Loading...
R02-101 RESOLUTION NO. R02- 1Ot A RESOLUTION OF TItE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 1 TO THE EAST WATER TREATMENT PLANT, PHASE m, PARKING LOT CONSTRUCTION PROJECT WITH MEGAN SOUTH, INC., IN THE AMOUNT OF $10,079, WITH A TIME EXTENSION OF 5 CALENDAR DAYS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this change order consists of an expansion of the scope of the project md is not a change in existing design documents, and consists of the construction of 54 new tsphalt paved parking spaces on an existing shellrock area, including drainage krrigation and landscaping; and ',VItEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve Change Orderl to the East Water Treatment Plant, Phase 11I, Parking Lot Construction project with Megan South, Inc., in the mount of $10,079, with a time extension of 5 calendar days; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF rile CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the Mayor and City Clerk to approve and execute Change Order No. 1 with Megan South, Inc., in the amount of $10,079, with a time extension of 5 calendar days, for the East Water Treatment Plant, Phase llI Parking Lot Construction project. Section 2. This Resolution shall become effective immediately upon passage. Distribution: Owner xO Architect Change Order A1A Document G701 City Of Boynton Beach Department of Engineenng Construction Services Division Consultant Q Contractor xO Field g:b( Other O Project: EWTP Parking Areas To: MEGAN SOUTH Inc. 6521 Orange Drive Davie, Fla. 33314 Change Order Number: initiation Date: 4/26/02 Contract Date: Jan. 1, 2002 You are directed to make the following changes in this Contract: 1 .Remove the concrete sidewalk on the east side of the front driveway 2. InstalFD" cur~l, along both edges of the front driveway per revised drawing #1 Install section of flush header curb at south end of the front driveway, for access to the tank'areas per drawing #1 Contract changes due to: Desir~ change by owner Not valid until signed by both the Owner and Architect, Signature of the Contractor indicates his agreement herewith, including- any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $153,200 Net change by previously authorized Change Orders $ 0 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $153,200 The (Contract Sum) (Guaranteed Maximum Cost) will be increased by this Change Order $ 10,079 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order $163,279 The Contract Time will be (increased) by 5 Days The Date of Substantial Completion as of the date of this Change Order therefore is HERBERT D, KELLEY, JR. P.F- FLORtDAREG. NO. 14405 Megan South, Inc. Address: By: Rullo, June 23, 2002 5/22/02 Address: Date: IMEGAN SOUTH, INC. Proposed Change Order [PCO) Attention: Project: Date: 16-Apr-02 Work: PCO NO. 001 TOTAL $10,079.40 MR. DAVID KELLEY Boynton Beach-East Water Treatment Plant and installation of various Scope of Work: DeScqptior) (A) Megan South "Self' Perform Quantity Unit Cost Totals Supedn[endent 16 Hrs $ 32.:~4 $ 514,24 Operator 4 Hrs $ 21.93 $ 87.72 LAlsor(2). 8 Hm $ 14.45 $ 115.60 Dump TrUck, 4 Hrs $ 49.16 $ 196.64 Rubber tire Cpmbo 4 Hfs $ 32,92 $ 131.68 Sub Total "A" $1,045,88 JDescription lB) Megan South Subcontractor Perform Quantity Unit Cost! Totals Type D Curl: 600 Lf $ 11.00 $ 6,600.00 Flush Header Curb 20 Lf : $ 11.00 $ 220.00 DOT Transition Curb 20 Lf !~$ 11.00 $ 220.00 Survey 5 Hfs ! $ 90.00 $ 450.00 Densities 1 LS ~ $ 300.00 $ 300.00 SubTotal 'lB" $ 7,790.00 Totals "A" $ 1.045.88 "B" $ 7,790.00 Sub Total A & B $ 8,835.88 Fees Profit (15%) $ 1,045.88 $ 9,881.76 InsJBond [2%) $ 197.64 Total PCO $10,079.40 Approved: Signature: Print Name: Title: APPRovED TO FORM: PASSED AND ADOPTED this ~ day of July, 2002. ~-TTEST: Efmmissioner Commissioner