Loading...
R01-178 RESOLUTION NO. R01- I '/8 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE TASK ORDER NO. 01-04 BETWEEN THE CITY OF BOYNTON BEACH AND METCALF & EDDY FOR A FEASIBILITY STUDY FOR UPGRADING WATER MAINS/SERVICES IN AN UNINCORPORATED AREA ADJACENT TO OCEAN RIDGE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Utility Department provides water services to an unincorporated area east of North Ocean Blvd., near Ocean Ridge, and the existing water mains are small diameter, galvanized, and nearing the end of their useful life; and WHEREAS, this Task Order authorizes an evaluation of the fights-of-way, requirements, cost, and fire flow needs for this area; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does authorize and direct the Mayor and City Clerk to approve and execute Task Order No. d-04 with Metcalf & Eddy for a feasibility study for upgrading water mains/services in an ,orated area adjacent to Ocean Ridge, which Task Order is attached hereto and made a part hereof. Section 2. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this I day of May, 2001. Vice Mayor )Y~T~N ~ACH, FLORA Commissioner ATTEST: II Commissioner TASK ORDER #01-04 -1"/8 April 5, 2001 FEE PROPOSAL AND SCOPE OF SERVICES CITY OF BOYNTON BEACH FEASIBILITY STUDY FOR UPGRADING WATER SERVICES IN U~'NINCORPORATED AREA ADJACENT TO OCEAN RIDGE Background It is the general intent of this scope of services to evaluate the feasibility of upgrading water services to an area east of North Ocean Boulevard near what is known as the Ocean Ridge area. This area is an unincorporated area of Palm Beach County that currently obtains water service from the City of Boynton Beach. The City would like to evaluate the feasibility of upgrading water services within this area so as to replace water lines that are nearing their useful life. This area is bounded by · Briny Breezes Boulevard on the north · Gulfstream Park on the south · North Ocean Boulevard on the west Hence, this fee proposal and scope of work address the work effort required to develop and quantify needed improvements for the water system, and to determine the associated costs for this proposed upgrading. SCOPE OF SERVICES 1.0 2.0 Project Management Management Project :.Management activities comprise contract administration. c°ordination Of project staff, monitoring of progress and project costs. 1.2 Owner Liaison M&E will attend up to four (4) meetings with representatives of the City for this project. Feasibility Evaluation 2.1 Data Collection and Field Investigation M&E will perform the folloWing activities: a. Data Collection and Review of Existing Documents: · Obtain available local geologic information; soil borings, groundwater levels, if available. · record drawings of buried and overhead utilities · property and easement records · existing plat maps · existing zoning maps · existing topographic maps · required fire flow requirements for area · transmission system pressure readings over last 2 years b. Field Investigation · Confirm record information in field · Investigate area and obtain photographs of typical rights-of-way 2.2 Feasibility Report M&E will prepare a feasibility report, which will consist of the following elements: go Assessment of Available rights-of-way M&E will obtain existing records and from these records assess what rights-of-way (ROW) are available within the study area, and ascertain if new easements are needed to locate new water services. Work effort assumes that ROW information (or plat information) is readily available. If this is not the case, M&E will advise the City as to what options there are available to acquire or develop this information. b. Discussion of required water system design criteria M&E will provide a brief description of required water system design criteria. This wilt be provided in tabular format. This will include: · Fire flow requirements · Minimum residual water pressure c. Regulator. requirements M&E will provide a brief discussion on regulatory requirements for proposed improvements. A summary matrix will be provided to depict required agency permitting and interface for the project. d. Estimate of Required water system improvements. M&E will develop estimates of required new water service improvements for the study area. This will include new water mains, water meters, instrumentation, and any recommended valves/control devices. e. Cost estimates of water system improvements. M&E will develop cost estimates of proposed water system improvements. These cost estimates will be planning level estimates (+ 20 percent) that the City can use to assess the requirements to go forward with proposed improvements, f. Schedule. M&E will provide a proposed schedule for the recommended improvements. PROJECT SCHEDULE Schedule Notice to Proceed Task 1 - Project Management Task 2 Feasibility Evaluation Data Collection Feasibility Report City Review Finalization of report Time Elapsed 0 weeks Continuous 4 weeks 10 weeks (Draft) 4 weeks 4 weeks COMPENSATION M&E .proposes to perform the above tasks fora lump sum amount of $28.564. Fee estimates are attached in the ensuing table. A breakdown of staff hours for each task is included in Attachment A. The cost estimate,is summarized below. Personnel HourlY Rate Hours-Task 1 HoUrs-Task 2 Hours Total Total $$ Administrative Assistant , ' $47,00 :~ : 4 0 4 $188.00 clerical $37.00 4' 34 38 $1,40600 cADD TeCh ' $61 .;00 ; i0 30 30i $1,830.00 Sr. Engineer ' $80.00 :: 28 80 108 $8,640.00 Sr, Project Manager $131.:00 ~ '' 42 ' 44 86i $11,266.00 : i6 i5 Project Director $154.:00 21' $3,234.00 )~p~ :. [ :,,' ---'~ -- $2,000.00 TOTALS $28:,564.00 APPROVED BY ~Iy~Y OF BOYNT.~. ~A "~i ~ ~roenin~ Mayo-~'~ Date: ~-'-- q Approved as to Form: SUBMITTED BY City Attorney y~-'"'~---~ ' M~~//ddy, Inc.~ 'Roberto S. CJrtiz, ice Prest'dent Date: ATTACHMENT A ENGINEERING FEE ESTIMATE