Loading...
DRAWINGS2 0' ALLEY WOOD POLE W/ EXIST. MANHOLE COVERS CONC. BASE NEW STOP SIGN 150.03' 20.00' (PER CITY ENGINEER) 36.0' 36.1' F] 22 NEW STOP PAVM'T MARKING (PER CITY ENGINEER) LANDSCAPED AREAS 1. COCOPLUM HEDGE: MINIMUM 2' TALLAT TIME OF PLANTING, PLACED 2' ON CENTER WITH BRANCHES TOUCHING IN ALL PLANTING BEDS, (63) TOTAL 0° 2. HAWIIAN TI PLANTS: MINIMUM 4' TALLAT TIME OF PLANTING, PLACED APPROXIMATELY VON CENTER ALONG THE EAST AND SOUTH WALLS OF THE WEST BUILDING AND YON CENTER (BETWEEN PARKING SPACES) AT THE OTHER TWO LOCATIONS (SEE PLAN) (13) TOTAL 3.3" OF MULCH IN ALL PLANTING AREAS. 4. ALL PLANTING BEDS ARE TO BE IRRIGATED. NEW PAVM'T - STRIPING Y NEW PLANTER - (SEE LEGEND FOR COUNT) 4------ - � - � =; y EXIST. CONC. FOOTING BENEATH EXIST. AL. DOORS � 21 a --_ EXIST. MAX G .- v � _ - � � � _ _ _ W/ EX HI H THRESHOLD Z 7 2 /FIB N v v V w v y w v NEW 4"THICK POURED SLAB W ER MESH z NEW 2500 PSI CONCRETE 2500 PSI CONCRETE - = - o - -- -EXIST. TRASH BINS (TYP.) - � � � .SIDEWALK WITH - 1 u _w =- _ _ THICKENED EDGE ._ W o 20 i- - . (1) #5 CONT. _ - _ - NEW (1) #5 CONTINUOUS -- _ N -EXIST. ASPHALT WITH WWM6X6-W1.4/W1.4 _ o == - �EXISTING ASPHALT TO _--_ � - = NEWASPHALT9_0EXISTING � RECEIVE NEW TOP COAT E..� NEW PLANTER 00 (SEE LEGEND FOR COUNT} 19 CRUSHED GRAVEL BASE ONE STORY O Ln 0 V ILDING NEW BASE B RELOCATED CONC. WHEEL STOP 8„ NEW COMPACTED FILL 1 CONC. SIDEWALK DETAIL q 2 SEE DETAIL 1 O EI S TING w 18 ASPHALT TO CONC. ° M: (SEE LEGEND FOR COUNT) NEW PLANTER ONE STOR i Z SIDEWALK • 1/211— 11-011 1-+-i EXISTING CONCRETE SIDEWALK EXIST. CONC. PAD � T ('� • W/ EXISTING CANOPYABOVE B V TT 1LDINV � EXIST. ASPHALT (TYP.) 1 % w NEW ACCESSIBLE RAMP CURB o ''- TO BE POURED CONCRETE _ SEE DETAIL 2 THIS SHEET N 51 5 3811LO 241_011 181_011 +4-1/2,. ELECTRICAL CIRCUIT FOR - IRRIGATION SYSTEM 16 UP 36.0' EXISTING ALUMINUM COLUMN TO REMAIN - o � , N cd N rr ,_ o �� �� . _� REMOVE EXISTING ASHALT SIDEWALK NEW PLANTER AS SHOWN AND REPLACE WITH NEW g UP 12,_011 9,-011 (SEE LEGEND FOR COUNT) 4" THICK POURED CONCRETE SIDEWALK a 18'-0" TO BE 1/2" MAX. BELOW EXISTING THRESHOLDS. 0 (TYP.) (TYP.) z n o UP N 15 +4-1/2" W ° EXISTING ASPHALT TO RECEIVE NEW TOP COAT O O O 4'_411 14 NEW STOP SIGN (PER CITY ENGINEER) NEW STOP PAVM'T MARKING SLY yY vT ,l • L7 L7 SCALE: 3/8" = V-0" PER CITY ENGINEER)— Iljr 0 11-011 91-011 51-011 121_011 d' N RESTRIPING DETAIL (TYP. REVISIONS BY Ca ro Caroline Ueberschaer RA no 94999 711 NE 36th Street Boca Raton, Florida 561.212.5080 v_ v _ EXISTING ASPHALT 12 -__- ------ ----- ------ � SCALE: 1/4 =1'-0" v _ y xwva 9 "' . �_��__ EXISTING CONC. �. � EXIa_T_I_N_O ENTRY SIDEWALK EXISTING ASPHALT TO RECEIVE NEW TOP COAT EXISTING BUILDING w ,,.. c o ... v..v✓w � .. ,.. '� L .G.: gl l: 'vG moi,:. vv.. '.. '.. . u 0 Per v _ N �a a_ ��,1:3 i '°i' Dig, ;� � •.,- ' Z r – -- U) 10 0 ► `cam w — �� o" o NEW POURED CONC 36.1 RAMP W/ 1.20 MAX . lu CROSS SLOPE WOOD NEW PLANTER ;h l UP POLE .. _ 1 (SEE LEGEND FOR COUNT) 150.03, ------ ---_ --�- ENT REQUEST EXISTING ASPHALT NEW IRRIGATION BUBBLER UTILITY DEPARTMENT ; _=��� :.20.00 PUMP TO SERVICE ALL PLANTERS 51011 51_p►��:� ON SITE (ELECTRICAL SERVICE FIELD VERIFY ;poli � 4__ 4, I bn� FROM NORTH-WEST BUILDING1 To BE > ED RIGHT—OF—WAY 40�Jl �I IlY1PRO V ALL SEWER LIDS, VALVE BOXES, METER BOXES and Blue RPM EXISTING PLANTER , O WITHIN THE PROPOSED 'WORK AREA' SHALL BE INSPECTED PRIOR TO FIELD ADJUSTED AND INSPEP` EXISTING ASPHALT TO REMAIN NEW STRIPING RESURFACING, SEALING AND CONCRETE, ASPHALT OR PAVERS INSTALLATIONS, ; to 4i -ani-49CE1G '3S c ti AS PER UTILITY DEPARTMENT STANDARDS. . CALL TO SCHEDULE UTILITY'S INSPECTION @ (561 ) 742-6400. -77::: RR.CTRTPTNC-r ,qTTF. PT .AN %1 p,.,r,;+n+inn niv ReaueSt AC';C IRSSUBIT RAMP D TAI - = V-0" PRIOR RESEALING OR RESURFACING, COORDINATE SOLID WASTE PICKUP AND/OR REMOVAL WITH SOLID WASTE SUPERVISOR AT 561.742.6200 S LE : 1/ = 1'- ' DRAWN CHECKED DATE 5-17-16 SCALE AS NOTED JOB NO. 14013 SHEET sp— • v_ v _ EXISTING ASPHALT 12 -__- ------ ----- ------ � SCALE: 1/4 =1'-0" v _ y xwva 9 "' . �_��__ EXISTING CONC. �. � EXIa_T_I_N_O ENTRY SIDEWALK EXISTING ASPHALT TO RECEIVE NEW TOP COAT EXISTING BUILDING w ,,.. c o ... v..v✓w � .. ,.. '� L .G.: gl l: 'vG moi,:. vv.. '.. '.. . u 0 Per v _ N �a a_ ��,1:3 i '°i' Dig, ;� � •.,- ' Z r – -- U) 10 0 ► `cam w — �� o" o NEW POURED CONC 36.1 RAMP W/ 1.20 MAX . lu CROSS SLOPE WOOD NEW PLANTER ;h l UP POLE .. _ 1 (SEE LEGEND FOR COUNT) 150.03, ------ ---_ --�- ENT REQUEST EXISTING ASPHALT NEW IRRIGATION BUBBLER UTILITY DEPARTMENT ; _=��� :.20.00 PUMP TO SERVICE ALL PLANTERS 51011 51_p►��:� ON SITE (ELECTRICAL SERVICE FIELD VERIFY ;poli � 4__ 4, I bn� FROM NORTH-WEST BUILDING1 To BE > ED RIGHT—OF—WAY 40�Jl �I IlY1PRO V ALL SEWER LIDS, VALVE BOXES, METER BOXES and Blue RPM EXISTING PLANTER , O WITHIN THE PROPOSED 'WORK AREA' SHALL BE INSPECTED PRIOR TO FIELD ADJUSTED AND INSPEP` EXISTING ASPHALT TO REMAIN NEW STRIPING RESURFACING, SEALING AND CONCRETE, ASPHALT OR PAVERS INSTALLATIONS, ; to 4i -ani-49CE1G '3S c ti AS PER UTILITY DEPARTMENT STANDARDS. . CALL TO SCHEDULE UTILITY'S INSPECTION @ (561 ) 742-6400. -77::: RR.CTRTPTNC-r ,qTTF. PT .AN %1 p,.,r,;+n+inn niv ReaueSt AC';C IRSSUBIT RAMP D TAI - = V-0" PRIOR RESEALING OR RESURFACING, COORDINATE SOLID WASTE PICKUP AND/OR REMOVAL WITH SOLID WASTE SUPERVISOR AT 561.742.6200 S LE : 1/ = 1'- ' DRAWN CHECKED DATE 5-17-16 SCALE AS NOTED JOB NO. 14013 SHEET sp—