Loading...
R04-185 II , 1 RESOLUTION NO. R04- ,e5" 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, AUTHORIZING AND DIRECTING THE 5 CITY MANAGER TO EXECUTE TASK ORDER NO. 6 U 04-05-12 \VITH CH2M HILL FOR ADDITIONAL 7 ENGINEERING SERVICES FOR THE 8 REDEVELOPMENT/ REPLACEMENT WATER 9 SUPPLY FOR THE EAST WELLFIELD, WELLS 10E, 10 llE AND 13E, IN THE AMOUNT OF $133,321.00; AND 11 PROVIDING AN EFFECTIVE DATE. 12 13 14 WHEREAS, Task Order No. 24 with CH2M Hill, approved by the City Commission 15 on April 1, 2003, provides for the design, permitting, bidding, and construction management 16 services in connection with the replacement of two surficial aquifer wells (Wells 3D and 17 10E) in the City's East Wellfield; and 18 WHEREAS, the City's Consumptive Use Permit issued by the South Florida Water 19 Management District ("SFWMD") has severely limited the individual well withdrawal rates 20 'in the entire East W ellfield due to the potential for saline intrusion at deeper depths within 21 .the shallow aquifer; and I WHEREAS, an application was approved by the SFWMD for a minor modification I 22 I 23 ;to reconstruct wells in the East Wellfield at a shallower depth in an effort to prevent saline ¡ 24 !intrusion; and 25 WHEREAS, upon the approval of this application by SFWMD, CH2M Hill was ¡directed to cease design on Well 3E referenced in Task Order No. 24 and redirect its efforts I 26 I , 27 ito the design of shallower wells; and 28 i WHEREAS, City staff intends to solicit bids for the construction of three wells, I I' I 29 [Wells lOE, lIE, and BE; and , I: I I' I I: i: ¡ ~:\CA\RESO\AgreementS\Task - Change Orders\CH2M Hill Task Order U040512.doc I II I 1 WHEREAS, additional funding is required to complete this necessary development I 2 ¡to the East Wellfie1d; and 3 WHEREAS, The cost for the additional funding for Task Order No. U04-05-12 is I 4 1$133,321.00. I ¡ ; I 5 I I I I I 6 I NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 7 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 8 I Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as I 9 being true and correct and are hereby made a specific part of this Resolution upon adoption 10 hereof. I I 11 I Section 2. The City Commission of the City of Boynton Beach, Florida does 12 I 13 hereby authorize and direct the approval and execution of Task Order No. U04-05-12 with 14 CH2M HILL for additional engineering services for the redevelopment/replacement Water 15 Supply for the East Wellfield, Wells, 10E, lIE and BE, in the amount of$133,321.00. 16 17 Section 3. This Resolution shall become effective immediately upon passage. 18 19 I 20 I 21 I 22 I 23 I 24 25 26 27 28 29 I 30 31 I I :ICAIRESOlAgreementslTask - Change OrderslCH2M Hill Task Order U040512.doc I I I I I I I 1 2 I PASSED AND ADOPTED this ~ day of November, 2004. 3 4 CITY OF BOYNTON BEACH, FLORIDA 5 I 6 I 7 I : II ~~ II I 12 I 13 , .' ISSloner ~ ~: ~ íJ~ LLl .) 16 CommissJ9n",i ~e _ ;?" r, _2',- '/,//, / ./ 17 , ~> ~/A,' ! /~_.- I I ,/- - '/~ 18. ^~. 1:.///-:/--.... v-;.. // 19 I ~omm~=_ er ,.,~'" . / 20 " . ,\. / 21 ¡ATTEST: \~ '- ~-~"\.._-/- 22 I 23 24 25 26 I :ICAIRESOlAgreementslTask - Change OrderslCH2M Hill Task Order U040512,doc \ I ROc.l-185 Task Order No. U04·5·12 Construction and Resident Inspection Services for Three Replacement Water Supply Wells at the City of Boynton Beach's East Well Field A. Introduction and Background As part of previous Task Order 24, CH2M HILL began preparing the design and permitting for replacement water supply wells 3E and 10E. Since that time, the City had been severely -:::imite.:rbythe South F10rida~~Vcì.ter IYtanagement Dislrlct (SFWMD) on the individual'w'eU " withdrawal rates in the entire East Wellfie1d due to the threat of saline water intrusion at depth within the shallow aquifer. Some of the lowest permitted withdrawal rate limitations were placed on wells 10E - 14E. In response, the CITY submitted an application to SFWMD for a minor modification to SFMWD to reconstruct these five wells at shallower depths. The application was approved and thus the CITY directed CH2M HILL to stop design on well 3E and redirect efforts towards the design of wells 10E-14E. The design was completed in February 2004, construction bids were received in March 2004. Construction of two of the wells (12E and 14E) were on Forest Park Elementary school property and required construction to be conducted during the summer months Gune - August). After bids were received and reviewed, the CITY selected the second lowest, responsive, responsible bidder, Southeastern Drilling Services, due to some concerns regarding the contractor providing the lowest bid. However, due to time constraints and meeting CITY Commission agendas, the CITY was unable to start the project in time to comply with the school's requirements for construction. Thus the OTY has elected to only construct wells 10E, 11E and 13E and re-bid the project. The City has requested that CH2M HILL provide rebidding and construction management and resident inspection services related to the replacement of wells 10E, llE and 13E. Although a portion of these services were included in Task Order 24 for wells 3E and 10E, the CITY authorized CH2M HILL to conduct the additional design, permitting and bidding for replacement wells llE-14E utilizing the fee previously set aside for construction management and resident inspection services. Therefore, this Task Order provides the scope of work, schedule, and fee estimate for conducting these services for wells 10E, 11E and 13E. B. Scope of Services This scope of services provides for bidding, construction management, resident observation and startup services for the replacement of water supply wells 10E, 11E and 13E, located within the City's East Wellfie1d. DFB\TASK ORDER U04-5-12 1 Task 4.1 . Bidding Services The CITY has requested that CH2M HILL repackage the Contract Documents to only include wells 10E, 11E, and 13E and re-bid the project, and the following describes those additional services. Bid Package Preparation. CH2M HILL will revise the previously conformed Drawings and Specifications to include only wells 10E, 11E and 13E, including City front ends, for bidding purposes. CH2M HILL will reproduce and distribute construction bid documents or solicitation of quotes to prospective bidders, on behalf of the CITY. Pre-Bid Meetings. CH2M HILL will coordinate and attend one Pre-Bid meeting and respond to significant Bidder questions. Technical Issues. CH2M HILL will coordinate communications with bidders on matters re]ated to technical aspects of the desigr_ Correspondepce on these matters will be copied to the City. Addenda. CH2M HILL will issue technical responses for the preparation of an addenda, if required, based upon the questions of prospective bidders and the need to clarify the Contract Document's intent. Bid Review. CH2M HILL will review the bids received for accuracy and prepare Bid Tabulation for review by the City. Based on feedback from the CITY, CH2M HILL will issue a Recommendation of Award letter to the CITY. " As Bid" Conformed Construction Documents. CH2M HILL will produce a total of six copies of the Contract Document Specifications and Drawings, including all Addenda. Two copies will be issued to the Contractor, two copies will be issued to the CITY, and two copies will be issued to CH2M HILL. Bid Service Completion. Bid services will be considered complete upon CH2M HILL's review and providing the Contractor's executed documents and conformed contract documents to the City. Task 5.1 . Construction Management Services CH2M HILL will be responsible for the management of construction of replacement water supply wells lOE-11E and 13E, which includes the following services. Preconstruction Conference. CH2M HILL will attend a pre-construction conference with the awarded contractor and the City. Monthly Progress Meetings. CH2M HILL will chair monthly progress meetings with the awarded contractor and the City. CH2M HILL will be responsible for preparing agenda, chairing and preparing minutes from the meetings. DFBIT ASK ORDER U04-5-12 2 ...,.......___-__c- . --- -<--~;..,,~.>-- - _ _~__~___'__'_"__"'__.__n<_ - ~_>..-,..._"."_._'" - ".'_on_'" -._"",1.__· Submittal Review. CH2M HILL will process and review submittals from the contractor including shop drawings, product data, schedules, progress payments and will provide up to one additional review per submittal. Payment Applications. CH2M HILL will review payment applications received from the Contractor and upon acceptance of quantities and percent complete, will sign and forward onto the City for approval and payment. Field and Change Orders. CH2M HILL will review with the CITY project manager and issue field orders, requests for quotation, work change directives, and change orders as needed throughout the project. Requests for Information. CH2M HILL will also review with the CITY project manager and respond to Field Change Requests (FCR), Requests for Information (RFI) and Clarification submitted by the Contractor. Following review by the City, CH2M HILL will issue field orders, Requests for Quotation (RFQ) and Change Orders as required by the project. Project Start up and Close Out. CH2M HILL shall conduct project close out services including: · Incorporation of as-built information provided by the Contractor into a final set of Record Drawings. · Conducting substantial completion and final acceptance inspection and issuing punch lists following each inspection. · As part of the above inspections, CH2M HILL will coordinate, document and provide technical oversight during start up. · Reviewing final close out change orders and payment applications from the Contractor for processing by the City. Task 6.1- Resident Observation CH2M HILL shall conduct resident observation services during the well construction and testing. It is assumed that each well take approximately 8 to 10 weeks to substantially complete. Of that time, it is assumed that full time (8-hour day) resident observation will be required for up to two (2) weeks per well. Full-time resident observation will be provided during drilling, casing installation, cementing and testing by the CONTRACTOR and includes time to coordinate with SFWMD for inspections as required. CH2M HILL shall provide part-time resident observation services during activities such as well development and the construction of surface facilities including piping, mechanical, pumps and motors, electrical and instrumentation. It is assumed that part-time (16-hours per week) resident observation will be required for up to 8 weeks per well. DFB\TASK ORDER U04-5-12.DOC 3 Task 6.2 - Additional Resident Observation The Contract Specifications call for the wells to be constructed with open boreholes (i.e. no well screen). This design will allow for increased well performance provided the formation is well consolidated and the borehole can be successfully developed to remove loose sand and silt. In the event that the formation cannot support an open-hole completion due to its unconsolidated nature; or more than 12S-hours of well development have elapsed with no significant improvement in water quality, the Specifications contain an alternate item that will provide for the construction of the well with a screen and gravel pack. This task has been established to provide for the eventuality that additional resident observation services will be required for one or more of the wells. This task assumes that one week of full-time resident observation could be required for each well, for a maximum total of 3 weeks or 120 hours. In addition, additional construction management and project time, such as progress meetings, are included in this task. D. Assumptions · Permits from SFWMD for construction of the replacement water supply wells and the abandonment will be the responsibility of the contracted well driller. · Submittals received from the Contractor will be reviewed initially by CH2M HILL and then submitted to the City for review and concurrence. All submittals will require the collective review of both CH2M HILL and the City. · This Task Order does not include services for addressing legal claims made by the Contractor. E. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated November 18, 2003, between the City of Boynton Beach and CH2M HILL, Inc. F. Compensation Compensation by the CITY to CH2M HILL for services provided in this Task Order will be a time and expenses basis in accordance with the above mentioned Agreement. The compensation for the services described in this Task Order is estimated at $133,321 as shown below. DFB\T ASK ORDER UD4-5-12.DOC 4 ........~,-- _>O'~_"4...~~...J_~_~~~~ ~ . -- ;._",-_",-.--.-"'-"'--_.-.--~,,,,-.- ~ '--"~ ~ _.- Task Description Labor Labor Cost Expense Cost Totals Hours Task 4.1 - Bidding Services 124 $11,998 $2,7558 $14,753 Task 5.1 - Construction Management 410 $39,297 $3,259 $42,556 Services Task 6.1 - Resident Inspection 620 $47,184 $12,016a $59,200 Task 6.2 - Additional Resident 202 $14,890 $1,922 $16,812 Inspection Grand Totals 1,356 $113,369 $13,938 $133,321 8 Includes costs for electrical and I&C subconsultant Hillers Electrical A breakdown of the labor costs is included as an attachment to this Task Order. Work completed by CH2M HILL will be invoiced as part of the original invoice monthly on a percent complete basis, but will be broken out by task. A summary of work completed will be included with each invoice. G. Schedule CH2M HILL will commence services upon receipt of written authorization and will complete the work according to the following schedule. Task Description Start Finish Task 4.1 - Bidding Services July 2004 October 2005 Task 5.1 - Construction Management November 2004 July 2005 Services Task 6.1 - Resident Inspection December 2004 June 2005 Task 6.2 - Additional Resident As Required As Required Inspection Total time for notice to proceed to completing construction close out services is estimated at approximately 10-12 months. DFB\TASK ORDER U04·S.12.DOC 5 APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA By: u.~ City Manager Dated this ..1 day of ~~2004. SUBMITTED BY: CH2M HILL, We. By: 7'~ Timothy ~ Sharp Office Manager Dated this\1- day of ac+a~ ,2004. DFBITASKORDER UQ4-5-12.DOC 6 '~A"",,, -, ~~.-...~--.. ~~- ____ ___'" '.~_c___·. . City of Boynton Beach East Wellfield Replacement - Rebidding and Construction Services Tasks and Hours Classification Rate 4.1 5.1 6.1 6.2 Total Costs Client Service Manager $ 150.0 4 8 8 4 $ 3,600 Senior Project Manager $ 160.0 24 96 12 $ 21,120 Engineer/Hydrogeologist $ 85.0 16 200 240 120 $ 48,960 Senior Field Representative $ 122.0 192 $ 23,424 Project Engineer $ 122.0 6 13 10 $ 3,538 Senior Designer $ 95.0 6 13 10 $ 2,755 Senior Administrative Support $ 75.0 48 $ 3,600 Administrative Support $ 54.0 24 54 40 $ 6,372 Total Labor Hours 128 384 480 156 $ 1,148 Total Labor $ 11,998 $ 39,297 $ 47,184 $ 14,890 $ 113,369 Expenses' $ 2,755 $ 3,259 $ 12,016 $ 1,922 $ 19,952 Totals $ 14,753 $ 42,556 $ 59,200 $ 16,812 $ 133,321 , Expenses for Tasks 4.1 and 6.1 include costs for Hillers Electrical Engineers.