Loading...
R66-RRRESOLUTION NO. 66-RR WHEREAS, the City Council of the CITY OF BOYNTON BEACH, FLORIDA, has heretofore determined the public necessity of enter- ing into a certain joint construction project with the Florida State Road Department pertaining to the construction and installa- tion of storm drainage facilities in and under a portion of North Second Avenue (State Road $804) within the municipal limits of said City wherein and whereby said storm drainage facilities will be oversized to accommodate not only the existing drainage for said North Second Avenue, but also additional drainage for areas of the City adjacent to and in the vicinity of said North Second Avenue, all at a substantial savings to the taxpaye~ of the City of Boynton Beach, Florida; and WHEREAS, the estimated cost of the City's share of said joint project has been established at $147,348.00; and WHEREAS, it is deemed essential that the terms and conditions of the above arrangement be incorporated into a written agreement and executed by the parties; and WHEREAS, a proposed form of agreement has been prepared and a copy thereof attached hereto and hereby made a part hereof; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CI~ OF BOYNTON BEACH, FLORIDA: 1. THAT the terms and conditions of the attached form of contract between the Florida State Road Department and the CITY OF BOYNTON BEACH, FLORiDA, pertaining to the proposed joint constructi¢ by the said parties relative installation of certain storm drainag~ facilities on North Second Avenue (State Road ~904) within the C2 OF BOYNTON BEACH, FLORIDA, are hereby approved and the Mayor and City Clerk of the City are hereby authorized to execute said agree- ment on behalf of the City. PASSED AND ADOPTED this 5th day of September, A.D. 1966. (CORP. SEAL) · ty Clerk CITY ~F BOS~NTON BEACH, FLORIDA [~/~/~' d~'~~4a YOr /',~_. Counc i lman "'>7' ' O ilm~n ~' Counci ~an JOLNT PROJECT THIS AGREF~fENT made and entered into this day of 196__6,' by and ben-ween the State Road Dc2ar~vae~:.a of i?iorida, hereinafter called the' Depart~nent, and ...the City of Boynton Beach, Florida hereinafter called the Body Politic, WITA~ESSETH: ~,~IEREAS, the Department has prepared plans and specifications on S~tate Road Department Job No. 93640-3601 , hereinafter called the "Joint Project", and it is necessary to enter into this Joint Pz-oject agreement to insure 'completion of this Job in the best interest of the parties hereto; and WHEREAS, the Body Politic has requested the Department to include in said Job certain facilities to m~et the needs of the Body .oiztzc; and ~ W~HEREAS, the Department and the Body Politic have determined that it would b~ to the mutual benefit of .both parties to eh:er into the Joint Project providing for the needs of each party, NOW, ~IEREFORE, THIS iND~N~jR~% i~Th%SSE~E: That in consideration of :he premises and covenants hereinafter set out to be kept. and performed by each of the parties hereto, it is hereby mutually covenanted and agreed, as follows: 1. The Department and Body POlitic shall participate in a Joint Project, the scope of which shall'be as set forth on Attachment "A", attached hereto and made 'a part hereof. 2. All of the work on the Joint Project is to be dona according to the plans and specifications of the Department, ~]ich plans and specifications, in- cluding properly authorized changes made by c.~noe order or supplemental agre~uan~, are, by reference hereto made'a part hereof. Such changes or alterations in th~ plans and/or specification~ as are made subsequent to execution of this agreement and which affect such portions of the Joint Project as are wholly or partially paid for' by the Body Politic shall be subject to the approval of the Body Politic. 3. ~"~e Departmen~ will provide the necessary engineering, design and super- visi6n to insure construction in compliance wi~h the plans and "=' · · ' specz~catlons herein- .above referred to, and shall receive all bids for and let all contracts for said work, and the Department shall be reimbursed for said cost at ~ 0 percent of the amoun~ to be paid by the Body Politic, as calculated under paragraph 7 below. - 1 - 4. Upon completion and acccptance of the work, the Department shall control and maintain the Joint Project unless otherx¢ise indicated on Attachment "A" t° this agreement. 5. Use of the Joint Project by the ~ody ?olitic shall be in actor-dance with the limitations set forth on A~Cachmen~ "k". between the estimated Cost of the cons~ruc:ion of the oriEinai ~"~' ~zzzties required by Dcpar~ent standards and specifications and the proposed enlarged Joint Projec: to be constructed as described on Attachment "A". 7. The est~ated cos: of said original faciligies is $ 234~724.00 ~d ~he cost of the enlarged Joint Project is es~ima:ed to be $ 382~072.00 . The asSUaged cost to the Body Politic as calculated ~ ~ra~ra~hs 3 and ~ herein- above is $ 147,348.00 . Final pa~eng of the Body Politic's share of the cos~ of the joint 'Project will be based on final plans and quantities and contrac~ bid prices, or from those estimated prices and quantities sh~n on Attachment "k" when said bid prices are no~ so available, and shall be made by the Body Politic ~o the Department ~thin sixty (60) days after completion and acceptance of :he Joint Project by the Depar~en~, less any advance deposit. 8. All services and work hereunder shall be parfo~ed go nhe satisfac- tion of the Depar~ent's Sta~e I{ighway Engineer, and he shall decide all quasnions, ' difficul~ies and disputes of whatever nature ~hich may arise under or by raagon of ~his agreement; the prosecution and fulfillment of the services hareundar~ and character, quality, ~oun~ and value thereof; and his decision upon all qhestions, and disputes shall be final and conclusive upon the par~ies hereto. 9. The Body Politic shall defend, save and hold hapless the Departmen~ fr~ any and all legal actions, claims or d~n%ands by any person or .legal en~i~y against the Depar~ent arising out of the participation in or use by the Body Politic of the Joint Project. ~ WI~ESS ~OF, the parties hereto have caused ~hese presents to be executed by their duly authorized officers and their official seals hereto -2 - affixed, the day and year first above written. WITNESSES: STAT£ ROAD DEPARTY~NT OF FLORIDA As ~o ti~e Department Execucive Dirccnor Secretary CITY OF BOYNTON BEACH~FI~ko , a body polinic As to the Body Politic By: Title Mayor .Title City Clerk -3- ATTACtD~ENT A. TO JOLNT PROJECT AGREE~LENT WITH %q~ CITY OF BOYNTON BEACH, FLORIDA. JOB NO. 93640-3601. 1. _Scope of Joint Projec~ The scope of the Joint Project shall be a drainage system along North Second Avenue from the Seaboard Airline Railroad to State Road 5 including an outfall and is shown on the at~ached map as location of 2. Limitations of Use By Body Politic The Department reserves ti~e ~ight no refuse to connect, or to sever any connection, which discharges any objectionable fluids or other than surface storm runoff into the system. 3. Preliminary Estimated Costs _Original Desi,~n for SRD Needs: 1050' of 15" pipe 61' of 18" pipe 1001' of 24" pipe ~ 943' of 30" pipe 1362' of 36" pipe 50' of 48" pipe 3306' of 60" pipe 12 Manholes 34 Inlets Endwalls: Reinf. Steel 758 Lbs. ,Class A Conc. 13.56 C.Y. $ 7.00 = $ 7,350.00 8~00 = 488.03 10.00 = i0,oi0.O0 13.00 = !2,f59.00 16.00 = 21,792.06 25.00 = 1,250.62 48.00 = i58,688.6S 550.00 = 6,600.00 450.00 = 15,300.06 0.14 = 881.00 65.00 = 106.06 Joint ~n ' ~ of 15" pipe Includin Draina e of Cit Areas: @ $ 7.00~ 297' of 18" pipe @ 8.00 = 780' of 24" pipe 636' of 30" pipe 73' of 36" pipe 426' of 42" pipe 184' of 48" pipe 750' of 54" pipe 612' of 60" pipe 1858' of 78" pipe 1448' of 84" pipe 15 Manholes 34 Inlets Endwalls: Reinf. Steel 2085 Lbs. Class A Conc. 19.3 C.Y. $234,724.00 $ 6,188.06 2,376.0f 10.00 = 7,600.06 13.00 = 8,268.06 16.00 = 1,i68.00 20.00 = 8,520.00 25.00 = 4,600.00 35.O0 = 26,250.00 48.00 = 29,376.00 75.00 = 139~350.00 85.00 = 123,080.00 550.00 = S~250.00 450.00 = 15,300.00 0.14 = 1,254.00 65.00 = 292.00 $382,072.00 Estimated cost to the City of Boynton Beach $382,072.00 - $234,724.00 $147,348.00