Loading...
REVIEW COMMENTS 7.E.l HIGH RIDGE PUD (MSPM 07-010) MAJOR SITE PLAN MODIFICATION DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 07-119 STAFF REPORT TO: Chair and Members Planning and Development Board and Mayor and City Commission FROM: Kathleen Zeitler ~ /l Planner '"; !../ . ; (;/ Michael W. Rumpf'" Director of Planning and Zoning THROUGH: DATE: November 20, 2007 PROJECT NAME f NUMBER: High Ridge PUD f MSPM 07-010 REQUEST: Major site plan modification to High Ridge PUD to change the type of housing approved from 48 single-family detached units and 126 fee-simple townhouse units to 110 single-family detached units (a net reduction of 64 units), and to modify related site improvements. PROJECT DESCRIPTION Property Owner: New Urban High Ridge, LLC Applicantl Agent: Mr. Tim Hernandez with New Urban High Ridge, LLC Location: Northwest corner of High Ridge Road and Miner Road (see Exhibit "A") Parcel Size: 18.44 acres Existing Land Use: Medium Density Residential (MeDR 9.68 dufac) Existing Zoning: Planned Unit Development (PUD) Proposed Use: 110 single-family detached homes Adjacent Uses: North: Single family homes in unincorporated Palm Beach County, designated Low Density Residential (PBC LR-2) and zoned Single-Family Residential (PBC RS). South: Right-of-way of Miner Road, then developed property (flex space warehouse) designated Industrial (I) and zoned Light Industrial (M-1); further south a townhome development (Canterbury) with a density of approximately 9.9 dufacre, designated Industrial (I) and zoned Planned Industrial Development (PID); to the southwest, undeveloped property within unincorporated Palm Beach County designated Industrial (IND) and zoned Single Family Residential (RS). Staff Report - High Ridge PUD (MSPM 07-010) Memorandum No PZ 07-119 Page 2 East: Right-of-way of High Ridge Road, then, to the northeast, Cedar Ridge Estates, with single family homes and townhomes (townhomes built at 8.04 dujacre), designated Low Density Residential (LDR) and zoned Planned Unit Development (PUD). To the southeast, High Ridge Commerce Park, developed properties designated Industrial (I) and zoned Planned Industrial Development (PID). West: To the west, undeveloped property (High Ridge Country Club) designated Low Density Residential (LDR) and zoned R1AA Single Family Residential. BACKGROUND Mr. Tim Hernandez, Vice-President of New Urban High Ridge, LLC, is requesting a major site plan modification for High Ridge PUD to modify the approved plan by reducing the total number of units, change the type of housing proposed, and revise related site improvements (see Exhibit "B" - Site Plan). According to the original site plan staff report (NWSP 05-016), the proposed High Ridge PUD was approved for 48 single-family detached units and 126 fee-simple townhouse units that would be developed in one (1) phase. The applicant now proposes to develop a total of 110 single-family detached units (a net reduction of 64 units). The maximum density allowed by the Medium Density Residential (MeDR) land use classification is 9.68 dwelling units per acre, which would provide the developer a maximum of 178 units. The project was previously approved for a total of 174 units, at a density of 9.43 dwelling units per acre. The applicant is now requesting a total of 110 units (a reduction of 64 units), at a density of 5.96 dwelling units per acre. The street and lot layouts where townhomes were previously proposed are also to be revised to accommodate single-family detached homes. Due to the modified design, a revised plat for the project must be submitted to the Engineering Division for their review and approval. To date, the High Ridge PUD project has been approved for the following: an annexation (ANEX 05-001); a future land use map amendment (LUAR 05-002) from Medium Density Residential (PBC MDR) with a density of 5 dwelling units per acre and Low Density Residential (PBC LR-2) with a density of 2 dwelling units per acre to the City's Medium Density Residential (MeDR) classification with a density of 9.68 dwelling units per acre; a rezoning (LUAR 05-002) from Single-Family Residential (PBC RS) to Planned Unit Development (PUD); a new site plan (NWSP 05-016); a minor site plan modification (MMSP 06-051); and a site plan time extension (SPTE 06-013), which extended site plan approval to September 20, 2007. ANALYSIS Concurrency: Traffic: On April 27, 2005, the Palm Beach County Traffic Division determined that the originally proposed residential development with a total of 174 units would meet the Traffic Performance Standards of Palm Beach County. A reduction of 64 units is now proposed, therefore, the project should continue to meet the traffic concurrency requirements, ensuring an adequate level of service. However, a revised traffic impact analysis and approval from the Palm Beach County Traffic Engineering Division is required to update the type and number of units proposed (see Exhibit "C" - Conditions of Approval). Staff Report - High Ridge PUD (MSPM 07-010) Memorandum No PZ 07-119 Page 3 School: A revised concurrency determination from the Palm Beach County School District, which approves the project for school concurrency purposes, is required prior to permitting (see Exhibit "C" - Conditions of Approval). Utilities: The project is expected to require approximately 47,300 gallons of water per day. The City's water capacity, as increased through the purchase of up to 5 million gallons of potable water per day from Palm Beach County Utilities, would meet the projected potable water needs for this project. The expected demand for sanitary sewer would be approximately 21,285 gallons per day. Sufficient sanitary sewer and wastewater treatment capacity is currently available to serve this project, subject to the applicant making a firm reservation of capacity, following approval of the modified site plan (see Exhibit "C" - Conditions of Approval). Drainage: Conceptual drainage information was provided for the City's review. The Engineering Division has found the conceptual information to be adequate and is recommending that the review of specific drainage solutions be deferred until time of permit review. All South Florida Water Management District permits and other drainage related permits must be submitted at time of building permit (see Exhibit "C" - Conditions of Approval). Police/Fire: Police staff reviewed the site plan and determined that current staffing levels would be sufficient to meet the expected demand for services. The Fire Department expects to be able to maintain an adequate level of service for the subject project with current or anticipated staffing. Infrastructure requirements such as hydrants and roadway would be addressed during plan reviews and the permitting process. Access: The proposed site plan shows that three (3) points of ingress f egress are proposed along High Ridge Road (see Exhibit "B" - Site Plan), identical to the previously approved site plan. All openings are identical to each other in terms of width and function and no driveway opening would be gated. This is a basic characteristic of new urbanism type of developments. The southernmost opening would be located approximately 650 feet from the intersection of High Ridge Road and Miner Road. The entrance would directly align with the recreation area. The second of the three driveway openings, would be located approximately 450 feet north of the southernmost opening. This opening would align with the larger lot single-family detached homes proposed at the rear of the development and also with the entrance to Cedar Ridge PUD on the opposite side of High Ridge Road. The northernmost driveway opening is proposed approximately 170 feet south of the north property line of the development. Similar to the middle opening, this third driveway would align with the single-family homes propose at the rear of the development. The presence of these three (3) driveway openings allows for sufficient ingress and egress of emergency and service vehicles. Streets: The proposed site plan depicts the dedication of a 15 foot wide strip along the west side of High Ridge Road, running the entire length of the development (see Exhibit "B" - Site Plan). The strip of land was required to be dedicated to Palm Beach County, due to their designation of High Ridge Road as an ultimate 80-foot wide right-of-way. The typical section of High Ridge Road on the previously approved site plan shows that the right-of- way as 65 feet in width. High Ridge Road presently contains a northbound and Staff Report - High Ridge PUD (MSPM 07-010) Memorandum No PZ 07-119 Page 4 southbound travel lane but as required, would be improved to include a 12-foot wide center-turn lane. The applicant indicates that the proposed internal rights-of-way, consisting of widths of 45 feet and 50 feet, remain the same as previously approved, except for the street layout where the town homes were previously proposed. Parallel, on-street parking spaces are proposed at various locations throughout the development. An important component to a new urban community is the use of alleys (subordinate street systems) throughout the development. The 20-foot wide alleys located to the rear of the proposed homes would have two (2) travel lanes, each 10 feet in width. Parking: Dwelling units with two (2) or more bedrooms require a minimum of two (2) parking spaces per unit. The project proposes 110 dwelling units, each with two (2) or more bedrooms therefore a minimum of 220 parking spaces would be required. Each dwelling unit would include a two (2)-car garage to meet the required parking spaces per unit. In addition, the planned recreational amenity area would require a minimum of five (5) parking spaces for guests. The site plan tabular data indicates that a total of 70 on-street parking spaces are proposed throughout the development. The graphic shows that these spaces would be dimensioned approximately nine (9) feet in width by 25 feet in length. A minimum of 225 parking spaces are required, and according to the revised site plan a total of 291 parking spaces would be provided, including a handicap accessible space near the recreation area. Landscape: The proposed landscape plan is similar to the previously approved landscape plan regarding the quantity and type of plant materials. The proposed site plan tabular data indicates that 6.77 acres (36.71 %) of the subject property would be pervious area. This figure does not include the 1.72-acre lake tract. Over 1.92 acres (10.41%) of the subject property would be set aside for buffer and open space areas. The subject site contained a mix of native and non-native trees and has been cleared and graded. The mitigation plan indicates that the property contained 220 trees, of which 13 trees would be preserved (12 pines and 1 oak). The total required mitigation inches for the project are 2,010, and the developer proposes to mitigate a total of 3,337 inches (an additional 1,327 inches). The Overall Landscape Quantities plant list indicates that 271 or 94% of the canopy trees would be native and 34 or 58% of the palm trees would be native. Likewise, a total of 74% of the shrubsjgroundcover would be native. The plant list includes the following species: Red Maple, Bougainvillea Tree, Gumbo Limbo, Silver Buttonwood, Seagrape, Dahoon Holly, Ligustrum Tree form, Live Oak, Bald Cypress, Coconut palm, Alexander palm, Medjool Date palm, Florida Royal palm, and Cocoplum. The landscape plan proposes buffers around the perimeter of the development (see Exhibit "B1" and "B2" - Landscape Plan). The east (front) landscape buffer along High Ridge Road was previously approved at a width of eight (8) to ten (10) feet. However, subsequent to approval, Palm Beach County has required the dedication of a 15-foot wide strip along High Ridge Road for future right-of-way. There are no plans to widen High Ridge Road due to its low level of traffic, so it is unlikely that the landscaping would be removed in the future. The plant species proposed within this green space would include the following: Live Oaks, Coconut palms, Crepe Jasmine, Ligustrum tree form, Dwarf Staff Report - High Ridge PUD (MSPM 07-010) Memorandum No PZ 07-119 Page 5 Yaupon Holly, and Redtip Cocoplum. The east perimeter landscape would also be supplemented by additional landscaping at each entrance to the development, at the ends of internal roads that terminate at the east property line, and within each lot that would abut the east property line. The south landscaped "common" area adjacent to Miner Road would be 15 feet in width and would have similar plant material as proposed within the east landscaped area. The west landscape buffer is five (5) feet in width and would be located adjacent to a buffer for High Ridge Country Club. The majority of the existing trees to be preserved or relocated would be located in the west landscape buffer. The plant material within this buffer would also include the following species: Pines, Coconut palms, Sabal palms, Silver Buttonwood, Gumbo Limbo, and Red Tip Cocoplum. The north landscape buffer would be seven (7) feet in width and contain similar plant material as the other perimeter buffers. A total of ten (10) units and an internal street are proposed within the proposed development along the north property line, adjacent to one (1) single- family home in unincorporated Palm Beach County. Staff is recommending that a masonry buffer wall be installed along the north property line to mitigate the impacts on the adjacent lot (see Exhibit "C" - Conditions of Approval). The private internal streets would be lined with Live Oaks and Dahoon Holly trees. Florida Royal palm trees would be planted at the entrance to the recreational amenity area. The pool and cabana area would be heavily landscaped with a variety of plant material. The surrounding lake would have littoral plantings that include Canna Lily, Spike Rush, and Water Lily. In addition, upland transitional plantings would include Bald Cypress, Red Maple, and Leather Fern. Varying planting schemes are proposed for the individual lots. The scheme would be dependent upon the house model proposed on each lot. The Typical Unit Landscape Plans indicate that each lot would have a multitude of plant material. A note on the site plan indicates that all air conditioner units and similar mechanical equipment shall be screened with landscaping which will achieve a height of 36 inches. Buildings: The proposed site plan tabular data indicates that collectively, the lots would account for 9.12 acres or 49% of the entire property. The private rights-of-way would account for 5.30 acres or 29% of the site. The development's recreation area would account for 1. 74% of the site. This 0.32-acre recreation area would accommodate a swimming pool, a 1,333 square foot cabana j veranda facility, and a tot-lot. In addition, pedestrian amenities such as marked pedestrian street crossings, bike racks, and park benches are proposed. The recreation area would be located adjacent to the site's lake j water management area. The project, designed according to new urban design principles, proposes homeowner accessibility to the lake by all, so that it functions as a public amenity rather than a private amenity enjoyed by few residents. The Typical Lot Details of the single-family homes shows three (3) different types of lots are proposed, namely a 40-foot wide, a 45-foot wide, and a 50-foot wide lot. The Detail shows that the 40-foot wide lots and 50-foot wide lots would be 110 feet in depth, and the 45-foot wide lots would be 55 feet in depth. The proposed site plan indicates the smaller 45-foot wide lots would be located along the perimeter of the development, where townhouses were previously proposed. The typical lot detail indicates that screen enclosures and pools would be permitted within the building setbacks of the house. Solid Staff Report - High Ridge PUD (MSPM 07-010) Memorandum No PZ 07-119 Page 6 roof screen enclosures are prohibited. On the larger lots, the houses would be setback 15 feet from the front property line and the entry porch would be setback seven and one-half (7-112) feet from the front property line and five (5) feet from the rear and side lot lines. On the smaller lots, the houses and entry porch would be setback ten (10) feet from the front property line and five (5) feet from the rear and side lot lines. The building setbacks, as proposed, are generally smaller than conventional PUD type of projects but they are common among New Urban type of developments. The proposed types of single-family homes are varied, and would come in several models. The smallest home would be a one (l)-story, three (3)-bedroom, two and one-half (2 112)-bath model with 1,875 square feet of air-conditioned space, and a two (2)-car garage. The largest home would be a two (2)- story, four (4)-bedroom, two and one-half (2 V2)-bath model with 3,009 square feet of air- conditioned space, and a two (2)-car garage. Design: Associated with the proposed type of single-family residential development are a wide variety of possible building designs (see Exhibits "B3 - B8" - Building Elevations). This is a New Urbanism type of project with traditional and contemporary architectural styles. The single-family homes would have varying roof styles. The tallest single-family detached home would be 25 feet - seven (7) inches tall at the mean roof height and 30 feet - four (4) inches tall at peak of roof. The single-family homes would come in numerous varieties of wall and accent colors. There are eight (8) different color schemes and each scheme has two (2) or three (3) varying options. The color palette proposed contains a combination of light or white pastels, and a soft color palette, such as light earth tones to match existing natural vegetation in the corridor. Lighting: Freestanding street lights, approximately 12 feet in height, will be located throughout the development. The site plan notes that street lights are to be FPL coach lights with light levels in compliance with residential requirements. Signage: Project development signs are proposed on small posts labeled "10 columns". These posts would be located on each side of the entrance drives. Its colors would be consistent with the building colors proposed throughout the community. The sign face would be located in the center of the post. Public Art: The original site plan approval (NWSP 05-016) occurred prior to the adoption of Ordinance 05-060, which requires Art in Public Places. However, this subsequent request for a major site plan modification after adoption of the aforementioned ordinance results in the project having to comply with the Art in Public Places requirements (see Exhibit "c" - Conditions of Approval). RECOMMENDATION: Staff has reviewed this request for a major site plan modification and recommends approval, subject to satisfying all comments indicated in Exhibit "C" - Conditions of Approval. Any additional conditions recommended by the Board or City Commission shall be documented accordingly in the Conditions of Approval. S:\Planning\SHARED\WP\PROJECTS\High Ridge- New Urban Communities\MSPM 07-01O\Staff Report.doc Exht6it wWA" - High Ridge PUD MSPM 07-010 R1-AA -- ..- -MINElfRD. -... NIC -- ---- . 420 210 0 ~- ; , . I i ! /= I . " / ,.... " j- . ! i i----- ,. J ----- I r..-.. --1 i i f i . "0 i i ~- -TOMAIOERO f i g' f ~: - 52. ; ----%~._._.-..-..---------..-.-..l : I i . ,L NIC R1-AA i , I ! I I ! I I , ...-.\ , , . .r~1 ... \ . .1 I I . k:--, -"'. ...LINDUS:r~~LWAt- ---., }-- --, Ii. .. ! , I .... ! , _,--J, [EJ n I , I . OMME~:P,~'!9<DRi 420 840 1,260 1,680 I Feet ,......:r..i'",,'^'-_(' / "'i:t.~}-" <" ,\~/)" . \/\:'! f',~.l-.{ / '," I' \/J' / '-:' '.1' ,/ /,{I C -l 'y."""1 / "" -"<1 1>- ~'1 f--/ I-:..Ji-, I-~ - "'J~ ' f~ s Vl n OJ iil ~ II CT> q ~~ ~ 8~ '" ill ~ i ~ ':~i II! I,; 'j!;<; ~ ~ ~! ~ ~~ Ui ~~~ ~~ . ; ~ IU d~P~ ~ ~ ~ ~ ~ ~ I -.. ~ ~n ! H~i I! '" ! " c. ' - ~ n~~ p m S' ~ ~ '" i ~ ~ ~ ~ ~ i ~ , i I I ;. ~ 'D ~ n ~H~= ~ ~. j ij Hi t ~ OJ ~ j ~ ~ ~ t ~ 1: ~ ~ t 1: ;;; ~.:; ! is .. "I i ,. nnid ~dn~ qS~n~ .'l,,' " ~ ~ ".T Ii :;jl~ '" '- - 01' H~~I~ g~~ ~ g~ ~ ~ Ie: ~OI:J> >0 ~ ~ 8 ~r~ ~~s~~ ~~~ ~ :;; ;ii'z zi~ ~liP <." "'. "l,,:;:;I.. ~IIU W~W :I!''lJ mP ~ I)> ~ >>' 'i:: n~" ~ !~ .J: Z Gi ~ "c" 'ii: ImO ~.~ .~ p m ~~~ ~ oJ " ~~ ~ > 8 ~ ~g?R R ~ ~~~ i:: > -j " x ~ ~ ~ " ~ ~ EXHIBIT "B',' 1<;) r:- ~ 'jit ~ ,J I: ~ ~~! Y ~ it 1,\ 1::1 I" d !/;' ~ ~ ! "'1\ ~! ~ ~ ~ ,J ': I'~ I: i:l i:-li~ Il'iJ I I; ~J :Ef ~ ,I i I ~., /; II d !, Ii lill Ili!1 9' ~,i II ~ I: I: .1 I Ii Ii " , 1~_lli I:: ill , II I , I, Ii Ii J~~:;",~f.ggN TIB' l!!I~ ilm~ : High Ridge PUD ~!~~ ,?! ::c () 0 pl~ 0 ~ia;l~ ~ i~ ~ ~ ~:;,~~ Pi Cb 0 Ii:' '" "1' lr I::!l , . ~~ l €~OJQ:. i~L~ ~ New Urban Communities l"~ ~ D ;:'~ i [ ~ s,g III CJ1 ! I Boynton Beach, Florida ~g; . .l '()Q '""t .. i...., " ~ OII[i:i m tl @ In n OJ ~ ~ II w q , , , , , ( I , , I I I , I r I , , , I I I , r I , I I I , I , I , , I I ! ~! "~' ~ i ~g: r'\ ' 11!i!~ ~ /+," 'fl'!;r~ " '0 ?-.~ " I I g "'4J ~. '~li I ~ \-' II , ~i I !/j ~ ~. t1'lIi . ,',!i! ' 1',:. CX> "\' !rlh~ Q !l'~~ III (]l " f ~~O.'~,' '~q.' i !:~~~I~~~i !! .1~i~I.II:r 1: l~i~~12 2'~! ~i .::~I~"'i~:~:~i:\~ EXHIBIT "B1" I" :: " " rHr , " " , , --------- '----------- 1<(: '" "I '" ...r J~ , 1';\ , i , , ! , /'1 , , /:,:, : ~ t I @ I ~'II f B ~ I ~ ~,l 8 "'lS i ;; , 0 , :> Ii 0 II I, Ii /)~ / I , ( \ I __-r~~:::~--= ", ", ,~ r _ > r'- Cr~ 0==_0 0= =:E6]g,=0~~ c- - 0===00M::6~.dfJ1\l'-'c-=::::::::::=::: :=~- avoC! C13NllfIj " '- ~ r~~ ~~il; . ~ , High Ridge PUD New Urban Communities Boynton Beach, Florida Em F~~ ::to 0 ~d ~IJi CD 0 .. I ~, ~ ~ &' €~ ~ [~5. c:: "'.JIOQ""I " EXHIBIT "B2" I; " I' I , , I , I : I : \ :~ I .1 i , I I I II I I , \ I , , I , , 1\ I :1 I , 'I I , , I'I I ~il Al' g m ~ ~ 'I ~ I t~~l , ~." I ~~I: II;~~ 1fj~ltl l <I I~~i I ~\I~~'I I I"" I I ~~ I , " ~ I I I I I I: I; :1 (/l n OJ !if II w "" 11 ~Q l'l!fS ~ I' .Ill' I!.:' ill jl.l~ lill' :. mOl ! 1~11~I~PWi II :l~:"I:1 ~; !~i~i~O~f!~~~ +1 High Ridge PUD New Urban Communities Boynton Beach, Florida ~tU'l &~~ ". ~~ ~~ ~~~ ,lj ~i ~~ ! :en 0 CLiO Q):=. s,g 00"" I I 1m i~. ~ I I ! I I I : ~oo i I i I , I I I i I I I I i I i ~ J I I( Il 1 1 J I ~ ~, III ~ s ,- ill I I It ~ ,f If~ I 'J} !: 'l :~ '. J II J ! ? Il s! :~ ,.:! '. '~ ! 0 ,I Iii l l " ~ 30 . BERMUDA i MODEL I . In" ElEVATION "A" ~l ml~ J-t ~ RIDGE P\J~ BEACH, flORIDA ~ Cm' OF 80YNT HIGH RIDGE. LLC. 0 by: NEW URBAN Z I en EXHIBIT "B3" I I i i , I I I im I I I I ~ i n?O= I ! DE8J I I i ~nrno ;0 Gl :J: -l I!! ~ -l i5 z ~ : I' I. I I :; I " ,. '. '. II '. ! J J ! fUlif o ~ I II .'" npn il ~ ~ Ii ~ > r ~. XHIBIT "B4" i~ ID'~"~]' . c . ~0J I I I im I I I I I -c:>> DODD ,DODD []OOOO ;0 00000 ~ []ODDD p:! 80000 ~ : DODD g DODD :z f ~. , ~ I -c:>> ' I Ii I; I~ J 1 J l I Id Ii ~~~ d~ 1" u~ ~ il" i~~; M ~ 1m I i[)Cj8J .." .... ;0 ~ m G5 ::!l :I: :z I I I I I -l -l m p:! m ~ .... ~ ~ -l -l -l 5 5 (5 :z z z . ~ Dl Dl ~~ I I~ !~ I I I~ !~ I I~ I, , ~I :~ '~ i~ II 11 ,I II :: I '. ,I " '. '. . '. '. '. '~ ,~ " J ,- J J I l J '~ l J J l l ~ Q, ~i ~i i MODEL I - 30 - ANGLO CARIBBEAN fUlfl o ~ i rr f I > tc IE ~I ~~~ ELEVATION "B" .'" ~ Ii l~ '-f LOT:_ i( ~r:c 8 HIGH RIDGE PlJD niUW (5 ~ ~fll crrv OF BOYNTON~, FLORIDA ii i ' z I ~ rn i en by: NEW URBAN HIGH RIDGE, L.L.C. .1 IBB~I~ ~m) w I -<:l)J. DODD , DODD []DDDD :;0 DDODD ~ []DODD J!! DODD ~ : DODD ~ ,DODD ci 1 I i~ :~ J m I ,. l ~i ~ l- Ull IIi, Il 1\ '~ '~ J J I pi ~il m im] "TI ~ ~ m ~ '-t (5 z ci 'l II J r- m :!I m r- ~ '-t J" I~ ~ II ci ~ H I~ !\ '~ I I~ !\ ,f II ,. ,f '~ 'I ,. 'I 'I ? J ~J J J '~ J J ~ !l. >i ,(" rn~ ~ 1 tll f I g Iii I~ ,. f ~ I i MODEL I - 30 - FLORIDA GEORGIAN ~ I \2~fl) ElEVATION"C" !2f?>, ~~O:j :~RlDGEP\JD 2 ~ ~ CITY Of BOYNTON BEACH, flORIDA Ilf: NEW URBAN HIGH RIDGE, LLC. EXHIBIT "85" I I I ! i I I I I I , I I I , I l H , II : DE3J I I I , -cJ)J- , IBB~I~ :;0 Ci :I: '-t m r- ~ '-t (5 z ci i: J J j 1 fUlil II ii Ii nnn h ~ I ! i O~I .1 I~ ,~ ,e ~ IIh .,.,. '- , iiiii il i~ ~ I ~ J Il ,I 'I J I~ l <\ ~I ~ Ilh I...I~ I iiiii i~ i~ ~ m~ ~l ~ rrr IJ ~ II Jill en I I 1 Il ,I 'I J > c:I ~ I oS: J-f ~r?~~~ ~ I :;g~:j I~ :. J I I I I I , I I rr:'~~" ml I ! : DE8J I I ' : 1 ! I ! D83J I I I ! I .~. i ~. I I ' :i i~ Illl I. ? ,.,. , ~ ~ F~'~:! I MOOEL I .40- BERMUD !l!l ELEV...TlON ..... A LOT: HIGH RIDGE PlJD CITY OF BOYNTON .,,."" ~ FLORIDA by: NEW URBAN HIGH RI llGE, L.L.C. HIBIT "B6" [8] I ~ J fUllf ~p nw .: .1 I I I -<:J>. ~ODDD : DODD DODD ~ ,8BBB J!! []DDDD ~ EJDDDD 6 []DDDO z l 1'''''' L ~ I -<:J>.' ! Il ,~ ,- J -<:J>. !! h .,1,2 ,. ,~ IU I 1 !~ Il 'I 'I l l I d I 1!1l1!!!li I 1 1 , ':1 ' -n ~ :z -l m ~ -l is :z ~ U Il ~ ,~ i J ~ ~i IIII h I~ I; I ~~ ~''',' ~i Ii :' ~ Wi II j m~ ~ J. Irl f I ~ fii ld[ l f ~ I r:.~ t m 0E3E3IJ m ;:a g m ~ -l is :z ~ ,- Ii m" ~~ ~, qO!'~ ,-~ ~k11j) ~ Ii 0-J I :~ Ii i I Illl JUl.:::! :~ :~ .. . EXHIBIT "B7" i !~!l II ~,,~ I ~Il~ I .! i ; ~ 111'il !~~!~ ~ ~i i ~~,p ~.~.i i j I ~,! IP! I \!! lclta: F '0 ~ (d. ;, ~~p q'~lil B i ~ ! I ! ~i~il 1m ;ml II 1:!i~!I! ii~d ~ ;h!111 ~~I! ! il~~ I ~'~ - ~ /:0. ~ / . : II n~; ~ l! ! i~d - I ~ ~i I [I I~ '. ,~ :i '< 'I J l l IE lUFf o ~ f .'" il I p II ii .1 IJ;I I MODEL I .40 . ANGLO CARIBBEAN I ~:;~ ~ATION'B" f?'::x::1':io HIGHRlllGEPUD I ~ fa:j CITY OF BOYNTON IlEACH, FLORIDA R:J by: NEW URBAN HIGH RIDGE, l.l.C. I ~DDDD : DODD DODD DODO ~ ,DODD m []OODD ~ []DDDD ::! []DDDD ~ L .,.~. l q 1 -QI-' I I O'-r ~."'" IIII 'I .~ I I "T1 ~ ~ m .- ~ '-I (5 z: q I~ ,J J II ~i ;;0 G5 I ..... m ..... ~ ..... (5 z: m ci I I !~i;1 !l I:~ !1 !J_ 'I ~~ 1 ""~ '. ,~ lJ J IU l:l:l i MODEL I .40 - FLORIDA GEORGIAN I ~>~ ~ATION"C" r?'1 ffi~O:j HIGHRlDGEPUD 7" r- CIlY Of BOYNTON BEACH, flORIDA H1 I~ ,J J , !! h ',l,~ ,. ,~ IU !i I~ 'I 'I l J 1 1 ~ d I liil !illli I 1 1 , ':1 ' I I I , i II h ! iiii ii i~ ~ fTl" ~l ~ o z en I~ ~~ 1 ~PI :~ il J ,fr f I Ii I~ ,. f I i ..~~ ~ ~ipi:il !I~i~' ~, ~li 'i!!l I ljil! i , : ill(~ ~! ~! i I !i!~! Iml ~nil II U~il!l~ g~~il, !hl hi ~ <Xl ffili ~ !i~ ~ ~I~! h 11 ~l j(~ f----l ~ l' Pl~! ~ -I n:1:u,. f m m DE3J I I 1m I I EXHIBIT "B8" !~ iffl Ii i mu IZ i, ilSl' ~ ~ ~~I. ~ , lah ll~ I ~ ~! U~il'll ql;~ ~ I! !i ", !.Si HI i ijl!il i U11 ! ~ ! ,! lad i !!! IF ! ~ t; ! j I~r'e I ~ i ii ! ~ 1111~~~UH ~~!i~ iI ~I~~~lil~~ i&P I tj ~ "~~II'~! !ill~ . i., ~ I',! 1 1= I~ ~ ,f ,. 'I I J J J !! fUlfl o~1 i( I p!l! Ii . f by: NEW URBAN HIGH RIDGE, L.L.C. EXHIBIT "C" CONDITIONS OF APPROVAL Maior Site Plan Modification Project name: High Ridge New Urban Communities File number: MSPM 07-010 Reference: 2nd review plans identified as a Maior Site Plan Modification with an October 30. 2007 Planning and Zoning Department date stamp marking DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - Solid Waste Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a). PUBLIC WORKS - Forestry Comments: 2. Add the following note to plans: "It will be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A. Lb.)". PUBLIC WORKS-Traffic Comments: 3. Prior to the issuance of the 56th certificate of occupancy, complete the improvement of High Ridge Rd. to a minimum of three (3) 12-foot lanes from Miner Rd. to the northern boundary of the proposed development. Provide plans, including typical sections, for off-site improvements, including curb and gutter along High Ridge Road. Palm Beach County permits will be required for work within the Palm Beach County right-of- way. Staff recognizes that improvements required by the city may not be required and/or supported by the County. The developer shall provide a letter of credit in the amount of 110% of the engineer's estimate for public roadway improvements prior to issuance of any building permits for this proj ect. The letter of credit shall be held until such time as the improvements are complete." ENGINEERING Comments: 4. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. COA - High Ridge PUD MSPM 07-010 Page 2 DEPARTMENTS INCLUDE REJECT 5. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 6. A re-plat of this subdivision will be required upon satisfactory Commission approval of this major site plan modification. 7. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 and Section 10.Z will be required at the time of permitting. UTILITIES Comments: 8. Even though this development has approved utility plans on file for the original development concept, please provide a time line that clearly illustrates when water and sewer services will be required to serve this revised project. Your starting date for the time line should be the date of City Commission approval. Also provide milestone dates for permit application, the start of construction, and the setting of the first water meter. This time line should be used to determine the adequacy of water and wastewater treatment capacity for this project's completion, so please be as accurate as possible. 9. Palm Beach County Health Department permits will be required for the water and sewer system revisions serving this project (CODE, Section 26- 12). 10. If not already paid, the CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within seven (7) days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 11. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. Easements shall be centered on the sanitary sewer main and the minimum width shall be determined by using two (2) times the depth of the sewer main plus three (3) feet (for trench bottom). Easements widths will be finalized at the time of platting and permitting. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Section 26-33(a). 12. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that COA - High Ridge PUD MSPM 07-010 Page 3 DEPARTMENTS INCLUDE REJECT setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. 13. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 14. PVC material not permitted on the City's water system. All lines shall be DIP. 15. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207. 16. Provide a minimum ten (10) feet separation between water main, sanitary sewer, and storm sewer lines. Please note that City of Boynton Beach separation standards are more stringent that FDEP standards. 17. Provide a minimum ten (10) feet separation between water main, sanitary sewer, and storm sewer lines and the outside edge of buildings. This includes the projection of roof lines, balconies, etc. to the ground. FIRE Comments: NONE POLICE Comments: 18. Prior to issuance of the first building permit, the applicant shall prepare a construction site security and management plan for review by the City's Police Department CPTED Official. . The developer/proj ect manager after site clearing and placement of construction trailers shall institute security measures to reduce or eliminate opportunities for theft. The management plan shall include, but not be limited to, temporary lighting, security personnel, vehicle barriers, construction/visitor pass, reduce/minimize entry/exit points, encourage sub contractors to secure machinery, tools at end of work day and/or any other measure deemed appropriate to provide a safe and secure working environment. The security management plan shall be maintained throughout the construction phase of the project. 19. Applicant shall provide a detailed photometric lighting plan. 20. All lighting shall be metal halide following IESNA Lighting standards. COA - High Ridge PUD MSPM 07-010 Page 4 DEPARTMENTS INCLUDE REJECT 21. Timer clock or photocell lighting for nighttime use shall be above or near entryways. 22. Pedestrian scale lighting shall be used for all street and pedestrian walkways. It is suggested that interactive or lighting on demand be used in sensitive areas. 23. Numerical address: . Shall be illuminated for nighttime visibility (dusk to dawn). . Shall not be obstructed. . Shall have bi-directional visibility from the roadway. 24. Lighting shall be provided for entrance signage. 25. Landscaping should not obstruct view of windows, building address numbers, and walkways. 26. Residential Security: . The door leading into a residential unit should be a solid core door and equipped with a single cylinder dead bolt lock (including garage door). . When placing the order for a front door that will have a side pane window it should be placed on the opposite side of the door handle and lock making them unreachable. . If front door has zero visibility to front entryway are, it should be equipped with a 180-degree peephole. . Entry door should open outward versus inward. . All exterior doors should be equipped with security hinges. . Anti lifting auxiliary locks should be installed on sliding doors and windows. . Should be pre-wired for alarm system. . Telephone lines should be run underground with box hook-up on inside of building versus the exterior of building where telephone lines can be cut making alarm system inoperable. It is strongly suggested that the architects and engineers incorporate this into the site plans to insure that the site supervisor is aware of this condition. 27. If benches in a park area are intended for nighttime use, adequate lighting should be provided for the area in which they are located. They should also be in open view to eliminate concealment areas. BUILDING DIVISION Comments: 28. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TART (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review. COA - High Ridge PUD MSPM 07-010 Page 5 DEPARTMENTS INCLUDE REJECT 29. At time of permit review, submit signed and sealed working drawings of the proposed construction. 30. A water-use permit from SFWMD is required for an irrigation system that utilizes water from a well or body of water as its source. A copy of the permit shall be provided at the time of building permit application, F.S. 374.216. 31. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: . The full name of the project as it appears on the Development Order and the Commission-approved site plan. . The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) 32. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review. 33. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal. The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission. 34. The full address of the project shall be submitted with the construction documents at the time of permit application submittal. The addressing plan shall be approved by the United States Post Office, the City of Boynton Beach Department of Engineering, the City of Boynton Beach Fire Department, the City's GIS Division, and the Palm Beach County Emergency 911. Palm Beach County Planning, Zoning & Building Division, 100 Australian Avenue, West Palm Beach, Florida (Sean McDonald-561-233-50 13). United States Post Office, Boynton Beach (Michelle Bullard-561-734-0872). PARKS AND RECREATION Comments: 35. Landscape plan must include the City's signature trees at the entrance. 36. Irrigation must be 110% coverage, include separate bubblers on each tree and have separate zones for grass and bed areas. 37. Park Impact Fee: 110 Single family homes x $1,418.00 = $155,980.00 due at issuance of first permit. COA - High Ridge PUD MSPM 07-010 Page 6 DEPARTMENTS INCLUDE REJECT FORESTER/ENVIRONMENT ALIST Comments: 38. The mitigation trees should all be shown only in the common areas of the site as depicted on pages 8 and 9 of 15. There can be additional mitigation tree inches provided by planting additional trees around the lake and increasing the diameter inches of all of the common area trees to meet the mitigation total inches. (Tree Mitigation Sheet page 15 of 15) 39. The Lake Management Plan (Upland and Littoral plantings) and time zero report must be submitted to the City. (Lake Management Plan document Time Zero Report) PLANNING AND ZONING Comments: 40. The project shall comply with the Art in Public Places requirements of Ordinance 05-060. Submit revised Public Art Information Form that provides more detail (art location, accessibility, 1% and 70% amounts, estimated site plan and completion dates, etc.). Prior to permitting, revise plans to indicate the location of public art on site and include a detail of the public art including colors and materials. 41. A revised traffic impact analysis must be approved by the Palm Beach County Traffic Division for concurrency purposes prior to the issuance of any building permits. 42. The project must obtain a revised school concurrency approval from the School District of Palm Beach County prior to the issuance of a building permit. 43. A unity of title may be required. The Building Division of the Department of Development will determine its applicability. 44. On Site Plan (sheet 3 of 15) revise setback lines at comer of Lot 8 to be measured from new property lines (after right-of-way dedication). 45. Revise side elevations of all proposed models (especially those that will be located along High Ridge Road) to include additional architectural features that will provide visual interest (enhanced with features similar to the front facades using elements such as balconies, individual roof features, porches, varying surface materials and colors, etc.). 46. Provide detail and information on the "ID column" located at various locations along the right-of-way on both the Master Plan and Site Plan. Indicate proposed signage locations on both Site Plan and Landscape Plan. Revise proposed locations to comply with setback and safe sight comer requirements for signs (minimum 10 feet from the new property line). COA - High Ridge PUD MSPM 07-010 Page 7 DEPARTMENTS INCLUDE REJECT 47. Provide a typical sign detail including height, sign face area, font, materials, color, etc. on sheet 5 of 15. 48. On Photometrics Plan, indicate proposed site lighting designed at a minimum average light level of one foot-candle and levels; specify that the light poles shall withstand a 140 MPH wind load (Chapter 23, Article II, Section Al.a and Florida Building Code); provide a note that the fixtures shall be operated by photo-electrical control and are to remain on until 2:00 a.ill. (LDR, Chapter 23, Article II, Section ALa.); and include pole wind loading and pole details in conformance with Chapter 6, Article IV, Section 11, Chapter 23, Article I, Section 5.B.7 and Chapter 23, Article II, Section A 49. Provide a detail of a typical screened-enclosure permitted within the building setbacks. 50. Include floor plan and building elevation for Cabana in the architectural drawings. 51. All building elevations should include the exterior finish, paint manufacturer's name, and color codes. (Chapter 4, Section 7.D.). 52. Provide paint swatches for the elevations (Chapter 4, Section 7.D.). 53. Revise site plan and landscape plan to include a decorative 6 foot high masonry buffer wall along the north property line to mitigate the difference in density and intensity of this area of the project compared with the adjacent single-family lot to the north. Shrubs shall be planted on outside of wall. 54. Revise Master Plan site data to delete reference to PBC RS zoning. 55. Revise all plans to renumber lots (110 lots proposed, 174 lots numbers). ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 1. To be determined. ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. MWR/kz S:\Planning\SHARED\WP\PROJECTS\High Ridge- New Urban Communilies\MSPM 07-010\COA.doc LAKE MANAGEMENT PLAN , ~._..,~-_._._'_........~_...~-,.. . ... ,~'l \ ~, ! ;.:' L~~ ; I ~j !:) il\,,:; . , ..-.--..-----; !Il ~~l NDV 20200T IWI PLANNING AND ZONING DEPT ., The following plan has been provided by the Owner/Developer of the High Ridge project. The Lake Management Plan shall be used to govem all activities or concerns related to the lake noted in the Site Plan for High Ridge, City of Boynton Beach, Florida. The plan conforms to the City of Boynton Beach Land Development Regulations regarding the protection and incorporation of native plant ecosystems into development lake tract. The Lake Area and its management shall be the responsibility of the master property owners in perpetuity. The lake tract referenced in this Lake Management Plan is centrally located within the site of the High Ridge project. The Lake Littoral and Transitional Zones will be located within the lake tract. The applicant proposes to plant aquatic and upland species on the littoral shelves and lake maintenance easements of these lakes per Section 5.R of the City of Boynton Beach Landscape Code. 3.1 Delineation and Surveying Specifications All Lake Areas shall be staked and field surveyed based on the approved Final Site Plan so as to maintain compliance with required Area calculations. Creation of littoral shelves shall be completed around the constructed borrow lakes and shall provide, at a minimum, an area equal to 10 square feet per two linear feet of lake perimeter. These littoral and transition zones shall be developed to create a variety of niches and ecotones and shall be vegetated with suitable native plant species. Littoral zone planting elevations are referenced to control water elevation of 10.0 NGVD and includes area down to 2.5 feet below control elevation. Upland transitional plantings extend upland from 10 NGVD to between 13.0 to 15.0 NGVD. The littoral zone shall be provided with a minimum of six (6) inches of organic topsoil to promote vegetative growth if soil conditions are determined to be unsuitable for littoral plant establishment. The littoral zone shall be planted with appropriate native wetland vegetation, spaced as shown on the plant list. Cotleur Hearing 1934 Commerce Lane. 9.i1e 1 JL.pIIer, FIoIlda 33458 6617476336 Fax7471377 Project #04-0910 Created on 3f23/200511:10 AM Revised on 11/08,2007 FIProjectsI04-0910-NUC-High Ridge Road\WordExce~Lake Management Plan.pdf 3.2 Plant Material Plant size and quantities are provided on the plant list. All plant material shall conform to ANSI Z60.1 "Standard for Nursery Stock" for shape and quality and "Grades and Standards for Nursery Plant" Volume I and II FDA. All plants to be Florida Grade #1 or better. Bareroot material shall have well-developed root and shall be planted with good soil to root contact. Plantings of bareroot or containerized nursery stock shall be planted by hand at a time when lake water elevation has stabilized and can sustain plant growth. All material not planted immediately upon delivery must be stored in water (wet framed, near shore, etc.) to prevent desiccation or damage to plants. Any and all conditions which the contractor feels will be detrimental to the success of the planting shall be brought to the Owner's representative's attention. All aquatic material is to be freshwater grown. All plant material above six (6) inches and above the lake control elevation shall be irrigated with a temporary system through the warranty period. All plant material shall be warranted for a period of 360 days after date of substantial completion against defects, including death and unsatisfactory growth, except for defects resulting from abuse or damage by others or unusual phenomena or incidents which are beyond the contractor's control. Warranty period for deciduous tress to be one full growing season. A minimum of eighty-percent (80%) survivorship and a minimum of eighty-percent (80%) coverage of the planted herbaceous marsh zone shall be achieved by the end of the establishment period. A minimum of one hundred-percent (100%) survivorship and a minimum of fifty 50% coverage shall be achieved in the upland transitional zones by the end of the establishment period. One hundred-percent (100%) survivorship of upland transitional trees and vegetation must be maintained at all times. 180 days after the issuance of "substantial completion" the landscape architect and contractor will evaluate the littoral and upland transitional zones to determine if they are trending toward success. All dead plant material will be replaced by the contractor in a timely manner. Plant material in the upland transitional zone must be replaced with in thirty days or an additional quarterly monitoring report will be required. If in the opinion of the landscape architect the required coverage's will not be obtained by the end of the establishment period the contractor shall provide supplemental plantings. If the required coverage's are not achieved at the end of the one year establishment period the contractor will continued to provide maintenance until such time that the minimum 80% and 50% coverage's of the Lake Littoral and Transitional Zones are obtained 3.3 Fetilization Trees and shrubs planted within the upland transitional zones shall be fertilized with "Agriform" 20-10-5 twenty-one (21) gram tablets at the below specified rate: . B&B stock to have seven (7) tablets . Seven gallon (#7) container stock to have five (5) tablets · Five gallon (#5) container stock to have two (2) tablets eotleur Hearing 1934 Commerce Lane, &.Me 1 J~, FIcxtda 33458 561 7476336 Fax 7471377 Project #04-0910 Created on 3/23/2005 11.10 AM Revised on 11/08, 2007 F.\ProjectsI04-091O-NUC-High Ridge RoadlWordExce~Lake Management 2 ~~ . One and three gallon (#1 and #3) container stock to have one (1) tablet Position plant in the hole. Backfill halfway up the rootball, and place tablet beside the rootball. 3.4 Prohibited Activities in Littoral and Upland Transitional Zones No construction or alteration shall be permitted within the Lake Area as reflected on the Final Site Plan, except as necessary in connection with the proposed Lake Area restoration/enhancement as outlined below. Prohibited activities within the Lake Areas include: . Trimming or pruning of native trees, shrubs or other valuable vegetation without approval of the City of Boynton Beach. . Construction or storage of building materials, soil, debris, trash or hazardous materials. . Mowing or the placement of sod. . Removal of native trees, shrubs or other valuable vegetation. . Excavation, dredging, soil removal or activities which create erosion. . Parking or operation of vehicles. . Any activity that would be detrimental to drainage, erosion control, habitat or wildlife preservation or conservation. 4.1 Exotic and Nuisance Activities that are allowed in Lake Littoral and Transitional Areas shall include removal and eradication of exotic and nuisance species, trash and debris. To minimize potential disturbance to surrounding vegetation, eradication of exotic and nuisance species shall be accomplished by herbicide treatment with the herbicides such as Arsenal, Garlon 3A, Tordon and/or Roundup, or other approved herbicides and only by licensed herbicide applicators, depending on the species. All activities within in Lake Littoral and Transitional Areas shall take proper care to avoid damage or disturbance of existing habitat. All exotic and nuisance vegetation as defined by the Florida EPPC, May 2003 list shall be eradicated from within the Lake Littoral and Transitional Areas and from on site. Cotleur Hearing 1934 Commerce lane, 5Ute 1 Jl.pItar, Florida 33458 561 7476336 Fax 7471377 Project #04-0910 Created on 3/23/2005 11-10 AM Revised on 11/08, 2007 F.\ProjectsI04-091 O-NUC-High Ridge Road\WordExce~Lake Management 3 ~~~ 4.2 Short Term Maintenance A monthly maintenance program shall be implemented to control invasive exotic and nuisance plant species and maintain Lake Littoral and Transitional Zones as functioning habitats. During routine maintenance events, all trees, shrubs and other plants shall be maintained by cultivating and fertilizing as required for healthy growth. No trimming or pruning shall occur without the approval of the City of Boynton Beach. All noxious plant species (Category I and II Exotic and Nuisance vegetation) shall be manually removed if possible. However, due to the invasiveness and control difficulty of species such as Torpedo Grass, herbicide control may be utilized depending on type and severity of problem. Herbicide treatment, if necessary, shall consist of controlled selective treatment of exotic or nuisance growth. Herbicides utilized shall be EPA registered products approved for use in the State of Florida that have been shown to present a wide margin of safety for fish, waterfowl and human life. Any herbicide treatment shall be conducted by personnel certified and licensed for such application in the State 0 Florida and in strict accordance with manufacturer recommendations. The maintenance programs will be conducted in an environmentally sensitive manner by hand or chemically. A list of the most commonly encountered exotics and nuisance plant species to be eradicated during maintenance procedures is provided below. Throughout the establishment period the contractor shall maintain Category I and II Exotic and Nuisance vegetation within the wetland mitigation area at coverage's equal to or less than 1 % with particular emphasis on the species below which shall be completely removed or eradicated from the entire Lake Littoral and Transitional Zones: Commonly Encountered Exotic and Nuisance Plant Species List Altemanthera philaxeroides Colocasia esculenta Eichhomia spp Hydrilla verticillata Ludwigia peruviana Me/aleuca quinquenervia Pancium hemitomon Panicum repens Pennisetum purpurea Phragmites australis Pistia lactuca Salix spp Typha spp Alligator weed Elephant, wild taro Water hyacinth Hydrilla Primrose willow Melaleuca Maidencane Torpedograss Elephant grass Common reed Water lettuce Willow Cattails Any population of Panicum hemitomon (maindencane) that becomes established in any area shall be maintained to less than 10% coverage of the total planted area. · All maintenance debris shall be collected and disposed of properly. eotleur Hearing 1934 Commerce Lane, sute 1 J~, FIatda 33458 5617476336 Fax7471377 Project #04-0910 Created on 3123/2005 11 10 AM Revised on 11/08, 2007 F:\ProjectsI04-0910-NUC-High Ridge Road\WordExce~Lake Management 4 ~~~ . At the end of the one-year establishment period, any tree staking or guying shall be removed. The landscape architect shall inspect the littoral zones for compliance one (1) year after planting. 4.3 Long Term Maintenance Lake littoral planting shall be maintained in accordance with the City of Boynton Beach Land Development Code and the Lake Littoral and Transitional Zone planting plans. At a minimum eighty-percent (80%) vegetative coverage and the survivorship of littoral zone planting area shall be maintained. The upland transitional zone must maintain a one hundred-percent (100%) survivorship at all times. Any of the dead or dying upland trees and vegetation must be replaced (100% survivorship) prior to submittal of the quarterly report and acceptance by the City of Boynton Beach. Exotic, invasive, and non-native invasive shall be kept free of the littoral planting area. Such species shall be maintained at <10% coverage at all times. The City of Boynton Beach approval shall be obtained prior to any reconfiguration of the approved Lake Littoral and Transitional Zones. Written approval shall be obtained from the City of Boynton Beach prior to modification of the planted littoral or upland zones. 4.4 Monitoring Program Upon completion of initial littoral zone development, routine maintenance and monitoring will be initiated according to the following specifications. The littoral and upland transitional zones shall be inspected and monitored for two (2) years after planting. During this two-year maintenance and monitoring period, maintenance shall occur monthly and monitoring reported quarterly to the City of Boynton Beach for two (2) years after planting. The maintenance and monitoring program shall consist of the following: · Inspections, monitoring, exotic removal and replanting during each monitoring period to maintain the minimum eighty-percent (80%) survivorship criteria for the planted littoral zone and one hundred- percent (100%) survivorship for the upland transitional zone. · Inspections and monitoring of all equipment storage, maintenance and service areas shall be required to ensure the site has not been contaminated by regulated substances. Construction areas shall be maintained in accordance with the "Regulated Substance Best Management Practices for the Construction Industry." · The submittal of a monitoring report to the City of Boynton Beach, landscape architect and owner representing a time zero monitoring, to be completed within thirty (30) days of initial planting; and quarterly monitoring reports thereafter for two (2) years after planting. Each report shall be submitted to the City of Boynton Beach, landscape Cotleur Hearing 1934 Commerce Lane. &.ite 1 J~ Florida 33458 5617476336 Fax7471377 Project #04-0910 Created on 3/23/2005 11:10 AM Revised on 11/08, 2007 F.\Projec1s104-0910-NUG-High Ridge Road\WordExce~Lake Management 5 ~~~ architect and owner within thirty (30) days of the completion of the monitoring period. The time zero monitoring report for this project shall include an as-built drawing signed and sealed by a professional recognized and approved by the Florida Department of Professional Regulations. . Each monitoring report, including the time zero, shall assess the species, numbers, locations of planted littoral zone shelves, and related upland transitional areas, and shall include multiple panoramic photographs of each lake clearly depicting the entire littoral zone planting. Photographs shall be taken at approximately the same location each time. The reports shall also detail the species, numbers and locations of additional plantings that were made to attain the survivorship and coverage criterion, if such plantings were necessary. The water body dissolved oxygen content will be measured in each lake and fauna species noted. The reports shall also depict the condition and location of storage and service areas if applicable. After the first year, the landowner or entity having maintenance responsibility for the planted littoral zone shall maintain the littoral zone in the following manner: · A minimum of eighty-percent (80%) survivorship and a minimum of eighty-percent (80%) coverage of the planted littoral zone. · A minimum of one hundred-percent (100%) survivorship in the uplands transitional zone. · Exotic, non-native invasive, and invasive plant species as defined by the Florida EPPC (1993), such as cattails, primrose willows and water hyacinths, shall be restricted to less than ten-percent (10%) of the required planted littoral zone. 4.5 Inspections Forty eight (48) hours prior to the completion of the lake excavation, the landscape architect will be contacted to inspect the slope angle of the littoral zone. Lake excavation slopes shall be re-vegetated within thirty (30) days of completion. The landscape architect shall be contacted forty-eight (48) hours after planting to inspect the littoral and transitional zones. Time Zero Monitoring Report shall be submitted with an "As Built" drawing of Lake Littoral and Transitional Plantings with in thirty (30) days of completion of plantings. Monitoring reports shall be submitted to the landscape architect and the owner as required within these technical specifications. 5.1 Enforcement Cotleur Hearing 1934 Commerce Lane. ~ 1 J~. Florida 33458 561 7476336 Fax 7471377 Project #04-0910 Created on 3123/200511:10 AM Revised on 11/08, 2007 FIProjectsI04-0910-NUC-High Ridge Road\WordExce~Lake Management 6 ~~~ The Lake Management Plan will not be changed without the approval of the City of Boynton Beach, and the City shall have the right to enforce the provisions of the Lake Management Plan through any available administrative or civil proceeding which may result in penalties, appropriate vegetation and other remedies as against any person, corporation or other entity in violation of any of the provisions of the Lake Management Plan. 5.2 Responsibilities The Affidavit of Responsibility identifies the responsible party for maintenance and protection of the Lakes shall be New Urban Communities, 398 NE 6th Avenue Delray Beach, Florida 33483. The Owner/Developer of the High Ridge site recognizes the natural scenic and habitat value of the native upland habitat on site. The Developer has agreed to eradicate and manage the encroachment of exotic vegetation and manage the Lake Littoral and Transitional Zones in accordance with guidelines set forth by the City of Boynton Beach. These management practices are intended to improve the potential utilization of these areas by various types of wildlife. The Owner/Developer of the High Ridge Site shall have the responsibility of maintaining the Lake areas free of litter, debris and yard clippings. Lake Management shall be the responsibility of High Ridge's Master Association from the point that the project has been completed. High Ridge's Master Association shall be responsible for the continued eradication of exotics. There must be a mechanism for policing the Lake to keep the area free of bottles, paper trash, plastics, and associated discards. All foreign material must be disposed in a proper waste disposal facility. Initial implementation and future management of all lake areas within the property will be the responsibility of the developer or its successors and/or assigns. Cotleur Hearing 1934 CornrneIce Lane, &.Me 1 J~, Florida 33458 561 7476336 Fax 7471377 Project #04-091 0 Created on 3/23/2005 11: 1 0 AM Revised on 11/08, 2007 F.\PrOjec1s104-0910-NUC-High Ridge Road\WordExce~Lake Management 7 ~~ Cotleur Hearing 1934 Commerce Lane, &i1e 1 JL!J/IBf, FIoItiJ 33458 5617476336 Fax7471377 HIGH RIDGE PUD MSPM 07-010 1st Review Planning October 5, 2007 ~ SI/fBlIt;( ~~we APP ~ ~ Ift3tNr W/lfC!f ~ ~~ ~ &uM/~ P&f'I- "17J11,.r 5ubN' ~. ~ At the technical advisory review team (TART) meeting, provide written responses to all staffs comments and questions. Submit 12 sets of revised plans. Do not include construction drawings in site plan sets. Each set should be folded and stapled. At the technical advisory review team meeting, provide a full set of drawings of each plan in a reduced size of 8Yz inches by 11 inches of each plan. Save each plan to a compact disk and submit that to staff as well. Submit updated survey with current revision date, or submit a notarized affidavit which states that the boundaries, including the metes and bounds legal descriptions indicated on the survey submitted for the New Site Plan application in 2005 have not changed. Submit revised Public Art Information Form that provides more detail (art location, accessibility, 1 % and 70% amounts, estimated site plan and completion dates, etc.). Submit two (2) revised traffic statements with revised unit type and count for the project. A revised traffic impact analysis must be approved by the Palm Beach County Traffic Division for concurrency purposes prior to the issuance of any building permits. The project must obtain a revised school concurrency approval from the School District of Palm Beach County prior to the issuance of a building permit. It would be preferable to have evidence of their approval prior to the Planning & Development Board meeting. A unity of title may be required. The Building Division of the Department of Development will determine its applicability. It is the applicant's responsibility to ensure that the new site plan is publicly advertised in accordance with Ordinance 04-007. Revise Cover Sheet and title blocks on all plans to: High Ridge PUD. Revise Master Plan (sheet 2 of 15) Site Data to delete PBC RS, LR-2, MR-5 designations. Reword to Zoning District: PUD, Future Land Use: Medium Density Residential (MeDR max. 9.58 dulac. Tabulations should also include overall project density. Add note to Master Plan that PUD will be under unified control and include the establishment of a Homeowner's Association and their recorded restrictions which will apply to all lots within the PUD. Provide revised HOA documents for proposed development if any changes have occurred. Revise Master Plan (sheet 2 of 15) to comply with Chapter 3. Master Plan Review, Article IV. Master Plan Preparation and Submission, Section 3. Master Plan Content, of the Land Development Regulations as follows: Indicate width (existing and ultimate) of adjacent rights-of-way (High Ridge Road and Miner Road), including street pavement width. Dimension to property boundaries. Include names and elevations of adjacent subdivisions, and existing zoning and future land use classification of all adj acent properties. Indicate pedestrian and vehicular circulation (access, traffic flow, and how vehicular traffic is separate from pedestrian and other types of traffic). Indicate bearings and distances of perimeter property lines; typical widths of internal streets and alleys; typical width of sidewalks; and typical dimensions of parking spaces. Label all common areas (landscape strips along perimeter rights-of-way, open space, recreational amenities, internal private streets less than 40 feet in width, etc). Note these common areas will be platted as separate tracts and will be under common ownership and maintenance of the Homeowner's Association. Indicate location of all existing temporary structures (i.e. sales trailer and related parking) and a statement of when the temporary structure will be removed from site. This information should be shown with "ghost lines" and clearly labeled. Indicate the following notes: (1) internal streets are private streets to be maintained by Homeowner's Association; (2) statement that all utilities are available to site and will be provided by appropriate agencies; (3) the PUD will be under unified control and have a homeowners association to maintain private internal streets, common areas, landscape tracts, etc. Indicate on all plans the locations and dimensions of all existing and proposed utility lines and easements. On Master Plan correct tabular setback information to include all situations, label square footage of cabana building and square footage of lake, and label use on lot located west of Lot 1. Also include total number of proposed residential units by phase, and characteristics such as number of bedrooms and bathrooms, setbacks, height of buildings, etc. Also include types of models proposed, what models will correspond with typical lot sizes, and square footage under air and total square footage for each model. Revise title blocks on floor plans for Bermuda models to indicate that it is also the floor plan for the Anglo-Caribbean and Florida-Georgian models of that type. Revise sheet A-2 "Fla-Ga Model 1-30 Elevation C" to re-label Right Elevation "B" to Right Elevation "C". Revise all plans to: (1) renumber lots; and (2) provide bolder phase line. On Site Plan (sheet 3 of 15) revise setback lines at comer of Lot 8 to be measured from new property lines (after right-of-way dedication). Revise side elevations of all proposed models (especially those that will be located along High Ridge Road) to include additional architectural features that will provide visual interest (enhanced with features similar to the front facades using elements such as balconies, individual roof features, porches, varying surface materials and colors, etc.) Provide detail and information on the "ID column" located at various locations along the right-of- way on both the Master Plan and Site Plan. Indicate proposed signage locations on both Site Plan and Landscape Plan. Revise proposed locations to comply with setback and safe sight comer requirements for signs (minimum 10 feet from the new property line). Provide a typical sign detail including height, sign face area, font, materials, color, etc. on sheet 5 of 15. On Site Plan (sheet 3 of 15), label cabana building, provide dimensions, and provide square footage on the building footprint. Is the cabana doubling as the "clubhouse" building? If so, it should be large enough to accommodate home owner association meetings. If not, where will HOA meetings take place? On Photometries Plan, indicate proposed site lighting designed at a minimum average light level of one foot-candle and levels; specify that the light poles shall withstand a 140 MPH wind load (Chapter 23, Article II, Section A1.a and Florida Building Code); provide a note that the fixtures shall be operated by photo-electrical control and are to remain on until 2:00 a.m. (LDR, Chapter 23, Article II, Section Al.a.); and include pole wind loading and pole details in conformance with Chapter 6, Article IV, Section 11, Chapter 23, Article I, Section 5.B.7 and Chapter 23, Article II, Section A Indicate location of lift station (on lot west of Lot 1) on the site plan and landscape plan. Provide a detail of a typical screened-enclosure permitted within the building setbacks. Are the swimming pools considered as a component of the impervious area calculations? Include floor plan and building elevation for Cabana in the architectural drawings. All building elevations should include the exterior finish, paint manufacturer's name, and color codes. (Chapter 4, Section 7.D.). Indicate the mean roof height on all building elevations. Submit colored elevations of all four (4) building facades of the single-family detached dwelling types at the Technical Advisory Review Team (TART) meeting (Chapter 4, Section 7.D.). These elevations will be on display at the public hearings. Colors should be consistent with established colors throughout the High Ridge Road corridor, and with the colors approved in the original Site Plan. Provide paint swatches for the elevations (Chapter 4, Section 7.D.). The removal/relocation of landscape material is subject to review and approval of the City Forester / Environmentalist. Staff recommends preserving as many of the native trees as feasible, especially along the west property line. On the landscape plan, ensure that the plant quantities match between the tabular data and the graphic illustration. Submit documentation from Palm Beach County that landscape strip within the High Ridge Road (right of way to be dedicated) is approved as proposed. The east landscape strip along High Ridge Road does not comply with minimum City requirements for number of tree and shrubs, spacing, etc. Landscape notes indicate that City landscape requirements will prevail in case of conflicts. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7.5, Article II, Section 5.C.2.). All shrubs and hedges are required to be at minimum 24 inches in height, 24 inches in spread, and planted with tip-to-tip spacing measured immediately after planting to adequately cover the planted areas on the site (Chapter 7.5, Article II, Section 5.CA.). Clearly label all types and quantities of landscape material on landscape plan. Perimeter trees do not appear to be clearly labeled. Revise site plan and landscape plan to include a decorative 6 foot high masonry buffer wall along the north property line to mitigate the difference in density and intensity ofthis area of the project compared with the adjacent single-family lot to the north. Shrubs shall be planted on outside of wall.