Loading...
R08-107 II 1 2 RESOLUTION NO. R08-/()7 3 4 A RESOLUTION OF THE CITY COMMISSION OF THE 5 CITY OF BOYNTON BEACH, FLORIDA, 6 AUTHORIZING THE CITY MANAGER TO EXECUTE 7 CHANGE ORDER NO.1 TO BID NO. 035-2821-08/CJD, 8 RECLAIMED WATER SYSTEM, PHASE 1 FOR B&B 9 UNDERGROUND CONTRACTORS, INC., IN THE 10 AMOUNT OF $120,210.00; AND PROVIDING AN 11 EFFECTIVE DATE. 12 13 WHEREAS, the City Commission upon recommendation from staff, deems it 14 appropriate to approve Change Order No.1 to bid #035-2821-08/CJD Reclaimed Water 15 System, Phase 1, between the City and B&B Underground Contractors, Inc., in the amount of 16 $120,210.00 which includes the jack and bore of a 30-inch steel casing pipe and 16-inch 17 ductile iron carrier pipe for potable water service under the FEC Railroad Crossing on SE 12th 18 Avenue, which was designed as part of the Southeast Federal Highway Corridor project. 19 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 20 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 21 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 22 eing true and correct and are hereby made a specific part of this Resolution upon adoption 23 Section 2. The City Commission of the City of Boynton Beach, Florida does 24 25 ereby approve and authorize and direct the City Manager and City Clerk to execute Change 26 rder No.1 to bid #035-2821-08/CJD Reclaimed Water System, Phase L between the City 27 nd B&B Underground Contractors, Inc., in the amount of $120,210.00, a copy of which is 28 ttached hereto as Exhibit "A". :\CA\RESOlAgreements\Change Orders\Reclaimed Water System Change Order doc 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Section 3. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ~ day of September, 2008. . Prainito, CMC lerk ,,(],~1{j~/~~:J:t;; ;~f;: J:~f' C~ia%e:~eat:r'j~~. ,~;;D'i,; ,Y ..... ,', ' . : ,. <";'~~f:,)} Yn. p~ Commissioner - Ronald '" , '\ ~ ILJCJd4~AJ Z,' -{.L- Commissioner - Woodro . '7?id~, A;;->2-/' Commissioner - Marlene Ross '\CA\RESOlAgreements\Change Orders\Reclaimed Water System Change Orderdoc /(0 Y-IIJ 7 Utilities Department City Of Boynton Beach Engineering Division Change Order Authorization Form (Over $10,000) Project: Phase 1A, Reclaimed Water System, CO Number: 00001 Contract 1 Contractor: B & B Underground Contractors, Inc. Purchase Order No.: 081246 Engineer: Mathews Consulting, Inc. Date Submitted for Approval: 8/25/08 Item Description of Work Cost Time 00001 Perform 30-inch Jack and Bore on SE 12m Avenue, which was designed as part of the Southeast Federal Highway Corridor project. Purchase Order #081246 will be increased by $120,210.00 for the $120,210.00 Zero change in project scope. Contingency approved for Phase 1 A, Reclaimed Water System, Contract 1 will not be used for this Change Order. 00002 Schedule adjustment - 60 day time extension to allow for completion 60 of work. $0.00 The cost of this work is: $120,210.00 Item #00002 - The Contract Time will be increased by 60 calendar days. The Adjusted Substantial Completion date is 11/11/08 with Final Acceptance 60 days anticipated on 12/11/08. ALL DOCUMENTATION IS ATTACHED FOR REVIEW Contin $0.00 $0.00 $0.00 $89,546.00 $89,546.00 Recommendation: Date Christo her Roschek, P.E., En ineerin Division Mana er 8/25/08 David Mathews, P.E., Mathews Consultin ,Inc. 8/25/08 Change Orders over $10,000 are NOT authorized until reviewed and approved by the Deputy Utilities Director and Utilities Director. A roved to Proceed B roved to Proceed B : Acknowled ement Peter Mazzella Dep- t Utilities Director ~ Signature Date: (Jr Date: 1 08/25/2008 16:52 FAX \4]0011001 . ~~~~~~#J'M; . . 6900 Dwight Road .West Palm Beach, Florida 33411 . 561 6823310. Fax: 561 6823304 August ~5, 2008 City of I!k>ynton-Beach UT1Lm~ DEPARTMENT B&B-Letter No. 1803,00()4 124 E~ Wootbright R~ Boynton Beach, FIorid$ 33435 Sent VIa: Fax-561 742. 6298 ~ IT": Mr: Christopher II RoschEM<, P.'E. R~ce: Phase 1A-Redairnet! Water System (Contract 1) , Project Cut~tnlcl'Daduments PBS&J plan Sheets C-1 and c.;10 City of Boynton- 8eeqh Correspondence dated July 2, 2008- Subjedt: Price Quotes for Referenced Jack &- Bores-REVJSED- Dear Sir. Pursuant to your nlquest, \N8 have.reviewed the referenced material and hereby provide pricing for the i above subject. We have revised our pricing as a result of our meeting. A cost breakdOwn for the 30- inch Jack & Bore is attached her8to for your review. In sum=, we 8re prepared to perform the 30 inch diameter Jack & Bore- for the price of $120,2. ~OO _ ~ In the cost breakdown. p~ does not indude the disinfection or sampling of the newty instaIted water main. The ~Irection and chtoTination Is exdud8d 801eIy as these tests would be' invalid after 60 days. The preaunI teat is inclUded. Pricing is baled on the plans pr8p8red by Poet. Buckley, Schuh, & Jernigan in FebnJary 2008, titled SoutheaIt Federaf Highway Corridor Watermain, Stormwater, and Roadway Improvement Project. Additional ~ indude work being performed concurrenIIy with the referenced ploject. This work will require an additional SIxty (eo) Calendar day time exII8nsion. Should you have any questions regarding the content of this correspondence, please do not hesitate to contact the undersigned. RECEIVED SDOIwfc AUG 2 5 2008 ENCL: Cost Breakdown BOYNTON BEACH UTILITIES cc: File 08/22/2008 13:43 FAX I4i 002/003 30" Steel Casing I Description Est Qty Units Unit Cost Value I Jack & Bore Pit @ 103+31.97 1 LS $15,000.00 $ 15,000.00 Jack & Bore Pit @ 102+21.04 1 LS $10,000.00 $ 10,000.00 30" Steel Casing with 16" DIP 110 LF $ 450.00 $ 49,500.00 Carrier Pipe Open Cut Pavement Repair 75 LF $ 150.00 $ 11,250.00 16" Gate Valve 2 Ea $ 4,000.00 $ 8,000.00 16" Restrained Joint Pipe 40 LF $ 120.00 $ 4,800.00 16" 22.S Deg Bends 2 Ea $ 2,500.00 $ 5,000.00 16" 45 Deg Bends 2 Ea $ 2,700.00 $ 5,400.00 16" Cap 2 Ea $ 1,000.00 $ 2,000.00 Dewatering 1 LS $ 2,500.00 $ 2,500.00 Addition Bond, Insurance, Overhead 1 LS $ 5,760.00 $ 5,760.00 Video Documentation 1 LS $ - $ - As Built Drawings 1 LS $ 1,000.00 $ 1,000.00 $ 120,210.00 Plan Used for Bidding Purposes: Titled: Southeast Federal Highway Corridor Watermain, Storm water, and Roadway Improvement Project By: PBS&J February 2008 Sheet C-1 CITY CLERK'S OFFICE MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Judith A. Pyle Deputy City Clerk DATE: September 22, 2008 RE: R08-l07 - Change Order # 1 for Phase lA, Reclaimed Water System Contract 1 with B&B Underground Contractors, Inc. Attached for your information and use are two originals of the above mentioned Change Order and a copy of Resolution R08-l0l. Since the documents have been fully executed, I have retained one original for Central File. Please contact me if there are any questions. Thank you. ~C;.~ Attachments cc: Central File S:ICCIWPIAFTER COMMISSIONIDepartmental Transmittalsl2008lBarb Conboy - R08-090doc