Loading...
DRAWINGS, SCOPE OF WORK: ..,...., ,,_ flooring will ll rem ain, without being removed or in any way altered 1.- Existing concrete . f th 2.- in the cross section o e proposed work you will see the following: Y..... ,,. .,' — — — — — - ' Aj The proposed installation of pavers will be done mixing water, sand and Portland cement. i B) The edges will be finished with tin set. B k EXISTING CONC. BLOCKOB UVALL I SNSTALLAT40N OF NEW PAVERS - _ OVER EXISTING V GONG SIDEWALK MIXED WATER SAND AND PORTALAND CEMENT Y_ I EXISTING 4 "GONG. SIDEWALK t - ._ EXISTING FOOTING }, r.� s/� {p _ V�Le`i.w �_ i}fj 1