEMENT ESTATES AT HERITAGE CLUB This will certify that the design of the stormwater drainage system for the Estates at Heritage Club project will conform with all rules, regulations, codes, etc. including, but not limited to, Chapter 6, Article IV, Section 5 ofthe City of Boynton Beach Land Development Regulations ~ -.. ~- James Drotos P.E. Fl. Reg. No. 35505 January 29, 2007 1st REVIEW COMMENTS Ma ior Site Plan Modification ..il Project name: Estates of Heritage Club File number: MPMD 07-002 Reference: 1 sl review plans identified as a Master Plan Modification with a December 20. 2006 Planning and Zonimr Denartment date stamn markinl!. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). Acknowled~ed. 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. The trash pickup areas have been expanded to provide the 3' clearance. 3. It may be necessary to replace or relocate canopy trees adjacent to trash pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. Trees that posed an issue have been shifted and/or removed. This can be viewed on sheets LP-l, 2, & 3. 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and Fire/Rescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated call boxes, etc., allow ingress and egress for Solid Waste and Fire/Rescue. The minimum turning radius has been provided. A separate fire access plan has been provided showinl! the vehicle travel path. PUBLIC WORKS - Forestry Comments: 5. The medians on Gulfstream Blvd. have existirtg irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notifY anp coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. This note has been provided within the median on both sheets LP-l & 3. It also appears as note 7 on the site plan sheet CE2. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A. Lb.). No large canopy trees fall within the 15' restricted area for light poles (only small trees). 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 2 DEPARTMENTS INCLUDE REJECT 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. Duly noted. PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Acknowled2ed. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. Acknowledged. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. Acknowledged. 11. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section 7.F.2. The required certification has been added as note 2 on sheet CE3. 12. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Acknowledged. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Acknow ledged. UTILITIES Comments: 14. Please provide a time line that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 3 DEPARTMENTS setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. All required utility construction permits have been received for the existing site plan. Since mainline design will be unchanged, we expect to begin construction in March, 2007 with connection of the first water meter by the end of2007. 15. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. All utili!)' easements and lines are shown on Landscape Plans and Water and Sewer Plans as requested and trees have been placed as not to be in conflict with such easements. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). Acknowledl!ed. 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). Utility easements are shown on the engineering drawings and proposed plat. Easements will be dedicated by plat. 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. Acknowledl!ed. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. Acknowledged. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. Acknowledged. INCLUDE REJECT I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 4 DEPARTMENTS INCLUDE REJECT FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. Acknowledged. The required plan will be provided prior to permit issuance. 22. Residential: ~ All lighting shall be metal halide. This note has been added to sheet LP-5. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). Duly noted. ~ Provide timer clock or photocell sensor engaged lighting for above or near entrvways to residences and all pedestrian sidewalks. Photocells provided. ~ Provide lighting for entrance sign. Provided, refer to new sheet LL-l. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. Duly noted. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. Provide on Landscape drawings LP-2 and 3. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) Agreed. - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of6"ifnon-illuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 5 DEPARTMENTS INCLUDE REJECT ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. These are located adjacent to the recreation area parking. Mail boxes are depicted as large "M" within a rectangle at the NW corner of parking area - this can be viewed on sheet LP-3 and on the site plan. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. Clubhouse is not air-conditioned, so alarm has not been provided. However, on sheet A290, a note has been added to the door schedule so that l!ates are key-locked for security purposes. ~ Restrict access to recreation buildings and pools through the use of key card or key. Note has been provided on sheet LP-3. 23. Residential Security ~ The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. A note has been added to the effect to all door schedules. See sheets A610, A611, A612, A613, A210, A220, A230, and A240. ~ When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. There are not any doors with a side pane window. Please see sheets A610, A611, A612, A613, A2to, A220, A230, and A240. ~ Entry doors to open outward versus inward. All entry doors open outwards. Please see sheets A610, A611, A612, A613, A210, A220, A230, and A240. ~ If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. A note has been added to the effect to all door schedules. See sheets A610, A611' A612, A613, A2to, AnO, A230, and A240. ~ Equip all exterior doors with security hinges. A note has been added to the effect to all door schedules. See sheets A610, A611, A612, A613, A210, A220, A230, and A240. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. Acknowledged. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 6 DEPARTMENTS INCLUDE REJECT the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. All buildin2s will comply with this requirement. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. Signed and sealed working drawings will be provided at time of permit review. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. IdentifY the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. This is now provided on sheet LC-l. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the property line. In addition, show the distance between all the buildings on all sides. Setbacks shown on the site plan are measured to the building wall. Building overhangs (eaves) will encroach up to 3' into the setback in accordance with CBBCO Part III, Chapter 2, Section 4.J.3. Side-to-side building separations requirements are shown on the lot details. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. There will be one master system for entire site that will run off of a well. The well location is shown on sheet LP-3. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. The water use permit has been issued bv SFWMD. A coov will be orovided. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) Acknowled2ed. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 7 DEPARTMENTS 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. Acknowledged. 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(t)) Acknowledged. 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. Acknowled2ed. 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) Acknowledged. 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2IO, A220, ABO, and A240. 37. Sheet A240 - Exterior wall fire resistance ratings shall comply with 2004 FBC, Residential, Section R302.l. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2IO, A220, A230, and A240. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 8 DEPARTMENTS INCLUDE REJECT PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408.00 TOTAL $105,533 The Developer has paid $63,222 for the current approval. The difference of $42,311 will be paid for the site plan modification. 39. Indicate which species are native and the overall percentage of native species. This information is provided on sheet LP-4. 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. The home site landscape plans have there own plant lists on their own sheets with two plant pallet options for each. The plant list shown on LP-4 is for common areas and town houses. FORESTER/ENVIRONMENT ALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.] This has been corrected on sheet LP-4. 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] This note has been added to sheet LP-4. 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Right tree in the Right Place manual selection for small trees only. This criterion has been met. 44. All shrubs and groundcover plants should have a height and spread dimension. This information has been provided on sheet LP-4. 45. The applicant should show an elevation cross-section detail (similar to sheet AO 1 0) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. This is shown on LP-4 in re~ards to item 'b' above, item 'a' and 'c' can be viewed on sheet LC-3. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 9 DEPARTMENTS INCLUDE REJECT Irri2ation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. Duly noted. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] This has been addressed on sheet LP-4. PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staffs comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. Acknowlede:ed. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 812 inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. Acknowlede:ed. 50. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. Acknowlede:ed. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. Notices will be done in accordance with Ordinance 04-007. 52. Revise application (Sec. 11.4.) Acreage Breakdown (a. through 1. added together should equal the total of j.). Aoolication has been revised. 53. Revise application (Sec. 11.6) Floor Area (a. through g. added together should equal the total of h.). Aoolication has been revised. 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). Aoolication has been revised. 55. Revise application (Sec. II.l O.b.) to provide calculation for required number of handicap spaces. Aoolication has been revised. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. Lee:al descriptions now match. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). Drainage statement is enclosed. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 10 DEPARTMENTS INCLUDE REJECT 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). A revised traffic study is enclosed. This revised traffic study was sent to the County on January 11,2007. 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. The revised school concurrency application is enclosed. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. Acknowledged. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. An on-site lift-station will not be required. 62. All elevation pages shall indicate the exterior finishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). A color schedule has been added to all elevation pages. See sheets A31O, A320, A330, and A340. 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). Acknowledged. 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. Dimensions have been added. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. Ad,jacent zoning is indicated on the site plan. 66. Revise tabular Building Code Data (sheets AOI0, 020, 030) under number of stories: change word "required" to "maximum". Tabular data has been revised as required. See sheets A010, A020, A030, and A040. 67. Revise Townhouse Building drawing index scale (sheets AOI0, A020) to revise scale from 1/8" = l' to !f4" = l' to coincide with scaled drawings (sheets A220, A221, A31 0, A311). Drawing index scale has been revised to coincide with scaled drawings. 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. All townhouse buildings are identical. All sheet titles now read, 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 11 DEPARTMENTS INCLUDE REJECT TOWNHOUSE BUILDING - BUILDINGS ONE THROUGH FIVE. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. Additional architectural elements have been provided to the rear and side elevations of the townhouse buildings. These elements include additional window banding, color changes per unit type, decorative shutters, and decorative balconette railings on all Lexington units, additional windows on the side elevations, additional keystone and sill details to side elevations. Please see sheets A310. 70. Typical single-family lot layout / setbacks on site plan and landscape plan do not match. Setbacks are now consistent between plans. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. SpecifY side setbacks and zero side and non-zero side. ClarifY what is meant by 2 foot side to corner, and 15 foot side to side. Setback data has been revised. Side to corner refers to the distance between the side of the structure and the side lot line. Side to side refers to the non- zero side lotline setback which is also the building separations since these are zero lot line lots. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adjacent to the zero side. This note has been provided on Home Site Landscape Plans sheets LP-6, 7, and 8. The easement is shown on the site plan and plat. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. All elevations, including front, rear and both sides of each single family model has bee provided. See sheets A320, A321, A330, A331, A340, and A341. In addition, zero side elevation has been labeled, so it becomes clear that zero side elevations have no window openings. Furthermore, two rear elevations have been provided for each model, one being the typical elevation and the second one being the Gulfstream Boulevard elevation 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc. A typical has been provided for the townhouses on the site plan and landscape plan. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. Please refer to the additional section sheet CE 6. A combination of concrete retaining wall / aluminum picket fence with landscaping has been used to provide the required buffers. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. The townhouse building does not encroach into the side setback. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 12 DEPARTMENTS 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). These lot numbers are now provided on LP-l, 2, and 3 and match the site plan sheet. 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. The typical lot details depict the allowable pools, decks, spas, and screen enclosures. Imperyious area includes all homeowners choosing to build these amenities. 79. On the floor plans for the townhouse buildings (sheet A210), graphically indicate the use of each room (Le. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. All main rooms have been labeled on the floor plan for the townhouse buildings, on sheet A2tO. 80. Indicate all easements, including five (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8) Duly noted. 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or ifthe streets will be public rights of way (trees in R1W subject to Engineering Division review and approval) A note has been added to LP-l, 2, and 3. Refer to note 8 on the site plan sheet CE 2. 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure Building height and highest point of structure has been provided on all elevations. 83. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. Developer has chosen to stav with open pavilion. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 13 DEPARTMENTS INCLUDE REJECT maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. Refer to note 5 on the site plan sheet CE2. HOA documents will also restrict removal of vegetation. 85. The tree removal plan (sheet T-l) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? Reason why trees can not remain is that there will be a significant grade change, however Sabal Palms from Site will be kept in Sales Trailer area and irri2:ated and will be used throu2:h out site later. 86. The removal I relocation of landscape material are subject to review and approval of the City Forester I Environmentalist. Duly noted. 87. Indicate on all landscape plans the screening of at-grade AIC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AIC units on the site plan (CE-2) and the landscape plan (LP-2) do not match All AC units are Landscaped with native material and this information can be found on sheets LP-l, 2, 3, 4, 6, 7, and 8. 88. Indicate the property lines of all proposed lots on sheet LP-2. Duly noted. 89. The landscape plan (sheet LP-I) depicts on-street parking along Lots 61 and /' 62. Please correct. This has been corrected. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. Dulv noted. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. Duly noted, see sheet LP-4. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). Dulv noted, see sheet LP-4. 93. The trees proposed around the townhouse buildings must be installed at Yz the building height of the building (Chapter 7.5, Article II, Section S.M.). Duly noted. 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). Duly noted, see sheets LP-3 and 4. 95. Landscaping at each project entrance shall contain a combination of colorful groundcoyer plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. This has been shown on sheets LP-3 and 4. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 14 DEPARTMENTS INCLUDE REJECT 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet / from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of Y:z the wall height. The wall/fence combination cannot exceed 8 feet in height. A 3' high Silver Buttonwood hedge has been provided; see sheets LP-2, 3, and 4. 97. Provide a detail of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd. See sheet LC-l. 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. See Sheet LC-2. 99. Revise the detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior finish, materials used (Le. concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 10.F.1.). See sheet LP-5. 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 10.F.2.). Duly Noted. 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 10.F.3.). See sheet LL-l. 102. All slgnage IS subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior finish, and letter color(s) (Chapter 4, Section 7.D.). See sheets LC-2 and LP-3. 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. V" This is not an option for the current desie:n of the proiect. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A knee/sitting wall? Provide additional detail of this area. V This area has changed a bit. What you speak of was a wall. Now there is an aluminum rail fence with two entries, see sheets LP-2 and LC-l. 105. Staff recommends the use of pavers for the area of trash container V' placement, rather that the sod depicted. Trash can areas are paved with pavers. and screen enclosure option. The 6' MAE has been eliminated from the single family lots since access for maintenance is now available between houses. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. The screen enclosure side setback has been shown as 8' to align with the edge of the house. MWR/sc S:\Planning\sHARED\WP\PROJECTS\Boynlon Dixie\MPMD 07-002\1ST REVIEW COMMENTS,doc , . 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 15 DEPARTMENTS 106. A second layer of landscaping is required along Gulfstream Blvd. This has been rovided, see sheet LP-3. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. This has been changed to all Silver Buttonwood Trees with an occasional Tri Ie Adonidia Palm ut in to break u the silver, see sheets LP-2, 3, and 4. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. The rear elevations of the units fronting Gulfstream Boulevard, on sheets A320, A330, and A340 have been revised. Each model received additional architectural elements to support its architectural styles, including additional banding, shutters, and all models received an additional tile roof overhang over the rear porch. creen enclosures will be hmt e 0 e underside of roo e porc es. 0 exterior (one or two story) screen enclosures will be allowed. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearly noted on the plans. Only perimeter lots will be allowed pools. All other lots will be allowed spas. All lots will be allowed screen enclosures. This is shown on the typical lot details on the site Ian sheet CE2 and on Sheets LP-l and 3. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. Screen enclosures up to the mean building height will be allowed on all units except those abutting Gulfstream Blvd. where the enclosure will be restricted to a sin Ie sto 'in hei ht. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. Corrected. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. ditionally, the five (5) foot easement for drainage structures an would not appear to allow the trees proposed within the landscape buffer. INCLUDE REJECT / ~ ~~ ~ 1/111 6rI ~. 1-- ~ ~ / A/'6f ~ ~I CG- - 2.- M6'A/i IT'" 111 '1st REVIEW COMMENTS Maior Site Plan Modification Project name: Estates of Heritage Club I File number: MPMD 07-002 ,l Reference: I st review plans identified as a Master Plan Modification with a December 2&:"2066- 'Planning and Zonin!! Deoartment date stamn markinl!. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). Acknowled2ed. 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. The trash pickup areas have been exoanded to provide the 3' clearance. 3. It may be necessary to replace or relocate canopy trees adjacent to trash pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. Trees that posed an issue have been shifted and/or removed. This can be viewed on sheets LP-I, 2, & 3. 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and Fire/Rescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated call boxes, etc., allow ingress and egress for Solid Waste and Fire/Rescue. The minimum turning radius has been provided. A separate fire access plan has been provided showin2 the vehicle travel path. PUBLIC WORKS - Forestry Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notify and coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. This note has been provided within the median on both sheets LP-I & 3. It also aooears as note 7 on the site olan sheet eE2. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.I.b.). No large canopy trees fall within the 15' restricted area for light poles (only small trees). 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 2 DEPARTMENTS INCLUDE REJECT 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. Duly noted. PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Acknowled2ed. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. Acknowled2ed. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. Acknowled2ed. 11. Provide an engineer's certification on the Drainage Plan as specified in LOR, Chapter 4, Section 7.F .2. The required certification has been added as note 2 on sheet CE3. 12. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Acknowledl!ed. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Acknowled1?:ed. UTILITIES Comments: 14. Please provide a time line that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for oermit aoolication, the start of construction, and the 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 3 DEPARTMENTS setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. All required utility construction permits have been received for the existing site plan. Since mainline design will be unchanged, we expect to begin construction in March, 2007 with connection of the first water meter by the end of 2007. 15. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. All utility easements and lines are shO\l n on Landscape Plans and Water and Sewer Plans as requested and trees have been placed as not to be in conflict with such easements. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). Acknowledged. 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). lJtili!)' easements are shm'\!n on the engineering d.oawings and proposed plat. Easements will be dedicated by plat. 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. Acknowledged. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. Acknowledged. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. Ackno\lledged. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 4 DEPARTMENTS INCLUDE REJECT FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. Acknowledl!ed. The required plan ,,,ill be provided pdor to permit issuance. 22. Residential: ~ All lighting shall be metal halide. This note has been added to sheet LP-5. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). Duly noted. ~ Provide timer clock or photocell sensor engaged lighting for above or near entryways to residences and all pedestrian sidewalks. Photocells nrovided. ~ Provide lighting for entrance sign. Provided, refer to new sheet LL-l. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. Duly noted. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. Provide on Landscape drawinl!s LP-2 and 3. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) A~reed. - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of6"ifnon-ilIuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 5 DEPARTMENTS INCLUDE REJECT >> Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. These are located adjacent to the recreation area parkin~. Mail boxes are depicted as large "M" within a rectangle at the NW corner of parking area - this can be viewed on sheet LP-3 and on the site plan. >> Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. Clubhouse is not air-conditioned, so alarm has not been provided. However, on sheet A290, a note has been added to the door schedule so that 2ates are key-locked for security purposes. >> Restrict access to recreation buildings and pools through the use of key card or key. Note has been provided on sheet LP-3. 23. Residential Security >> The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. A note has been added to the effect to all door schedules. See sheets A61 0, A6J I, A612, A613, A210, A220, A230, and A240. >> When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. There are not any doors with a side pane window. Please see sheets A61O, A611, A612, A613, A21O, A220, A230, and A240. >> Entry doors to open outward versus inward. All entry doors open outwards. Please see sheets A610, A61 I, A612, A613, A210, AnO, A230, and A240. >> If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. A note has been added to the effect to all door schedules. See sheets A61O, A611, A612, A613, A2to, A22(), A230, and A24(). >> Equip all exterior doors with security hinges. A note has been added to the effect to all door schedules. See sheets A610, A61 I, A612, A613, A2 1 0, A220, A230, and A240. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. Acknowledged. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 6 DEPARTMENTS the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. All buildin2s will comply with this reauirement. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. Signed and sealed working drawings will be provided at time of permit review, 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. IdentifY the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. This is now orovided on sheet LC-l. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the property line. In addition, show the distance between all the buildings on all sides. Setbacks shown on the site plan are measured to the building wall. Building overhangs (eaves) will encroach up to 3' into the setback in accordance with CBBCO Part III, Chapter 2, Section 4..1.3. Side-to-side building separations requit-ements aloe shown on the lot details. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. There will be one master system for entire site that will run off of a well. The well location is shown on sheet LP-3. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. The 'water use permit has been issued by SFWMD. A COOy will be orovided. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building numberls must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) Acknowled2ed. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 7 DEPARTMENTS 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. Acknowledged. 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter I, Article V, Section 3(f)) Acknowledged. 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. Acknowledged. 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 9 I I. A Palm Beach County Planning, Zoning & Building Division, 100 Australian A venue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) Acknowledged. 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2tO, A220, ABO, and AHO. 37. Sheet A240 - Exterior wall fire resistance ratings shall comply with 2004 FBC, Residential, Section R302.1. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A21O, A220, ABO, and A240. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 8 DEPARTMENTS INCLUDE REJECT PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408.00 TOTAL $105,533 The Developer has paid $63,222 for the current approval. The difference of $42,311 will be paid for the site plan modification. 39. Indicate which species are native and the overall percentage of native species. This information is provided on sheet LP-4. 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. The home site landscape plans have there own plant lists on their own sheets with two plant pallet options for each. The plant list shown on LP-4 is for common areas and town houses. FORESTER/ENVIRONMENT ALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.] This has been corrected on sheet LP-4. 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] This note has been added to sheet LP-4. 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Right tree in the Right Place manual selection for small trees only. This criterion has been met. 44. All shrubs and groundcover plants should have a height and spread dimension. This information has been provided on sheet LP-4. 45. The applicant should show an elevation cross-section detail (similar to sheet AOIO) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. This is shown on LP-4 in regards to item 'b' above, item 'a' and 'c' can be viewed on sheet LC -3. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 9 , . DEPARTMENTS INCLUDE REJECT Irrilzation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. Duly noted. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] This has been addressed on sheet LP-4. PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staff's comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. V Acknowled!!ed. 49. At the technical advisory review team meeting, also provide a full set of ~ 86 / f-~ - reduced drawings, sized 8~ inches by II inches of each plan. Save each I )\O/'''Z plan to a compact disk and submit that to staff as well. (l r-ll, - (O/n/A.) . Acknowled!!ed. ) 50. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review, As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the V TART meeting would be required to be shown at the time of permitting. Acknowled!!ed. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. V Notices will be done in accordance with Ordinance 04-007. 52. Revise application (Sec. 11.4.) Acreage Breakdown (a. through i. added together should equal the total ofj.). V Application has been revised. 53. Revise application (Sec. 11.6) Floor Area (a. through g. added together should equal the total of h.). V Application has been revised. 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). V Application has been ,'evised. 55. Revise application (Sec. II. 1 O.b.) to provide calculation for required number of handicap spaces. .\1( V Application has been revised. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description, 1/- Lc!!al descriptions now match. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). V Dntina!!e statemcnt is enclosed. :)/~ J ) 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). A revised traffic study is enclosed. This I'evised traffic study" as sent to the County on January 11,2007. 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (Le. a letter) of their approval prior to the Planning & Development Board meeting. The revised school concurrency application is enclosed. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. Acknowledged. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. An on-site lift-station will not be required. 62. All elevation pages shall indicate the exterior finishes, roof material, paint I-' manufacturer's name, and color codes. Staff recommends using a color ~ I rc /. ...-....c.~ schedule (Chapter 4, Section 7.D.). (,..I ~ ~ :c ~ ~ . ref (: 1 L I' '( A color schedule has been added to all elevation pages. See sheets A31O, -r, () L 0 A320, A330, and A340. L e ~.(!"-'( (' 10 Nt{. 63. Include a full-sized (24 inches by 36 inches) color rendering, including , color swatch~s, of all buildings ~t the Technical Advisory Review Team\i? \. \lo( ({ (TART) meetmg (Chapter 4, SectIon 7.D.). (I) (, r Acknowledged. 0 64, On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. Dimensions have been added. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. Ad,jacent zoning is indicated on the site plan. 66. Revise tabular Building Code Data (sheets AOIO, 020, 030) under number of stories: change word "required" to "maximum". Tabular data has heen revised as required. See sheets AOIO, A020, A030, and A040. 67. Revise Townhouse Building drawing index scale (sheets AOI0, A020) to revise scale from 1/8" = l' to 1,4" = l' to coincide with scaled drawings (sheets A220, A221, A31 0, A311). Drawing index scale has been revised to coincide with scaled drawin2s. 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. All townhouse buildin2s are identical. All sheet titles nm\' read, 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 10 DEPARTMENTS INCLUDE REJECT v ..to VV j/v~_ (j 0 I 1f ( p-f (' cl '-'-P/) { i C! . [,,1.':(( S{AI ()/ v v ~r SF> 05-;;).)9 1/-l ~{Lvl'~~ '/ v- v j/' 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 II DEPARTMENTS INCLUDE REJECT TOWNHOUSE BUILDING - BUILDINGS ONE THROUGH FIVE. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. Additional architectural elements have been provided to the rear and side L/ elevations of the townhouse buildings. These elements include additional window banding, color changes per unit type, decorative shutters, and decorative balconette railings on all Lexington units, additional windows on the side elevations, additional keystone and sill details to side elevations. Please see sheets A31 O. 70. Typical single-family lot layout / setbacks on site plan and landscape plan ~ do not match. NV f/ ~'p . Setbacks are now consistent between nlans. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2 foot side to corner, and 15 foot side to side. Setback data has been revised. Side to corner refers to the distance between 'V the side of the structure and the side lot line. Side to side refers to the non- zero side 10tIine setback which is also the building separations since these are zero lot line lots. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adjacent to the zero side. V This note has been pmvided on Home Site Landscape Plans sheets LP-6, 7, and 8. The easement is shown on the site nlan and nlat. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. All elevations, including front, rea.' and both sides of each single family model has bee provided. See sheets A320, A321, A330, A331, A340, and V A341. In addition, zero side elevation has been labeled, so it becomes clear that zero side elevations have no window openings. Furthermore, two rear elevations ha\ce been provided for each model, one being the typical elevation and the second one bein!?: the Gulfstream Boulnard elevation 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc. A typical has been provided for the townhouses on the site plan and V landscape plan. 75. Revise location of six (6) foot aluminum picket fence on east property line V to terminate at the rear property line of townhouse lot 7, and continue the 0 j (.., concrete buffer wall from that point north. (t ) Please refer to the additional section sheet CE 6. A combination of concrete '":' retaining wall / aluminum picket fence with landscaping has been used to provide the required buffers. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. '/ The townhouse building does not encroach into the side setback. I. t/O.{}- ~ 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 12 DEPARTMENTS 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). These lot numbers are now provided on LP-I, 2, and 3 and match the site plan sheet. 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. The typical lot details depict the allowable pools, decks, spas, and screen enclosUl"es. Impervious area includes all homeowners choosing to build these amenities. 79. On the floor plans for the townhouse buildings (sheet A2l0), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. All main rooms have been labeled on the floor plan for the townhouse buildiDl!S, on sheet A21 O. 80. Indicate all easements, including five (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru ~P-8) I I Duly noted. 'i 6 I L ([;. f,) r( 4 If'" \J f' ~tXf! ~ Ie 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in RfW subject to Engineering Division review and approval) A note has been added to LP-I, 2, and 3. Refer to note S on the site plan sheet CE 2. 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure Building height and highest point of sft"ucture has been provided on all elevations. 83. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. Developer has chosen to stay with open pavilion. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and INCLUDE REJECT t.../ ~ ,/ ".) ~.........- v ~---- v 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 13 DEPARTMENTS INCLUDE REJECT maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required V buffer plant material and the penalty for doing so. Refer to note 5 on the site plan sheet CE2. HOA documents will also restrict removal of ve!!etation. 85. The tree removal plan (sheet 1'-1) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? Reason why trees can not remain is that there will be a significant grade V change, however Sabal Palms from Site will be kept in Sales Trailer area and irrigated and will be used through out site later. 86. The removal I relocation of landscape material are subject to review and approval of the City Forester I Environmentalist. './ Dulv noted. 87. Indicate on all landscape plans the screening of at-grade AIC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AlC units on the site V plan (CE-2) and the landscape plan (LP-2) do not match All AC units are Landscaped with native matel'ial and this information can be found on sheets LP-I, 2, 3, 4, 6, 7, and 8. 88. Indicate the property lines of all proposed lots on sheet LP-2. Iv- DlIlv noted. 89. The landscape plan (sheet LP-1) depicts on-street parking along Lots 61 and 62. Please correct. V- This has been corrected. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. V- Dulv noted. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article IT, Section 5.P). Please categorize as follows: Shade V trees, Palm trees, and Shrubs & Groundcover. Dul} noted, see sheet LP-4. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, V Section 5.C.2.). Dulv noted, see sheet LP-4. 93. The trees proposed around the townhouse buildings must be installed at Y2 the building height of the building (Chapter 7.5, Article II, Section 5.M.). 'V Dulv noted. 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). . L--- Dulv noted, see sheets LP-3 and 4. 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, V Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. This has heen shown on sheets LP-3 and 4. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 14 , . DEPARTMENTS INCLUDE REJECT 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.0.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of Y2 the wall height. The wall/fence combination V cannot exceed 8 feet in height. A 3' high Silver Buttonwoolt1iedge has been provided; see sheets LP-2, 3, and 4. 97. Provide a detail of the fence proposed around the pool/clubhouse area and (l {/ d along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.0). Also provide the same detail for the fD{urS emergency access gate off of Gulfstream Blvd. See sheet LC - t. ~, 98. Provide a detail of the decorative posts proposed on each side of the entry tldr/ drive (west of mail kiosk), including its dimensions and height, material, and color. () U lv (fy-"< See Sheet LC-2. 99. Revise the detail of the typical outdoor freestanding lighting fixture (sheet ~ LP-5) to also include the exterior finish, materials used (i.e. concrete or :i (j I (j aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height f! :)( <)~ and shall consider safety, function, and aesthetic value (Chapter 9, Section IO.F.1.). See sheet LP-5. 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section IO.F.2.). V Duly Noted. 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is \/ encouraged (Chapter 9, Section IO.F.3.). See sheet LL- t. 102. All signage is subject to reVIew and approval of the Planning & Development Board and City Commission. Is there an entrance sign -% proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the Add ~ dimensions, sign face area proposed, exterior fmish, and letter color(s) [V ()l () G (Chapter 4, Section 7.0.). See sheets LC-2 and LP-3. 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. V This is not an option for the current design of the pro.iect. 104. What is the heavy line depicted wrapping the SE corner of the tot lot? A knee/sitting wall? Provide additional detail of this area. y This area has changed a bit. What you speak of was a wall. Now there is an aluminum rail fence with two entries, see sheets LP-2 and LC-l. 105. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. V Trash can areas al'e paved with navers. 106. A second layer of landscaping is required along Gulfstream Blvd. This has been provided, see sheet LP-3. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. This has been changed to all Silve.' Buttonwood Trees with an occasional Triple Adonidia Palm put in to break up the silver, see sheets LP-2, 3, and 4. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure, The rear elevations of the units fronting Gulfstream Boulevard, on sheets A320, A330, and A340 have been revised. Each model received additional architectural elements to support its architectural styles, including additional banding, shutters, and all models received an additional tile roof overhang over the rear porch. Sc.'een enclosures will be limited to the underside of roofed porches. No exterior (one or two story) screen enclosures will be allowed. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure,? Make sure this is clearly noted on the plans. Only ~1~eb61s-will be allowed pools. All other lots will be allowed spas. All lots will be allowed screen enclosu.'es. This is shown on the typical lot details on the site plan sheet eE2 and on Sheets LP-l and 3. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. Screen enclosures up to the mean building height will be allowed on all units except those abutting Gulfstream Blvd. "here the enclosure will be restricted to a sinl.!le storv in heil.!ht. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. Corrected. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the five (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please figure out how to accommodate all these needs or eliminate the pool and screen enclosure option. The 6' MAE has been eliminated from the single family lots since access for maintenance is now available between houses, 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, V ~6fuct , The screen enclosure side setback has been shown as 8' to align with the edge t1. t. t ~ (" . of the house. ~ + J X MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynlon Dixie\MPMD 07-002\1ST REVIEW COMMENTS.doc 1/(f};0/1 (' (' ~ KJ'5p01.J~ Joe ~ J.;of- a-rJdre-s s t;' vt~ I)..) ri tv l:J tLrds flt::~~riV7t~ LttNti'S~ bV-~ IS fropos-td>> -i-LA- cd- c: Y1 1!Pf: ,e ~ r4- tt~ LIJ+ CL+ ,114. 2.T J/V1..f' ef / f.J~' I I 7l ~~ f( AJ() "YlA..t1 NoT:: WOt..; -trf€.s., ' ~C,~I- il.Lt d trl-p ttf l>.l~1.i {f-/I-) LJ ~+6.-,1 L 'i :;t L~."I- e. 0 . lot App{~(L{J-..jv+ t II/i'cud h _. I J ., -0 ( N ('l.tl.r{$,~..ed ~0W. tv ~ ~ I/LJi'\LLI/ l~/j1/t; ....J-".!;".--I~ 1 .--Ll _,II .__,/ ~. .,~ 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 15 DEPARTMENTS / I INCLUDE REJECT 'V' v v ~ () of tI f\/ 0 ie +0 (!['-.:L, 1-- v ,0( I/l :~1 IV ,Tf <! PI .1\ j -Ii 1 f'\ IV . ,~ v- v '"1 st REVIEW COMMENTS :: \ :\ ,.--.- Maior Site Plan Modification 'I ~ ' I "i ; i JUt 3 n 2001 . : ; IPFbject name: :t;states ofHerit~ge Club lFile..number: MPMD 07~OO2 j Reference.: _,~ st_~~yi~w plans id~ntifie~ as a Master Plan Modification with a December 20,2006 ~Irg Department date stamp markm!r Plannin!r and DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. 3. It may be necessary to replace or relocate canopy trees adjacent to trash pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and FirelRescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated callboxes, etc., allow ingress and egress for Solid Waste and FirelRescue. PUBLIC WORKS - Forestry Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notify and coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A. Lb.) 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. 1 ST REVIEW COMMENTS 01/08/07 2 DEPARTMENTS INCLUDE REJECT PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. 11. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section 7.F.2. 12. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article N, Section 5 will be required at the time of permitting. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application, UTILITIES Comments: 14. Please provide a timeline that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the timeline should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. 15. All utility easements and utility lines shall be shown on the site plan and 1ST REVIEW COMMENTS 01/08/07 3 DEPARTMENTS INCLUDE REJECT landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce 1 ST REVIEW COMMENTS 01/08/07 4 DEPARTMENTS INCLUDE REJECT or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. 22. Residential: ~ All lighting shall be metal halide. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). ~ Provide timer clock or photocell sensor engaged lighting for above or near entryways to residences and all pedestrian sidewalks, ~ Provide lighting for entrance sign. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of 6"if non-illuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. 1ST REVIEW COMMENTS 01/08/07 5 DEPARTMENTS INCLUDE REJECT ~ Restrict access to recreation buildings and pools through the use of key card or key, 23. Residential Security ~ The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. ~ When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. ~ Entry doors to open outward versus inward. ~ If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. ~ Equip all exterior doors with security hinges. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhanl! or canopy to the 1ST REVIEW COMMENTS 01/08/07 6 DEPARTMENTS INCLUDE REJECT property line. In addition, show the distance between all the buildings on all sides. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373,216. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 1 ST REVIEW COMMENTS 01/08/07 7 ~~.c)1 \ . ~ DEPARTMENTS INCLUDE REJECT 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. 37. Sheet A240 - Exterior wall fire resistance ratings shall comply with 2004 FBC, Residential, Section R302.1. PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408.00 TOTAL $105,533 39. Indicate which species are native and the overall percentage of native species. 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. FORESTER/ENVIRONMENTALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Bluebeny Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). / [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.] 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a ~ certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] 43. All trees proposed under any existing overhead electric power lines must ~ meet the FP & L Rioht tree in the RiQ:ht Place manual selection for small 1 ST REVIEW COMMENTS 01/08/07 8 DEPARTMENTS INCLUDE REJECT trees only. 44. All shrubs and groundcover plants should have a height and spread ~ dimension. 45. The applicant should show an elevation cross-section detail (similar to sheet AOIO) of the actual heights of the proposed landscape trees and vegetation ~ at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. Irrie:ation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate ~ zones and time duration for water conservation. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec, 5, ~ C.2.] PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staffs comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8Y2 inches by 11 inches of each plan, Save each plan to a compact disk and submit that to staff as well. 50. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. 52. Revise application (Sec. IIA.) Acreage Breakdown (a. through i. added together should equal the total ofj.). 53. Revise application (Sec, 11.6) Floor Area (a. through g. added together 1 ST REVIEW COMMENTS 01/08/07 9 DEPARTMENTS INCLUDE REJECT should equal the total of h.). 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). 55. Revise application (Sec. n.lO.b.) to provide calculation for required number of handicap spaces. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. 62. All elevation pages shall indicate the exterior finishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D,). 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. 66, Revise tabular Building Code Data (sheets AOIO, 020, 030) under number of stories: change word "required" to "maximum". 67. Revise Townhouse Building drawing index scale (sheets A010, A020) to revise scale from 1/8" = l' to Y4" = I' to coincide with scaled drawings (sheets A220, A221, A3lO, A311). 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. 70. Typical single-family lot layout / setbacks on site plan and landscape plan 1 ST REVIEW COMMENTS 01/08/07 10 DEPARTMENTS INCLUDE REJECT do not match. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant bv 2 foot side to comer, and 15 foot side to side. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adiacent to the zero side. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc.. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. 79. On the floor plans for the townhouse buildings (sheet A21O), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. 80. Indicate all easements, including five (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8) 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in R/W subject to Engineering Division review and approval) 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure 83. Staff recommends constructing a clubhouse building (w AlC) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide 1 ST REVIEW COMMENTS 01108/07 11 DEPARTMENTS INCLUDE REJECT Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. 85. The tree removal plan (sheet T-1) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't thev be preserved in areas earmarked for plant material? 86. The removal I relocation of landscape material are subject to review and approval of the City Forester I Environmentalist. 87. Indicate on all landscape plans the screening of at-grade AlC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the A/C units on the site plan (CE-2) and the landscape plan CLP-2) do not match 88. Indicate the property lines of all proposed lots on sheet LP-2. 89. The landscape plan (sheet LP-1) depicts on-street parking along Lots 61 and 62. Please correct. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). 93. The trees proposed around the townhouse buildings must be installed at ~ the building height of the building (Chapter 7.5, Article II, Section S.M.), 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of Y2 the wall height. The wall/fence combination cannot exceed 8 feet in height. 97. Provide a detail of the fence proposed around the pool I clubhouse area and along Gu1fstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd.. 1 ST REVIEW COMMENTS 01/08/07 12 DEPARTMENTS INCLUDE REJECT 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. 99. Revise the detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior finish, materials used (i.e. concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 1O.F.1.). 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 1O.F.2.). 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 1O.F.3.). 102. All slgnage IS subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior finish, and letter color(s) (Chapter 4, Section 7.D.). 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A knee/sitting wall? Provide additional detail of this area. 105. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. 106. A second layer oflandscaping is required along Gulfstream Blvd.. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearly noted on the plans. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the five (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please figure out how to accommodate all these needs or eliminate the pool and screen enclosure option. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynton Dixie\MPMD 07-002\1ST REVIEW COMMENTS.doc 1st REVIEW COMMENTS ~ --~c_~____ ,r:J ',' ,-, -- Ma ior Site Plan Modification 1/ n" I' r~' n n, r,'-':,-;-- i: I" I Project name: Estates of Heritage Club JAM ,1 n. ~-,_ File number: MPMD 07-002 Reference: 1 sl review plans identified as a Master Plan Modification with a December 20. 2006 Planning and Zonin!! Deoartment date stamo markin!! DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). Acknowled!!ed. 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. The trash pickup areas have been expanded to provide the 3' clearance. 3. It may be necessary to replace or relocate canopy trees adjacent to trash pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. Trees that posed an issue have been shifted and/or removed. This can be viewed on sheets LP-l, 2, & 3. 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and Fire/Rescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated call boxes, etc., allow ingress and egress for Solid Waste and Fire/Rescue. The minimum turning radius has been provided. A separate fire access plan has been provided showin2 the vehicle travel path. PUBLIC WORKS - Forestrv Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notify and coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. This note has been provided within the median on both sheets LP-l & 3. It also appears as note 7 on the site plan sheet CE2. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.l.b.). No large canopy trees fall within the 15' restricted area for light poles (only small trees). 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 2 DEPARTMENTS 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. Duly noted. PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Acknowledged. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. Acknowled!!ed. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. Acknowled!!ed. 11. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section 7.F.2. The required certification has been added as note 2 on sheet CE3. 12. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Acknowled!!ed. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Acknowled!!ed. UTILITIES Comments: 14. Please provide a time line that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 3 DEPARTMENTS setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. All required utility construction permits have been received for the existing site plan. Since mainline design will be unchanged, we expect to begin construction in March, 2007 with connection of the first water meter by the end or2007. 15. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. All utility easements and lines are shown on Landscape Plans and Water and Sewer Plans as requested and trees have been placed as not to be in conflict with such easements. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). Acknowled2ed. 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). Utility easements are shown on the engineering drawings and proposed plat. Easements will be dedicated by plat. 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. Acknowled2ed. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. Acknowled2ed. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. Acknowled2ed. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 4 DEPARTMENTS INCLUDE REJECT FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. Acknowledl!ed. The required plan will be provided prior to permit issuance. 22. Residential: ~ All lighting shall be metal halide. This note has been added to sheet LP-5. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). Duly noted. ~ Provide timer clock or photocell sensor engaged lighting for above or near entryways to residences and all pedestrian sidewalks. Photocells provided. ~ Provide lighting for entrance sign. Provided, refer to new sheet LL-l. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. Dulv noted. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. Provide on Landscape drawinl!s LP-2 and 3. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) Agreed. - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of 6"if non-illuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 5 DEPARTMENTS INCLUDE REJECT ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. These are located adjacent to the recreation area parking. Mail boxes are depicted as large "M" within a rectangle at the NW corner of parking area - this can be vie",ed on sheet LP-3 and on the site plan. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. Clubhouse is not air-conditioned, so alarm has not been provided. However, on sheet A290, a note has been added to the door schedule so that 2ates are key-locked for security purposes. ~ Restrict access to recreation buildings and pools through the use of key card or key. Note has been provided on sheet LP-3. 23. Residential Security ~ The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. A note has been added to the effect to all door schedules. See sheets A6lO, A611, A612, A613, A210, A220, ABO, and A240. ~ When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. There are not any doors with a side pane window. Please see sheets A6lO, A611, A612, A613, A21 0, A220, ABO, and A240. ~ Entry doors to open outward versus inward. All entry doors open outwards. Please see sheets A610, A611, A612, A613, A2lO, A220, A230, and A240. ~ If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. A note has been added to the effect to all door schedules. See sheets A610, A611, A612, A613, A2lO, A220, A230, and A240. ~ Equip all exterior doors with security hinges. A note has been added to the effect to all door schedules. See sheets A610, A611, A612, A613, A210, A220, ABO, and A240. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at pennit review. Acknowledged. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be detennined by the provisions of ASCE 7, Chapter 6, and 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 6 DEPARTMENTS INCLUDE REJECT the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. All buildings will complv with this reQuirement. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. Signed and sealed working drawings will be provided at time of permit review. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. This is now provided on sheet LC-l. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the property line. In addition, show the distance between all the buildings on all sides. Setbacks shown on the site plan are measured to the building wall. Building overhangs (eaves) will encroach up to 3' into the setback in accordance with CBBCO Part III, Chapter 2, Section 4.J.3. Side-to-side building separations reQuirements are shown on the lot details. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. There will be one master system for entire site that will run off of a well. The well location is shown on sheet LP-3. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. The water use permit has been issued bv SFWMD. A copv will be provided. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) Acknowledged. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 7 DEPARTMENTS 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. Acknowledged. 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) Acknowledged. 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. Acknow ledged. 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) Acknowledged. 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2to, A220, ABO, and A240. 37. Sheet A240 - Exterior wall fire resistance ratings shall comply with 2004 FBC, Residential, Section R302.1. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2to, A220, ABO, and A240. INCLUDE 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 8 DEPARTMENTS INCLUDE REJECT PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408.00 TOTAL $105,533 .V' The Developer has paid $63,222 for the current approval. The difference of )U tJ T tJ- $42,311 will be paid for the site plan modification. 39. Indicate which species are native and the overall percentage of native species. V This information is provided on sheet LP-4. 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. The home site landscape plans have there own plant lists on their own sheets V. with two plant pallet options for each. The plant list shown on LP-4 is for common areas and town houses. FORESTER/ENVIRONMENT ALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.] This has been corrected on sheet LP-4. 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] This note has been added to sheet LP-4. 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Right tree in the Right Place manual selection for small trees only. This criterion has been met. 44. All shrubs and groundcover plants should have a height and spread dimension. This information has been provided on sheet LP-4. 45. The applicant should show an elevation cross-section detail (similar to sheet AO 1 0) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. This is shown on LP-4 in regards to item 'b' above, item 'a' and 'c' can be viewed on sheet LC-3. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 9 DEPARTMENTS INCLUDE REJECT Irril!ation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. Duly noted. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] This has been addressed on sheet LP-4. PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staff's comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. Acknowledged. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8Yz inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. Acknowledged. 50. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. Acknowledl!ed. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. Notices will be done in accordance with Ordinance 04-007. 52. Revise application (Sec. 11.4.) Acreage Breakdown (a. through 1. added together should equal the total ofj.). Application has been revised. 53. Revise application (Sec. 11.6) Floor Area (a. through g. added together should equal the total of h.). Application has been revised. 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). Application has been revised. 55. Revise application (Sec. 1I.10.b.) to provide calculation for required number of handicap spaces. Application has been revised. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. Legal descriptions now match. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). Drainage statement is enclosed. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 10 DEPARTMENTS INCLUDE REJECT 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). A revised traffic study is enclosed. This revised traffic study was sent to the County on January 11,2007. 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (Le. a letter) of their approval prior to the Planning & Development Board meeting. The revised school concurrency application is enclosed. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. Acknowledged. 61. Will an on-site lift-station be required as a result of this development? Ifso, show its location on the site plan (sheet CE-2) and landscape plan. An on-site lift-station will not be reauired. 62. All elevation pages shall indicate the exterior finishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). A color schedule has been added to all elevation pages. See sheets A3IO, A320, A330, and A340. 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). Acknowledged. 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. Dimensions have been added. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. Adiacent zoning is indicated on the site plan. 66. Revise tabular Building Code Data (sheets AOIO, 020, 030) under number of stories: change word "required" to "maximum". Tabular data has been revised as required. See sheets AOIO, A020, A030, and A040. 67. Revise Townhouse Building drawing index scale (sheets AOIO, A020) to revise scale from 1/8" = l' to W' = l' to coincide with scaled drawings (sheets A220, A221, A310, A311). Drawinl! index scale has been revised to coincide with scaled drawings. 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. All townhouse buildinl!s are identical. All sheet titles now read, 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 11 DEPARTMENTS INCLUDE REJECT TOWNHOUSE BUILDING - BUILDINGS ONE THROUGH FIVE. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. Additional architectural elements have been provided to the rear and side elevations of the townhouse buildings. These elements include additional window banding, color changes per unit type, decorative shutters, and decorative balconette railings on all Lexington units, additional windows on the side elevations, additional keystone and sill details to side elevations. Please see sheets A310. 70. Typical single-family lot layout / setbacks on site plan and landscape plan do not match. Setbacks are now consistent between plans. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2 foot side to comer, and 15 foot side to side. Setback data has been revised. Side to corner refers to the distance between the side of the structure and the side lot line. Side to side refers to the non- zero side lotline setback which is also the building separations since these are zero lot line lots. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adjacent to the zero side. This note has been provided on Home Site Landscape Plans sheets LP-6, 7, and 8. The easement is shown on the site plan and plat. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. All elevations, including front, rear and both sides of each single family model has bee provided. See sheets A320, A321, A330, A331, A340, and A341. In addition, zero side elevation has been labeled, so it becomes clear that zero side elevations have no window openings. Furthermore, two rear elevations have been provided for each model, one being the typical elevation and the second one being the Gulfstream Boulevard elevation 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc. A typical has been provided for the townhouses on the site plan and landscape plan. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. Please refer to the additional section sheet CE 6. A combination of concrete retaining wall / aluminum picket fence with landscaping has been used to provide the required buffers. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. The townhouse building does not encroach into the side setback. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 12 DEPARTMENTS 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). These lot numbers are now provided on LP-I, 2, and 3 and match the site plan sheet. 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. The typical lot details depict the allowable pools, decks, spas, and screen enclosures. Impen'ious area includes all homeowners choosing to build these amenities. 79. On the floor plans for the townhouse buildings (sheet A210), graphically indicate the use of each room (Le. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. All main rooms have been labeled on the floor plan for the townhouse buildings, on sheet A2to. 80. Indicate all easements, including five (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8) Duly noted. 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in R/W subject to Engineering Division review and approval) A note has been added to LP-I, 2, and 3. Refer to note 8 on the site plan sheet CE 2. 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure Building height and highest point of structure has been provided on all elevations. 83. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. Developer has chosen to stay with open pavilion. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 13 DEPARTMENTS INCLUDE REJECT maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. Refer to note 5 on the site plan sheet CE2. HOA documents will also restrict removal of vegetation. 85. The tree removal plan (sheet T-I) indicates that only one (I) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? Reason why trees can not remain is that there will be a significant grade change, however Sabal Palms from Site will be kept in Sales Trailer area and irri!!ated and will be used through out site later. 86. The removal I relocation of landscape material are subject to review and approval of the City Forester I Environmentalist. Dulv noted. 87. Indicate on all landscape plans the screening of at-grade AIC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AIC units on the site plan (CE-2) and the landscape plan (LP-2) do not match All AC units are Landscaped with native material and this information can be found on sheets LP-l, 2, 3, 4, 6, 7, and 8. 88. Indicate the property lines of all proposed lots on sheet LP-2. Duly noted. 89. The landscape plan (sheet LP-I) depicts on-street parking along Lots 61 and 62. Please correct. This has been corrected. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. Dulv noted. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. Dulv noted, see sheet LP-4. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). Duly noted, see sheet LP-4. 93. The trees proposed around the townhouse buildings must be installed at Yz the building height of the building (Chapter 7.5, Article II, Section S.M.). Duly noted. 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). Dulv noted, see sheets LP-3 and 4. 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. This has been shown on sheets LP-3 and 4. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 14 DEPARTMENTS INCLUDE REJECT 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of Yz the wall height. The wall/fence combination cannot exceed 8 feet in height. A 3' high Silver Buttonwood hedge has been provided; see sheets LP-2, 3, and 4. 97. Provide a detail of the fence proposed around the pool/ clubhouse area and along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd. See sheet LC-l. 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. See Sheet LC-2. 99. Revise the detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior finish, materials used (Le. concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 10.F.1.). See sheet LP-5. 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 10.F.2.). Duly Noted. 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 10.F.3.). See sheet LL-l. 102. All slgnage IS subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior finish, and letter color(s) (Chapter 4, Section 7.D.). See sheets LC-2 and LP-3. 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. This is not an option for the current desil!n of the project. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A knee/sitting wall? Provide additional detail of this area. This area has changed a bit. What you speak of was a wall. Now there is an aluminum rail fence with two entries, see sheets LP-2 and LC-l. 105. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. Trash can areas are paved with pavers. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 15 DEPARTMENTS INCLUDE REJECT 106. A second layer of landscaping is required along Gulfstream Blvd. This has been provided, see sheet LP-3. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. This has been changed to all Silver Buttonwood Trees with an occasional Triple Adonidia Palm put in to break uv the silver, see sheets LP-l, 3, and 4. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. The rear elevations of the units fronting Gulfstream Boulevard, on sheets A3lO, A330, and A340 have been revised. Each model received additional architectural elements to support its architectural styles, including additional banding, shutters, and all models received an additional tile roof overhang over the rear porch. Screen enclosures will be limited to the underside of roofed porches. No exterior (one or two story) screen enclosures will be allowed. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearly noted on the plans. Only perimeter lots will be allowed pools. All other lots will be allowed spas. All lots will be allowed screen enclosures. This is shown on the typical lot details on the site vlan sheet CEl and on Sheets LP-l and 3. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. Screen enclosures up to the mean building height will be allowed on all units except those abutting Gulfstream Blvd. where the enclosure will be restricted to a sin21e stOry in hei2ht. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. Corrected. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the five (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please figure out how to accommodate all these needs or eliminate the pool and screen enclosure option. The 6' MAE has been eliminated from the single family lots since access for maintenance is now available between houses. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. The screen enclosure side setback has been shown as 8' to align with the edge of the house. MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynlon Dixie\MPMD 07-002\1ST REVIEW COMMENTS,doc · 1st REVIEW COMME:;;/tti1{q;;r<-eI_ Maior Site Plan Modification !J(-:"~{/t!r;w Project name" Estates of Heritage Club ( 17C/ t7) l File number: MPMD 07-002 I Reference: 1 streview olans identified as a Master Plan Modification with a Decdmber 20 2006 Planning an~ ,:t . Zoning Denartment date stamo marking, -~ ", / I ; DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. 3. It may be necessary to replace or relocate canopy trees adjacent to trash pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and Fire/Rescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated callboxes, etc., allow ingress and egress for Solid Waste and Fire/Rescue. PUBLIC WORKS - For.estry Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notify and coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.1.b.) 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles, r' 1 ST REVIEW COMMENTS 01/08/07 2 DEPARTMENTS INCLUDE REJECT PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. 11. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section 7.F.2. 12. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. UTILITIES Comments: 14. Please provide a timeline that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. 15. All utility easements and utility lines shall be shown on the site plan and 1 ST REVIEW COMMENTS 01/08/07 3 DEPARTMENTS INCLUDE REJECT landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce 1ST REVIEW COMMENTS 01/08/07 4 DEPARTMENTS INCLUDE REJECT or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. 22. Residential: ~ All lighting shall be metal halide. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). ~ Provide timer clock or photocell sensor engaged lighting for above or near entryways to residences and all pedestrian sidewalks. ~ Provide lighting for entrance sign. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of 6"if non-illuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. 1 ST REVIEW COMMENTS 01/08/07 5 DEPARTMENTS INCLUDE REJECT >- Restrict access to recreation buildings and pools through the use of key card or key. 23. Residential Security >- The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. >- When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. >- Entry doors to open outward versus inward. >- If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. >- Equip all exterior doors with security hinges. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical V Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and V the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 26. At time of permit review, submit signed and sealed working drawings of the / proposed construction. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. / Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below finish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code, V 28. As required by the CBBCO, Part III titled "Land Development Regulations", / submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the 1 ST REVIEW COMMENTS 01/08/07 6 DEPARTMENTS INCLUDE REJECT property line. In addition, show the distance between all the buildings on all sides. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are Li readily available. 30. A water-use permit from SFWMD is required for an irrigation system that z/ utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the ~ Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. J For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfied by a paid fee or conveyance of property. The following information shall be provided: / A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for J review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 1 ST REVIEW COMMENTS 01/08/07 7 DEPARTMENTS INCLUDE REJECT 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach / County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) 36. Exterior wall openings shall comply with the 2004 FBC, Residential, ~ Section R302.2. 37. Sheet A240 - Exterior wall fire resistance ratings shall comply with 2004 i/ FBC, Residential, Section R302.1. PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408,00 TOTAL $105,533 39. Indicate which species are native and the overall percentage of native speCIes. V 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. V FORESTER/ENVIRONMENTALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5,C. 2.] 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Right tree in the Right Place manual selection for small 1 ST REVIEW COMMENTS 01/08/07 8 DEPARTMENTS INCLUDE REJECT trees only. 44. All shrubs and groundcover plants should have a height and spread dimension. 45. The applicant should show an elevation cross-section detail (similar to sheet AOlO) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. Irrh!ation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec, 5. C.2.] PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staff s comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8Y2 inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. 50. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and sho""ll on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not sho""ll on the plans at the TART meeting would be required to be sho""ll at the time of permitting. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. 52. Revise application (Sec. IIA.) Acreage Breakdo""ll (a. through i. added together should equal the total of j,). 53. Revise application (Sec. II.6) Floor Area (a. through g. added together 1 ST REVIEW COMMENTS 01/08/07 9 DEP ARTMENTS INCLUDE REJECT should equal the total of h.). 54. Revise application (Sec. H.8) Gross Density (9.4186 du/ac = 9.42 du/ac). 55, Revise application (Sec. H.lO.b.) to provide calculation for required number of handicap spaces. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.), The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. 62. All elevation pages shall indicate the exterior finishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. 66. Revise tabular Building Code Data (sheets AOlO, 020, 030) under number of stories: change word "required" to "maximum". 67. Revise Townhouse Building drawing index scale (sheets AOlO, A020) to revise scale from 1/8" = l' to W' = l' to coincide with scaled drawings (sheets A220, A22l, A3l0, A3ll). 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. 70, Typical single-family lot layout / setbacks on site plan and landscape plan 1 ST REVIEW COMMENTS 01/08/07 10 DEPARTMENTS INCLUDE REJECT do not match. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2 foot side to comer, and 15 foot side to side. n. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adiacent to the zero side. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc.. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured bv other information). 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. 79. On the floor plans for the townhouse buildings (sheet A2IO), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. 80. Indicate all easements, including five (5) foot utility easement in front of each unit, on all landscape plans (LP-I thru LP-8) 81. Street trees are proposed within the rights-of-way internal to the development. ClarifY on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in R/W subject to Engineering Division review and approval) 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure 83. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide 1 ST REVIEW COMMENTS 01/08/07 11 DEPARTMENTS INCLUDE REJECT Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. 85. The tree removal plan (sheet T-1) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? 86. The removal/relocation of landscape material are subject to review and approval of the City Forester / Environmentalist. 87. Indicate on all landscape plans the screening of at-grade AlC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AlC units on the site plan (CE-2) and the landscape plan (LP-2) do not match 88. Indicate the property lines of all proposed lots on sheet LP-2. 89. The landscape plan (sheet LP-1) depicts on-street parking along Lots 61 and 62. Please correct. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). 93. The trees proposed around the townhouse buildings must be installed at ~ the building height of the building (Chanter 7.5, Article II, Section S.M.). 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of ~ the wall height. The wall/fence combination cannot exceed 8 feet in height. 97. Provide a detail of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd.. 1ST REVIEW COMMENTS 01/08/07 12 DEPARTMENTS INCLUDE REJECT 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. 99. Revise the detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior finish, materials used (i.e. concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 10.F.1.). 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 1O.F.2.). 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 1O.F.3.). 102. All signage IS subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior finish, and letter color(s) (Chapter 4, Section 7.D.). 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A lmee/sitting wall? Provide additional detail of this area. I 05. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. 106. A second layer of landscaping is required along Gu1fstream Blvd.. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearlv noted on the plans. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the five (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please figure out how to accommodate all these needs or eliminate the pool and screen enclosure option. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynlon Dixie\MPMD 07-002\1ST REVIEW COMMENTS,doc .; 1st REVIEW COMMENTS Maior Site Plan Modification Project name: Estates of Heritage Club File number: MPMD 07-002 Reference: I sf review plans identified as a Master Plan Modification with a December 20. 2006 Planning and Zoninl! Deoartment date staron markin!!. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). Acknowled1!ed. . - 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient space (minimum 3-ft.) between carts to allow for solid waste pickup. / The trash pickup areas have been expanded to provide the 3' clearance. ! -' 3. It may be necessary to replace or relocate canopy trees adjacent to trash ! ~' ( pickup areas, particularly at the townhouses to allow for solid waste and bulk trash equipment to operate. I Trees that posed an issue have been shifted and/or removed. This can be , viewed on sheets LP-l, 2, & 3. , -- 4. Provide a minimum outside turning radius of 55 ft. to allow turning "...- movements for Solid Waste (and FirelRescue) inside the proposed community. Using AutoTurn (or similar), show on the plans that the required turning movements are provided. Particular attention should be given to the entryways/gates, and the associated call boxes, etc., allow ingress and egress for Solid Waste and FirelRescue. The minimum turning radius has been provided. A separate fire access plan has been provided showinl! the vehicle travel path. PUBLIC WORKS - Forestry Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. The contractor shall notify and coordinate with the City of Boynton Beach Forestry & Grounds Division of Public Works a minimum of six (6) weeks in advance of any underground activities. Please acknowledge this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. This note has been provided within the median on both sheets LP-l & 3. It also appears as note 7 on the site plan sheet eE2. 6. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.l.b.). No large canopy tJ'ees fall within the 15' restricted area for light poles (only small trees). 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 2 DEPARTMENTS INCLUDE REJECT 7. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the potential for vertical conflicts with high-profile vehicles. Duly noted. PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: 8. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. Acknowled!!ed. 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. Acknowledl.!:ed. 10. Upon satisfactory Commission approval of the site plan, the applicant shall enter the process to re-plat this property through the City's Engineering Division. All Conditions of Approval (COA) generated by the City Commission applicable to this new site shall be reflected on the new record plat. Acknowledl.!:ed. 11. Provide an engineer's certification on the Drainage Plan as specified in LOR, Chapter 4, Section 7.F.2. The reouired certification has been added as note 2 on sheet CE3. 12. Full drainage plans, including drainage calculations, in accordance with the LOR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Acknow ledl.!:ed. 13. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Acknowled!!ed. UTILITIES Comments: 14. Please provide a time line that clearly illustrates when water and sewer services will be required to serve the proposed project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 3 DEPARTMENTS setting of the first water meter. This time line will be used to determine the adequacy of water and wastewater treatment capacity for your project upon the project's completion, so please be as accurate as possible. All required utility construction permits have been received for the existing site plan. Since mainline design will be unchanged, we expect to begin construction in March, 2007 with connection of the first water meter by the end of 2007. IS. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. All utility easements and lines are shown on Landscape Plans and Water and Sewer Plans as requested and trees have been placed as not to he in conflict with such easements. 16. Palm Beach County Health Department permit revisions will be required for the water and sewer systems serving this project (CODE, Section 26-12). Acknowled\;!ed. 17. Water and sewer lines to be owned and operated by the City shall be included within utility easements in accordance with the LDR, Chapter 6, Article IV, Section 6. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(e). Utility easements are shown on the engineering drawings and proposed plat. Easements will be dedicated hv plat. 18. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. Acknowled\;!ed. 19. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. Ackno\\ ledged. 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates) and will be reviewed at the time of construction permit application. Acknowled\;!ed. INCLUDE REJECT I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 4 DEPARTMENTS FIRE Comments: Forthcomin POLICE Comments: 21. The Staff recommends that prior to issuance of the fIrst building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. Acknowled ed. The re uired Ian will be rovided rior to er'mit issuance. 22. Residential: ~ Allli htin shall be metal halide. This note has been added to sheet LP-5. ~ Landscaping shall not conflict with lighting (to include long-term tree cano owth). Duly noted. ~ Provide timer clock or photocell sensor engaged lighting for above or near ent a s to residences and all edestrian sidewalks. Photocells royided. ~ Provide lighting for entrance sign. Provided, refer' to new sheet LL- t. ~ Landscaping should not obstruct view of windows, building address numbers, and walkwa s. Duly noted. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. Provide on Landsca le drawinus LP-2 and 3. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) Agreed, Needs to be illuminated for nighttime visibility. Must have bi-directional visibility from the roadway. Address numbers on doors of multi-units and single family homes need to be a minimum of 6"if non-illuminated. Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. INCLUDE REJECT D I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 5 DEPARTMENTS ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum efficiency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. These are located adjacent to the recreation area parking. Mail boxes are depicted as large "M" within a rectangle at the NW corner of par'king area - this can be viewed on sheet LP-3 and on the site Ian. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. Clubhouse is not air-conditioned, so alarm has not been provided. However, on sheet A290, a note has been added to the door schedule so that ates are kev-Iocked for securi ur oses. ~ Restrict access to recreation buildings and pools through the use of key card or ke . Note has been rovided on sheet LP-3. Residential Security The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. A note has been added to the effect to all door schedules. See sheets A6tO, A6tl, A6t2, A613, A2tO, AnO, ABU, and A240.' ~ When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. There are not any doors with a side pane window. Please see sheets A6lO, A611, A612, A613, A210, AnO, ABO, and A240. ~ Entry doors to open outward versus inward. All entry doors open outwards. Please see sheets A6lO, A611, A612, A613, A2to, AnO, ABO, and A240. ~ If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. A note has been added to the effect to all door schedules. See sheets A610, A611, A612, A6I3, A2lO, A22U, A230, and A240. ~ Equip all exterior doors with security hinges. A note has been added to the effect to all door schedules. See sheets A6to, A611, A612, A6I3, A210, A220, A230, and A240. 23. ~ BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. Acknowled ed. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined b the rovisions of ASCE 7, Cha ter 6, and INCLUDE REJECT ;) rJ 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 6 DEPARTMENTS INCLUDE REJECT the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. All buildin2s will complv with this requirement. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. Signed and sealed working drawings will be provided at time of permit review. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below fInish grade and the height that the fence is above fInish grade. The location and height of the fence shall comply with the fence regulations specifIed in the Zoning Code. This is now provided on sheet LC - t. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the property line. In addition, show the distance between all the buildings on all sides. Setbacks shown on the site plan are measured to the building wall. Building overhangs (eaves) will encroach up to 3' into the setback in accordance with CBBCO Part Ill, Chapter 2, Section 4.".3. Side-to-side building separations requirements are shown on the lot details. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. There will be one master s)'stem for entire site that "ill run off of a well. The well location is shown on sheet LP-3. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. The water use permit has been issued by SFWMD. A COIlV will be provided. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) Acknowledl.'ed. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 7 DEPARTMENTS 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. Acknowledl!ed. 33. At time of building permit application, submit verifIcation that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfIed by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter I, Article V, Section 3(f)) Acknowledl!ed. 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. Acknowled2:ed. 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post Office, Boynton Beach (Michelle Bullard - 561-734- 0872) Acknowledl!ed. 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance requirement tables on sheets A2to, AnO, A230, and A240. 37. Sheet A240 - Exterior wall fIre resistance ratings shall comply with 2004 FBC, Residential, Section R302.l. All buildings comply with this requirement. In addition, a note to the effect has been added below the Fire resistance req uirement tables on sheets A2l 0, A220, A230, and A240. INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 8 . , DEPARTMENTS INCLUDE REJECT PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1 ,4l8/unit = $79,408.00 TOTAL $105,533 The Developer has paid $63,222 for the current approval. The difference of $42,311 will be paid for the site Illan modification. 39. Indicate which species are native and the overall percentage of native species. This information is provided on sheet LP-4. 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. The home site landscape plans have there own plant lists on their own sheets with f\\'O plant pallet options for each. The plant list shown on LP-4 is for common areas and town houses. FORESTER/ENVIRONMENT ALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.] This has been corrected on sheet LP-4. 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specifIcation that: these Palm trees must be grown from a certifIed grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] This note has been added to sheet LP-4. 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Right tree in the Right Place manual selection for small trees only. This criterion has been met. 44. All shrubs and groundcover plants should have a height and spread dimension. This information has been provided on sheet LP-4. 45. The applicant should show an elevation cross-section detail (similar to sheet AOlO) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. This is shown on LP-4 in regards to item 'b' above, item 'a' and 'c' can be viewed on sheet LC-3. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 9 DEPARTMENTS INCLUDE REJECT Irrieation Plan 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. Duly noted. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] This has been addressed on sheet LP-4. PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staff's comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. Acknowledged. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8'i1 inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. Acknowledged. 50. Staff considers these plans to be at the fInal stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. Acknowledged. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. Notices will be done in accordance with Ordinance 04-007. 52. Revise application (Sec. 11.4.) Acreage Breakdown (a. through I. added together should equal the total of j.). Application has been revised. 53. Revise application (Sec. 11.6) Floor Area (a. through g. added together should equal the total of h.). AIlPlication has been revised. 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). AIlPlication has been revised. 55. Revise application (Sec. 11.1 O.b.) to provide calculation for required number of handicap spaces. Alllllication has been revised. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. LC2:al dcscriptions now match. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). Draina2:e statcmcnt is enclosed. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 10 DEPARTMENTS INCLUDE REJECT 58. Submit a revised traffic study and approval letter from the Palm Beach County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffic study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). A revised traffic study is enclosed. This revised traffic study was sent to the Counh' on .Januarv 11, 2007. 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. The revised school concurrency application is enclosed. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. Acknowled2:ed. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. An on-site lift-station will not be rea uired. 62. All elevation pages shall indicate the exterior fmishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). A colol' schedule has been added to all elevation pages. See sheets A310, A320, A330, and A340. 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). Acknowledl!ed. 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. Dimensions have been added. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. Ad,iacent zoninl! is indicated on the site Illan. 66. Revise tabular Building Code Data (sheets AOlO, 020, 030) under number of stories: change word "required" to "maximum". Tabular data has been revised as required. See sheets AOto, A020, A030, and A040. 67. Revise Townhouse Building drawing index scale (sheets AOlO, A020) to revise scale from 118" = l' to 1,4" = l' to coincide with scaled drawings (sheets A220, A22l, A3 1 0, A3ll). Drawing index scale has been revised to coincide with scaled drawin2:s. 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarifY if all townhouse buildings are identical. All townhouse buildinl!s aloe identical. All sheet titles now read, 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 11 DEPARTMENTS INCLUDE REJECT TOWNHOUSE BUILDING - BUILDINGS ONE THROUGH FIVE. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. Additional architectural elements have been provided to the rear and side elevations of the townhouse buildings. These elements include additional window banding, color changes per unit type, decorative shutters, and decorative balconette railin~s on all Lexington units, additional windows on the side elevations, additional keystone and sill details to side elevations. Please see sheets A31O. 70. Typical single-family lot layout / setbacks on site plan and landscape plan do not match. Setbacks are now consistent between Illans. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2 foot side to corner, and 15 foot side to side. Setback data has been revised. Side to corner refers to the distance between the side of the structure and the side lot line. Side to side refers to the non- zero side lotline setback which is also the building separations since these are zero lot line lots. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adjacent to the zero side. This note has been provided on Home Site Landscape Plans sheets LP-6, 7, and 8. The easement is shown on the site Illan and Illat. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. All elevations, including front, rear and both sides of each single family model has bee provided. See sheets A320, A321, A330, A331, A340, and A341. In addition, zero side elevation has been labeled, so it becomes clear that zero side elevations have no window openings. Furthermore, two rear elevations have been provided for each model, one being the typical elevation and the second one bein2: the Gulfstream Boulevard elevation 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc. A typical has been provided for the to,,, nhouses on the site plan and landscalle Illan. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. Please refer to the additional section sheet CE 6. A combination of concrete retaining wall / aluminum picket fence with landscaping has been used to provide the required buffers. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. The townhouse building does not encroach into the side setback. I ST REVIEW COMMENTS WITH RESPONSES 01/29/07 12 DEPARTMENTS 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). These lot numbers are now provided on LP-l, 2, and 3 and match the site plan sheet. 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. The typical lot details depict the allowable pools, decks, spas, and sneen enclosures. Impervious area includes all homeowners choosing to build these amenities. 79. On the floor plans for the townhouse buildings (sheet A210), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. All main rooms have been labeled on the floor plan for the townhouse buildin2:s, on sheet A21 O. 80. Indicate all easements, including fIve (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8) Duly noted. 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in RIW subject to Engineering Division review and approval) A note has been added to LP-l, 2, and 3. Refer to note 8 on the site plan sheet CE 2. 82. The code defmes building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than fIve (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure Building height and highest point of structure has been provided on all elevations. 83. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. Develoller has chosen to stay with Ollen pavilion. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide Home Owners' Association documents and plat language to verifY necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and INCLUDE REJECT 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 13 " DEPARTMENTS INCLUDE REJECT maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. Refer to note 5 on the site plan sheet CE2. HOA documents will also restrict removal of ve2:etation. 85. The tree removal plan (sheet T-l) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? Reason wh~: trees can not remain is that there will be a significant grade change, however Sabal Palms from Site will be kept in Sales Trailer al-ea and irril!ated and will be used throu2:h out site later. 86. The removal/relocation of landscape material are subject to review and approval ofthe City Forester / Environmentalist. Duly noted. 87. Indicate on all landscape plans the screening of at-grade NC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the NC units on the site plan (CE-2) and the landscape plan (LP-2) do not match All AC units are Landscaped with native material and this information can be found on sheets LP-l, 2, 3, 4, 6, 7, and 8. 88. Indicate the property lines of all proposed lots on sheet LP-2. Dulv noted. 89. The landscape plan (sheet LP-l) depicts on-street parking along Lots 61 and 62. Please correct. This has been corrected. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. Duly noted. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. Dulv noted, see sheet LP-4' 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). Duly noted, see sheet LP-4. 93. The trees proposed around the townhouse buildings must be installed at 'is the building height of the building (Chapter 7.5, Article II, Section 5.M.). Duly noted. 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). Dulv noted, see sheets LP-3 and 4. 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. This has been shown on sheets LP-3 and 4. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 14 DEPARTMENTS INCLUDE REJECT 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of 'is the wall height. The walVfence combination cannot exceed 8 feet in height. A 3' high Silver Buttonwood hedge has been provided; see sheets LP-2, 3, and 4. 97. Provide a detail of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd. See sheet LC-l. 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. See Sheet LC-2. 99. Revise the detail of the typical outdoor freestanding lighting fIxture (sheet LP-5) to also include the exterior fInish, materials used (i.e. concrete or aluminum) and color(s). The lighting fIxture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 1O.F.1.). See sheet LP-5. 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 10.F.2.). Dulv Noted. 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 10.F.3.). See sheet LL-l. 102. All signage IS subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior fInish, and letter color(s) (Chapter 4, Section 7.D.). See sheets LC -2 and LP-3. 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. This is not an olltion for the current desi2:n of the Ilroiect. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A knee/sitting wall? Provide additional detail of this area. This area has changed a bit. What you speak of was a wall. Now there is an aluminum mil fence with two entries, see sheets LP-2 and LC-1. 105. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. Trash can areas are Ilaved with pavers. 1 ST REVIEW COMMENTS WITH RESPONSES 01/29/07 15 DEPARTMENTS INCLUDE REJECT 106. A second layer of landscaping is required along Gulfstream Blvd. This has been Ilrovided, see sheet LP-3. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. This has been changed to all Silvel" Buttonwood Trees with an occasional Triple Adonidia Palm put in to break up the silver, see sheets LP-2, 3, and 4. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. The rear elevations of the units fronting Gulfstream Boulevard, on sheets A320, A330, and A340 have been revised. Each model received additional architectural elements to support its architectural styles, including additional banding, shutters, and all models received an additional tile mof overhang over the rear porch. Screen enclosures will be limited to the underside of roofed porches. No exterior (one or two stol'Y) screen enclosures will be allowed. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearly noted on the plans. Only perimeter lots will be allowed pools. All other lots will be allowed spas. All lots will be allowed screen enclosures. This is shown on the typical lot details on the site plan sheet CE2 and on Sheets LP-l and 3. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. Screen enclosures up to the mean building height will be allowed on all units except those abutting Gulfstream Blvd. "here the enclosure will be restricted to a sin2:le story in height. Ill. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. Corrected. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the fIve (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please fIgure out how to accommodate all these needs or eliminate the pool and screen enclosure option. The 6' MAE has been eliminated from the single family lots since access for maintenance is now available between houses. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. The screen enclosure side setback has been shown as 8' to align with the edge of the house. MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynton Dixie\MPMD 07-002\1ST REVIEW COMMENTS,doc 1 st REVIEW COMMENTS Maior Site Plan Modification ii, . (r" fe-- t. 'r-t-- " .. ( ~ -"-;' / --'r,; Project name: Estates of Heritage Club File number: MPMD 07-002 Reference: 1 slreview plans identified as a Master Plan Modification with a December 20,2006 Planning and Zoning Department date stamp marking. l' DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: ',- 1. Prior to permit application contact the Public Works Department (561-742- ~, 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). ' ,...I , _..~ 2. Trash pickup areas for Townhouse Buildings 1-5 need to provide sufficient , r/ \ space (minimum 3-ft.) between carts to allow for solid waste pickup. I , I~ ~ ,( 3. It may be necessary to replace or relocate canopy trees adjacent to trash ,/,' /, f{ pickup areas, particularly at the townhouses to allow for solid waste and bulk \, r trash equipment to operate. b-: '~.y,.', , \- f 4. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and FirelRescue) inside the proposed I. \ community. Using AutoTurn (or similar), show on the plans that the required \ \ turning movements are provided. Particular attention should be given to the -r. I' " i( J entryways/gates, and the associated callboxes, etc., allow ingress and egress if for Solid Waste and FirelRescue. '/-:;; \: PUBLIC WORKS - Forestry Comments: 5. The medians on Gulfstream Blvd. have existing irrigation and plant material belonging to and maintained by the City of Boynton Beach. Any damage to the irrigation system and/or plant material as a result of the contractor's " operations shall be repaired or replaced to the equivalent or better grade, as .' \ _" I /', approved by the City of Boynton Beach, and shall be the sole responsibility of . ()<j the developer. The contractor shall notify and coordinate with the City of ,./ Boynton Beach Forestry & Grounds Division of Public Works a minimum of - six (6) weeks in advance of any underground activities. Please acknowledge ' -r-.. this notice in your comments response and add a note to the appropriate plan sheets with the above stated information. 6. It may be necessary to replace or relocate large canopy trees adjacent to light . \, fixtures to eliminate future shadowing on the parking surface (LDR, Chapter I , " " ' 23, Article II, Section A. Lb.) /f ''K' ( r~!', "_./ it' 7. Staff strongly recommends placing canopy trees far enough back from drive , aisles to minimize the potential for vertical conflicts with high-profile f--.- " vehicles. ~,'" / I' , , " " ,,- \ 1 ST REVIEW COMMENTS 01/08/07 2 DEPARTMENTS INCLUDE REJECT PUBLIC WORKS-Traffic Comments: NONE ENGINEERING Comments: , 8. All comments requiring changes and! or corrections to the plans shall be I~,~ reflected on all appropriate sheets. ...-' -' ( 9. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review ..f~ , ' , j Team (TART) process does not ensure that additional comments may not be , /' 'J generated by the Commission and at permit review. /' / .. ':'" , ' -,.. 10. Upon satisfactory Commission approval of the site plan, the applicant shall -t_~ enter the process to re-plat this property through the City's Engineering -,.~ - " Division. All Conditions of Approval (COA) generated by the City ( /' J I Commission applicable to this new site shall be reflected on the new record . ......... plat. .:.: (' , 11. Provide an engineer's certifIcation on the Drainage Plan as specifIed in LDR, I~ Chapter 4, Section 7.F.2. . '\.; / 4~.1 !~~'I" \. '. t 12. Full drainage plans, including drainage calculations, in accordance with the , &~, . \ LDR, Chapter 6, Article IV, Section 5 will be required at the time of 1" ~ft'-J . permitting. .~ ':5 J ( 13. Paving, drainage and site details will not be reviewed for construction 1::),.... , " acceptability at this time. All engineering construction details shall be in " accordance with the applicable City of Boynton Beach Standard Drawings I /" ... and the "Engineering Design Handbook and Construction Standards" , '. and will be reviewed at the time of construction permit application. '~, '-" ('- . UTILITIES Comments: 14. Please provide a time line that clearly illustrates when water and sewer "- services will be required to serve the proposed project. Your starting date for "- the timeline should be the date of City Commission approval. Also provide ~~ milestone dates for permit application, the start of construction, and the /// setting of the first water meter. This time line will be used to determine the '....... adequacy of water and wastewater treatment capacity for your project upon " ." '- t" \ the project's completion, so please be as accurate as possible. 15. All utility easements and utility lines shall be shown on the site plan and 1 ST REVIEW COMMENTS o I/08/07 3 DEPARTMENTS INCLUDE d landscape plans (as well as the Water and Sewer Plans) so that we may ", determine which appurtenances, trees or shrubbery may interfere with '\-\ utilities. In general, palm trees will be the only tree species allowed within ~)--~ utility easements. Canopy trees may be planted outside of the easement so " \/ that roots and branches will not impact those utilities within the easement in ~ .... the foreseeable future. The LDR, Chapter 7,5, Article I, Section 18.1 gives .. - ('. public utilities the authority to remove any trees that may interfere with utility services, either in utility easements or public rights-of-way. 16. Palm Beach County Health Department permit revisions will be required for ~"" the water and sewer systems serving this project (CODE, Section 26-12). I" .,J ~r 17. Water and sewer lines to be owned and operated by the City shall be included ,. , r_"- within utility easements in accordance with the LDR, Chapter 6, Article IV, ----- '" /. ~ Section 6. Please show all proposed easements on the engineering drawings, . using a minimum width of 12 feet. The easements shall be dedicated via ;..... --- ( ". separate instrument to the City as stated in CODE Sec. 26-33(e). 18. This office will not require surety for installation of the water and sewer , , "- utilities, on condition that the systems be fully completed, and given to the ,t~:t.....' " " City Utilities Department before the fIrst permanent meter is set. Note that " '/<. 'J setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. / ..-- ,'""--, -- \ 19. A building permit for this project shall not be issued until this Department has ;$. '" approved the plans for the water and/or sewer improvements required to ".,J'- ", J service this project, in accordance with the CODE, Section 26-15. I / . . -'--' '-.;(' 20. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the .._~,--~ ~~~ Utilities Department's "Utilities Engineering Design Handbook and " , / ..J Construction Standards" manual (including any updates) and will be r / reviewed at the time of construction permit application. ...., .::... 1 FIRE Comments: Forthcoming POLICE Comments: 21. The Staff recommends that prior to issuance of the first building permit, the applicant prepare a construction site security and management plan for approval by the City's Police Department CPTED Official. a. The developer/project manager after site clearing and placement of construction trailers shall institute security measures to reduce 1ST REVIEW COMMENTS 01/08/07 4 DEPARTMENTS INCLUDE REJECT or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure workingenvrronment. b. The security management plan shall be maintained throughout the construction phase of the project. Non-compliance with the approved plan shall result in a stop-work order for the entire planned unit development. 22, Residential: ~ All lighting shall be metal halide. ~ Landscaping shall not conflict with lighting (to include long-term tree canopy growth). ~ Provide timer clock or photocell sensor engaged lighting for above or near entryways to residences and all pedestrian sidewalks. ~ Provide lighting for entrance sign. ~ Landscaping should not obstruct view of windows, building address numbers, and walkways. ~ Strategically place directories with arrow indicators for building addresses at the ingress point at driver eyesight level mounted in a permanent stationary and durable manner and should remain unobstructed at all times from trees, shrubs, or anything that would tend to hide or obscure from public access. ~ Numerical Address: (City Ordinance Chapter 20 Section 16) - Needs to be illuminated for nighttime visibility. - Must have bi-directional visibility from the roadway. - Address numbers on doors of multi-units and single family homes need to be a minimum of 6"if non-illuminated. - Building numbers for multi-unit buildings need to be located on the front and rear of each building, a minimum of 12" and placed in a conspicuous location away from landscaping. ~ Mail boxes for multi-units should be placed in a high activity and conspicuous location for enhanced safety and natural surveillance of users. For safety purposes due to cars stopping in the rights of way for mail pick- up and for maximum effIciency in delivering the mail, both the City and the Postmaster request that all mail kiosks be placed in a central location for delivery and pick-up. We recommend that the kiosks be located within the recreation facility. ~ Sales center, clubhouse and recreational facilities should be pre-wired for alarm systems. 1ST REVIEW COMMENTS o I/08/07 5 DEPARTMENTS INCLUDE REJECT ~ Restrict access to recreation buildings and pools through the use of key card or key. 23. Residential Security ~ The inside garage door leading into the residence shall be a solid core door and equipped with a single cylinder dead bolt lock. ~ When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. This would not apply to customized doors. ~ Entry doors to open outward versus inward. ~ If front door has zero visibility to front entryway area, equip it with a 180- degree peephole. ~ Equip all exterior doors with security hinges. BUILDING DIVISION Comments: 24. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. 25. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 26. At time of permit review, submit signed and sealed working drawings of the proposed construction. 27. Add to the submittal a partial elevation view drawing of the proposed perimeter fence. Identify the type of fence material and the type of material that supports the fence, including the typical distance between supports. Also, provide a typical section view drawing of the fence that includes the depth that the fence supports are below fInish grade and the height that the fence is above finish grade. The location and height of the fence shall comply with the fence regulations specified in the Zoning Code. 28. As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimenSIOns from each property line to the leading edge of the building/so The leading edge of the building/s begins at the closest point of the overhang or canopy to the 1 ST REVIEW COMMENTS 01/08/07 6 DEPARTMENTS property line. In addition, show the distance between all the buildings on all sides. 29. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: A The full name of the project as it appears on the Development Order and the Commission-approved site plan. B If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. The number of dwelling units in each building. D The number of bedrooms in each dwelling unit. E The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review, 33. At time of building permit application, submit verification that the City of Boynton Beach Parks and Recreation Impact Fee requirements have been satisfIed by a paid fee or conveyance of property. The following information shall be provided: A A legal description of the land. B The full name of the project as it appears on the Development Order and the Commission-approved site plan. C If the project is a multi-family project, the building number/s must be provided. The building numbers must be the same as noted on the Commission-approved site plans. D The number of dwelling units in each building. E The total amount being paid. (CBBCO, Chapter 1, Article V, Section 3(f)) 34. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for reVIew at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. INCLUDE REJECT I ST REVIEW COMMENTS 01/08/07 7 DEPARTMENTS INCLUDE REJECT 35. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post OffIce, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. A Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald - 561- 233-5013) B United States Post OffIce, Boynton Beach (Michelle Bullard - 561-734- 0872) 36. Exterior wall openings shall comply with the 2004 FBC, Residential, Section R302.2. 37. Sheet A240 - Exterior wall fIre resistance ratings shall comply with 2004 FBC, Residential, Section R302.l. PARKS AND RECREATION Comments: 38. Park Impact Fee 25 Single Family Attached x $1,045/unit = $26,125.00 56 Single Family Detached x $1,418/unit = $79,408.00 TOTAL $105,533 39. Indicate which species are native and the overall percentage of native specIes, 40. Typical Homesites A, B & C contain plant material that is not on the Plant List. FORESTER/ENVIRONMENT ALIST Comments: 41. The shade tree Elaeocarpus decipiens / Japanese Blueberry Tree must be listed in the description as a minimum of 3" DBH (4.5' off the ground). [Environmental Regulations, Chapter 7.5, Article II Sec. 5,C. 2.] 42. The Cocos nucifera / Green Malayan Coconut Palm must have the notation added to the specification that: these Palm trees must be grown from a certified grower. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.C.3.N.] 43. All trees proposed under any existing overhead electric power lines must meet the FP & L Rioht tree in the RiQ:ht Place manual selection for small 1 ST REVIEW COMMENTS 01/08/07 8 DEPARTMENTS INCLUDE REJECT trees only. 44. All shrubs and groundcover plants should have a height and spread dimension. 45. The applicant should show an elevation cross-section detail (similar to sheet AOI0) of the actual heights of the proposed landscape trees and vegetation at the time of planting to (proper scale) visually buffer the proposed buildings and parking areas from a.) the Gulfstream Estates single family residents b.) Gulfstream Boulevard and c.) Old Dixie Highway roads rights-of-ways. Irri2atioD PlaD 46. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. 47. Trees should have separate irrigation bubblers to provide water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] PLANNING AND ZONING Comments: 48. At the technical advisory review team (TART) meeting, provide written responses to all staffs comments and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. 49. At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8Y2 inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. 50. Staff considers these plans to be at the fInal stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. 51. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. 52. Revise application (Sec. 11.4.) Acreage Breakdown (a. through i. added together should equal the total of j.). 53. Revise application (Sec, 11.6) Floor Area (a. through g. added together 1 ST REVIEW COMMENTS 01/08/07 9 DEPARTMENTS INCLUDE REJECT should equal the total of h.). 54. Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac). 55. Revise application (Sec. 11.1 O.b.) to provide calculation for required number of handicap spaces. 56. The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. 57. A drainage statement is required prior to the TART meeting (Chapter 4, Section 7.F.2.). 58. Submit a revised traffIc study and approval letter from the Palm Beach County TraffIc Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffIc study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE- 2). 59. The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. 60. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. 61. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2) and landscape plan. 62. All elevation pages shall indicate the exterior fInishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). 63. Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). 64. On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. 65. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting vards when in other zoning districts. 66. Revise tabular Building Code Data (sheets AOlO, 020, 030) under number of stories: change word "required" to "maximum". 67. Revise Townhouse Building drawing index scale (sheets AOlO, A020) to revise scale from 1/8" = l' to W' = l' to coincide with scaled drawings (sheets A220, A22l, A310, A31l). 68. Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. 69. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of recessed areas, banding, shutters, balconies, etc.. 70. Typical single-family lot layout / setbacks on site plan and landscape plan 1 ST REVIEW COMMENTS 01/08/07 10 DEPARTMENTS INCLUDE REJECT do not match. 71. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2 foot side to comer, and 15 foot side to side. 72. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adiacent to the zero side. 73. Provide elevations for front, rear, and both sides of each single-family model. Indicate side elevations as zero side and non-zero side and demonstrate compliance with zero side limited opening requirements. 74. Provide a typical of the fee-simple townhouse lot including lot dimensions, setbacks, etc.. 75. Revise location of six (6) foot aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. 76. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. 77. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured bv other information). 78. Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the TART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid- roof enclosure at the rear of their unit. 79. On the floor plans for the townhouse buildings (sheet A2l0), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. 80. Indicate all easements, including fIve (5) foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8) 81. Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in R/W subject to Engineering Division review and approval) 82. The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge. On all elevation pages, indicate the proposed building heights and also include the dimension of the highest point of the structure 83. Staff recommends constructing a clubhouse building (w A/e) rather than a small cabana building in order to provide a place where homeowner association meetings can occur. 84. What would keep property owners from removing perimeter buffer landscape material in their back yard? At the time of permitting, provide I ST REVIEW COMMENTS 01/08/07 11 DEPARTMENTS INCLUDE REJECT Home Owners' Association documents and plat language to verify necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and maintained by the Home Owners' Association. Language should clearly indicate individual homeowners shall not be allowed to remove any required buffer plant material and the penalty for doing so. 85. The tree removal plan (sheet T-l) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? 86. The removal/relocation of landscape material are subject to review and approval of the City Forester / Environmentalist. 87. Indicate on all landscape plans the screening of at-grade AlC units proposed behind each unit with native hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AlC units on the site plan (CE-2) and the landscape plan (LP-2) do not match 88. Indicate the property lines of all proposed lots on sheet LP-2. 89. The landscape plan (sheet LP-l) depicts on-street parking along Lots 61 and 62. Please correct. 90. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. 91. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. 92. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). 93. The trees proposed around the townhouse buildings must be installed at ~ the building height of the building (Chapter 7.5, Article II, Section 5.M.). 94. All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article IT, Section 5.0). 95. Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if suffIcient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. 96. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. Ensure wall is setback a minimum of two (2) feet from the property line to accommodate landscape material other than just the Creeping Fig depicted on the plans. The landscape material shall be planted at a minimum of Y2 the wall height. The wall/fence combination cannot exceed 8 feet in height. 97. Provide a detail of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., including its dimensions and height, material, and color (Chapter 4, Section 7.D). Also provide the same detail for the emergency access gate off of Gulfstream Blvd.. 1 ST REVIEW COMMENTS 0I/08/07 12 DEPARTMENTS INCLUDE REJECT 98. Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), including its dimensions and height, material, and color. 99. Revise the detail of the typical outdoor freestanding lighting fIxture (sheet LP-5) to also include the exterior finish, materials used (i.e. concrete or aluminum) and color(s). The lighting fixture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 10.F.1.). 100. Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 10.F.2.). 101. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 10.F.3.). 102. All signage is subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior fInish, and letter color(s) (Chapter 4, Section 7.D.). 103. Staff recommends that the units along Gulfstream Blvd. have a walkway and gate from the sidewalk to give the appearance of front entries. 104. What is the heavy line depicted wrapping the SE comer of the tot lot? A knee/sitting wall? Provide additional detail of this area. 105. Staff recommends the use of pavers for the area of trash container placement, rather that the sod depicted. 106. A second layer oflandscaping is required along Gulfstream Blvd.. 107. Staff recommends the use of a substitute plant material for the Crepe Myrtle in the buffer planting, due to its nature of being devoid of foliage at certain times of the year. 108. The rear elevations of the units fronting Gulfstream Blvd. need further architectural enhancement over what has been presented, since they turn their backs to a major thoroughfare. In no instance, should these units be allowed any kind of screen enclosure. 109. Will only the premium (72' deep) lots be allowed a pool? Screen enclosure? Make sure this is clearly noted on the plans. 110. Two (2) story screen enclosures should not be permitted. Change note on the plans. 111. Pool and screen enclosure setbacks do not match between the site plan and landscape plan. Please correct. 112. A five (5) foot screen setback encroaches into the 6 foot M.A.E. Additionally, the five (5) foot easement for drainage structures and pipe would not appear to allow the trees proposed within the landscape buffer. Please figure out how to accommodate all these needs or eliminate the pool and screen enclosure option. 113. Indicate the screen enclosure side setback on the non-zero side is 14 feet, not 6 feet. MWR/sc S:\Planning\SHARED\WP\PROJECTS\Boynton Dixie\MPMD 07-002\1ST REVIEW COMMENTS,doc jy~7/r~!'~~ ~~ THE ESTATES AT HERITAGE CLUB " . / ~.1 (FKA BOYNTON DIXIE) . 0 MPMD 07-002 ~"7kL ~ ~ 1st Review Planning ~/r~' January 4, 2007 O~ / ~ (1.... At the technical advisory review team (TART) meeting, provide written responses to all staffs comments / 2iJ.. and questions. Submit 12 sets of revised plans. Each set should be folded and stapled. ---- At the technical advisory review team meeting, also provide a full set of reduced drawings, sized 8'iS inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. Staff considers these plans to be at the final stage of site plan review, the last stage prior to permit review. As such, all comments need to be addressed and shown on the plans prior to the Technical Advisory Review Team (TART) meeting. Any information not shown on the plans at the TART meeting would be required to be shown at the time of permitting. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. Revise application (Sec. 11.4,) Acreage Breakdown (a. through i. added together should equal the total of j.) Revise application (See, 11.6) Floor Area (a. through g. added together should equal the total of h.) Revise application (Sec. 11.8) Gross Density (9.4186 du/ac = 9.42 du/ac) Revise application (Sec. II.lO.b.) to provide calculation for required number of handicap spaces. les The legal description of the subject property on site plan and survey do not match. Use the most recent legal description. A drainage statement is rFq".ired prior to the TART meeting (Chapter 4, Section 7.F.2.). r ('l _.... ' c ;-e Vt 5.{ at -t' r ~ f+-;c.:_ r.. u IV C C \. r ,,'~-C AJ ~l- J ~y:) P r (;) ~" u J -r-tTJ t "'l f) (~ c... Submit a traffl-C-impact analysis prior to the TART meeting. Theanafysis /mist be approved by the Palm Beacb...County Traffic Division for concurrency purposes (Chapter 4. Section 8.F.). The proposed uses and intensities on the traffIc study must be consistent with the proposed uses and intensities itemized on the site plan (sheet CE-2). The project must obtain approval from the School District of Palm Beach County regarding school concurrency prior to the issuance of a building permit. It would be preferable to have evidence (i.e. a letter) of their approval prior to the Planning & Development Board meeting. The dimensions of the roadway (pavement), drive aisles, back-up areas, and rights-of-way are subject to the Engineering Division of Public Works' review and approval. Will an on-site lift-station be required as a result of this development? If so, show its location on the site plan (sheet CE-2)M09 ~ PU1rll. All elevation pages shall indicate the exterior fInishes, roof material, paint manufacturer's name, and color codes. Staff recommends using a color schedule (Chapter 4, Section 7.D.). Include a full-sized (24 inches by 36 inches) color rendering, including color swatches, of all buildings at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D,). On site plan (sheet CE-2), label the names, centerlines, and total widths of the following rights-of-way: Florida East Coast railroad; Dixie Highway; and Gulfstream Boulevard. Label on site plan (sheet CE-2) the zoning of adjacent development. According to Chapter 2.5, Section 9.B., PUD setbacks shall most closely resemble required setbacks of abutting yards when in other zoning districts. Revise tabular Building Code Data (sheets AOlO, 020, 030) under number of stories: change word "required" to "maximum". Revise Townhouse Building drawing index scale (sheets AOlO, A020) to revise scale from 1/8" = l' to W' = l' to coincide with scaled drawings (sheets A220, A22l, A3l0, A3ll). Label townhouse building numbers (per site plan) on all townhouse architectural sheets and elevations, or clarify if all townhouse buildings are identical. Provide additional architectural interest on side and rear elevations of townhouse buildings through use of , r.JAl.e(llo.lUi~ recessed areas, bandmg, shutters, etc. ~ Typical single-family lot layout / setbacks on site plan and landscape plan do not match. Revise tabular site data and typical lot layouts for single-family to indicate they are zero lot line. Specify side setbacks and zero side and non-zero side. Clarify what is meant by 2' side to comer, and 15' side to side. On the site plan and landscape plan depict and label a 3' overhang maintenance easement on each lot adjacent to the zero side. Ir#P ~ compl, with zero side limited opening requirements, It IIftIC$ Provide elevations for front, rear, and both sides of each single-family model. zero side and non-zero side, Provide a typical of the fee-simple townhouse lot including lot dimensions, setbac s, etc. Revise location of 6' aluminum picket fence on east property line to terminate at the rear property line of townhouse lot 7, and continue the concrete buffer wall from that point north. Shift southernmost townhouse building to the west to avoid encroachment of unit 7 into side setback. Lot numbers on site plan and landscape plan do not match. Revise the lot numbers to be more legible (some are obscured by other information). Will there be a provision for outdoor patios, concrete patios, screen enclosures, or solid-roof enclosures for the townhouses? Please discuss these amenities with staff prior to the T ART meeting. Indicate the impervious area should all homeowners choose to build a screen or solid-roof enclosure at the rear of their unit. 1/"'. &r1fi {JJf' Ptvt4J ~y Jlf 1 -. ~ ~....-.....,..... ~r M ~.I'- - . 1 - ........"q.& - ., .... On the floor plans for the townhouse buildings (sheet A2l0), graphically indicate the use of each room (i.e. garage, bedroom, and kitchen). In addition, indicate the square footage and the number of bedrooms for each unit. Indicate all easements, including 5 foot utility easement in front of each unit, on all landscape plans (LP-l thru LP-8). Street trees are proposed within the rights-of-way internal to the development. Clarify on plans that streets (including trees) will be privately owned and maintained by the homeowner's association, or if the streets will be public rights of way (trees in R/W subject to Engineering Division review and approval). The code defines building height as follows: The vertical distance in feet measured from the lowest point at the property line of an adjacent property or from the minimum base flood elevation as established by FEMA, whichever is highest, to the highest point of the roof for flat roofs, to the deck line for mansard roofs and parapet roofs with parapets less than five (5) feet in height. Gable and hip roof heights shall be measured to the midpoint between the eaves and the ridge, On all elevation pages, indicate the proposed building heights and also include the dimension ofthe highest point of the structure. Staff recommends constructing a clubhouse building (w Ale) rather than a small cabana building in order to provide a place where owner association meetings home can occur. ~ p~ ~ What would keep property owners from removing perimeter buffer landsc~~aterial in their back yard? At the time of permitting, provide Home Owners' Association document~~~:~~y necessary maintenance of common areas and landscape buffers. In order to ensure proper maintenance of the buffer areas, staff recommends converting them from private property to platted "buffer tracts" that would be owned and maintained by the Home Owners' Association. ~G.c)-~ ~ ~ 11Jj,/~ IN.}.)I ~ ~~ ~ IJvr fIG ~ 'T1J~ AtU!:I ~Ultu::t> ~fitgl PUtUr ~~~l>~ ~ ~/,x;. .so . ~removal plan (sheet T-l) indicates that only one (1) tree would be preserved. Can't any of the other 68 trees be preserved; along the perimeter? Can't they be preserved in areas earmarked for plant material? The removal/relocation of landscape material are subject to review and approval of the City Forester / Environmentalist. i ~1Staff recommends installing the Redtip Cocoplum hedges at 36 iuches iu height (7 gallons -proposed on ~~ ';:~he south side of the buffer wall along Gulfstream Boulevard). t # p rI""'. Indicate on all landscape plans the screening of at-grade AlC units proposed behind each unit with native ~~. hedge material. Ensure that this hedge material is counted in the plant list. Also the locations of the AlC ?J.il units on the site plan (CE-2) and the landscape plan (LP-2) do not match. Indicate the property lines of all proposed lots on sheet LP-2. ~ ~ ~ On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Shade trees, Palm trees, and Shrubs & Groundcover. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.), The trees proposed around the townhouse buildings must be installed at Yz the building height of the building (Chapter 7.5, Article II, Section 5.M.). All freestanding monument signs shall have colorful groundcover installed at the base (Chapter 7.5, Article II, Section 5.0). Landscaping at each project entrance shall contain a combination of colorful groundcover plants and a minimum of two (2) colorful shrub species on both sides of the entrance (if sufficient space is provided- Chapter 7.5, Article II, Section 5.N.). Revise landscape plans so that they comply with the above referenced code. Provide a detail of the proposed buffer wall, including its dimensions and height, material, and color (Chapter 4, Section 7.D.). Label masonry wall as 6' masonry buffer wall. ~~ ~ I.S .5'~ A- "",AJ/~ ~ Z t:aT ~ TIle ~ tI~ ro p~ ~ ~A-t."/ 01JiO&. "TJh+.N0Ju4"(" ~ ~/~ ";1" DEPlet1!.bf/P ~~.,..~ ~UF5 ~Ai, .s~1Js '~KIfIMI);JIM.uM IF y" fU4 ~~ "I~ proviae a detaIl of the fence proposed around the pool/clubhouse area and along Gulfstream Blvd., W#4/t:l:NfL including its dimensions and height,.111aJerial, and color (Chap1er ~Section 7.D). IJ4,o ~P:;1E Ct1IJ,IbI1t11~ ~~./JeJ1fI{,fWt,~~~A~~~C#" ~~P. ~6)C~ Provide a detail of the decorative posts proposed on each side of the entry drive (west of mail kiosk), ~~ including its dimensions and height, material, and color. Revise the detail of the typical outdoor freestanding lighting fixture (sheet LP-5) to also include the exterior fInish, materials used (i.e, concrete or aluminum) and color(s). The lighting fIxture height, style, design, and illumination level shall be compatible with the building design and height and shall consider safety, function, and aesthetic value (Chapter 9, Section 10.F.1.). Lighting shall not be of an intensity that produces glare on adjacent property (Chapter 9, Section 10.F.2.). Feature lighting emphasizing plants, trees, barriers, entrances, and exits is encouraged (Chapter 9, Section 10.F.3.). All signage is subject to review and approval of the Planning & Development Board and City Commission. Is there an entrance sign proposed for the project? If so, on the site plan indicate its location and provide a detail of the sign area on the landscape plan, including the dimensions, sign face area proposed, exterior finish, and letter color(s) (Chapter 4, Section 7.D,). S:IPlanningISHAREDlWPIPROJECTSIBoynton DixielMPMD 07-002\Planning 1st review. doc -r IH ~~CA-H. ?~ ~1IeZT t.f./) ~crs ~ J11f.l:.E:"1" hht,u,Pr;, ~ LdTl, " .,2-. ~ ~ "&T7fFF 1U~ 7'MI-r TNE (),v,rS ~ ~~ &..vb. ~ " W~/O~ + ~ ~ THG ~/~ ~ ~/1.J6 116 ~ e;: ~~E$. WUft1" IS T1ItI me IH:*V!f WAJIi lJ€19~ WI'lHIJ"Pf; 1Hf4 Sf. ~~ "f TJH. ""' tAr? A klueE/fJt17l,.;{r UfiHL, ? ~ ~n~ "",Ii'- cF- T1HS M€A. .sntH ~ TlI€ UIf!s ~ ~ F.A.. '11JC AU;f ~ 1'1L;iff# ~T1H~ p~ ~ ~ TNe ,:)/Jf) tJ&11t ~ . I /I ~ ~6p ~~~ I~ ~/~ ~ ~S~ 1kuiP. S~ R.Ii~ .",. ~ ~ II- ~117VrE. P~M/n'I!JtI'U.Jff"t~71IC ~ 1k~47Z6INTJI€ ~ Pt/dJr,. IUfI, />US. ~ Ir~ AlII'f\TU tI= MJPli ~"1I()fD II': FowA-U DU..e CDln/~"MIa /IF ~~_ ~ ~ El..EV,ffltrLAS'.' ~ IJNrrS ~~ r!w-~7'1.-' .111( ~ ~ ~~7E.~ ~~ d~(,(J~ ~ ~ p.c~" SiJ#~ "'T).Ie::,y ..,.",~ '1'}.IO-t.. ~ 7Z> A ~ ~ . /'" #l> I CI$ntJC.t <!.G I ~J.IdV'-6 Tf.h!G6 ()AJ/ rS S6 ~ MJ,!f J,qAlt;, t11F St!.IJ,E€1lI ~~u~. /)J/U f$'r 7H€. ~/CLM (721.J;ezp)ur~ ee ~ A Pt:JDL? ~eAJ~? ~ ~ 71.fts IS ~11JfJTtEt> thO ~ P~. It>><O ~ 'oS~ e:tbe.LtJ~ $l;/fJVVA uti'!" /JIB ADuu,m;:t). ~fUj ~ HI TJI6~. ft'Jt:JC., ~ .$~ ~OA.eJ:= ~ ~ 11-H.. 'sITE. ~ ~ ~1IkS~ PWMI. p~ ~-. 4 5Fot?r s~~~~/NTlJ-r~~/1I1.4.E... 4-t>/)ll1~rJ '711€- 5 ~ ~ -'M- ~A.)1Ir(d; ~ ~ hl'E ~ U7J"f ~ (7) ~ '11J8 ~ ~ tuf'fHrAJ 7N€ ~ ~ . ~ M~ Wf' J.h,Q 10 A-~'"1E. Att.. ~ ~s (Ill,. EUM(p-~ nJ(. /Itnll,~ c5~ CTV~ bfJ'17 &AI . INtH~ T1J€. d~ G>vUA>.s-~ ,s,/)t ~ cMJ ~ Qgp - 'Zelc;J .$ItH;; IS /1 Fa:r J ~ "F6!:r. . , BOYNTON BEACH FIRE RESCUE TART COMMENTS PROJECT: ESTATES OF HERITAGE CLUB LOCATION: Gulfstream Blvd and west of the RR Tracks FILE# MPMD 07-002 TYPE OF PROJECT: Private Homes and Townhouses CAPACITY: 81 Living Units COMMENTS 1. All buildings, except free standing private homes, that are over 30' high must have a fire sprinkler system per NFPA 13R. 2. Entrance gates and all roadways must be a minimum of 20 feet wide if for two way traffic and 12 feet wide if one way. 3. Entrance gates must have a KNOX key override installed for Fire and Emergency Forces entry. 4. Fire Hydrants shall be spaced a maximum of 400 feet of road travel apart with no part of any building further than 250 feet from a hydrant. 5. A flow test shall be conducted within six month of submittal of this project that shows 1500gpm at 20psi available above normal domestic use for Fire Department operations. Page 1 of 1 ZeitlerJ Kathleen From: Coale, Sherie Sent: Thursday, February 01, 2007 8:50 AM To: Zeitler, Kathleen Subject: FW: From: Lee, Rick Sent: Thursday, February 01, 2007 7:50 AM To: Coale, Sherie Subject: RE: Yes. From: Coale, Sherie Sent: Wednesday, January 31,2007 11:44 AM To: Lee, Rick Subject: Rick, the email you sent to Ed",.. do you mean all your comments from yesterday's TART are to remain as conditions? 2/1/2007 BOYNTON BEACH FIRE RESCUE TART COMMENTS PROJECT: ESTATES OF HERITAGE CLUB LOCATION: Gulfstream Blvd and west of the RR Tracks FILE# MPMD 07-002 TYPE OF PROJECT: Private Homes and Townhouses CAPACITY: 81 Living Units COMMENTS 1. All buildings, except free standing private homes, that are> '/1 Af over 30' high must have a fire sprinkler system per NFPA 13R. 2. Entrance gates and all roadways must be a minimum of 20 "7.)4 4~,Ly feet wide if for two way traffic and 12 feet wide if one way. / ~~"' ~ 3. Entrance gates must have a KNOX key override installed for Fire and Emergency Forces entry. 4. Fire Hydrants shall be spaced a maximum of 400 feet of road travel apart with no part of any building further than 250 feet from a hydrant. 5. A flow test shall be conducted within six month of submittal of this project that shows 1500gpm at 20psi available above normal domestic use for Fire Department operations. )tll<,