CORRESPONDENCE The City 01 Boynton beach. DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org March 27, 2008 Mr. Carlos Ballbe Development Consulting Group 12855 SW 132nd Street, Suite 206 Miami, Florida 33186 Re: Waterside MMSP 07-010 Dear Mr. Ballbe: In response to your request date-stamped December 7, 2006 and most recent response letter date-stamped March 21, 2008, for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: · Modification of the front entry gate (as depicted on the attached drawing) Please be informed that the proposed changes on the revised plan date-stamped 3/21/08 are "minor" as defined within the Land Development Regulations, Chapter 4 - Site Plan Review. This project may continue to be processed by the Building Division as a permit application, subject to the following conditions: 1. The Traffic Markings plan (Sheet #TM1 of 1) incorrectly identifies the "Through/Turn" pavement markings as Rl-2 ("Yield") signs. Per the MUTCD, pavement markings do not have a set designation. Please correct this on the permit drawings. 2. Prior to the receipt of any further Certificates of Occupancy, Provide a hold-harmless agreement for the portion of sanitary sewer main that runs under the entry bridge. A standard hold-harmless agreement can be found in Exhibit "M" of either the Engineering Design Handbook & Construction Standards or the Utili ties Engineering Design Handbook & Construction Standards. 3. Acceptance of these plans during the Minor Site Plan Modification process does not ensure that additional comments may not be generated during permit review. . Page 2 March 27, 2008 Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer Wayne Bergman, Building Official Pete Mazzella, Deputy Utilities Director Chris Roschek, Engineering Manager DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 08-033 TO: Ed Breese, Principal Planner, Planning and Zoning FROM: Laurinda Logan, P.E., Senior Engineer.\.~-~ March 25, 2008 \ ~-->'\ DATE: RE: Review Comments Minor Site Plan Modification - 3rd Review Waterside Entry Gate & Curb Modifications File No. MMSP 07-010 The above referenced revised Site Plans, received on 3/24/08, were reviewed against the comments dated 2/29/08. Following are our remaining comments (remaining, revised, or new.) 1. (New) The Traffic Markings plan (Sheet #TM1 of 1) incorrectly identifies the "Through/Turn" pavement markings as R1-2 ("Yield") signs. Per the MUTCD, pavement markings do not have a set designation. Please correct. 2. (Replaces Comments #4 and #5) Provide a hold-harmless agreement for the portion of sanitary sewer main that runs under the entry bridge. A standard hold-harmless agreement can be found in Exhibit "M" of either the Engineering Design Handbook & Construction Standards or the Utilities Engineering Design Handbook & Construction Standards. Cc: Jeffrey R. Livergood, P.E., Director of Public Works Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E.! P.S.M., City Engineer, Public Works/Engineering Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File . esulting group development planning. civil engineering (,onstruction administration March 19, 2008 Mr. Ed Breese Principal Planner Development Department Planning and Zoning Division CITY OF BOYNTON BEACH 100 E. Boynton Beach Boulevard Boynton Beach, Fl. 33425-0310 /[;;). D. "jf;;;, 7 . /i -.r-,-'rl ".'~'-~l.i'i':I" Ii < -~-- I i':1; ! ; It' ,I MAR 2 , ?0r>n ( i.Un Re: WATERSIDE Engineer's Project Number: 220953 MMSP 07-010 (2nd Review) Dear Mr. Breese: Pursuant to the staff review comments dated February 29, 2008 for the minor modification request 1.0 the entrance at the above referenced project, we offer the following response: 1. A "no right turn" sign has been added at the west gate (eastbound approach). "Residents keep right" sign has been removed to avoid confusion. 2. Stop signs have been added to the east and west gate at the stop bars. Please note that buildings number I, 2 & 5 will not be constructed within the near future and therefore, the entrance revisions are proposed to meet the existing site conditions (temporary sales center and construction trailer). Developer will apply for another modification at the time of applying for a building permit for these buildings. 3. Residents will be utilizing clicker devices for access. 4. The Boynton Utilities Department has already accepted the utilities and they have been conveyed. Also, they are aware of the bridge existence and have not requested a Hold Harmless Agreement or Waiver. Please discuss this item with Peter Mazzella and if required, let me know so we can prepare a Hold Harmless Agreement. 5. There are no proposed structures in this submittal; all structures are existing and constructed as per the approved plans. Enclosed please find a copy of the water and sewer plan approved by the Utilities Department. Applicant will not be subject to a review of the utilities as they are existing, approved and conveyed to the City. 6. Plans have been revised to depict existing conditions. development consulting group, inc. miami-dade. 12855 SW 132 street. suite 206 . miami, florida 33186 . P-305.253.1970 . f- 305.253.0897 formerly Carlos J. Ballbc, P.A. Enclosed please find two sets of the revised plans for your review and approval. If you have any questions or require additional information, please do not hesitate to call our office. Sincerely, DEVE OPMENT CONSULTING GROUP, INC. cc: ctor Garcia, S.H. COMMUNITIES The Citu..!lf Bounton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org February 29,2008 Mr. Carlos Ballbe, P .E. Development Consulting Group 12855 SW 132 Street, Suite 206 Miami, Florida 33186 Re: Waterside MMSP 07-010 (2nd Review) Dear Mr. Ballbe: The City of Boynton Beach staffhas reviewed your February 7,2008 responses to our May 21,2007 letter regarding the above-mentioned project. The following comments are being forwarded to you for your review and response: 1. Ifthe west gate is for egress only (both lanes?), then that is all the more reason to add a "No Right Turn" sign on the eastbound approach. (The west gate is the gate closest to the main entrance, east gate refers to the gate directly east of the main entrance and south gate is the gate entering/exiting on to Chukker Rd.) 2. Ensure "Stop" signs are placed at the stop bars on the egress aisle at both the east and west gates. Stop bars are not to be used alone (per the MUTCD) but to supplement a stop sign, traffic control signal or some other traffic control device. Per City and County Standards, add double lane separators at each stop bar/stop sign location. The gates alone are not sufficient visual reference to motorists to stop. The gates are painted black and would not be readily visible at night. 3. Signing at the entrance directs residents to keep right, however the card reader/call box is on the left side of the two-lane entrance. Please indicate if residents will be utilizing clicker devices for access. 4. The main entry feature bridge crosses a sanitary sewer main. This violates City standards that do not allow structures within utility easements. The applicant/developer will be required to obtain a waiver from the Utilities Department allowing this configuration, as well as executing a Hold Harmless Agreement. Utility staff finds no evidence of approval for this arrangement. Should you have any written documentation to the contrary, please submit it with your responses to the other outstanding items. 5. Show proposed utilities and utility easements on each ofthe plans submitted for Minor Site Plan Modification so that conflicts between the proposed structures and utility lines (water and sewer) may be evaluated. 6. The plans provided (Key, P-l, TMl of 1, and A-9) do not correctly depict the field condition ofthe gates at the west entrance. It shows the one leaf swinging out (to the north); the actual condition is the leaf sliding to the east. Please correct plans. . . Page 2 February 29, 2008 7. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 8. Please note that changes or revisions to these plans may generate additional comments. Please submit revised plans reflecting the changes discussed above to continue the review of your request through the process. Staff will be happy to meet with you to discuss any of these issues or any potential plan revisions prior to your re-submittal. Do not hesitate to contact me with any questions or if there is anything I can do to assist you. Sincerely, Ed Breese Principal Planner cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer Peter Mazzella, Deputy Utilities Director \ . esulting group development planning. civil engineering construction administration February 7,2008 \ir. Ed Breese Principal Planner Development Department f ianning and Zoning Division CITY OF BOYNTON BEACH 100 E. Boynton Beach Boulevard ;:.(..vnton Beach, Fl. 33425-0310 Re: WATERSIDE Engineer's Project Number: 220953 MMSP 07-010 Dear Mr. Breese: ~'Jrsuant to the staff review comments dated May 21, 2007 for the minor modification request to ~ne entrance at the above referenced project, we offtr the following response: 1. Enclosed please find two copies of the revised landscape plans for the entry. 2. The request to add a "no right turn" at the eastbound approach is not required as the driveway located to the south is for "exit only" and the gates will not operate when the visitors or residents obtain approval to enter the site. 3. Stop bar striping has been added to the egress lanes (westbound and northbound) at the gate locations as a reference for traffic to use while waiting for gates to open. No stop sign or double yellow striping has been added because the gates are being use as a reference to stop and not to overpass other vehicles. 4. "Keep Right" sign has been added at the egress of the east gate. 5. "Right Lane Residents Only" sign has been added at the entrance to direct residents to the correct lane. 6. New entry feature located north of the entrance is a fountain with a tower. The total impervious area is 412 s.f. and therefore, no revised plan will be required. 7. Sidewalk has been added on the south side of the entrance to connect to sidewalk along US1. 8. Main entry feature does not encroach over 8" main with the exception of the "bridge" over which is 14' minimum in height. The entry feature and utilities have been approved by the Utilities Department (see attached scketch). development consulting group, inc. miami-dade. 12855 sw 132 street. suite 206 . miami, florida 33186 . P-305.253.1970 . f- 305.253.0897 formerly Carlos J. Ballhe. P.A. .' 9. Structures are existing and locations have been approved by the Utilities Department. All roadways have been dedicated as utility easements per the recorded plat. 10. Enclosed please find two sets of the revised plans. 11. Please note that we have renamed our company to Development Consulting Group, Inc. If you have any questions or require additional information, please do not hesitate to call our office. Sincerely, ENT CONSULTING GROUP, INC. cc: Hector Garcia, S.H. COMMUNITIES Mark Welch, S.H. COMMUNITIES DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 08-018 FROM: Ed Breese, Principal Planner, Planning and Zoning Laurinda Logan, P.E., Senior Engineer ,~---~ February 28, 2008 ,'~ Review Comments ~__j Minor Site Plan Modification - 2nd Review Waterside Entry Gate & Curb Modifications File No. MMSP 07-010 TO: DATE: RE: The above referenced revised Site Plans, received on 2/20/08, were reviewed against the comments generated and forwarded to P&Z 5/15/08. Following are our remaining comments (remaining, revised, or new.) PUBLIC WORKS - SOLID WASTE No comments at this time. PUBLIC WORKS - FORESTRY & GROUNDS 1. The landscape plans need to include a legend to allow identification of trees and clearly show the location of water and sewer lines. PUBLIC WORKS - TRAFFIC 2. If the west gate is for egress only (both lanes?) then that is all the more reason to add a "No Right Turn" sign on the eastbound approach. (The west gate is the gate closest to the main entrance, east gate refers to the gate directly east of the main entrance and south gate is the gate entering/exiting on to Chukker Rd.) 3. Add "Stop" signs at the stop bars on the egress aisle at both the east and west gates. Stop bars are not to be used alone (per the MUTCD) but to supplement a stop sign, traffic control signal or some other traffic control device. Per City and County Standards add double lane separators at each stop bar/stop sign location. The gates alone are not sufficient visual reference to motorists to stop. The gates are painted black and would not be readily visible at night. 4. Signing at the entrance directs residents to keep right, however the card reader is on the left side of the two-lane entrance. How will the residents open the gates? Dept. of Public Works, Engineering Division Memo No. 08-018 RE: Waterside Entry Gate & Curb Modifications, File No. MMSP 07-010 February 28, 2008 Page 2 ENGINEERING 5. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 6. Please note that changes or reVISions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 7. The plans provided (Key, P-1, TM1 of 1, and A-9) do not correctly depict the field condition of the gates at the west entrance. It shows the west leaf swinging out (north); the actual condition is the leaf sliding to the east. Please correct plans. UTI UTI ES 8. The main entry feature crosses a 8 in W3tor sanitary sewer main. This violates City standards that do not allow structures within utility easements. The applicant/developer will be required to obtain a waiver or variance from the Utilities Department allowing this configuration. 9. Show proposed utilities and utility easements on the plans so that conflicts between the proposed structures and utility lines (water and sewer) may be evaluated. Cc: Jeffrey R. Livergood, P.E., Director, Public Works Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File fete, According to M,-. Carlos 5allbe in his response to our first review comments: 8. "The entr~ feature and utilities have been approved b~ the Utilities Department (see attached sketch)." 9. "Structures al-e existing and locations have been approved b~ the Utilities Department. All roadwa~s have been dedicated as utilit~ easements per the ,-ecorded plat." So I don't know when or how this "approval" took place. I'm just going to respond back to him with a "prove it" comment. I'll also ask Angie if she remembers seeing an~thing in his Christmas card to us, I'm not even sure we got one from him. Again, thanks millions for ~our help -I'm sure glad someone has a brain and memor~ on this! Too bad Carlos didn't remember correctl~. Talk to ~ou later! L.aunn(L, From: Mazzella, Pete Sent: Wednesday, February 27,20084:17 PM To: Logan, Laurinda Cc: Roschek, Christopher Subject: RE: Waterside Laurinda I don't see anything in our file approving a structure in or over the utility easement. Nor do I see a hold harmless agreement for said structure, which we would require prior to its approval. What was the form of our alleged approval? Plans? Letter? Handshake? Christmas card? Pete From: Logan, Laurinda Sent: Wednesday, February 27,20082:16 PM To: Mazzella, Pete Cc: Roschek, Christopher Subject: FW: Waterside Importance: High Need a response to this one first ... f&Z's waiting on me! La.J.-inda From: Logan, Laurinda Sent: Tuesday, February 26, 2008 2:47 PM To: Mazzella, Pete Cc: Roschek, Christopher Subject: Waterside Importance: High Fete and Chris, Howd~! How are .1:)ou gu.1:)s doing? I'm back (again) to work and hope to sta.1:) back this time. I know I can't handle the thought o~ another operation or hospital time. Although it is a great wa.1:) to lose weight ... we can call it the 50.1:)nton 5each/5ethesda Hospital Diet ... one taste o~ the ~ood at the hospital and .1:)ou stop eating! E.a S.1:) , huh? Oka.1:), down to business. Carlos 5allbe brought in a minor mod re9uest ~or the entr.1:) ~eature at Waterside. One o~ m.1:) comments to him regarded the entr.1:) ~eature crossing over the sanitar.1:) sewer main under the "bridge" on the south side o~ the entrance. He was told that this was not acceptable. He now sa.1:)s, in his written response to our comments, that the "bridge" provides a 14-h minimum clearance and that the Utilities Dept. has approved this con~lict. Could .1:)ou please con~irm or den.1:) this vicious rumor? I need to get m.1:) comments back to F&Z as soon as possible. Thanks! Laurinda Logan, F.E.. Senior E.ngineer Cit.1:) o~ 50.1:)nton 5each loe;a n I@ci .bo~ nton-beach .~I.u s 561-742-6982 5651-742-6285 (~ax) The Citu..!lf Bounton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org May 21,2007 Mr. Carlos Ballbe Carlos J. Ballbe, P.A. 4863 NE 4th Avenue Fort Lauderdale, Florida 33308 Re: Waterside MMSP 07-010 Dear Mr. Ballbe: The City of Boynton Beach staff has reviewed the revisions to your plans for the above-mentioned project. The following comments are being forwarded to you for your review and response: 1. No landscape plans were provided to allow the impact of the proposed changes on landscaping to be evaluated. Please provide a copy of revised landscape plans for this purpose. 2. Add a "No Right Turn" sign on the eastbound approach to the west gate. It appears that, with those gates open, vehicles will cross into the egress traffic making the right turn maneuver. The plans depict swing gates that open out into traffic approaching from the entry. At the site it appears that the contractor/developer plans to install sliding gates, as the concrete base guide has been placed. Revise the plans to depict the desired configuration. 3. Add stop bars, "Stop" signs, and double yellow lane separators for the egress aisle at both the east and west gates. 4. Add a "Keep Right" sign at the egress of the east gate. 5. Show location of signage at the main entry directing residents and guests into the correct lanes. 6. New entry features have been added at the main entrance and on the north side of the main entrance. Provide information regarding the proposed area for drainage design purposes. If the proposed structures increase the impervious area by 800-S.F. or more a revised drainage plan will be required. 7. The proposed changes appear to eliminate the sidewalk between the gates and Federal Hwy. The plans show the sidewalk being placed on the south side ofthe main entry, however the sidewalk was not placed when the entry feature was constructed. Indicate how and where pedestrian traffic will be handled. 8. The main entry feature crosses an 8-in water main. This violates City standards that do not allow structures within utility easements. The applicant/developer will be required to obtain a waiver or variance from the Utilities Department allowing this configuration. 9. Show proposed utilities and utility easements on the plans so that conflicts between the proposed structures and utility lines (water and sewer) may be evaluated. .. . Page 2 May 21, 2007 10. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 11. Please note that changes or revisions to these plans may generate additional comments. Please submit revised plans reflecting the changes discussed above to continue the review of your request through the process. Staff will be happy to meet with you to discuss any of these issues or any potential plan revisions prior to your re-submittal. Do not hesitate to contact me with any questions or if there is anything I can do to assist you. Sincerely, Ed Breese Principal Planner cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer Breese, Ed From: Sent: To: Cc: Subject: Logan, Laurinda Wednesday, May 16, 2007 3:08 PM Mazzella, Pete Roschek, Christopher; Allen, Brent; Breese, Ed; Kelley, David; LaFontant, Frantz; Hall, Ken RE: Waterside Entry Gate Minor Modification (MMSP 07-010) Pete, You should have received the original memo via e-mail yesterday. Ed talked me into going out to the job (sure am glad he did and I did) and found out that the plans don't really look like the final product. In any event I think they may have to spend a little money to correct the deficiencies. Probably the biggest issue, cost-wise, will be the water main easement/entry feature conflict. Expect to hear from them in the near future. I don't think they have adequate clearance under the entry feature to operate machinery if repairs to the water main are required at that location. Let me know if you have questions, or need additional information about this minor modification. If you would like I can get you a copy of the minor modification plans - it's just a couple of sheets. Talk to you soon! Laurinda -----Original Message----- From: Mazzella, Pete Sent: Wednesday, May 16, 2007 10:16 AM To: Logan, Laurinda Cc: Roschek, Christopher; Allen, Brent Subject: Re: Waterside Entry Gate Minor Modification (MMSP 07-010) Sounds like they have some issues! Thanks for pointing out these problems. I'll pass it along to Chris and Brent Allen. Pete -----Original Message----- From: Logan, Laurinda To: Breese, Ed CC: Livergood, Jeffrey; Mazzella, Pete; Kelley, David; Hall, Ken; Quinn, Larry Sent: Wed May 16 10:10:25 2007 Subject: Waterside Entry Gate Minor Modification (MMSP 07-010) Ed, After our site visit to Waterside this morning (5/16/07) I would like to add (or amend) comments that were sent on the minor modification application currently under review. * First - the modifications have apparently already been installed. The applicant/developer should be advised that changes to the site plan are to be approved prior to constructing them. There is the potential for costly changes to the site from the City's comments since the modifications have already been installed. * Add a Comment #11: The main entry feature crosses an 8-in water main. This violates City standards that do not allow structures within utility easements. The applicant/developer will be required to obtain a waiver or variance from the Utilities Department allowing this configuration. * Add to Comment #2: The plans depict swing gates that open out into traffic approaching from the entry. At the site it appears that the contractor/developer plans to install sliding gates as the concrete base guide has been placed. Revise the plans to depict the desired configuration. * Comment #8: Add after the first sentence - The plans show the sidewalk being placed on the south side of the main entry, however the sidewalk was not placed when the entry 1 feature was constructed. Deiete the second sentence and add L_.c following - Indicate how and where pedestrian traffic will be handled. Thank you for taking care of the changes to my memorandum. Please give me a call if you have questions or need additional information regarding these comments. Laurinda Logan Senior Engineer City of Boynton Beach Public Works/Engineering 561-742-6982 561-742-6285 (fax) loganl@ci.boynton-beach.fl.us <blocked: :mailto:loganl@ci.boynton-beach.fl.us> 2 DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 07-062 TO: Ed Breese, Principal Planner, Planning and Zoning FROM: Laurinda Logan, P.E., Senior Engineer .\."t~~' .u___--' May 15, 2007 . , '''''- / DATE: RE: Review Comments Minor Site Plan Modification - 1 st Review Waterside Entry Gate & Curb Modifications File No. MMSP 07-010 The above referenced Site Plans, received on 4/10/07, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced. PUBLIC WORKS - SOLID WASTE No comments at this time. PUBLIC WORKS - FORESTRY & GROUNDS 1. No landscape plans were provided to allow the impact of the proposed changes on landscaping to be evaluated. Please provide a copy of revised landscape plans for this purpose. PUBLIC WORKS - TRAFFIC 2. Add a "No Right Turn" sign on the eastbound approach to the west gate. It appears that, with those gates open, vehicles will cross into the egress traffic making the right turn maneuver. 3. Add stop bars, "Stop" signs, and double yellow lane separators for the egress aisle at both the east and west gates. 4. Add a "Keep Right" sign at the egress of the east gate. 5. Show location of signage at the main entry directing residents and guests into the correct lanes. ENGINEERING 6. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 7. Please note that changes or reVISions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART) process does not ensure that additional comments may not be generated by the Commission and at permit review. 8. The proposed changes eliminate the sidewalk between the east gate and Federal Hwy. Show how pedestrians will be directed to the new proposed route on the south side of the main entry. Dept. of Public Works, Engineering Division Memo No. 07-062 RE: Waterside - Entry Gate, Minor Site Plan Modification -1st Review, MMSP 07-010 May 15, 2007 Page 2 9. New entry features have been added at the main entrance and on the north side of the main entrance. Provide information regarding the proposed area for drainage design purposes. If the proposed structures increase the impervious area by 800-S.F. or more a revised drainage plan will be required. UTILITIES 10. Show proposed utilities and utility easements on the plans so that conflicts between the proposed structures and utility lines (water and sewer) may be evaluated. Cc: Jeffrey R. Livergood, P.E., Director, Public Works Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\ Memorandums\Memorandums 2007\07-062- LOGAN MMSP 07-010 Waterside Entry Gate 051507.doc October 2,2006 (Revised 03-28-07) Planning & Zoning Division City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425-0310 Re: Application for Minor Modification to Entry Curb & Gate Approved Elevation Attn: Planning & Zoning Official; Please consider this letter as our application for Minor Modification to the approved curb for the Waterside Entry Gate. This change was required to allow the traffic of vehicles turn easier, and the gates swing better in addition the east gate was changed from a swinging door to a sliding gate. Please find attached the four copies of site plan ofthe mentioned above area and a check of 100.00 dollars to complete this request. If you should have any questions please feel free to contact myself or Mr. Frank Perez- Vice President of Architecture & Planning. est or L. Meji Project Manager ~ October 2,2006 O'-.r'> ell 1 2GDS Planning & Zoning Division City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425-0310 Re: Application for Minor Modification to Entry Curb & Gate Approved Elevation Attn: Planning & Zoning Official; Please consider this letter as our application for Minor Modification to the approved curb for the Waterside Entry Gate. This change was required to allow the traffic of vehicle be easier, and the gates swing better. Please find attached the four copies of site plan of the mentioned above areaand a check of I 00.00 dollars to complete this request. mcerely, / ----:- Nestor L. Mejia Project Manager If you should have any questions please feel free to contact myself or Mr. Frank Perez- Vice President of Architecture & Planning. L Nestor L. Mejia Project Manager - Architecture _ ) ,i 12900 S.w. 128th Street, Ste. 204 Miami, Flonda 33186 102' Fax (305)971-0190 . Phone (305) 971-0 _ l 'ia@southemhornesonlme.com www.SouthemHornesOnline.com . E-rnat. nrnel 12900 S.W. 128TH STREET, SUlTE#100 . MIAMI, FLORIDA 33186 . PHONE (305) 971 PROJECT NAME: Wat'erside LOCATION: PCN: I FILE NO.: MMSP 07-010 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: Southern Homes of Palm Beach Nestor Mejia ADDRESS: ADDRESS: 12900 SW 128tb Street FAX: Suite 100 PHONE: Miami, FL 33186 FAX: 305-971-6662 PHONE: 305-971-0102 SUBMITTAL / RESUBMITT AL 12/7/06 1 ST REVIEW COMMENTS DUE: PUBLIC NOTICE/ SIGNS 30 days /10 days IPARC: TART MEETING: LEGAL AD PLANNING & DEVELOPMENT BOARD MEETING: COMMUNITY REDEVELOPMENT AGENCY BOARD CITY COMMISSION MEETING: COMMENTS: S:\P]anning\SHARED\WP\PROJECTS\Southem Homes ofPa]m Beach\Waterside\MMSP 07-0]0\2007 PROJECT TRACKING INFO.doc