Loading...
R04-0401 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 RESOLUTION NO. R04- 0 ~dO A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORDA, AUTHORIZING EXECUTION OF TASK ORDER NO. R04-05-05, FOR ARCHITECTURAL AND ENGINEERING SERVICES FOR DESIGN AND CONSTRUCTION ADMINSTRATION OF BOAT CLUB PARK BUILDING RESTROOM IMPROVMENTS, IN THE AMOUNT OF $13,900, TO CH2M HILL; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, this ,project was approved as part of the fiscal year 2003-2004 Capital Budget; and WHEREAS, the City Commission, upon staff's recommendation, has deemed it and in the best interests of the public to approve Task Order No. R04-5-05 with for Architectural and Engineering services for the design and construction >n for Boat Club Park in the amount of $13,900. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as true and correct and are hereby made a specific part of this Resolution upon adoption Section 2. The City Commission of the City of Boynton Beach, Florida does authorize and direct the approval and execution of Task Order No. R04-5-05 with CH2MHILL for architectural and engineering services in the amount of $13,900. Section 3. This Resolution shall become effective immediately upon passage. l:~CA\RESO~Agreements\Task - Change Orders\CH2M Hill U04-5-05.doc CH2MHILL CH2M HILL One Harvard Circle West Palm Beach, FL 33409-1923 Tel 561.515.6500 Fax 561.515.6502 Task Order No. 04-05-05 Reference No. RFP No. 065-2821-051CJD Architectural and Engineering Services for Design and Construction Administration for Boynton Beach Boat Club Park, Coast Guard Auxiliary Building Restroom Improvements A. Project Description: The City of Boynton Beach has funded and approved Improvements to the Boynton Beach Boat Club Park, Coast Guard Auxiliary Building Restroom to upgrade them to ADA Compliance. B. Scope of Services At the request of the City, CH2M HILL is to provide Architectural and Engineering pre-design, construction documents, bidding assistance and construction administration services for the Boat Club Park, Coast Guard Auxiliary Building Restroom. Task I - Pre-Design Services A. Geotechnical Services (Provided by City) $ 0 B. Site Survey $ 0 C. Programming: C.1. Based on interviews with appropriate City and Staff, prepare a building space program indicating required assigned and support spaces for the building. $ 500 C.2 Concept drawings and meetings. Provide concept site plan and building sketches; and prepare for and attend one (1) review meeting with City. $ 500 Expenses: Programming submission to include six (6) sets of Program Requirements, black line concept Site Plan and Building Sketches and Conceptual S.F. Cost Estimate $ 200 TOTAL TASK 1 LUMP SUM $1,200 DDAVIS/PROPOSAUBOYNTON BCH BOAT CLUB PARK, COAST GUARD AUXILIARY BDG_2-11~4 Task 2-TRC Submittal (NIC) $ 0 Task 3 - Construction Documents Based on an approved design development, final drawings, specifications, cost estimate, interior room finish material selection and equipment schedule will be prepared. All architectural and engineering systems in Attachment A will be finalized and submitted to building department and engineering. Up to two meetings with City Staff will be held to review, and finalize the construction documents. $ 5,000 Expenses: Three permit sets of construction documents and signed and sealed will be submitted. $ 200 TOTAL TASK 3 LUMP SUM $ 5,200 Task 4 - Bid Phase Services Based on the "Standard Procedures and Functions for Consultants, Procurement Services, and the Project Management Team,' (provided by the City) the following services will be provided under Task 4: Prepare and Distribute Design Documents to Project Manager, Procurement Department and City Clerk - Three sets of the contract and technical specifications will be prepared, bound, and distributed to the appropriate groups within the City. Distribute Plans to Interested Contractors and Maintain Plan Holders List - CH2M HILL will copy the contract documents and have them available for sale to interested contractors. The cost for reproduction will be borne by the contractors through the sale price (to be determined). CH2M HILL will maintain a list of all plan holders that have purchased plans through the West Palm Beach, Florida, office. This information will sent to the City's procurement office on a weekly basis. Answer Technical Questions from Contractors - CH2M HILL will provide general answers to contractors regarding this project. Answers will be in the form of verbal communication and will be general in nature. If questions arise that identify inconsistencies or omissions, CH2M HILL will contact Procurement Services to assist with the preparation of an addendum. CH2M HILL will prepare the technical response. The City's Procurement Services department will be responsible for issuing technical clarifications and addenda. Conduct Pre-Bid Meeting- CH2M HILL's project manager will conduct the pre-bid meeting with the assistance of the City's Project Manager. CH2M HILL will provide answers to technical questions that arise. The meeting will be conducted at a time and location selected and coordinated by the City's Project Manager. CH2M HILL will maintain a contractor's sign-in sheet and will prepare meeting minutes. DDAVlS/PROPOSALABOYNTON BCH BOAT CLUB PARK SOW_2-11-04.DOC 2 Attend Bid Opening Meeting - CH2M HILL's project manager will attend the bid-opening. It is assumed that the City's Procurement Office will conduct the meeting and that meeting minutes will not be prepared. Assist With Bid Evaluation - CH2M HILL will tabulate the bids and prepare a summary table for the City that identifies bid item, unit prices, and any assumptions provided by contractor. The bid summary will also include the Engineer's estimate of probable construction cost on a unit price basis. CH2M HILL will review the references and background of the apparent low bidder. A letter summarizing the bid tabulation and the results of the reference check will then be submitted to the City. If the City rejects the apparent low bidder, CH2M HILL will conduct a reference review on additional bidders. TOTAL TASK 4 LUMP SUM $ 2,000 Task 5 - Construction Administration The City requested we provide full construction administration for the duration of the construction. It is understood that the fees presented in this proposal Attachment A are estimates and are not guaranteed and are dependent upon City involvement authorization by the City. Specific tasks will include the following: Prepare for and conduct a pre-construction conference. Prepare and distribute the meeting minutes. · Review shop drawings and other construction related submittals. · Attend weekly construction project meetings. · Assist the City with the evaluation of request for payment by the Contractor. · Assist in the technical interpretations of the contract documents, and the evaluation of requested deviations from the approved design or specifications. · Evaluate any required design changes, and if requested, assist the City in preparing the required design changes and drawings. · Assist in negotiating the scope and cost of necessary change orders. · Perform a substantial completion inspection of the project areas and assist in the preparation of a final "punch list" for project close-out. · Assist the City with the evaluation of requests for payment by the Contractor. · Perform a final inspection. TOTAL TASK 5 LUMP SUM $ 4,000 Task 6 - Post Construction Services Provide record CADD drawings (electronic file) based upon contractor's marked up Changes and provide one (1) year warranty walk thru. TOTAL TASKS 6 LUMP SUM C. Assumptions · No TRC Submittal. · No Structural Analysis Included. · No off site work included. · Three month construction. · No Up Grade to the existing building included. $ 8OO DDAVlS/PROPOSAIABOYNTON BGH BOAT CLUB PARK SOW_2-11-O4.DOC 3 O. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated November 2003, between the City of Boynton Beach and CH2M HILL, Inc. E. Compensation Compensation by the CITY to the CONSULTANT for this Task Order will be on a Lump Sum basis in accordance with the above mentioned Agreement. The estimated compensation for the services described in this Task Order is $13,900 as shown in Table 1. TABLE 1 Senior Center Phase III Labor Labor Cost Expense Cost Total Hours Task 1 - Pre-Design Services $1,000 $200 $1,200 Task 2 - TRC Submittal (NIC) 0 0 0 Task 3 - Construction $5,000 $200 $5,200 Documents Task 4 - Bid Phase $2,000 $400 $2,400 Task 5 - Construction $4,000 $200 $4,200 Administration Task 6 - Post Construction $800 $100 $900 Services $12,800 $1,100 $13,900 TOTAL F. Schedule The CONSULTANT will commence Professional Services upon receipt of written authorization and will complete the work according to the table below. Task 1 - 3 - Design Modifications Days For Design after Notice to Proceed Task 4 - Bid Phase Services 45 Days Bidding and 30 Days for Award Task 5 - Construction Administration 3 Months construction A tentative schedule will be developed within tasks / services once a Notice To Proceed for Design has been issued and City review commission and procurement dates have been established. DDAVIS/PROPOSALABOYNTON BCH BOAT CLUB PARK S0W_2-11-04, DOC 4 APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA By: Kurt Bressner, City Manager Dated thisg~_~_ day of IY~C,V~ ,2004. SUBMITTED BY: CH2M HILL, INC. By: Alan Bollinger ~o Project Delivery Director Dated this a-z~ day of .o~.-,~ ,2004 ODAVISJPROPOSALABOYNTON BCH BOAT CLUB PARK SOW._2-11-04.DOC 5 ATTACHMENT A Boynton Beach Boat Club Park, Coast Guard Auxiliary Building Rest-room Boynton Beach Project No Scope of Services/Estimated Drawings (Schematic Design through Construction Documents) Discipline Est. # of Sheets T-1 Sheet Title Title, Index, Location Map Site Survey Civil Landscape/Irrigation Architecture A-lA A-2.1 A-2.2 A-3.1 Site Plans & Details Floor Plan & Schedule Interior Elevations & Equipment Exterior Elevations & Sections Structural S-2.1 S-3.2 Mechanical Foundation, and Floor Framing Plan Sections & Detail HVAC Floor Plan & Details Plumbing P2.1 Plumbing Floor Plan & Details Fire Protection Electrical E2.1 Lighting Plan, Power Plan & Details DDAVIS/PROPOSAI-ABOYNTON BCH BOAT CLUB PARK SOW_2-11-04.DOC 6 PASSED AND ADOPTED this . day of March, 2004. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 ATTEST: 23 3..~z '~t'~ '~ ~/~X _~ 25 -~ity Clerk--q'x3~e~ t~ .~.~( 26 I S:\CA\RESOXAgreement$\Task - Change Orders\CH2M Hill U04-5-05.doc