Loading...
R95-100RESOLUTION NO. R95-/~ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AMENDING RESOLUTION NO. R94-87 and R94-196, PROVIDING FOR AN INCREASE IN THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF BOYNTON BEACH AND ROSSI AND MALAVASI FOR ADDITIONAL ENGINEERING SERVICES FOR THE DESIGN OF MINER ROAD FROM LAWRENCE ROAD EAST TO CONGRESS AVENUE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on May 17, 1994, the City Commission approved by Resolution No. R94-87, the execution of a Contract with Rossi and Malavasi, Engineers, Inc., for engineering services for Miner Road; and WHEREAS, on November 15, 1994, the City Commission approved ResolUtion No. R94-196, which provided for the expansion of the scope of engineering services; and WHEREAS, Palm Beach County has requested that additional engineering services be provided for the design of Miner Road from Lawrence Road east to Congress Avenue, at an additional negotiated cost of $10,550.00; and WHEREAS, it has been determined by the city Commission to be in the best interests of the City to expand the scope of services for that project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: ~ The City Cormmission of the City of Boynton Beach, Florida does hereby amend Resolution No. R94-87, and R94- 196 to encompass the expanded scope of services, attached hereto as Exhibit "A" ~-~ That this Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ~¢~ day of July, 1995. ATTEST: Cit~ Clerk CITY OF BOYNTON BEACH, FLORIDA Vice Mayor /) Commi ~ioner (Corporate Seal) Authsig.doc 6/29/95 ~inerRd. ROSSI AND MALAVASI ~I~GINEG~S, INC. CONSULllN~ ENGINEERS THE BARRISTERS BUILDING 1818 FORUM PLACE, SUITE WEST PALM BEACH, FL ~ FAX February 6, 1995 Carried Parker, City Manager City of Boynton Beach P.O. Box 310 Boynton Beach, Fl. 33425-0310 Re: Miner Road, Congress Avenue to Lawrence Road Additional Professional Services Dear Miss Parker: As requested by Palm Beach County the following is our proposal to provide additional engineering services for the above referenced project. The additional design services are beyond our contracts with the City of Boynton Beach for this project. As discussed in our meeting on December 14, 1994 with Mr. Javier Lopez, the current contracts with the City of Boynton Beach do not include the full extent of a set of construction drawings as listed in the "Palm Beach County Thoroughfare Road Design Procedures" Manual, nor does it include the requirements of Lake Worth Drainage District for reshaping of the L-20 Canal, design of a new drainage system for the section of road from Congress Avenue west to the existing pavement terminus and the new ERM clearing permit application. The existing roadway section, just west of Congress Avenue, consists of approximately 1,800.00 L.F. of two lanes of an ultimate six lane roadway, which have been constructed along with a temporary drainage system. This section has an approved 24' C.AI.P. outfail culvert into the L.W.D.D. L-20 Canal with a sluice gate for emergency situations. Water quality and quantity demands for this section are currently being met at the undeveloped section of the road right of way. The drainage system for the above referenced existing roadWay section, previously designed by "Want~nan and Associates, Inc.', did not include drainage for the ultimate roadway section. ' The owner of the remaining undeveloped section of the "Melear P.U.D.' project has dedicated 1.00 AC. of land for drainage accommodation of the proposed Miner Road project. Preliminary drainage computations by our office conclude that the proposed 1.00 AC. site can address the drainage demands of the remaining portion ~.,of Miner Road, for which drainage has not been provided. As you can see in the attached copies of the previous proposals to the City of Boynton Beach, none of the additional design, services were included in it. ROSSI AND MALAVASi ENGINEERS, INC. SCOPE OF WORK This project consist of providing additional engineering services for the design of Miner Road, from Lawrence Road east to Congress Avenue, a total of approximately '5,250 L.F. The additional design will consist of the following: 1. Design of a drainage system for the last 1,800.00 L.F. of roadway, west of Congress Avenue. Design of required improvements for the L.W.D.D. L-20 Canal. Additional Palm Beach County design requirements that are not included in the attached proposals-. 4. Permit applications. Description Design of drainage system for last section of road Man Hrs. e a. Drainage computations 24 b. Updating Drainage Area Map 8 c. Updating Plan and Profile sheets 12 d. Updating Summary of QUantities sheet 8 e. Updating Summary of Drainage Structures sheet 8 f. New Drainage Structures sheets 24 g. Updatin!~ Cost Estimate 8 Design of L-20 Canal improvements a. Updating Cross Section sheets 54 b. Updating Plan and Profile sheets 15 c. Ululating Details sheet 2 d. Updating Quantities 2 Additional items a. Summary of Quantities sheet 16 b. Summary of Drainage Structure sheet 8 c. Drainage Structure sheets 40 d. Summary of Pavement Marking sheet 20 Total 249 Total this Proposal 2~.00~.~ ................... · 249 Hrs. x $49.00 = $ I ROSSI AND MALAVASI F.,NGINKERS, INC. I would like to thank you for the opportunity to provide you with this proposal. Should you have any questions please do not hesitate to call our office. ' Very Truly yours, ROSSI & MALAVASI ENGINEERS, INC. Santiago Malavasi, P.E. c.c. Mr. Javier Lopez, Program Manager, Palm Beach County Roadway Production ROSSI AND MALAVA$1 ENGINEERS, INC. CONSULTINQ ENQINEE.q8 Carrie Parker, City Manager City of Boynton Beach P.O. Box 310 Boynton Beach, FI. 33425-0310 Re: Miner Road, Congress Avenue to Lawrence Road Additional Professional Services Dear Miss Parker: THE BARRISTER8 BUILDING le15 FORUM PLACE, SUITE ~ WE81' PALM BEACH, FL 3340 FAX 4OT~ee.~4e June 12, 1995 This letter is to clarify the proposals, contracts, resolutions, etc. for professional services for the above referenced project. First, our original proposal to the City of Boynton Beach, dated March 28, 1994 in the amount of $ 39,545.00 for the design of Miner Road from Lawrence Road to the entrance of Chalet IV development was accepted by the City of Boynton. Second, our proposal for the additional professional services dated November 4, 1994 in the amount of $ 7,400.00 was also accepted by the City of Boynton. These two proposals gave a total contract amount of $ 46, 945.00 approved by the City under Resolutions # R-94-87 and R-94-196. Palm Beach County then requested a proposal to extend the design approximately 1,800 L.F. to Congress Avenue. Which is the referenced proposal dated February 6, 1995. After negotiations with Palm Beach County, the total Lump Sum Fee agreed upon was $ 57,495.00, an additional amount of $ 10,5~0.00 to be added to the original contract amount of $ 46, 945.00. Attached, please find copies of all the referenced correspondence for your review. Your review and approval of the additional amount at your earliest convenience, will be greatly appreciated. I trust this letter will answer any questions you may have concerning this matter, if not please do not hesitate to call. Very truly yours, Santiago Malavasi, P.E. R-ECEI ED JUN CiTY MANAG;R,S