R08-090 , , I 1 RESOLUTION NO. R08-0Q ~ 2 3. , A RESOLUTION OF THE CITY OF BOYNTON 4 I i BEACH, FLORIDA, AUTHORIZING EXECUTION OF 5 T ASK ORDER NO. U08-7-03 IN THE AMOUNT OF 6 $32,936.00 WITH A 10% OWNER'S CONTINGENCY 7 OF $3,294.00 FOR A TOTAL BUDGET 8 APPROPRIATION OF $36,230.00 WITH ERDMAN 9 ANTHONY OF FLORIDA, INC., TO PROVIDE 10 PROFESSIONAL ENGINEERING SERVICES FOR 11 SECTION B OF THE RAW WATER MAIN 12 INTERCONNECT PROJECT; AND PROVIDING AN 13 EFFECTIVE DATE. 14 15 16 WHEREAS, the Business Case Evaluation for Water Supply Strategy included the 17 interconnection of the East and West wellfields by construction of a 6-mile long raw water 18 main as one of the City's most critical water supply projects over the next 5 years; and 19 WHEREAS, Task Order #U08-7-03 with Erdman Anthony of Florida, Inc., involves 20 the pre-design activity of route selection in Section B and will evaluate two alternate routes 21 within this Section B; and 22 WHEREAS, the City Commission of the City of Boynton Beach upon 23 recommendation of staff, deems it to be in the best interest of the citizens of the City of 24 Boynton Beach to authorize execution of Task Order U08-7-03 in the amount of $32,936.00 25 with an additional owner's contingency of $3,294.00 for a total budget appropriation of 26 $36,230.00 to Erdman Anthony of Florida, Inc., for professional engineering services for 27 Section B of the Raw Water Main Interconnect project. 28 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 29 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: S\CAIRESOlAgreements\Task - Change Orders\Erdman Anthony-Task Order UOB-7-03.doc II I 1 Section I. The foregoing "Whereas" clauses are hereby ratified and confirmed as 2 being true and correct and are hereby made a specific part of this Resolution upon adoption 3 hereof. 4 Section 2. The City Commission of the City of Boynton Beach, Florida does 5 hereby authorize and direct the approval and execution of Task Order U08-7 -03 in the 6 amount of $32,936.00 with an additional owner's contingency of $3,294.00 for a total 7 budget appropriation of $36,230.00 to Erdman Anthony of Florida, Inc., for professional 8 engineering services for Section B of the Raw Water Main Interconnect project, a copy of 9 which is attached hereto as Exhibit "A". 10 Section 3. This Resolution shall become effective immediately upon passage. 11 PASSED AND ADOPTED this ~ day of August, 2008. 12 13 CITY OF BOYNTON BEACH, FLORIDA 14 -----------{ 15 16 17 18 19 ~-J 20 lC/'/ 21 22 Commissioner - Ronald Weilan 23 ~-z:?!f~/z~ ~ 24 25 Commissio.ner - Woodrow L ay 26 //'}ih~ d~' 27 ~ 28 Commissioner - Marlfne Ross 29 ATTEST: 30 31 32 33 34 35 f ar~9J Task Order No. U08-7-3 Raw Water Main Interconnect - Section B A. Background The City has capacity to treat more raw water at its East Water Treatment Plant (EWTP); however they the raw water must be transported to that East Water Treatment plan from the well fields near the West Water Treatment Plant (WWTP). Therefore, the City desires to interconnect the two water treatment plants. They plan to design and construct this raw water main in four phases: 1. Section A - From the WWTP to Military Trail and Woolbright Road (or Golf Road, if needed). 2. Section B - From Military Trail east to Congress Ave (either down Woolbright Road or down Golf Road) 3. Section C - From Congress Ave to 1-95 (either down Woolbright Road or down Golf Road) 4. Existing Facilities - Under 1-95 to the EWTP down Woolbright Road It is anticipated that a 30" or 36" ductile iron or high density polyethylene water main will be needed for sections A, Band C. This proposal is for the design of Section B which will be investigated in the following two steps: 1. Route analysis and recommendation 2. Design, plans, permitting, assistance during construction, and certification This proposal is for the first phase, the route analysis and recommendation, for Section B, from Military Trail to Congress Ave (either down Woolbright Road or down Golf Road) as shown on the sketch above in the solid green line labeled Section B. TASK ORDER NO.3 - Raw Water Main Interconnect - Section B B Scope of Services for Phase 1- Route Analysis The CONSULTANT will investigate the existing conditions and recommend either Alternative #1, Golf Road, or Alternative #2 Woolbright Road for the proposed water main between Military Trail and Congress A venue. The following items are included: 1. Obtain documents of record, where available, related to the existing conditions including utility company record drawings, roadway plans, proposed improvements, right-of-way maps. Review available utility plans, atlases, and maps of the area for location of existing utilities. Coordinate the proposed facilities with existing utility alignments to avoid conflicting routings to the extent possible. 2. Perform site investigation activities including a field survey of the project area to verify water line, sanitary sewer, and other utilities locations and alignments are consistent with those shown on utility record drawings. Document surface details such as fences, sidewalks, walls, curbs, vegetation, sign poles, etc. to the extent that they are visible and may be materially affected by the construction of the proposed improvements. 3. Coordinate with the stakeholders regarding the project to include the following: a. City staff b. County roadway department regarding the installation of this water main within their right of way, any future plans for these rights of way, the permit process, maintenance of traffic c. Utility departments regarding relocation of their existing facilities, if needed. Coordination with the up to 8 utilities (such as FPL, Bell South, Gas, Cable TV, PBC Traffic) is anticipated. d. The consultants for Sections A and C regarding the connection to those projects at Military Trail and Congress A venue. 4. Review the data and recommend which of the two alternative alignments is preferable. It is anticipated that a decision matrix will be used to conclude which alternative will be preferable with the items to be included in the decision matrix to be determined and weighted during the project and with City staff approval but will likely include items such as: Utility Impacts, Maintenance of Traffic/Public Safety, Constructability/Roadway Impacts, Permitablity, Right of Way Impacts, Community Impacts, Environmental Impacts, and Construction Costs 5. Prepare a summary report of the findings and recommendations to include the following: a. Summary of the findings along each of the two alternative corridors to include a listing of the potential conflicts and photographs b. Copies of the record drawings, roadway plans, etc. that are obtained c. A sketch of the key features (on County aerial photographs at 1"=200' scale on 11 x 17 paper) to graphically depict the features found along each of the two corridors with a general alignment indicated d. Recommendations 2 TASK ORDER NO.3 - Raw Water Main Interconnect - Section B 6. Two review meetings with the City staff to present our findings, review our approach to the analysis, decision matrix items and weights, and recommendations. C. Assumptions In addition to the work items discussed above, the following assumptions were made in establishing the scope of this Amendment and associated fee. Changes and/or modifications in the above work items or these assumptions are considered an Additional Services Item under the terms of the contract. Assumptions include: 1. This analysis will investigate only the east west corridors along Woolbright Road and Golf Road. The north south corridors along Military Trail and/or Congress A venue between Woolbright Road and Golf Road are not included and will be addressed in the alternative analysis performed for Section C. Should Section B be installed along Woolbright and Section C be installed along Golf, an additional 5,000' +/- will be needed for Section C. The impacts of that additional length of water main will be addressed in the route recommendation for Section C and are not included in this proposal. 2. This recommendation will address the general corridor to be designed; however, the exact placement of the proposed pipe within this corridor will need to be designed and determined in the final design phase of the project. 3. The CITY will provide copies of any records in their possession regarding existing facilities in the vicinity (atlases, plans, record drawings, easements, etc.). 4. The following items are not included in this proposal: subsurface utility locations, land survey, geotechnical investigation, title search, cost estimating. 5. No interim booster pump station is included in this Section. 6. This phase is to recommend an alignment only, no final design, plans, permitting, specifications, etc. are included in this Phase 7. Survey and acquisition of any easements are not anticipated and are not included in this Phase. 8. Attendance at public meetings or hearings associated with public involvement or with permits applied for in support of the project is not included in this Phase. 9. The design is to be based on the local codes and standards in effect at the beginning of the project. Revisions required for compliance with any subsequent changes to those regulations is considered an Additional Services item. D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Engineering Consulting Services dated November 18,2003 between the City of Boynton Beach and Crossroads Engineering & Surveying (Resolution 03-182), assigned to Erdman Anthony of Florida, Inc. on June 15,2004 (Resolution R04-089) and extended by the 3 TASK ORDER NO.3 - Raw Water Main Interconnect - Section B City Commission on February 21,2006 (Resolution R06-050) and extended a second time by the City Commission on February 19, 2008 (Resolution R08-027). E. Additional Services The following are examples of some specific Additional Services Items that may be required, but are not included within this Task Order. Generally, a condition contrary to the work description in Section B or assumptions of Section C (upon which the design fee is based) is considered an Additional Services item. Examples include: 1. Development of property descriptions of easements, road right-of-ways, etc. Preparation of right-of-way or easement boundary surveys. 2. Threatened or endangered species and species of special concern permitting or relocation work. 3. Archeological/Historical preservation permits, studies, or reports. 4. Analysis of additional corridors. 5. Design modifications to the Construction Contract Documents (i.e., change orders) required during construction. These and other services can be provided, if desired by the CITY, under separate Task Order(s) or by an amendment to this Task Order. Services performed will be on an as-directed basis in accordance with a written Notice to Proceed from the CITY. F. Obligations of the CITY 1. The CITY shall provide the CONSULTANT in a timely manner, record data and information related to the sewer system, water distribution system and streets within the project as necessary for all the performance of services specified herein. 2. The CITY shall review all drawings and other documents presented by CONSULTANT and obtain advice of an attorney, insurance counselor, and others as CITY deems appropriate for such review and render decisions pertaining thereto within reasonable time so as not to delay the services of CO NS UL T ANT. G. Compensation In accordance with the above mentioned Agreement, compensation by the CITY to the CONSULTANT will be on a lump sum basis. The estimated time and compensation for the services described in this Task Order is as shown in Exhibits A attached. H. Schedule The CONSULTANT will commence design and permitting services upon receipt of written authorization and will complete all work associated with this Task Order in accordance with the attached schedule shown on Exhibit B. K:\Business-Development\Proposals\Boynton Beach\2 Year gen.consult.contract\lnterconnect\Scope.doc 4 TASK ORDER NO.3 - Raw Water Main Interconnect - Section B APPROVED BY: ::YOFBO~~A Kurt Bressner, City Manager B ('"' Dated this day of ...::>€- pT . ,2008 SUBMITTED BY: ERDMAN ANTHONY OF FLORIDA INC. By: Dg~e~M Principal Associate 5 ERDMAN ~ EXHIBIT A - STAFF-HOUR ESTIMATE Project Name: Raw Water Main Interconnect - Section B ANTHONY . Date: 5/14/08 Basis of No. of Hours Total Project Project Senior Senior Project Project Senior Senior Total Category 1 Item Estimate Units per Unit Hours Director Engineer Designer Admin. Director Engineer Designer Admin. Support Support $150.00 $120.00 $95.00 $60.00 Phase 1- Route Analysis 1. Records research LS 1 20 20 10% 10% 80% 0% $300.00 $240.00 $1,520.00 $0.00 $2,060.00 2. Field review Mile 4.2 16 67.2 10% 10% 80% 0% $1,008.00 $806.40 $5,107.20 $0.00 $6,921.60 3. Coord - utilities EA 8 3 24 50% 50% 0% 0% $1,800.00 $1,440.00 $0.00 $0.00 $3,240.00 Coord - pbc, city, termini EA 4 8 32 50% 50% 0% 0% $2,400.00 $1,920.00 $0.00 $0.00 $4,320.00 4. Analysis Mile 4.2 12 50.4 20% 20% 60% 0% $1,512.00 $1,209.60 $2,872.80 $0.00 $5,594.40 5. Report LS 1 40 40 10% 30% 30% 30% $600.00 $1,440.00 $1,140.00 $720.00 $3,900.00 6. Review meetinos EA 2 20 40 100% 0% 0% 0% $6,000.00 $0.00 $0.00 $0.00 $6,000.00 Subtotal 273.6 43% 22% 33% 2% $32,036.00 Expenses $900.00 Total $32,936.00 Expenses Description Size No. of Sets Sheets per Set Total Units Cost per unit Total Cost Correspondance 8.5"x11 " 1 nla 500 0.1 $50.00 Plans 11"x17" 50 14 700 0.2 $140.00 Overnight ShippinO or local delivery 7 20 $140.00 No. of Trips Miles per Trip Total Miles Mileaoe 19 50 950 0.6 $570.00 Total $900.00 CITY CLERK'S OFFICE MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Janet M. Prainito City Clerk DATE: September 8, 2008 RE: R08-090 - Task Order #U08-7-3 Raw Water Main Interconnect Section B Attached for your information and use are two originals of the above mentioned Task Order. Since the documents have been fully executed, I have retained one original for Central File. Please contact me if there are any questions. Thank you. s:y~'L Yn P/L~~ ( "-- Attachments cc: Central File S:ICCIWPIAFTER COMMISSIONIDepartmental Transmittals\20081Barb Conboy ~ R08-090 doc