Loading...
R05-041 II I 1 RESOLUTION NO. R05 - 041 2 3 4 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 5 FLORIDA, APPROVING AWARD AND AUTHORIZING 6 AND DIRECTING THE PROPER CITY OFFICIALS TO 7 EXECUTE A CONTRACT IN A FORM ACCEPTABLE TO 8 THE CITY ATTORNEY'S OFFICE WITH JADE 9 COMMUNICATIONS, INC., IN THE AMOUNT OF 10 $48,937.71 PLUS A 10% CONTINGENCY FOR A TOTAL 11 AMOUNT OF $53,830.00 FOR THE INSTALLATION OF A 12 FIBER-OPTIC SYSTEM FOR TELECOMMUNICATIONS 13 AND COMPUTER CONNECTION FOR THE NEW FIRE 14 STATION #4; AND PROVIDING AN EFFECTIVE DATE. 15 16 17 18 WHEREAS, staff has recommended that the City enter into a contract in a form 19 cceptable to the City Attorney's office for the installation of a fiber-optic system for 20 elecommunications and computer connection between the Utilities Department Operation- 21 echnical Building at the East Water Treatment Plant and the new Fire Station #4 located at 22 919 S. Federal Highway to JADE COMMUNICATIONS, INC., in the amount of 23 48,937.71 plus a 10% contingency to be included for a total amount of$53,830.00. 24 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 25 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 26 27 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 28 eing true and correct and are hereby made a specific part of this Resolution upon adoption 29 ereof. 30 Section 2. The City Commission of the City of Boynton Beach, Florida, at the 31 ecommendation of staff, hereby authorizes and directs the proper City Officials to enter into 32 contract in a form acceptable to the City Attorney's office for the installation of a fiber- :\CA\RESO\Agreements\Jade Communications - Fire Station #4.doc · . I 1 ptic system for telecommunications and computer connection between the Utilities 2 epartment Operation-Technical Building at the East Water Treatment Plant and the new 3 ire Station #4 located at 1919 S. Federal Highway to JADE COMMUNICATIONS, INC., in 4 he amount of $48,937.71 plus a 10% contingency to be included for a total amount of 5 53,830.00, a copy of the proposal is attached hereto as Exhibit "A". 6 Section 3. This Resolution shall become effective immediately upon passage. 7 8 PASSED AND ADOPTED this 15"" day of March, 2005. 9 10 11 CITY OF BOYNTON BEACH, FLORIDA 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 :\CA\RESO\Agreements\Jade Communications - Fire Station #4.doc , , ROb -oL{, Proposal in Response to City of Boynton Beach Department of Public Works Senior Center & Fire Station #4 Extensions Fiber Optic and Communication Lines Routing Project. JAIl I 0 2005 Prepared for: H. David Kelly, Jr. Prepared by: Gene Bradley Account Executive Jade Communications Inc. 5612390336 October 25,2004 Dear Mr. Kelly, Project General Description; Jade Communications Inc. (JCI) will trench, bore and drill One (1) 2" HDPE and install handholes. JCI will also install a 2" quad innerduct as specified in sections E-l, I, H, and G on provided Design. General Scope of Work; Location of Existing Utilities; JCI will locate existing utilities prior to construction. If there should be any conflicts with planned design JCI will notify City Engineer for resolution. Trenching and Backfill; JCI will trench and backfill all locations on plan. All areas will be restored to their original condition. JCI will be in compliance with local noise ordinances. Equipment; All necessary and proper equipment will be setup and removed by JCI. This equipment will be onsite and ready for inspection prior to construction. Installation and Materials; JCI will supply and install (location on blue print for phase one) the following; )i;- 2" Carlon HDPE Ribbed wall directional bore pipe )i;- 24' X 36" X (4" and 6") CDR Hand Holes "-,- Hybrid fiber optic cable, innerduct and termination components r )i;- 25 pair cable and termination components Guaranty; All materials, equipment and craftsmanship will be guaranteed by JCI for one (1) year of final acceptance. Price; See attached price sheets. I Balance due upon receipt of invoice. I All material is guaranteed to be as specified. All work above to be completed in a skillful manner according to standard practices. Any alteration or deviation from above specifications involving extra cost, will be executed only upon written orders, and will become a liT & Mil extra charge over and above the estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. No permit fee's or bonding is included in this quotation. This proposal subject to acceptance within thirty days and is void hereafter at the option of the undersigned. Florida License ESOOOO112 AUTHORIZED SIGNATURE Date ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. ACCEPTED: KURT BRESSNER CITY MANAGER Signature BOYNTON BEACH, Fl Date ~-I~-O' Approx. Item Quantities Items and Unit or Lump Sum Price Unit Prices Extension No. Units Bid (prices to be written in words) (in figures) FURNISH & INSTALL MATERIALS (on EWTP prooertv se2ment only) $1'7,687 Dollars .w Cents $17,087 . 1 ~ Provide & install 25-pr. phone copper cable 1,000 inside its own inter-duct. (*) 1. Lin. 2 Dollars Ft. .69 Cents $2,685 .32 Provide & install fiber-optic cable (hybrid 1,000 of 6-strand multi-mode and 6-strand single- 2. mode) inside its own inter-duct. (**) Lin. 9 Dollars Ft. . ] 4 Cents !l:Q lId Q1' 2" ø "Carlon" HDPE ribbed wall bore tube 770 (4' deep), installed in open trench. 3. Lín. 2 Dollars Ft. .55 Cents <1:1 Q¡:;,,\ 7" Hand hole units - CDR system box on Type 2 "C" inlet base - 4- foot deep unit. 4. $1,647 Dollars Each .06 Cents !l:1 ?Q¿ 1 Dollars Cents Dollars Cents SUB-TOTAL: Dollars Cents I Page 2 of4 Approx. Item Ouantities Items and Unit or Lump Sum Price Unit Prices Extension No. Units Bid (prices to be written in words) (in figures) FURNISH & INSTALL MATERIALS (along SE 18th Avenue segment) $31.ß5Q Dollars .')8 Cents $31,850 58 Provide & install 25-pr. phone copper cable 930 inside its own inter-duct. (*) 11. Lin. 2 Dollars Ft. .86 Cents $2,664 .lï Provide & insta1lfiber-optic cable (hybrid 930 of 6-strand multi-mode and 6-strand single- 12. mode )inside its own inter-duct. (**) Lin. 9 Dollars Ft. .19 Cents $8,549 .2l¡ 2" ø "Carlon" HDPE ribbed wall bore tube 730 (4' deep), directional bore. 13. Lin. la Dollars Ft. . 16 Cents $13,260 .24 2" ø "Carlon" HDPE ribbed .}Vall bore tube 160 (10' deep), directional bore. .. 14. Lin. lß Dollars Ft. Hi Cents. $2,906 .35 Hand hole units - CDR system box on Type 1 "c" inlet base - 4-foot deep w/traffic rated 15. cover. $2,235 Dollars Each ?Q Cents $2,235 .29 Hand hole units - CDR system box on Type I 1 "c" inlet base - 6-foot deep. 16. $2,235 Dollars Each ?Q Cents $2,235 .29 Dollars Cents Page 3 of4 Approx. Item Quantities Items and Unit or Lump Sum Price Unit Prices Extension No. Units Bid (prices to be written in words) (in figures) FURNISH & INSTALL MATERIALS (along SE 18th Avenue segment) Dollars Cents $31,850 .58 SUB-TOTAL: Dollars Cents $17,087 . 1 ~ Dollars Cents PROJECT TOTAL: Dollars Cents $48,937 .71 . Dollars Cents NOTES: (*) Copper cable shall be installed and terminated to a wall-mounted 110-block, with surge arrestors at each end. (**) Fiber cable shall be installed and terminated within a wall-mounted fiber enclosure, and shall use ST type connectors at each end. All components for the installation shall be provided by the Bidder; all cabling terminations shall be tested and certified by the Bidder. Page 4 of4