DRAWINGSI. THE CONTRACTOR WILL BE HELD TO HAVE EXAMINED AND UNDERSTAND THE 5. INSTALL ALL SHORING AND BRACING IN ACCORDANCE WITH MANUFACTURERS SCOPE OF WORK, FIELD CONDITIONS, DIMEN51ON5 AND CONDITIONS UNDER WHICH RECOMMENDATIONS UNLE55 OTHERWISE NOTED OR WHERE LOCAL CODES AND /OR HE WILL BE OBLIGED TO OPERATE IN PERFORMING THE CONTRACT. HE WILL CONFIRM REGULATIONS TAKE PRECEDENCE. THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING. NO INSPECTION, EXAMINATION AND FEES OR CHARGES REQUIRED BY ANY OF THE PUBLIC ALLOWANCE WILL BE MADE 5U55EQUENTLY ON BEHALF OF CONTRACTOR FOR ANY AUTHORITIES HAVING JURISDICTION. ALL WORK PERFORMED AND MATERIALS ERROR THROUGH NEGLIGENCE ON HIS PART IN EXAMINING PREMISES. INSTALLED SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM STANDARDS AS 2. DRAWINGS WILL DEPICT THE GENERAL DIMENSIONS OF THE BUILDINGS. EXISTING BUILDING CONSTRUCTION AND OCCUPANCY CLASSIFICATION ORDINANCES. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND COMPLYING BASED ON FLORIDA BUILDING CODE 2010. 3. THE CONTRACTOR 15 RE5PON516LE FOR MAKING THE ARCHITECT AWARE OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE OF THE WORK. QUE5TION5 OR DISCREPANCIES REGARDING THE SCOPE OF WORK, EXISTING NUMBER OF STORIES: FOUR ( 4) STORIES F OUR (" CONDITIONS, AND /OR INTENT. A WRITTEN CLARIFICATION FROM THE ARCHITECT 15 KIST. BUILDING HEIGHT: A.F.F. REQUIRED PRIOR TO PROCEEDING WITH THE WORK IN QUESTION. . EXIST. HEIGHT FROM FLOOR TO LOWEST MEMBER OF ROOF: +I I' -0" A.F.F. 9. MAINTAIN THE EXISTING BUILDING IN A 5AFE AND WEATHER-TIGHT CONDITION • FIRE PROTECTION: 100% 5PRINKLERED 4. THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITIES, WHICH WILL REQUIRE • EXISTING OCCUPANT CLASSIFICATION (FBC CHAP. 3): BU51NE55 " B " TEMPORARY INTERRUPTION OF BUILDING MECHANICAL OR ELECTRICAL SYSTEMS. A PROTECT EXISTING EXTERIOR WALLS BY 5HORING AND BRACING AS REQUIRED AND WRITTEN METHOD OF PROCEDURE WILL BE REQUIRED FROM THE CONTRACTOR PRIOR . TYPE OF CONSTRUCTION (FBC TABLE 503): TYPE III B TO COMMENCING WITH WORK. 5. INSTALL ALL SHORING AND BRACING IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS UNLE55 OTHERWISE NOTED OR WHERE LOCAL CODES AND /OR REGULATIONS TAKE PRECEDENCE. 6. THE CONTRACTOR SHALL ARRANGE, APPLY AND PAY FOR ALL NECESSARY PERMITS, INSPECTION, EXAMINATION AND FEES OR CHARGES REQUIRED BY ANY OF THE PUBLIC AUTHORITIES HAVING JURISDICTION. ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM STANDARDS AS SET FORTH BY ALL APPLICABLE LOCAL AND FEDERAL CODES, REGULATIONS AND ORDINANCES. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND COMPLYING WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE OF THE WORK. 7. ALL WORK (BOTH TEMPORARY AND PERMANENT) SHALL COMPLY WITH ALL APPLICABLE OSHA REQUIREMENTS. CODE DATA 8. ALL ELECTRICAL/TELEPHONE CONDUIT AND /OR PLUMBING WITHIN THE DEMOLISHED SCALE: - PARTITIONS SHALL BE REMOVED UP TO THE POINT WHERE IT 15 NO LONGER EXPOSED AND CLEAR OF NEW WORK. PROPERLY CAP AND TERMINATE AS PER CODE. 9. MAINTAIN THE EXISTING BUILDING IN A 5AFE AND WEATHER-TIGHT CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. MAKE NECESSARY PROVISIONS TO PROTECT EXISTING EXTERIOR WALLS BY 5HORING AND BRACING AS REQUIRED AND UPON COMPLETION OF WORK REPAIR ANY DAMAGE THAT MAY OCCUR DURING ARCHITECTURE CONSTRUCTION AT NO CO5T TO THE OWNER. AD -101 DEMOLITION PLAN AND NOTES 10. THE CONTRACTOR SHALL KEEP ALL AREAS FREE FROM THE ACCUMULATION OF CONSTRUCTION DE5R15. NO STOCK PILING OF DEBRIS WILL BE ALLOWED ON SITE. ALL DEBRIS SHALL BE REMOVED FROM SITE ON A DAILY BA515 AND PLACED IN WASTE CONTAINERS FOR PROPER REMOVAL. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OR RECYCLING OF ALL DEMOLISHED MATERIALS, AND BE RE5PON51BLE FOR ALL ASSOCIATED TIPPING FEES AT THE LANDFILL. THE CONTRACTOR 15 SHALL PROPOSE A PLAN TO RECYCLE REMOVED AND DEMOLISHED MATERIALS. I I .THE CONTRACTOR SHALL PERFORM HIGH QUALITY PROFESSIONAL WORK. DRAWING LIST 12. STRUCTURAL COMPONENTS OF TH15 BUILDING SHALL NOT BE ALTERED IN ANY WAY. PROVIDE ADEQUATE 5HORING AND BRACING WHEN REMOVING INTERIOR FLOORS AND WALLS. SCALE: - 13. GENERAL CONTRACTOR SHALL HAND NOTATE ON DEMOLITION DRAWINGS ANY "A5- 13UILT" INFORMATION OF INTEREST TO THE OWNER. 14. ARCHITECT AND OWNER'S REPRESENTATIVE SHALL HAVE THE RIGHT TO REJECT DEMOLITION PROCEDURES PROPOSED BY THE CONTRACTOR. THE DEMOLITION SCOPE WILL INCLUDE THE FOLLOWING: 15. CONTRACTOR SHALL PROTECT FROM DAMAGE EXISTING EXTERIOR ENCLOSURE . PARTIAL DEMOLITION OF THE EXISTING WALL. INCLUDING ROOF AND WINDOWS. 16. CONTRACTOR SHALL TURN THE PROJECT OVER TO THE OWNER FREE FROM ALL CONSTRUCTION DEBRIS, SCRAPS, MATERIAL AND EQUIPMENT; 17. AVOID EXCEEDING ALLOWABLE FLOOR LOADING CAPACITY AT ANY LOCATION BY ANY CONSTRUCTION PROCESS AND SPECIFICALLY BY THE MOVING AND STORAGE OF CONSTRUCTION MATERIALS OR OPERATION OF ANY HOIST, VEHICLE OR CRANE DEVICE. S COPE OF WORK 18. WHERE CUTTING AND /OR PATCHING IS REQUIRED, THE CONTRACTOR SHALL PROTECT ADJAC IWOR�- SCALE: - 19. WHERE APPLICABLE PROVIDE TEMPORARY WEATHER' TIGHT ''CLOSURE Of OPENINGS IN EXTERIOR ENCLOSURE SURFACES. SUCH ENCLOSURE SHALL PREVENT ENTRY OF UNAUTHORIZED PERSONS. 20. IF ASBESTOS 15 PRESENT OR 5U5PECTED TO BE PRESENT, THE CONTRACTOR MUST FOLLOW EPA, STATE ENVIRONMENTAL AGENCY, AND OSHA REGULATIONS. IF SUSPECT MATERIAL 15 NOT TESTED THE CONTRACTOR SHALL PROCEED AS IF THE MATERIAL CONTAINS ASBESTOS. FAILURE TO REALIZE THAT A SUBSTANCE CONTAINS ASBESTOS DOES NOT ABSOLVE CONTRACTORS FROM LIABILITY. 21. THE CONTRACTOR SHALL SUBMIT TO THE BROWARD COUNTY - AIR QUALITY DIVISION A COMPLETE NOTICE OF ASBESTOS RENOVATION OR DEMOLITION FORM < HTTP:// WWW .CO.BP,OWAP,D.fL.US /DN100500.HTM> AT LEAST 10 DAYS IN ADVANCE OF THE PROPOSED DEMOLITION. STRUCTURAL BRACING CONSIDERATIONS DURING DEMOLITION 1. PRIOR TO DEMOLITION OF FLOORS, CONTRACTOR SHALL SURVEY THE CONDITION C0 OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN CC co A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION. PROJECT AREA 2. WALLS SHALL BE BRACED AT EXISTING FLOOR LOCATIONS. THE BRACING SHALL BE CONSTRUCTED 50 THAT BRACING MEMBERS CAN WITHSTAND TENSION COMPRESSION FORCES. 3. CONTRACTOR 15 RESPONSIBLE FOR CONNECTING BRACING TO MEMBERS DESIGNED TO TRANSFER OR RESIST LATERAL LOADS. 0 0 4. CONTRACTOR SHALL MAINTAIN STRUCTURAL INTEGRITY OF THE STRUCTURE DURING DEMOLITION. 5. STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF DEMOLITION. CONSTRUCTION SITE SAFETY SECOND FLOOR KEY PLAN I . THE CONTRACTOR SHALL ENSURE THAT DEMOLITION WORK DOES NOT INTERFERE WITH OR PROHIBIT THE CONTINUING OCCUUPATION OF ADJACENT OPERATIONS AND SCALE: N.T.S. CITY OPERATIONS WITHIN AND AROUND THE STRUCTURE. THIS INCLUDES BUT 15 NOT LIMITED TO THE SELECTIVE DEMOLITION OF PARTITIONS, ELECTRICAL AND MECHANICAL SYSTEMS. THE CONTRACTOR SHALL INFORM THE OWNER OF A MINIMUM OF 72 HOURS OF DEMOLITION ACTIVITIES THAT WILL AFFECT NORMAL OPERATION OF BUILDINGS AND OR CITY SERVICES. 2. THE CONTRACTOR SHALL REPAIR DAMAGAE5 CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. 3. THE CONTRACTOR SHALL COORDINATE WITH F.P.L., WATER MANAGEMENT AND ALL CITY AFFECTED SERVICES ALL DEMOLITION WORK TO PROPERLY PROTECT ALL CITY LINES DURING DEMOLITION WORK. CONTRACTOR WILL BE HELD LIABLE FOR ALL WORK NOT COORDINATED WITH THE CITY PRIOR, DURING, AND AFTER DEMOLITION WORK HAS BEGUN WOOLBRIGHT RD F DEMOU5H PORTION OF EXISTING WALL (V.I.F.). PATCH AND REPAIR AS REQUIRED. 2❑ EXISTING AREA TO REMAIN 0 M 0 V 0 O O W � Q w � x U d" H � O 0 N O 0 0 N b4 a N � o v O � U 41 °� • @ by z 00 z r ' ON ti ON w C) � � et O • o N Q. � M N M 0 V �.1 y �t w cd 7S o I � this document or parts thereof may not be reproduced in any form without permission copyrighted material DESIGNED DRAWN CHECKED CVG JO CVG DATE: COMM: 3/23/15 140825 R E V I S 1 O N S t o I` PERMIT :. 4. Date: CONSTRUCTION DOCUMENTS C . DEMOLITION PLAN SCALE: 1/8"=l'-O" DEMOLITION KEY NOTES SCALE: - 1 40; LO CATION MAP SCALE: N.T.S. AD -101