R09-166 , II , , I 1 RESOLUTION NO. R09- It>cP 2 3 A RESOLUTION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, AUTHORIZING EXECUTION OF 5 AMENDMENT NO.1 TO TASK ORDER NO. U04-08-10 6 IN AN AMOUNT NOT TO EXCEED $215,375.00 TO 7 GLOBAL TECH, INC., TO PROVIDE DESIGN BUILD 8 SERVICES TO EVALUATE AND REPLACE MEDIA IN 9 FILTER #1 AT THE EAST WATER TREATMENT 10 PLANT; AND PROVIDING AN EFFECTIVE DATE. 11 12 13 WHEREAS, Globaltech, Inc., has been working in a preliminary design report for 14 the East Water Treatment Plant to ascertain the requirements to bring the rated capacity of 15 the plant up to the levels required in the City's long term water supply plan; and 16 WHEREAS, the purpose of this amendment to task order is to remove the existing 17 filter media from Filter #1, examine the condition of the underdrains and make necessary 18 repairs before replacing the media; and 19 WHEREAS, the City Commission of the City of Boynton Beach upon 20 recommendation of staff, deems it to be in the best interest of the citizens of the City of 21 Boynton Beach to authorize execution of Amendment No. I to Task Order U04-08-10 in an 22 amount not to exceed $215,375.00 to Globaltech, Inc. 23 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 24 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 25 Section I. The foregoing "Whereas" clauses are hereby ratified and confirmed as 26 being true and correct and are hereby made a specific part of this Resolution upon adoption 27 hereof. 28 Section 2. The City Commission of the City of Boynton Beach, Florida does 29 ereby approve and authorize the City Manager to execute Amendment No. I to Task Order \Data\37\ltams\37\500\296\Reso_ -_Amendment_1 lo_Globaltech_ _ Task_Order_UD4-0e 10 doc II 1 U04-08-10 in an amount not to exceed $215,375.00 to Globaltech, Inc., to provide Design 2 Build services to evaluate and replace media in Filter #1 at the East Water Treatment Plant, a 3 copy of which is attached hereto as Exhibit "A". 4 Section 3. This Resolution shall become effective immediately upon passage. l\.ci.... 5 PASSED AND ADOPTED this.3 day of November, 2009. 6 7 8 ..- 9 10 11 12 13 14 15 16 17 18 ~ 19 20 21 22 Commissio 23 24 ATTEST: 25 26 .P~ 27 28 29 30 31 32 33 (C 34 IData\37\ltems\37\500\296\Reso _- _Amendment_ 1 ~ 10_ Globaltech_- _Task_Order _ UQ4-Q.B-10 doc VcCl- \00 Globaltech, Inc. Task Order No. U04-08-10 - Amendment 1 Preliminary Design Report To Increase the Capacity ofthe East Water Treatment Plant Design Build Services to Evaluate Filter and Replace Filter Media in Filter#l A. Background The City of Boynton Beach (CITY) will be making improvements to the East Water Treatment Plant (WTP) to increase its capacity. Currently, a Preliminary Design Report (PDR) is being prepared by Globaltech, Inc. to identify improvements to be made to increase the plant capacity. Filter tests conducted under the PDR project has identified that the west filter bank (Filters #1 through #4) are not currently able to perform to their original design capacity of 3 gpm per foot. The reason for the reduction in filter capacity is unknown at this point and will require additional investigation which is beyond the scope of the PDR. The reason for the reduced capacity could range from clogged underdrain or gravel, undersized underdrain, debris in filter, faulty hydraulics, or calcification of media which will require the media in the filter to be removed. In order to determine the reason for the lower capacity in Filters # I through #4, the filter media will need to be removed to check the condition of the gravel and underdrains. The CITY desires to inspect and rehabilitate Filter #1 to assess the general condition of Filters # I through #4. The filter media for Filter # I shall be removed and replaced and the filter shall be inspected. The media will be replaced as it is estimated to be 20 years old. Plant staff cannot recall the filter media ever being replaced or the underdrain inspected since the filters were modified in 1989. After Filter # I has been inspected and rehabilitated, it can then be tested to determine if it can operate at a higher capacity. This would indicate if the remaining filters could be operated at higher capacity if they were also rehabilitated. The CITY has requested that Globaltech, Inc (DESIGN-BUILDER) provide engineering and construction services to remove and replace the media (gravel, sand, and anthracite) in Filter # 1. In addition, the DESIGN-BUILDER will also inspect the condition of the existing gravel and underdrain in Filter #1. It is currently assumed that the underdrain orifices will be slightly plugged with calcium carbonate and are to be drilled out during the media replacement. However, if the underdrains are determined to be in worse condition, the existing underdrains could be replaced by the DESIGN-BUILDER with a similar style underdrain constructed of plastic if replacement is approved by the CITY as accessed through an allowance. The replacement underdrains shall be manufactured by Leopold, Roberts, or Tetra. This Amendment I to Task Order No. U04-08-1O provides authorization for Globaltech, Inc., to perform the requested evaluation and replacement services. The original Task Order was approved by the City Commission on December 10,2008. TASK ORDER No U04-0S-10 - Amendment I B. Scope of Services Task 1 - Filter Evaluation The filter inspection and evaluation shall consist of the following: . During filter media removal, the DESIGN-BUILDER shall visually inspect the condition of the media for calcification and debris that may reduce the capacity of the media. . After the filter media is removed, the DESIGN-BUILDER shall evaluate the condition of the underdrains to determine if the orifice hole size has been reduced. A series of short filter backwashes will be required to evaluate the underdrain without media. . The DESIGN-BUILDER shall probe the orifice holes for signs of debris. If the extremely small size of the orifice hole will allow a camera inserted, the DESIGN- BUILDER shall also televise the underdrain if possible. . With the assistance of the CITY and their pipeline camera, DESIGN-BUILDER shall remove the 16" x 10" tee connecting the backwash supply line to the underdrain channel of one filter section to inspect for accumulation of calcium or debris inside the channel. The second section will be assumed to be in a similar condition and its piping shall not be disassembled for televising. . After the media has been replaced, the CITY shall operate the rehabilitated filter at the original loading rate and at higher loading rates to be determined by the DESIGN- BUILDER. Data from the filter loading tests provided from the CITY shall be evaluated by the DESIGN-BUILDER. Observations collected from the evaluation of the underdrains will be presented to the CITY in a conditional assessment. The summary will make recommendations regarding repair or replacement of the filter underdrains and the cost associated with the proposed alternatives. CITY staff will then provide direction and authorization for DESIGN-BUILDER to move forward with the repair or replacement of the underdrains and provide a separate authorization to access all or a portion of the funding associated with the allowances included in the Section C - Assumptions. Task 2 - Media Replacement The DESIGN BUILDER shall provide the following services to remove and replace the filter media in the two sections of Filter #1. . Prepare specification for new filter media for CITY's review . Remove the existing gravel, sand, and anthracite by vacuuming the media out with a Vac Truck. Removed media will be transferred on site to the existing sludge storage area for ultimate disposal by the CITY. . Pressure wash the two filter sections. . Drill out the filter underdrain holes as required. 20f6 TASK ORDER No. U04.OS-10 -Amendment 1 . Furnish and install new replacement media in layers consistent with proper media installation techniques. . Disinfect filter media as required to place back in service. C. Assumptions In addition to the work items discussed above, the following assumptions were made in establishing the scope of work and associated fee. Changes and/or modifications in the above work items, or these assumptions, are considered an Additional Service Item under the terms of the contract. . Should the underdrain be damaged and need repair a $10,000 allowance has been set aside to be used as approved by the CITY. The existing clay underdrain is no longer manufactured; therefore, a repair may involve fabrication of new material to be used. . Should the underdrain be determined to be in need of replacement, an $88,200 allowance has been set aside to be used if needed as approved by the CITY. This allowance assumes $50,000 for underdrains, $10,000 for underdrain hardware and accessories, and a 2 week installation period from receiving the underdrains. . The DESIGN-BUILDER will provide an on-site sanitary facility for the duration of the project. . The DESIGN-BUILDER will coordinate deliveries and unload media with their equipment. . The CITY will televise the underdrain with the DESIGN-BUILDER assistance and provide video for the DESIGN-BUILDER to evaluate. . The CITY will provide operation staff to assist the draining/filling and backwashing of the filter with water as necessary for the removal and installation of media. . The CITY will provide lay down area for storage of media and equipment on the East WTP site as required for the work. . The CITY will operate equipment as necessary for the operational testing and gather test parameters as requested. . The CITY will provide for the ultimate disposal of the removed filter media. . The CITY will conduct bacteriological testing to determine when the filters are cleared for service after media has been replaced. . Project does not require bonding. 30f6 TASK ORDER No U04-08-IO Amendment I D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement for General Consulting and Engineering Services dated February 19, 2008 between the City of Boynton Beach and Globaltech, Inc. It will serve to amend Task Order U04-08-10 which was approved by the City of Boynton Beach on December 10, 2008. E. Additional Services The following are examples of some specific Additional Service Items that may be required, but are not included within this Task Order. Generally, a condition contrary to the work described in Section B or assumptions of Section C (upon which the fee is based) is considered an Additional Service Item. Examples include: . Filter underdrain repair - Allowance provided if required. . Filer underdrain replacement - Allowance provided if required. . Filter concrete wall repair. . Filter spray wash system repair or modification. . Rehabilitation of remaining filters These and other services can be provided, if desired by the CITY, under separate Task Order or by an amendment to this Task Order. Services performed will be on an as-directed basis in accordance with a written Notice to Proceed from the CITY. F. Compensation Compensation by the CITY to Globaltech for all tasks will be on a lump sum basis in accordance with the above-mentioned Agreement and as shown in the Table below. Individual task limits will not be exceeded without prior written authorization from the CITY. Work completed by Globaltech will be invoiced monthly on a percent complete basis. The compensation for the services described in this Task Order Amendment is $215,375.00 which includes a base amount of$1l7,175.00 to remove and replace the filter media for Filter 1 and provide an assessment of the underdrains, and an allowance of $10,000.00 for the repair of the underdrain or an $88,200.00 allowance for replacement of the underdrains for Filter 1, if necessary. $99,580.00 $215,375.00 $314,955.00 40f6 TASK ORDER No_ U04-08-10 -Amendment I ~ Underdram Senior Engineer 24 $130 $3,120 $100 $3,220 Evaluation Proiect Engineer 16 $85 $1,360 $100 $1,460 Preparation of Senior Engineer 24 $130 $3,120 $50 $3,170 Technical Proiect Engineer 4 $85 $340 $50 $390 Memorandum Administrative 2 $55 $110 $110 Filter Media Senior Engineer 16 $130 $2,080 $100 $2,180 Inspections Proiect Engineer 24 $85 $2,040 $100 $2,140 . ' . I,iiii,~~lil: l'-'M . Ta',k 1 - SUbtO~~~.~:~670 ,c.\; .. 'at Media Specification Senior Engineer 4 $130 $520 $520 Project Management, Senior Proiect Manager 20 $120 $2,400 $2,400 General Conditions. Proiect Engineer 10 $85 $850 $850 Scheduling, Mobilization, and Const. SuDer. NE08 50 $90 $4,500 $4,500 Demobilization Const. Worker NE05 20 $48 $960 $960 Const. Worker NE03 20 $34 $680 $680 Administrative 8 $55 $440 $440 Media Replacement, Senior Proiect Manager 20 $120 $2,400 $2,400 Pressure Wash Filter, Proiect Engineer 12 $85 $1,020 $1,020 Drill Underdrain Orifice Holes, Assist Const. SuDer. NE08 92 $90 $8,280 $8,280 with Televising Const. WorkerNE05 140 $48 $6,720 $6,720 Underdrain Channel Const. Worker NE04 140 $40 $5,600 $5,600 Const. Worker NE03 90 $34 $3,060 $3,060 Const. WorkerNE02 120 $26 $3,120 $3,120 Administrative 15 $55 $825 $825 Port-a-Iet (2-months) $390 $390 Combination (2-months) $3,800 $3,800 Vac Con Subcontractor $10,700 $10,700 Crane Subcontractor $9,500 $9,500 Filter Media $37,840 $37,840 Miscellaneous Tools/Consumables $500 $500 Fuel $400 $400 I,!,:i"~ If,i, 1~~U~$lii' I: " , ","",.,:;: ":.: k..iSl . Allowance I (Repair Clay Underdrain) $10,000 $10,000 ~1~.ePla~eUnderdr~~ for ~ilter I) "'~ 5 of6 TASK ORDER No. U04-08-10 Amendment I G. Schedule The CONSULTANT will commence work upon receipt of written authorization. The Table below shows the proposed schedule: Table 2: Schedule Table for Task Order No. U04-08-10 - Amendment 1 Media Replacement 16 Weeks from NTP Filter Evaluation 18 Weeks from NTP Allowance items if necessary will require an additional 2 to 4 weeks of time after materials are received on site for the work. DATED this day of ,2009. CITY OF BOYNTON BEACH GLOBAL TECH, INC. Kurt Bressner, City Manager ~.~ ;id Schuman, P.E., Secretary Attest! Authenticated: (Corporate Seal) City Clerk Approved as to Form: Attest! Authenticated Office of the City Attorney _~ ~~-ft~ Not<I!Y. 'l<\lS"(E 1&11 \ .........oal>oi<!'\1 ltIlI00061 , . co<" 011. ~ ~\\llllJlflll,j, S 61221'l \ · .v. a'J<l>l,e ~\f'<C' -;. g~ . ~ tlO'Bf'l ;....... ~ a" Ii' f\Q(\d.8 ....... 'i~~Of ~ ............. . In! ....... \.......... 60f6 CITY CLERK'S OFFICE MEMORANDUM TO: Barb Conboy Utilities Manager FROM: Janet M. Prainito, CMC City Clerk DATE: November 16, 2009 RE: R09-166 Globalteeh, Inc. Task Order #U04-08-10 Amendment 1 Preliminary Design Report to Increase the Capacity of the East Water Treatment Plant Attached for your information and use are two originals of the above mentioned Task Order. Since the documents have been fully executed, I have retained one original for Central File. Please contact me if there are any questions. Thank you. c!!r- 'm p~ Attachments (3) (Task Orders 2 and Resolution 1) cc: Central File SICCIWPIAFTER COMMISSION\Dapartmental Transmitlals\2009\Barb Conboy _ R09-166.doc