Loading...
R08-043 II 1 RESOLUTION NO. R08- otis 2 3 A RESOLUTION OF THE CITY COMMISSION OF THE 4 CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING 5 EXECUTION OF AMENDMENT NO.2 TO TASK ORDER 6 NO. U04-16-2 TO PBS&J TO ELIMINATE THE 7 CONSTRUCTION RELATED SERVICES ON THE 8 SOUTHEAST FEDERAL HIGHWAY CORRIDOR 9 PROJECT RESULTING IN A COST REDUCTION OF 10 $241,583.00; AND PROVIDING AN EFFECTIVE DATE. 11 12 WHEREAS, On July 20,2004 the City Commission approved Task Order No. U04-16- 13 2 for PBS&J to perform professional engineering services for water service, roadway and storm 14 water improvements for the S.E. Federal Highway Corridor Project; and 15 WHEREAS, on December 6,2005, Amendment #1 was approved for additional design 16 efforts based on an Interlocal Agreement between the City of Boynton Beach and the 17 Community Redevelopment Agency; and 18 WHEREAS, staff has determined that it would be more efficient to procure the services 19 of Mathews Consulting, Inc., for construction administration. 20 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 21 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 22 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 23 being true and correct and are hereby made a specific part of this Resolution upon adoption 24 hereof. 25 Section 2. The City Commission of the City of Boynton Beach, Florida does hereby 26 authorize and direct the approval and execution of Amendment NO.2 to Task Order U04-16-2 27 to PBS&J for a cost reduction of $241,583.00, a copy of which is attached hereto as Exhibit 28 "A". S:ICAIRESOlAgreements\Task - Change Orders\PBSJ -Amd #2 Task Order U04-16-2doc II Section 3. 2 This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ~ day of April, 2008. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ATTEST: 22 23 24 25 26 27 28 CITY OF BOYNTON BEACH, FLORIDA h~r ~, Je. TaYlo~ ~ m. (J~ S\CA\RESOlAgreements\Task - Change Orders\PBSJ -Amd #2 Task Order U04-16-2doc Exhi bi +- A R08-0&.l3 ORIGINAL AMENDMENT NO.2 TO TASK ORDER NO. U04-16-02 FINAL DESIGN, PERMITTING, AND SERVICES DURING CONSTRUCTION FOR W A TERMAIN REPLACEMENT, STORMW A TER MANAGEMENT AND ROADWAY IMPROVEMENTS FOR SOUTHEAST FEDERAL HIGHWAY CORRIDOR PROJECT December 2007 City of Boynton Beach, Florida PBS&J Project No. 140497.01 Background The City of Boynton Beach (CITY) has previously authorized PBS&J (CONSULT ANT) to provide professional engineering services relating to neighborhood improvements for the area along the southeastern corridor of Federal Highway (US I). The work approved by the CITY and authorized for Task Order No. U04- I 6-02 consists of various combinations of water, roadway and drainage improvements for the area generally described as "Southeast Federal Corridor". Subsequent to the above task order, the CITY was requested by the CRA to modify certain design elements to the project precipitating in additional engineering services and hence in the creation of Amendment No. I to Task Order U04-16-02 which was approved by the CITY. Subsequent to Amendment 1, the CITY requested additional modifications to the scope of Amendment No. I as a Letter of Understanding. Subsequently the CITY has requested PBS&J make the following changes to the current contract: y Change Task 5 Services During Construction to not duplicate the Construction Management Services Task Order No U04-14-06 y Eliminate Task 6 Resident Observation This document describes the changes or amendments to the original work that are needed to satisfy the new development requirements. Proposed Scope Modification of Task 5. Modify Task 5 Services During Construction to only include responses to Request For Infonnation from the Construction Mangers and minor redesign due to unforeseen circumstances. PBS&J shall not certify the construction to any permitting agencies. The fee will be revised to $ I 9,220 and will be on a time and materials basis. The previous fee was $78,587.00 Elimination of Task 6 Task 6 Resident Observation will be deleted from the contract. The fee for Task 6 was $ I 83, 177. The proposed total fee (Revised Task 5) is $19,220 which is Revised Task 5, and an estimated $961 in expenses which represents 5 percent of the Task for a total of $20, 181. After eliminating Task 6 the net change is -$241,583.00 A breakdown of costs for each task is summarized in Exhibit 1, Staff Mix. The CONSULTANT will commence work on Amendment 2 upon receipt of written authorization. APPROVED BY: CITY OF BOYNT~9IJFLORIDA By: ~ Kurt Bressner City Manager City of Boynton Beach, Florida Dated this 7 day of a.p~ .ij ,2008 SUBMITTED~BY: PBS&J ~ By: Grethe L McLaughlin Senior Group Manager Dated this c>29 day of -- Ie rJrt/~~8 Attachments: Exhibit I - Staff Mix wL!'l ll..~ :::to ll..~ (/)fh N 0 , CD .... .t 0 ~ 0 Z ... l: 41 "C - 0 ... U :;::: 0 41 U .:.: '0 :::I ... III ... - I'll ll.. III l- e l: 0' 0 41 01 - E M 01, 0 41 l: > .;: z 0 :::I ... - c. C l: .E I.~ 41 E ... 0 > "C "C I'll '~ l: .;: ~ 41 ..."C 41 , E o I'll (/)1 c:( o 0 011 ... >a: .5 .~ 0 I'll~ ..., - ~ ... 41 ::E 01 '5,.$..c: 41 l: l: :t: '6 .- I'll u '61 CD l: J: ~ I'll I~ .:.: ca I'll - E 41 lI:: III - - ~...lQ , , I'll en III 41 0 l: (/) I- ... c:( 41 "C-o 'l5 I "C 41(/)- I- ..... l: LL. t: ;. co l: - ~ 'lii'iij 09 0 :s - m:::t~.g :;::: "iii 0..., I'll "'~..c:"'0LL. l: '0 J: 41(/):;.$>' :~ - >< == lQ I'll _ .... '&i W ~ll..~==ON jjj Z l: 'E C\J ~~ ..: (/) c. 41 a:!,- "C!'- ii:fh The City of Boynton Beach City Clerk's Office 100 E BOYNTON BEACH BL VO BOYNTON BEACH FL 33435 (561) 742-6060 FAX: (561) 742-6090 e-mail: prainitoj@ci.boynton-beach.fl.us www.boynton-beach.org MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Janet M. Prainito City Clerk DATE: April 14, 2008 SUBJECT: R08-043 - Task Order No. U04-16-02 Attached for your information and files, is a copy of Resolution # R08-43 and two original executed documents Task Order No. u04-16-02. That was approved by the City Commission at their regular meeting on April 1, 2008. If I can be of any additional service, please do not hesitate to contact me. Thank you. ~ Yn. An., :...k Attachments (2) c: Central File S:\CC\WP\AFTER COMMISSION\Departmental Transmittals\2008\Karen Riseley, CPPB - ROB-042.doc America's Gateway to the Gulfstream