Loading...
R02-150RESOLUTION NO. R02- I A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE TWO (2) CHANGE ORDERS NO. 3 AND 4 IN THE AMOUNT OF $10,049.49 AND $12,055.59 RESPECTIVELY, FOR THE INDUSTRIAL AVENUE CORRIDOR/LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENT PROJECT WITH MORA ENGINEERING CONTRACTORS, INC.; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, due to unforeseen field/site conditions that were not anticipated in the Contract Documents, staff has recommended that the City Commission approve Change Orders No. 3 and 4 for the Industrial Avenue Corridor/Lake Boynton Estates Infrastructure Improvement Project; and WHEREAS, the City Commission deems it appropriate, and in the best interests of the citizens and residents of the City of Boynton Beach to authorize execution of Change Orders No. 3 and 4, in the amount of $10,049.49 and $12,055.59, respectively, to the Industrial Avenue Corridor/Lake Boynton Estates Infrastructure Improvement Project with Mora Engineering Contactors, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the Mayor and City Clerk to execute Change Orders No. 3 and 4, in the amount of $10,049.49 and $12,055.59, respectively, to the Industrial Avenue Corridor/Lake Boynton Estates Infrastructure Improvement Project with Mora Engineering S:\CA\RESOXAgreements\Task - Change Orders\Change Order - 3 & 4 - Mora Engineering.doc Contactors, Inc. Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ~ day of September, 2002. CITY OF BOYNTON BEACH, FLORIDA ATTEST: qllllllllll S:\CA\RESO~Agreements\Task - Change Orders\Change Order - 3 & 4 - Mora Engineering.doc Change Order City Of Boynton Beach Department of Engineering Construction Services Division Distribution: Owner · Architect [] Engineer · Contractor · Field · Other [] Project' Industrial Avenue Corridor Stormwater Change Order Number' 003 Improvement Project To · Mora Engineering Contractors, Inc. Initiation Date · 03/18/02 9660 West Sample Road, #101 02/04/02 Coral Springs, FL 33065 Contract Date · Notice to Proceed You are directed to make the following changes in this Contract · See attached Change Order Request No. 005 from Mora Engineering Contractors, Inc. (MEC) with addendum from Michael Spruce of Kimley-Horn and Associates, Inc. (KHA). Funds to be drawn from Owner's Contingency Allowance. Contract changes due to · RFI No. 010 was submitted on 03/7/02 by MEC requesting resolution of conflict between a newly discovered FPL vault and the installation of the 16" WM and the 3(7' storm drain along Southwest 6th Street. KHA responded with directions on 03/13/02. MEC submitted Change Order Request No. 005 on 03/18/02 for additional time and the cost of crew down time, restocking charges and pot holing the vault. KHA added the cost of resolving the conflict caused by the FPL vault. The attached revisions to Change Order Request No. 005 were agreed to verbally by MEC and KHA. Item I Description I See attached copy of Change Order Request No. 005 from MEC with KHA I adjusted cost addendum. See also RFI No. 010 response. TOTAL Amount $10,049.49 $10,049.49 The original Contract Sum was Less Contingency Adjusted Contract Sum is Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contingency amount will be decreased by this Change Order The new Contract Sum including this Change Order The remaining amount of the Contingency is $ 2,510,704.50 $ 5O,0OO.OO $ 2,460,704.50 $ 6,978.35 $ 2,467,682.85 $ 10,049.49 $ 2,477,732.34 $ 32,972.16 fThe Contract Time will be (increased / decreased) by I I Days *** The Date of Substantial Completion as of the date of this Change Order therefore is 11/05/02 *** Concurrent with 45-day extension requested with Change Order Request No. 004 from MEC H:\044349002\Change Directives\Change Order 003.doc Change Order City Of Boynton Beach Department of Engineering Construction Services Division Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. Engineer Kimley-Horn & Associates, Inc. 4431 Embarcadero Drive West Palm Beach, FL 33407 Contractor Mora Engineering Contractors 9660 West Sample Road, #101 Coral Springs._____~, FL 33065 Owner City of Boynton Beach 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 Date: APPROVED AS TO FORM= CITY ATTORNE~ H:\044349002\Change Directives\Change Order 003.doc ~C 874)77 ~GC O40142 :L CERT. )BE I MBE mora en~neering contractors, inc. date: submit to: job name: initiator CO request: INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENTS PROJECT No. 4434901~ CITY OF BOYNTON BEACH CHANGE ORDER REQUEST 005 i(IMLEY-HORN AND ASSOCIATEES. INC. MICHAEL D. SPRUCE F.a~x (ss1) s63-a175 INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON ESTJ I~ESPONSE TO RFI No. 010. BID DESCRIPTION QUANTITY ITEM NIA UNDERGROUND CREW DOWN TIME UNIT AMOUNT PRICE 6.00 HR 356.00 2,136.00 62.- RESTOCKING CHARGES 16" BUTTERFLY VALVE 1,298.50 $ 25% 63.- RESTOCKING CHARGES 16" DIP VVM 2,891.57 $ 25% 66.- RESTOCKING CHARGES 16" FITTINGS 4,809.22 EA 25% NIA POT HOLD DUCT BANK TO CONFIRM ELEVATION AND SIZE 324.63 '~ 722.89 ---" 1,202.31 ~ 2.00 HR 89.17 178-34~ .- SUB-TOTAL MOBILIZATION M .O.T. TOTAL 4,564.17 N/A N/A 4,564.17 9600 W. Sample Rd. Suite 401 · Coral Springs, FL 33065 (954) 752-8065 · Fax (954) 345-9268 BG 87-~77 CGC 040142 FL CERT. DBE I MBE mora engineering contractors, inc. INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENTS PROJECT No. 44349000 CITY OF BOYNTON BEACH CHANGE ORDER REQUEST No. 004 CONTINUATION ADDITIONAL TIME I DAYS If there should be any additional information required, please contact me at your convenience. Sincerely yours, MORA ENGINEERING CONTRACTORS, INC. 9600 W. Sample Rd. Suite 401 · Coral Springs, FL 3306S (954) 752-8065 · Fax (954) 345-9268 and Associates, Inc. Summary of Costs Associated with Rede$iqn around FPL Vault and Duct Mora Engineering Contractors, Inc. DESCRIPTION From MEC Change Order Request No. 1 Additional crew time to overcome conflict of the proposed 30" HOPP and the existing water main between B-4H and B-4E, including support of existing utilities Additional crew time to ovemome conflict of the proposed 30" HDPP and the existing FPL duct bank between B4-E and B-4A, including support of existing utilities QUAN~'I~, 3 Hrs 3 Hrs UN~ COST AMOUNT $362 $362 7.6% MOB 8.4% MOT Subtotal Construction Impacts: $1,086.00 $1,086.00 $165.07 $182.45 $2,519.52 Reroute and lower storm water pipe between B-4 and B-4E Odginal length of pipe (30" HDPE): B-4 to B-4A (142') @ inverts 9.7' to 9.86' B-4A to B-4E (44') @ inverts 9.7' to 9.6' Total: 186 LF New Pipe (30" HDPE): B-4 to B-4A (127') @ inverts 9.86' to 9.7' B-4A to B-4E (30') @ inverts 5.7' to 5.7' B-4E to B-4H (23') @ inverts 5.7' to 5.6' Total:180 LF Net 6' Less @ $39/LF Additional Structures: B4E (New) Subtotal Estimated Road Restoration: Additional 8' x 70' of road subgrade and base Stabilized subgrade Subtotal 62 SY 62 SY $8.90 -$234.00 $2,400.00 $2,166.00 $551.80 $248.00 $799.80 Net Construction Cost Increase Total Construction and Labor Cost $5,485.32 $5,485.32 MEC Change Order 5 -see attached Total $4,564.17 $10,049.49 H:\044349002\CORRESP~.4AY 02~ocera cost est.xls Request for Information ~o.5065 ¢. 3- CONTINUATION SHEET USED? YES o NO · ' Mora Enameer~ 'CLIENT: City of Boynton Beach CONTRACTOR: ' r,m'a'eet=~ mc. PROJECT NAME: Industrial Avenue Project LOCATION: ISSUED TO: Klmtey Horn & ~ iRFI NO,: 0t0 REFERENCED DOCUMENTS: Not applk:aUa _REQUEST I CLARIFICATION Subject: 16' WM ,at b'W eth St. and NW t~t Ave.. While doing the Inatallation of the 16' WM cm~fli~ we found a FPL vault that wa~ n~. ,IoFated by the utility eempan~. The vault the a~,' dndm~ge I~lPe. SEE ATI'ACHED SKBTCH. Please advi~e. Does the answer to this RFIr impose a cost and/or schedule Impa~t? I Yes · No 0 CREW DOWN TIME & POSSIBLE REINSTALLA'ilO# OF WATER CONFLICT ORIGINATOR/DATE: I Maroh 7, 20~ IRESPONSE DUE DATE: A.$.A.P. RESPONSE co. CUp. RE.C. VERIFICATION OF ITEM RESOLUTION ORIGINATOR/DATE: I , ssu o CBB Project Manager g~)0w. Sarlde Rd., ~uite40~. · Call ,Si:rln~, F1orid~33CT:~ (gM) 752.8065 FAX (9e4) 34S.gLa~ s~c -,ora ens:. I~0.50~5 P. 4 ~00! " I Change Order o2- City Of Boynton Beach Department of Engineering Construction Services Division Distribution: Owner · Architect [] Engineer · Contractor · Field · Other [] Project: Industrial Avenue Corridor Stormwater Change Order Number: 004 Improvement Project To: Mora Engineering Contractors, Inc. Initiation Date: 07/09/02 9660 West Sample Road, #101 02/04/02 Coral Springs, FL 33065 Contract Date: Notice to Proceed You are directed to make the following changes in this Contract: See attached Change Order Request Nos. 009, 010, and 011 from Mora Engineering Contractors, Inc. (MEC) with revisions by Michael Spruce of Kimley-Horn and Associates, Inc. (KHA). Funds to be drawn from Owner's Contingency Allowance. Contract changes due to: Change Order Request No. 009 was submitted by MEC on July 9, 2002 requesting additional payment and one additional day for modifying drainage structures along Industrial Avenue. Change Order Request No. 010 was submitted by MEC on July 9, 2002 requesting additional payment and one additional day for resolving a conflict with an unmarked BellSouth cable. Change Order Request No. 011 was submitted by MEC on July 16, 2002 requesting additional payment and 4 additional days to resolve a conflict with an FPL duct. Kimley-Horn, the City, and MEC met on July 26, 2002 to discuss the Requests and agreed to the attached modifications. The three Change Order Requests (modified) are being combined into Change Order No. 004. Item Description Amount Change Order Request No. 009 (Revised July 26, 2002) $ 3,260.62 Change Order Request No. 010 (Revised July 26, 2002) $ 1,670.40 Change Order Request No. 011 (Revised July 26, 2002) $ 7,124.57 TOTAL $12,055.59 The original Contract Sum was $ 2,510,704.50 Les¢ Contingency $ 50,000.00 Adjusted Contract Sum is $ 2,460,704.50 Net change by previously authorized Change Orders $ 17,027.84 The Contract Sum prior to this Change Order was $ 2,477,732.34 The Contingency amount will be decreased by this Change Order $ 12,055.59 The new Contract Sum including this Change Order $ 2,489,787.93 The remaining amount of the Contingency is $ 20,916.57 The Contract Time will be (increased / decreased) by The Date of Substantial Completion as of the date of this Change Order therefore is 2 Days 11/06/02 H:\044349002\Change Directives\Change Order 004a.doc Change Order City Of Boynton Beach Department of Engineering Construction Services Division Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. Engineer Kimley-Horn & Associates, Inc. 4431 Embarcadero Drive West Palm Beach, FL 33407 Date: Contractor Mora Engineering Contractors 9660 West Sample Road, #101 Coral Springs, FL 33065 By: Date: Owner City of Boynton Beach 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 By: Date: APPROVED AS TO FORNI~ CITY AI-rORN~ H:\044349002\Change Directives\Change Order 004a.doc engineering contractors, inc. PROJECT No.~ CITY OF BOYNTON BEACH CHANGE ORDER REQUEST KIMLEY-HORN AND ASSOCIATES, INC MICHAEL D. SPRUCE FAX (SS2) SS3-~TS INDUSTRIAL AVENUE CORRK)OR/LAKE BOYNTON ESTATES inilfator CO R: SEWER CONFUCT ALONG EAST INDUSTRIAL AVEHUE For your co~sidaratior~ and alp'oval: ITEM No. DESCRIPTION MATERIALS EQUIP & LABOR AMOUNT SUBTOTAL ITEM LOWER RUN FROM A-11 TO A-14 156 LF. OF 36" HDP SUBTOTAL ITEM 2 MODIFY S'IR. No. 23112' SHORTER -74 00 07/08/02 MON 16:20 9~ow. SampleRd. Salte tO~. Co*~l~gL3~O6S (~) 7~ . l~ax (~s4) ~ts.~a RISE RUN FROM A-23 'TO A-25 122 IF. OF 36' HDPP SUBTOTAL ITEM 4- [TX/RX NO 7769] CUT AND FILL OPENINGS STRUCTURE A-20 RAISE RUN FROM A-20 TO A-23 179 LF. OF 36' HI~-~-~-''~-''~ -767.00 SUBTOTAL ITEM 3- No.2641' P. 3 eng~n~ contractors, inc. submit to: CHANGE ORDER REQUEST KIMLEY4JORN AND ASSOCIATES, INC MICHAEL D. SPRUCE FAX (ss2) iniciator CO IR: INDUe'RIAL AVENUE GORRIDOR/LAKE BOYNTON ESTATE~ ~'WER (:X)NFLK~T ALONG EA~T IND~ AVENUE RAISE RUN FROM A-31 TO A-33 139 IF. OF 36' HDP -446.00 SUBTOTAL ITEM 5------- SUB-TOTAL ~ 2..8J0. ~1~ MOBILIZATION 7.6 % M-O. T_ 8.4 %  TOTAL Si Project Manager 966o w. S~uple Rd, Suke 10t · Coral Sprb~ ~ 3.306S (gsa) ?s2-se~ . Fax (9s4) 34~92ss 07/08/02 MON 16:20 [TX/RZ NO 7769] ME C inc. mora engineering contractors, inc. BC CQC 044142 FL CERT. D~E I MBE INDUSTRIAL AVENUE CORRIDOR / LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENT... PROJECT No. 44349000 CITY OF BOYNTON BEACH CHANGE ORDER REQUEST 010 date: July 9. 2002 submit to: KIMLEy-HORN AND ASSOCLATEES, INC. MICHAEL D. SPRUCE FAX (S~l) ~3-817s job name: INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON EST. initiator CO request: BELL SOUTH SERVICE LINE CONFLICT AT SW 6TH ST. & NW 1ST AVE. For your consideration and approval, the following is the scope of work and cost breakdown due to unforeseen conditions created by a conflict between an existing Bell South cable that was not marked at approximately 15 feet west of structure B4-E. BID DESCRIPTION ITEM ADD'L TIME TO SOLVE CONFLICT WITH BELLSOUTH SERV. LINE BY 6/20/02 UNIT QUANTITY AMOUNT PRICE ,~.oo ~ 360.00 SUB-TOTAL MOBILIZATION 7.6% M .0. T. 8.4% there should ~ any a Sincerely yours, Go zaloz / Project Manager / 9660 W. Sample Rd. Suite 101 · Cornl Springs, FL 33065 (954) 752-8065 · Fax (954) 345=9268 BC 87-977 mora engineering contractors, inc. CGC 040142 FL CERT. DI~E I MBE date: submit to: INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENTS PROJECT No. 44349000 CITY OF BOYNTON BEACH CHANGE ORDER REQUEST 011 KIMLEY-HORN AND ASSOClATEES. INC. MICHAEL D. SPRUCF FAX (561) 863-8175 job name: initiator C. O. R.: INDUSTRIAL AVENUE CORRIDOR / LAKE BOYNTON EST, FPL SERVICE LINE CONFLICT AT SW 6TH.AVE- SAT. 111+9,3 For your consideration and approval the following is the scope of work and cost breakdown for the extra work due to an unknown and/or concealed condition found dudng the installation of the proposed piping connecting structures B-4G, B-4H, B-4E and B-4A at SW 6th. Street between sra. 111 +39 and sra. 112+20. On June 6th. 2002 during the installation of the pipe connecting structures B-4H and B-4A, the excavation to cross under the existing FP&L ductbank caused it to settle, due to' the lack of proper connection of the ductbank to the FP&L vault. We proceeded to support the ductbank and contact you and FP&L for directions on corrective methods for the problem. We were directed to support the ductbank and told that in the following morning a directive to the fix of the problem would be given. Special support beams were brought to support the ductbank over night. This day was a total lost, with eqUipment and personal on standby and supporting the ductbank. 8 hr. crew time at $ 360.00 / hr. $ 2,880.00 v//' The following morning June 7th. several alternatives were discussed, and we were directed to lower the proposed drainage pipe to allow it to go under the ductbank and to back fill the area around and under the ductbank with flowable fill. One load (9 cy. ) of flowable fill. $ 741.87 v'/ June 8th. additiona crew time to install structures B-4E and B-4A +/- 12" lower 2 hr. $ !,~.'I. 0.09 _ 720.00 9660 W. Sample Rd. Suite 101 · Coral Springs, FL 33065 (954) 752-8065 · Fax (954) 345-9268 ME C inc. mora engineering contractors, inc. O4O142 ~RT. INDUSTRIAL AVENUE CORRIDOR / LAKE BOYNTON ESTATES INFRASTRUCTURE IMPROVEMENTS PROJECT No. 44349000 CITY OF BOYNTON BEACH CHANGE ORDER REQUEST 011 date: page 2 / 2 submit to: KIMLEY-HORN AND ASSOClATEES. INC', MICHAEL D. SPRUCF FAX (561} 863-817~ job name: initiator C. O. R.: INDUSTRIAL AVENUE CORRIDOR I LAKE BOYNTON EST. FPL SERVICE LINE CONFLICT AT SW 6'rH A~/E. SAT. 111+913 June 8th. additional crew time to install pipe between structures B-4H and B-4E lower +/- 12". 1 hr. $ June 8th. and 9th. additional crew time to install pipe between structures B-4A and B-4 lower from +/- 0" to 12". $ 360.00 1,440.00 ADDITIONAL TIME SUB-TOTAL ~ MOBILIZATION 7.6% ~ ~.~,~, 7~' U .o.m. 8.4% ~ 51 cj.qZ.' TOTAL CHANGE ORDER REQUEST No. 11 The above information has been verified by Mr. Alex Ballum, Mr. Paul Fleming and/or your self. If there should be any additional information required and/or discrepancies, please contact me at your convenience CONTRACTORS, INC. 9660 W. Sample Rd. Suite 101 · Coral Springs, FL 33065 (954) 752-8065 · Fax (954) 345-9268 Sincerely yours, MORA ENG~EERING President