Draft Action Plan 09-18-12
City of Boynton Beach Flood Mitigation Plan
Action Plan - Section Eight
The following are flood mitigation activities recommended by the City of Boynton Beach Flood
Mitigation Task Force in September 2012. The activities have been prioritized based on the
following criteria:
1.Overall effectiveness to mitigate flooding
2.Feasibility and affordability
3.Reduction of repetitive losses
4.Urgency of need
The priority of the items may change due to urgency of need, current events and funding.
rd
1.Implement the Utility Department capital improvement project named NE 3 Street Stormwater
stth
Improvements, which includes NE 1 Street and NE 6 Avenue in the Heart of Boynton area.
Action
: This area is from Boynton Beach Boulevard north to the C-16 Canal and from
Seacrest east to Railroad Avenue. It includes the City’s Public Works compound, which was a
problem with TS Isaac because this is where the City vehicles are fueled but it was under
water; we would not have been able to fuel our emergency vehicles if there had been five
more inches of rain. Will require an RFQ for a study first and then the design would follow
stth
the study. The NE 1 Street and NE 6 Street area should be top priority.
Funding
: Capital Improvement Program Fund. Will research possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
th
2.Implement the Utility Department Lakeside/NE 20 Avenue Neighborhood Utility Improvements
capital improvement project.
Action
: Has been on the books for a while and would require an RFQ to go out for
engineering services to study the area and come up with a design.
Funding
: Capital Improvement Program Fund. Will research possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
3.Implement a program to encourage homeowners’ associations (HOAs) to maintain their drainage
control structures/systems.
Action
: The Utilities Department will create a set of Standard Operating Procedures for the
management companies of the HOAs so that they are educated as to what they should be
doing pre-storm and post-storm. There should be a checklist for the management companies
to follow. This will empower the HOAs to hold the management companies responsible if
flooding occurs.
Funding
: Staff time (operating funds)
4.Implement the Utility Department capital improvement project named “Golfview Harbor
Neighborhood Utility Improvements”. This area is west of I-95
Action
: Primarily a swale project. To be completed in the next fiscal year of 2013-2014.
Funding
: Capital Improvement Program Funds. Will research possibility of FEMA grant
funds.
5.Continue City participation in, and compliance with the National Flood Insurance Program (NFIP)
and the Community Rating System (CRS). Seek CRS classification improvements within
capabilities of City programs, including adoption and administration of FEMA-approved
ordinances and flood insurance rate maps (FIRMs) thus enhancing the City’s flood mitigation
efforts while securing insurance premium rewards for its residents and businesses.
Action
: This is the responsibility of the Development Department. This is an ongoing policy
and the City will continue its current approach.
Funding
: Staff time (operating funds)
6.Implement the Utility Department Chapel Hill Utility/Lake Eden Improvements capital
improvement project. This area is east of I-95.
Action
: Primarily a swale project. Will be completed in the next fiscal year of 2013-2014.
Funding
: Capital Improvement Program Funds. Will research possibility of FEMA grant
funds.
7.Encourage all property owners to purchase flood insurance.
Action
: This is the responsibility of the Development Department to be implemented through
education and outreach.
Funding
: Staff time (operating funds)
8.Encourage drainage solutions such as the use of pervious concrete and pavement.
Action
: This is current City policy and will continue as is. This is the responsibility of the
Development Department.
Funding
: Staff time (operating funds)
9.Provide ongoing training and evaluation of the CERT program.
2 of 15
Action
: This is current on-going City policy and will continue as is. The CERT members
meet with the City’s Fire Department four times a year. Two of those meetings are within two
months of hurricane season. The Boynton Beach CERT program is one of the best in the
County.
Funding
: Staff time (operating funds)
10.Implement the Utility Department North and South Road Neighborhood Utility
Improvements capital improvement project.
Action
: The City has tried to implement this project but it is on hold. Originally it was a
water main and stormwater project. The homeowners have refused to grant an easement in
their side yards for the outfall. This area is at the seawall. Part of the problem is that the lots
of some of the newer homes are built at a higher elevation, which has impeded the sheet flow
of water.
Funding
: Capital Improvement Program funds. Will research possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
11.Implement the Utility Department capital improvement project called Replacement
Stormwater Pump in stormwater retention areas.
This is to help with Utility Department’s operations and maintenance budget.
Action
:
Funded each year basically on an as needed basis. There is not a specific project area
identified. The City may need a replacement pump if the flow exceeds the pump
capacity. These funds would be used if something comes up that would exceed the
operating budget
Funding
: Capital Improvement Program Funds. Could only submit project for a grant if a
specific pump or project is identified.
12.Encourage the City’s departments to come forward with projects to enhance flood mitigation,
particularly in repetitive loss areas and areas of frequent flooding for which the Grant Coordinator
will pursue appropriate grants to fund the projects. Some examples of available grants are:
Flood Mitigation Assistance Grant
Hazard Mitigation Grant
Pre-Disaster Mitigation Grant
Repetitive Flood Claims
Severe Repetitive Loss Grant
Action
: The Grant Coordinator will follow up annually on this responsibility and provide a
progress report to the Flood Mitigation Task Force in August of each year.
Funding
: Staff Time (operating funds). Matching funds, if required will have to be
budgeted in or will be assumed by the homeowner if agreed.
Plan goal and objective achieved
: Goal, Objective 2.6
3 of 15
13.Assign an individual to continually update information prior to, during, and after a hurricane or
flood event, including road and bridge closures, evacuation orders, emergency shelter locations
and electrical outages. This update responsibility can include some of the following options:
City website
Email advisements
Television Government Access Channel
BBTV
Electronic message boards
Reverse 911 telephone system
E-News
Public service announcements through local media (radio, newspapers, etc.)
Social media including Twitter and Facebook
Citizen Hotlines
Brochure handouts at Points of Distribution (PODs). The POD in Boynton
Beach is the Hester Center.
Action
: This is a current City procedure and will continue as is as a responsibility of the
Boynton Beach Emergency Management Division. The Standard Operating Procedure written
for emergency information dissemination shall include the items listed above.
Funding
: Staff time (operating funds)
14.Implement the Utility Department Stormwater Rehabilitation through the entire City System
capital improvement project.
Action
: This is to help our operations and maintenance. Funded each year basically on an as
needed basis. There is not a specific project area identified. This is used if something would
exceed the operating budget.
Funding
: Capital Improvement Program Funds. Could only submit project for a grant if a
specific pump or project is identified.
15.Ensure that City crews maintain and operate all flow control structures for which it is responsible
and encourage private and regional entities to do the same.
Action
: This is the responsibility of the Utility Department.
Funding:
Staff time (operating funds)
16.Evaluate the City of Boynton Beach Flood Mitigation Plan, particularly the Action Plan, annually.
Action
: The Development Department will be responsible to prepare an evaluation of the
Flood Mitigation Plan, including the Program for Public Information, for every annual
meeting of the Flood Mitigation Plan Task Force. This responsibility will be ongoing.
Funding
: Staff time (operating funds)
4 of 15
17.Update the City of Boynton Beach Flood Mitigation Plan every five years.
Action
: The Development Department will be responsible to ensure that the Flood Mitigation
Plan is updated every five years and coordinate the update with the Palm Beach County
Unified Local Mitigation Strategy’s five-year update committee.
Funding
: Staff time (operating funds)
18.Enhance communication methods in preparation for, response to, and recovery from natural
hazard events by utilizing social media, smartphone applications, and other new technology.
Action
: Palm Beach County has introduced a free smartphone app, PBC DART (Palm Beach
County Disaster Assessment and Resource Tool). The American Red Cross Hurricane app use
should b e encouraged. The City’s Emergency Management Division will continue the use of
social media and explore new technology as it becomes available
Funding:
Staff time (operating funds)
19.Review City Code of Ordinances and make recommendations, if necessary to strengthen
maintenance requirements of private stormwater management facilities, including structures
controlling flow and prohibiting parking in swales.
Action
: The Utility Department will collaborate with the Building Official, Code Compliance
Division and others to make code revisions that would improve private stormwater
management facilities attenuation.
Funding
: Staff time (operating funds)
20.Ocean Inlet Drive and Shore Drive Stormwater Improvements should be submitted as a future
Utility Department Capital Improvement Project.
Action:
Flood conditions have been observed within these rights-of-way, in part, due to debris
in storm drains. Staff recommends purchasing different types of grates that would help allow
for more efficient drainage. The Utilities Department may consider this area for a future
capital improvement project.
Funding
: Capital Improvement Program Funds. Research the possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
21.Implement the Utility Department Lake Boynton Estates Neighborhood Utility Improvements
capital improvement plan
Action
: Includes potable water mains and stormwater improvements; primarily swales and
some exfiltration. The project is in the final design stage is planned to be bid by the end of the
calendar year (2012) pending approval of the City, which is being done by procurement in the
City Attorney’s office.
5 of 15
Funding
: Capital Improvement Program funds. Research the possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
22.Implement the Utility Department Seacrest Corridor Neighborhood Utility Improvements capital
improvement project.
Action
: Similar to the Lake Boynton Estates project; primarily a water main project that will
include some stormwater improvements such as swaling and exfiltration. It is planned to be
out for bid by December 2012.
Funding
: Capital Improvement Program funds. Research the possibility of FEMA grant
funds. This mitigation project will be submitted to the Palm Beach County Unified Local
Mitigation Strategy (PBC LMS) Project Prioritization List (PPL).
23.Ensure adherence to the City’s Emergency Procedures Manual, particularly in the event of
evacuation orders.
Action
: A consultant has been hired by the City to update the Emergency Procedures Manual,
which will be completed by the end of October 2012. Emergency Management Division
personnel should review key components of the procedures before June 1st of each year.
Funding
: Staff time (operating funds)
24.Complete the inventory of the City’s drainage structures.
Action
: This is a requirement of the City’s National Pollutant Discharge Elimination System
(NPDES) permit. As part of the 5-year permit cycle, 20% must be inventories annually. To
be completed by the Utility Department by March 2016.
Funding
: Staff time (operating funds)
25.Implement the following Utility Department Capital Improvement Plan stormwater project:
Stormwater Master Plan and Updates – Review the status of the City’s stormwater system and
develop plans for its ongoing maintenance and improvement and ensure compliance with any
NPDES regulations.
Action
: This is a “high priority” Capital Improvement Project scheduled to be completed in
2013. This will be a study of the Heart of Boynton area. Has to go to RFQ.
Funding
: Capital Improvement Program funds. Research the possibility of FEMA grant
funds.
26.Encourage designation, protection, and maintenance of wetlands, mangroves and environmentally
sensitive lands.
Action: The U.S. Army Corps of Engineers manages wetland ecosystems and requires permits
for certain development activities. In addition, the Palm Beach County Department of
6 of 15
Environmental Resource Management (ERM) may also have permitting jurisdiction over
certain wetlands and mangrove swamps. This recommendation is ongoing and is the
responsibility of the City’s Development Department. There are no plans to change the
current approach.
Funding
: Staff time (operating funds)
27.Encourage FEMA to update Flood Insurance Rate Maps (FIRM) to include base flood elevations
in all Special Flood Hazard Areas (SFHA).
Action
: FEMA is in the process of updating the County’s FIRMs at this time. The
Development Department will keep the City updated on the progress of the mapping.
Funding
: Staff time (operating funds)
28.Increase the correction of localized drainage problems so that Level of Service standards are
enhanced.
Action
: The Utility Department will continue efforts to maintain, replace, and upgrade
drainage features to minimize or eliminate localized drainage problems. The Director of the
Utility Department shall submit records in August of each year to the Flood Mitigation Plan
Task Force Chair outlining the previous year’s accomplishments. This is reported annually to
the Department of Environmental Protection.
Funding
: Capital Improvement Program funds. Research the possibility of FEMA grant
funds.
29.Require that installation of stormwater management facilities made necessary by new
development is the responsibility of the developer.
Action
: This is current policy and will continue as is. This activity is ongoing as the
responsibility of the Utility Department.
Funding
: Staff time (operating funds)
30.Identify City parks and unbuildable lots (as determined by the Development Department) that
could be designated for permanent open space and encourage such designation where possible.
Action
: This responsibility will be a collaboration of the Parks and Recreation Department,
Development Department, and the Public Works Department.
Funding
: Staff time (operating funds)
31.Consider areas for multiple uses that can be used for storage of floodwaters (retention/detention
areas), such as ball fields, public rights of way, parks and designated open space in locations that
have flooding problems.
Action
: This will be a joint responsibility of the Utility and Development Departments.
7 of 15
Funding
: Staff time (operating funds)
32.The Development Department shall evaluate the building/site regulations of each zoning district
and make recommendations for minimum open space requirements.
Action
: The Development Department will be responsible to implement this activity.
Funding
: Staff time (operating funds)
33.Require new development that requires site plan approval to incorporate historical drainage
patterns in the analysis of the required stormwater storage.
Action
: This is current City policy and the collaboration between the Utility and
Development Departments will continue as is.
Funding
: Staff time (operating funds)
34.Encourage developing provisions for stormwater design management practices in low-impact
development.
Action
: The Utility and Development Departments have joint responsibility for this item.
Funding
: Staff time (operating funds)
35.Continue the City’s maintenance program to clear debris from stormwater drainage areas.
Action
: The Utility Department will assure that this program is implemented and shall make
the records available to the CRS Coordinator each year. This activity is ongoing and the City
will continue its current approach.
Funding
: Staff time (operating funds)
36.As part of the City’s NPDES program, continue sediment control to prevent clogged drainage
systems such as street sweeping, curb and gutter cleaning and planting vegetation on bare ground.
Action
: This is current policy and the Public Works Department will continue the current
approach..
Funding
: Staff time (operating funds)
37.Prioritize the reduction of repetitive loss properties through various means of mitigation, update
repetitive loss forms and strive to remove properties from the Repetitive Loss List.
Action
: This is an ongoing activity that will continue as a top priority of the City’s
Development Department, the results of which will be reported annually to the Flood
Mitigation Task Force. This is current policy and will continue as is.
8 of 15
Funding
: Staff time (operating funds)
38.Include notification of grants, loans and service availability in all City media publications,
seminars and websites that pertain to flood mitigation.
Action
: This item will become a part of the City’s Program for Public Information (PPI) and
will be a joint collaboration between the City Manager’s Office and the Development
Department.
Funding
: Staff time (operating funds)
39.Provide information to residents, businesses, property owners on the purpose, and importance, and
proper maintenance of swales.
Action:
This is an ongoing activity by the Utility Department and will continue the current
approach.
Funding:
Staff time (operating funds)
40.Work with developers when redeveloping commercial or mixed-use sites along the Intracoastal
Waterway by encouraging that they dedicate the easternmost portions of land granted as an
easement or to be greenways for public access and use.
When redevelopment is proposed on private properties located along the Intracoastal Waterway,
staff shall collaborate with the developers to encourage public access along the easternmost
portion of the property (e.g., development of a greenway, pedestrian path, bikeway, etc.) by the
granting of an easement or other legal means.
Action
: This is an ongoing responsibility of the Development Department.
Funding
: Staff time (operating funds)
41.Consider City acquisition of repetitive loss and/or adaptation action area properties along the
Intracoastal Waterway.
Action
: This responsibility will be a collaboration of the City Manager’s Office, the
Development Department and the Legal Department.
Funding
: Staff time (operating funds). Research the possibility of FEMA and other grant
funding.
42.Collaborate with Florida Communities’ Trust to assist with funds in acquiring properties in the
Special Flood Hazard Area (SFHA).
Action
: This responsibility will be a collaboration of the City Manager’s Office, the
Development Department and the Legal Department.
9 of 15
Funding
: Staff time (operating funds) and grant trust funds.
43.Collaborate with the Southeast Florida Regional Climate Change Compact as they make
recommendations for land development standards with respect to low-lying coastal areas.
Action
: The City will be asked to pass or approve by Commission resolution to adopt the
Compact where feasible for the Boynton Beach community, saying we accept the Compact
and will look to incorporate the feasible implementation strategies into the City’s land
development regulations and Comprehensive Plan. In early 2013 all of the municipalities will
be presented with a resolution and will be asked by the County Administrators of Palm Beach,
Broward, Miami-Dade and Monroe Counties to adopt. This will be the responsibility of the
City Manager’s Office.
Funding
: Staff time (operating funds). Research grant funds for implementation.
44.Educate citizens about and encourage them to consider the following forms of retrofitting for areas
or buildings with major flooding issues:
Install backflow valves on sewer systems
Elevation of structures by piers, posts and columns, and pilings
Create a secondary water barrier
Elevate the lowest floor above the 100-year flood level
Wet floodproofing (allowing water to enter uninhabited areas of the structure)
Dry floodproofing (sealing the structure to prevent flood waters from entering)
Levees and floodwalls (constructing a barrier around the structure to keep out
flood waters)
Demolition (tearing down the structure and rebuilding with appropriate
floodproofing techniques or relocating the structure)
Elevate the main breaker or fuse box
Action
: This is an ongoing activity through education and outreach and is the responsibility
of the Development Department.
Funding
: Staff time (operating funds)
45.Encourage floodproofing techniques in order to preserve and revitalize neighborhoods.
Action
: This is an ongoing activity through education and outreach and is the responsibility
of the Development Department.
Funding
: Staff time (operating funds)
46.Encourage property owners to use qualified hazard mitigation professionals to inspect building
foundations and access damage after flood events.
Action
: FEMA, insurance agents, the State National Flood Insurance Program (NFIP) office
and the City’s Development Department will provide contact information
Funding
: Staff time (operating funds)
10 of 15
47.Identify, inform and encourage homeowners’ associations to install littoral/upland buffer plantings
around lakes and retention areas.
Action
: This will be a responsibility of the Development Department through education and
outreach.
Funding
: Staff time (operating funds)
48.Identify privately owned and public natural and beneficial areas in the City and consider
expansion of the City’s properties that are designated natural and beneficial areas.
Action
: The Development Department will implement this item. Recommendations will be
presented to the Flood Mitigation Plan Task Force in its Task Force meetings.
Funding
: Staff time (operating funds)
49.Maintain strong enforcement of South Florida Water Management District and Lake Worth
Drainage District regulations pertaining to floodplain management
Action
: The Utility and Development Departments continue this current policy as is.
Funding
: Staff time (operating funds)
50.Encourage individual property owners to pursue percolation-oriented drainage improvements
using best management practices through outreach and education. Drainage that seeps into the
soil, rather than being directed out to the ocean, provides multiple benefits. Not only does it
mitigate flooding, but it also recharges the aquifer, enhances water quality, and reduces erosion.
Action
: The Development Department will include recommendations pertaining to
percolation-oriented drainage in the form of outreach and education. This activity will be
ongoing.
Funding
: Staff time (operating funds)
51.Implement strict enforcement of best management practices for reducing erosion during
development activity.
Action
: The Development Department will be responsible to implement this activity. This is
current City policy and should continue as is. An accounting of enforcement of this activity
will be included in each annual evaluation of this Plan.
Funding
: Staff time (operating funds)
52.Consider dune restoration programs.
Action
: This activity will be the responsibility of the Parks and Recreation Department.
11 of 15
Funding
: Staff time (operating funds). Research the possibility of grant funds.
53.Research whether the State will provide free sand and sandbags to residents prior to impending
floods.
Action
: This will be the responsibility of the City’s Emergency Management Division.
Research the possibility of the State providing sandbags through the County for distribution at
PODs.
Funding
: Staff time (Operating funds)
54.Ensure optimal staffing of emergency management personnel to receive and respond to emergency
events.
Action
: This practice will continue as in the past, in accordance with Incident Command
System (ICS) standards and ensuring adherence to the City’s Emergency Procedures Manual.
Funding
: Staff time (operating funds)
55.Integrate response to flooded homes with appropriate response organizations (CERT, American
Red Cross, faith based organizations and other non-profit entities).
Action
: The Emergency Management Division will contact appropriate response
organizations at least 24 hours prior to anticipated hurricane or flooding event. During or
immediately following the event, contact with these organizations will be made again to
ensure integration of response in accordance with the City’s Emergency Procedures Manual.
Funding
: Staff time (operating funds)
56.Identify all critical facilities located within SFHAs and make contingency plans for each, in the
event of flooding.
Action
: The City’s Fire and Life Safety Division will collaborate with the Risk Management
Department to identify all critical facilities located within the SFHAs and to make the
recommended contingency plans by [date] of each year. A preliminary report will be
presented to the Palm Beach County Local Mitigation Strategy and the Boynton Beach Flood
Mitigation Task Force.
Funding
: Staff time (operating funds)
57.Continue to ensure that all new public buildings that serve first response and critical
emergency/public needs, including record/data collection and communication
centers/infrastructure, are located outside of flood zones or floodprone areas.
Action
: The Development and Engineering Departments will be responsible for this activity
and will continue the current policy as is.
12 of 15
Funding
: Staff time (operating funds)
58.Annually update the list of nursing homes and smaller home care centers (Type 1 Group Homes)
in the City and the priority list of critical facilities.
Action
: The City’s Fire Department completes this every year
. This procedure will
continue as is.
Funding
: Staff time (operating funds)
59.Confirm that all nursing homes have an emergency plan.
Action
: This is required every year by the City’s Fire Department and will continue the
current procedure as is.
Funding
: Staff time (operating funds)
60.Keep Special Registry List and share with CERT teams.
Action
: This list is maintained by the City’s Fire Department and will continue its current
approach.
Funding
: Staff time (operating funds)
61.The Stormwater crew will keep a registry of problem areas that requires the use of vacuum trucks
in the event of a flood event, including after regular business hours.
Action
: This is current policy and will continue as is. The Stormwater Director will
coordinate with the Fire and Life Safety Division.
Funding
: Staff time (operating funds)
62.Explore funding opportunities to retrofit critical facilities to be more flood and wind resistant.
Action
: This is the responsibility of the City Manager’s Office and is an ongoing policy that
will continue as is.
Funding
: Staff time (operating funds)
63.Continue to advertise evacuation routes.
Action
: This responsibility of the Emergency Management Department will continue as is
through education and outreach.
Funding
: Staff time (operating funds)
13 of 15
64.Post contact information so that citizens know how to contact FEMA post-flood.
Action
: The Emergency Management Department shall ensure that the literature and
announcements included in the City’s public information outreach includes this information.
The City will continue this practice as is.
Funding
: Staff time (operating funds)
65.Provide knowledgeable staff to assist citizens, before, during and after a flood event to help them
understand their repair, rebuilding, flooding and mitigation options.
Action
: The Building Official will coordinate this assistance based on staff availability and
prioritized needs. This is a current City procedure and will continue as is
Funding
: Staff time (operating funds)
66.Assure annual distribution of printed copies of the Boynton Beach Hurricane Survival Guide in
multiple languages at City Hall.
Action
: This item will be the responsibility of the Emergency Management Department.
Currently the guide is not provided in printed form due to budget constraints.
Funding
: Research grant availability.
67.Post the Boynton Beach Hurricane Survival Guide and a link to the Palm Beach County Hurricane
Survival Guide on the City’s website in a location that is easily accessed by the community. There
are no plans to change this practice.
Action
: This is current practice and will continue as is as the responsibility of the Emergency
Management Department.
Funding
: Staff time (operating funds)
68.Implement the City’s Program for Public Information (PPI), a copy of which can be found in the
Appendix of this Plan.
Action
: The Development Department shall be responsible to implement the City’s Program
st
for Public information and to report on its annual evaluation and revisions by October 1 of
each year.
Funding
: Staff time (operating funds)
69.Conduct an emergency procedures public outreach campaign (chambers, civic groups, etc.).
Action
: The Emergency Management Department will continue this activity as is.
Funding
: Staff time (operating funds)
14 of 15
70.Continue to work with the City Housing Program to provide education to homebuyers regarding
flood information.
Action
: The Development Department will follow up with the Flood Mitigation Task Force
annually on this responsibility by October 1st of each year.
Funding
: Staff time (operating funds)
71.The Community Rating System (CRS) program should sponsor an information session and invite
the insurance industry, Florida League of Cities and other interested parties to distribute
information on potential insurance premium discounts, provide information to contractors and
homeowners on the risks of building in hazard-prone areas and mitigation, provide the public with
Federal Emergency Management Agency (FEMA) floodplain maps and develop a list of
techniques for homeowner self-inspection and implementation of mitigation activities.
Action
: The Palm Beach County CRS Users’ Group, of which the City of Boynton Beach is a
member, will work with the CRS Program to implement this activity. Much of this
information is distributed at the CRS Users’ Group’s Hurricane Expo which in held in June of
each year.
Funding
: Staff time (operating funds)
72.Research if the realtor community has a hazard disclosure requirement for deed transfers, leases or
other contracts for sale or exchange of property in flood hazard areas.
Action
: This will be the responsibility of the Development Department.
Funding
: Staff time (operating funds)
73.Consider adopting a freeboard ordinance requiring new and substantially improved construction in
the floodplain to build to an elevation of one foot above Base Flood Elevation.
Action
: This activity will be the responsibility of the Development Department.
Funding:
Staff time (Operating funds)
74.The City shall discourage hospitals, congregate living facilities for persons with special needs,
nursing homes and the like from locating within Coastal High Hazard Area (CHHA) and shall
encourage such existing facilities to relocate to safer locations within the City.
Action
: This responsibility will be with the Development Department.
Funding:
Staff time (operating funds)