R04-041 5 6 7 8 9 10 11 12 A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING EXECUTION OF TASK ORDER NO. R04-5-04, FOR ARCHITECTURAL AND ENGINEERING SERVICES FOR DESIGN AND CONSTRUCTION ADMINSTRATION OF THE SENIOR CENTER PHASE III, IN THE AMOUNT OF $81,366, TO CH2M HILL; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on January 6, 2004, the City Commission approved funding for Phase 13 !III of the Senior Center, and; 14 15 16 17 18 19 2O 21 22 23 24 WHEREAS, the City Commission, upon staff's recommendation, has deemed it 25 26 27 28 appropriate and in the best interests of the public to approve Task Order No. R04-5-05 with CH2MHILL for Architectural and Engineering services for the design and construction administration of the Senior Center Phase III, in the amount of $81,366. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this Resolution upon adoption hereof. Section 2. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the approval and execution of Task Order No. R04-5-04 with CH2MHILL for architectural and engineering services in the amount of $81,366. Section 3. This Resolution shall become effective immediately upon passage. SSCA\RESO~Agreements\Task - Change Orders\CH2M Hill U04-5-04.doc 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 PASSED AND ADOPTED this __ day of Mtn,4 ,2004. ! ATTEST: lerk CITY OF BOYNTON BEACH, FLORIDA S:\CA\RESO~Agreements\Task - Change Orders\CH2M Hill U04-5-04.doc CH2MHILL One Harvard Circle West Palm Beach, FL 33409-1923 Tel 561.515.6500 Fax 561.515.6502 Task Order No. 04-05-04 Reference No. RFP No. 065-2821-031CJD Architectural and Engineering Services for Design and Construction Administration for Boynton Beach Senior Center Phase III- Renovation and Addition A. Project Description: The City of Boynton Beach has funded and approved Phase III Improvements to the Boynton Beach Senior Center Phase III - Renovation and Addition B. Scope of Services At the request of the City, CH2M HILL is to provide Architectural and Engineering pre-design, Minor Technical Review Committee (TRC) submittal, construction documents, bidding assistance and construction administration services for the Phase III Senior Center Renovation and Addition. Task 1 - Pre-Design Services A. Geotechnical Services (Provided by City) $ 0 B. Site Survey C. Programm/n' g: C.1. Based on interviews with appropriate City and Senior Center Staff, prepare a building space program indicating required assigned and support spaces for the building. $ 1,000 C.2 Concept drawings and meetings. Provide concept site plan and building sketches; and prepare for and attend one (1) review meeting with City. $ Z000 Expenses: Programming submission to include six (6) sets of Program Requirements, black line concept Site Plan and Building Sketches and Conceptual S.F. Cost Estimate $ 700 TOTAL TASK 1 LUMP SUM $ 3,700 DDAVIS10/PROPOSAUBOYNTON BCH SR CTR SOW_1-23-04 Task 2-Minor TRC Submittal Based on approved pre-design services provide further developed floor plan, exterior elevation drawings color elevation and preliminary construction cost estimates. One meeting with City personnel will be held to review the Minor TRC Submittal. $ 5,500 Colored Elevations $ 1,500 TOTAL TASK 2 LUMP SUM Task 3 - Construction Documents Based on an approved design development, and Minor TRC submittal, final drawings, specifications, cost estimate, interior room finish material selection and equipment schedule will be prepared. All architectural and engineering systems in Attachment B will be finalized and submitted to building department and engineering. Up to three meetings with City Staff will be held to review, and finalize the construction documents. $ 19,500 Expenses: Four permit sets of construction documents and one set of engineering documents, signed and sealed will be submitted. $ 600 TOTAL TASK 3 LUMP SUM $ 7,ooo 20,100 Task 4 - Bid Phase Services Based on the "Standard Procedures and Functions for Consultants, Procurement Services, and the Project Management Team," (provided by the City) the following services will be provided under Task 4: Prepare and Distribute Design Documents to Project'Manager, Procurement Department and City Clerk - Three sets of the contract and technical specifications will be prepared, bound, and distributed to the appropriate groups within the City. Distribute Plans to Interested Contractors and Maintain Plan Holders List - CH2M HILL will copy the contract docttments and have them available for sale to interested contractors. The cost for reproduction will be borne by the contractors through the sale price (to be determined). CH2M HILL will maintain a list of all plan holders that have purchased plans through the West Palm Beach, Florida, office. This information will sent to the City's procurement office on a weekly basis. DDAVISl0/PROPOSAL~OYNTON BCH SR. CTR SOW_l-23-04. DOC 2 Answer Technical Questions from Contractors - CH2M HILL will provide general answers to contractors regarding this project. Answers will be in the form of verbal communication and will be general in nature. If questions arise that identify inconsistencies or omissions, CH2M HILL will contact Procurement Services to assist with the preparation of an addendum. CH2M HILL will prepare the technical response. The City's Procurement Services department will be responsible for issuing technical clarifications and addenda. Conduct Pre-Bid Meeting- CH2M HILL's project manager will conduct the pre-bid meeting with the assistance of the City's Project Manager. CH2M HILL will provide answers to technical questions that arise. The meeting will be conducted at a time and location selected and coordinated by the City's Project Manager. CH2M HILL will maintain a contractor's sign-in sheet and will prepare meeting minutes. Attend Bid Opening Meeting - CH2M HILL's project manager will attend the bid-opening. It is assumed that the City's Procurement Office will conduct the meeting and that meeting minutes will not be prepared. Assist With Bid Evaluation - CH2M HILL will tabulate the bids and prepare a summary table for the City that identifies bid item, unit prices, and any assumptions provided by contractor. The bid summary will also include the Engineer's estimate of probable construction cost on a unit price basis. CH2M HILL will review the references and background of the apparent low bidder. A letter summarizing the bid tabulation and the results of the reference check will then be submitted to the City. If the City rejects the apparent low bidder, CH2M HILL will conduct a reference review on additional bidders. TOTAL TASK 4 LUMP SUM $ 5,200 Task 5 - Construction Administration The City requested we provide full construction administration for the duration of the construction. It is understood that the fees presented in this proposal Attachment A are estimates and are not guaranteed and are dependent upon City involvement authorization by the City. Specific tasks will include the following: · Prepare for and conduct a pre-construction conference. Prepare and distribute the meeting minutes. · Review shop drawings and other construction related submittals. · Attend weekly construction project meetings. · Assist the City with the evaluation of request for payment by the Contractor. · Assist in the technical interpretations of the contract documents, and the evaluation of requested deviations from the approved design or specifications. · Evaluate any required design changes, and if requested, assist the City in preparing the required design changes and drawings. · Assist in negotiating the scope and cost of necessary change orders. · Perform a substantial completion inspection of the project areas and assist in the preparation of a final "punch list" for project close-out. · Assist the City with the evaluation of requests for payment by the Contractor. · Perform a final inspection. DDAVIS10/PROPOSAL~OYNTON BCH SR. CTR SOW_1-23-04.DOC 3 Perform a one (1) year walk-thru. TOTAL TASK 5 LUMP SUM $40,396 Task 6- Post Construction Services Provide record CADD drawings (electronic file) based upon contractor's marked up Changes and provide one (1) year warranty walk thru. TOTAL TASKS 6 LUMP SUM C. Assumptions · City will provide Geotechnical Services. · No Traffic Study included. · No off site work included. · No data, telephone, cable TV, fiber optics and security design included (conduit and pull strings to communication room included). · Six month construction. $ 4,970 D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated November 2003, between the City of Boynton Beach and CH2M HILL, Inc. E. Compensation Compensation by the CITY to the CONSULTANT for this Task Order will be on a Lump Sum basis in accordance with the above mentioned Agreement. The estimated compensation for the services described in this Task Order is $104,221 as shown in Table 1. DDAVISIO/PROPOSAL\BOYNTON BCH SR. CTR SOW_l-23-O4. DOC 4 TABLE 1 Senior Center Phase III Labor Cost Expense Cost Total Task 1 - Pre-Design Services $3,700 $3,700 Task 2 - Minor TRC Submittal $5,500 $1,500 $7,000 Task 3 - Construction $19,500 $600 $20,100 Documents Task 4 - Bid Phase $4,000 $1,200 $5,200 Task 5 - Construction $37,396 $3,000 $40,396 Administration Task 6 - Post Construction $4,670 $300 $4,970 Services $71,066 $10,300 $81,366 TOTAL F. Schedule The CONSULTANT will commence Professional Services upon receipt of written authorization and will complete the work according to the table below. Task 1 - 3 - Design Modifications Task 4 - Bid Phase Services 90 Days for Design after Notice to Proceed and 90 Days for TRC/P&Z approvals. 30 Days Bidding and 30 Days for Award Task 5 - Construction Administration 6 Months construction A tentative schedule will be developed within tasks / services once a Notice To Proceed for Design Has been issued and review of TRC, P&Z, commission and procurement dates have been established. DDAVlS10/PROPOSAL~:)YNTON BCH SR. CTR SOW_1-23-04. DOC 5 APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA By: Kurt Bressner, City Manager Dated this [_~_0 day of 0~ ~ ,2004. SUBMITTED BY: CH2M HILL, INC. By: Allan Bollinger Project Delivery Director Dated this __ day of ,2004 DDAVISIO/PROPOSAL~BOYNTON BCH SR. CTR SOW_1-23q)4. DOC 6 ATI'ACHMENT A BOYNTON BEACH SENIOR CENTER - PHASE III TASK 5: CONSTRUCTION PHASE SERVICES Construction Phase (Basic Services Based on 24 week/76month construction period). Construction Phase Services include the following: Schedule A Hours Rates Total · Prepare for and Attend Pre-Construction Meeting · Office administration (correspondence, RFI's, change orders, Shop drawing review, proposal requests, and review of Monthly pay applications, phone, fax, etc.) Architect/Engineer (Ave. 4 hrs/wk) Shop Drawing Review: Architectural Mechanical Plumbing/Fire Protection Electrical Structural Weekly Meetings: Equivalent of (1) 4 hour visit week to include travel and prepare and distribute Meeting Minutes and Monthly Pay Application Miscellaneous Engineering Site Visits: To include, Mechanical, Structural, Plumbing and Electrical Engineer to attend Progress Meeting (4 Engineers @ 8 Hrs each) 4 P.M. $122 $488 96 Prof $95 $9,120 32 16 16 24 20 108 Prof $ 95 $10,260 $19,380 96 Sr. Prof. $95 $9,120 32 Sr. Prof $95 $3,040 DDAVIS10/PROPOSAL~OYNTON BCH SR. CTR SOW_l-23-04. DOC 7 · Substantial Completion & Punch List Architect/PM Mechanical Electrical Clerical Final Completion/Close Out Architect/PM Clerical · Expenses: TOTAL 12 P.M. $122 $ 1,464 8 Sr. Prof.$ 95 $ 760 8 Sr. Prof. S 95 $ 760 ~ $ 54 $ 216 32 588 16 P.M. $122 $1,952 4 $ 54 $ 216 20 $ 3,200 $ 2,168 $ 3,000 $40,396 DDAVISIO/PROPOSAL\BOYNTON BCH SR. CFR SOW_1-23-O4. DOC Discipline Site Survey Civil ATTACHMENT B Boynton Beach Senior Center - Phase III Boynton Beach Senior Center Project No. Scope of Services/Estimated Drawings (Schematic Design through Construction Documents) Est. # of Sheets T-1 T-2 S SS Sheet Title Title, Index, Location Map Code Information, Abbreviations Symbols Site Survey 0 Landscape/Irrigation Architecture Structural Mechanical A-I.1 A-2.1 A-2.2 A-2.3 A-2.4 A-2.5 A-3.1 A-4.1 A-5.1 A-7.1 S-I.1 S-2.1 S-2.2 S-3.1 S-3.2 MI.1 M2.1. M3.1 M3.2 M3.3 Site Details Floor Plan Casework & Interior Elevations Equipment Plan Reflected Ceiling Plan Wall Types Plan / Room Finish Schedule Exterior Elevations Roof Plan / Details Building & Building Structures Door & Window Schedules/Details General Structural Notes Fotmdation, and Floor Framing Plan Attic, Roof Framing Plans Typical Details & Schedules Sections & Details Mechanical Legend HVAC Floor Plan HVAC Details Mechanical Sections & Details HVAC Controls DDAVISIO/PROPOSAL~BOYNTON BCH SR. CTR SOW_1-23-O4. DOC 9 Discipline Plumbing Fire Protection Electrical Est. # of Sheets Pl.1 P2.1 P3.1 P4.1 FP.1 FP.1 FP.2 El.1 E1.2 E2.1 E3.1 E4.1 E5.1 E6.1 E7.1 Sheet Title Plumbing Legend & Abbreviations Plumbing Floor Plan Plumbing Stack Diagram Plumbing Details Site Plan Fire Protection Floor Plan Fire Protection Roof Plan Fire Protection Legend & Abbreviations Electrical Site Plan Lighting Plan Power Plan Communications Plan Risers & Room Enlargement One Line Diagram Electrical Details / Schedule DDAVISIOhoROPOSAL~)YNTON E, CH SR. CTR SOW_1-23-O4. DOC 10