R03-024 RESOLUTION NO. R03- OZ2q A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF TASK ORDER NO. 7, WITH ENGINEERING CONSULTANT HARTMAN & ASSOCIATES, INC., IN THE AMOUNT OF $63,100 FOR THE POINCIANA HEIGHTS WATER MAIN IMPROVEMENT PROJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this Task Order will allow Hartman and Associates, Inc., (HA1) to become the Engineer of Record, revise construction plans, and provide Construction Phase Services for upgrading of water mains and services in the project area; and WHEREAS, the City Commission, upon staff's recommendation, has deemed it appropriate, and in the best interests of the public, to approve Task Order No. 7 for Hartman & Associates, Inc., in the amount of $63,100, for the Poinciana Heights Water Main Improvement Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct execution of Task Order No. 7 for Hartman & Associates, Inc., in the amount of $63,100, for the Poinciana Heights Water Main Improvement Project. Section 2. This Resolution shall become effective immediately upon passage. S:\CA\RESO~Agreements\Task - Change Orders\Change Order - Hartman & Associates.doc PASSED AND ADOPTED this ~ day of February, 2003. ~yor '/ ',,,~ Commissioner S:\CA\RESO~Agreements\Task - Change Orders\Change Order - Hartman & Associates.doc CITY OF BOYNTON BEACH TASK ORDER NO. 7 Poinciana Heights Watermain Improvements January 02, 2003 I. BACKGROUND The City of Boynton Beach (City) has prepared construction plans for upgrading the potable water system within the Poinciana Heights section of the City. The City retained Hartman and Associates, Inc. (HAI) to review the constructability of these plans, recommend other required infrastructure improvements and develop a means of preventing debris from being trapped in FDOT Type 5 and 6 inlets. This was accomplished with Task Order No. 3. This Task Order No. 7 is to prepare revised construction plans, as Engineer of Record, implementing the watermain recommended improvements. II. SCOPE OF SERVICES CONSTRUCTION PLANS PHASE: The following services shall be provided by HAI: 1. Review City prepared construction drawings to permit HAI to assume responsibility as Engineer of Record in accordance with State Statutes. Work will consist of installing approximately 6,400 linear feet of new water mains, upgrading services and abandonment of existing watermains. 2. Modify existing construction plans to enhance constructability. 3. Review specifications prepared by CH2M Hill to be used on this project. 4. During this phase of work, HAI shall: MAG/lem/wordproc/Agreements/Task Order7 HAIg 00-197.ml 1 -1- 010203 During this phase of work, HAI shall: a. Conduct a start-up meeting and distribute minutes. b. Provide two (2) sets of 90% drawings and attend 90% review meeting with City. c. Provide two (2) sets of 100% drawings and attend 100% review meeting with City. d. Provide and distribute approved drawings as follows: City, two (2) full size and two (2) half size sets. - Contractor, three (3) full size sets. B. CONSTRUCTION PHASE HAI shall provide the following services: a. Conduct pre-construction meeting. b. Attend four (4) monthly progress meetings. c. Review four (4) pay requests. d. Make a maximum of six (6) periodic site inspections to ensure that the work is being performed in general conformance with the Construction Documents and City Standards. e. Prepare Health Department certification for the project and record drawings from information provided by the Contractor. f. Project management. Resident Project Representative Services (RPR). a. Provide an on-site RPR for eight (8) hours per day, for a maximum of 240 man-hours. MAG/lem/wordproc/Agreements/Task Order#7 HAI# 00-197.m 11 -2- 010203 III. PROJECT SCHEDULE A. CONSTRUCTION PLANS PHASE Conduct start-up meeting within five (5) days of Notice to Proceed. Provide 90% plans within twenty (20) working days of start-up meeting. Provide 100% plans within five (5) working days of receipt of 90% comment from City. B. CONSTRUCTION PHASE Services are based on a 90-day Construction Schedule to final completion. C. RESIDENT PROJECT REPRESENTATIVE Services are base on providing a RPR for a maximum of 240 man- hours. IV. COMPENSATION Ao SERVICES FOR PROFESSIONAL ENGINEERING FEES ARE AS FOLLOWS: 1. Construction Plans Phase 2. Construction Phase 3. RPR Services 4. Miscellaneous Expenses $16,750.00 25,970.00 19,880.00 500.00 63,100.00 MAG/lem/wordproc/Agreementstrask Order7 HAI# 00-197.m 11 -3- 010203 Fees are further described in Exhibit "A". Services shall be billed based on actual time charged to the project and billed monthly. APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA BY: City Date SUBMITTED BY: HARTMAN & ASSOCIATES, INC. By: Charles W. Drake, P.G. Vice President Date MAG/lem/wordproc/Agreements/Task Order#7 HAI# 00-197.m 11 -4- 010203 z,~ O~ m~ 0 o o o o o oo