Loading...
DRAINAGE CALCULATIONS - .. - .. .. . .. '- June 2007 .. .. ... - Kohls Boynton Beach ... .. .. .. Drainage Calculations - - .. - Prepared for: South Florida Water Management District 3301 Gun Club Road West Palm Beach, FL 33466 - - - .. Prepared by: Kimley-Horn and Associates, Inc. 601 21 st Street, Suite 400 Vero Beach, FL 32960 - .. .. .. ilIiJfr/1 Pe r J. Van Rens, P.E. Date: June 11, 2007 Florida Registration .No. 55553 Corp Registration #: CA 00000696 .. .. - .. 1IIII"'1-_InI. Kimley-Horn -.J r, and Associates, Inc. - - I. SITE LOCATION: TARGET SHOPPING CENTER BOYNTON BEACH The site is located at 1901 North Congress Avenue on the Southwest corner of Congress Avenue and Gateway Boulevard. It consists of an existing Target store, planned for a conversion to a Kohl's, on 8.84 acres, with a Carrabas and CVS on the remaining portion of the 12.72 acres site. II. MODIFICATION SUMMARY '<II The Target is permitted as part of the Congress Lakes P.UD. (Permit #50- 01116-8). This surface water management permit was modified August 9, 1990. The permit modification includes Carriage Homes 36.11 acre, off site mobile home park 37.04 acre, and the Target Shopping Center 13.18 acre. ""'" ... This report will address the improvements being made to the existing Target future Kohls building which is part ofthe Target Shopping Center. ... III. POST-DEVELOPMENT SITE DATA Below are the permitted and proposed area breakdowns for the Target Shopping Center. Previously Permitted (#50-01116-S) Kohls Modifications (Proposed) Parameter Area (ac) Parameter Area (ac) Buildings 3.51 Buildings 3.25 Pervious Area 0.80 Pervious Area 1.61 Impervious Area 8.87 Impervious Area 7.86 Total 13.18 Total 12.72 2 IV. WATER QUALITY .. We have evaluated the water quality requirement for the proposed modifications and compared them to the water quality provided for the Target site based on the permitted site data. There is less water quality required in the post-development than was originally permitted. Therefore, no water quality improvements are proposed. See below for the calculations.. ... The permitted water quality was 2.5" x % impervious. .. 2.5" x % impervious is as follows: WI .. a) 13.18 - (roof) b) 9.67 - green area c) % impervious d) 2.5 * % impervious e) 2.293" * 9.67 ac 13.18 - (3.51) 9.67- 0.80 (8.87/9.67)* 1 00 2.5 * .917 22.173 ac-in = 9.67 ac = 8.87 ac = 91.7 % = 2.293 in = 1.85 ac-ft The proposed water quality is 2.5" x % impervious. 2.5" x % impervious is as follows: a) 12.72 - (roof) b) 9.47 - green area c) % impervious d) 2.5 * % impervious e) 2.075" * 9.47 ac 12.72 - (3.25) 9.47- 1.61 (7.86/9.47)*100 2.5 * .830 19.650 ac-in = 9.47 ac = 7.86 ac = 83.0 % = 2.075 in = 1.64 ac-ft From the calculations 1.64 ac-ft < 1.85 ac-ft, therefore this site meets permitted requirements for water quality. 3 " oil ;!if ... .. V. PERMITTED DESIGN PARAMETERS "" ... 3 year 1 day = 6.50 in rainfall 25 year 1 day = 12.0 in rainfall 100 year 3 day = 21.74 in rainfall Control Water Elevation = 8.5 ft NGVD (6.97 NA VD) FFE =13.77 ft NGVD (12.24 NA VD) Lowest Inlet =11.51 ft NGVD (9.98 NA VD) 25 year Berm EI =12.81 ft NGVD (11.28 NA VD) .. "" ... - .. VI. ALLOWABLE DISCHARGE .. We are not adding any additional area to the original permit and not modifying any of the discharge structures. Therefore, no increase in discharge is proposed. ... VII. CONCLUSIONS ,. There is no additional water quality treatment, no change in the stage/storage assumptions, and no additional discharge relative to the Congress Lakes P.UD. Permit #50-01116-S. Therefore, no modifications to the stormwater system are proposed other than some minor piping/inlet relocations. ... - ... ,"" H :\4 7956000\ENG\Drainage\DrainageStatement.doc ... 4 ..