Loading...
R12-090 1 RESOLUTION NO. R12 -090 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, RATIFYING THE ACTION TAKEN BY THE SOUTH 5 CENTRAL REGIONAL WASTEWATER TREATMENT AND 6 DISPOSAL BOARD, ON AUGUST 16, 2012, AS STATED 7 HEREIN; AUTHORIZING AND DIRECTING THE INTERIM 8 CITY MANAGER AND CITY CLERK TO EXECUTE SAID 9 RATIFICATIONS; AND PROVIDING AN EFFECTIVE DATE. 10 11 WHEREAS, The South Central Regional Wastewater Treatment & Disposal Board 12 (SCRWTDB) requests ratification of the action taken by the Board at the Quarterly Meeting of 13 August 16, 2012, as set forth in the attached Exhibit "A ". 14 15 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE 16 CITY OF BOYNTON BEACH, FLORIDA THAT: 17 18 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 19 being true and correct and are hereby made a specific part of this Resolution upon adoption. 20 21 Section 2. The City Commission does hereby ratify the action taken by the South 22 Central Regional Wastewater Treatment & Disposal Board on August 16, 2012, as set forth on the 23 attached Exhibit "A" and authorizes the Interim City Manager and City Clerk to execute said 24 Ratifications. 25 26 Section 3. This Resolution shall take effect immediately upon passage. 27 28 PASSED AND ADOPTED this 4 day of September, 2012. 29 30 CITY OF BOYNTON BEACH, 31 FLORIDA 32 , / 33 , - %frlz,L/LLige 34 May • , I oo • r ',,_,, ii 35/ 'i. 37 vice Mayor —Mack McCray 38 39 40 Co - r • 41 ATTEST: 42 '-+- 43 • :• iss n Steven Holzma 44 — P 1 46 mid MC Commissioner- Marlene Ross 47 , ' er ..r r 48 `; m Ya x ` i" , 49 (I • oraSeal) d Doc ''':1 Win , I V xplorer 1I 441,51EWATER rit4, CC 0 ' o o go y , 1 %s 6 � d o 0 RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF AUGUST 16, 2012 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on AUGUST 16, 2012, by a vote of 7 -0,• TO ACCEPT THE 2012/2013 WASTEWATER AND RECLAIM O &M BUDGETS. WHEREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach. NOW, THEREFORE, the City of Boynton Beach hereby ratifies said Board action independently. The above action is hereby ratified in open session by the City of Boynton Beach this �{ day of S , , by a - D vote. CITY OF BOYNTON BEACH B i / — Aoo► G`T`y QA, Mayor /City Man- • - Attest: wc.L m City Jerk 0 e T Approved as to l.lkv City Attorney F IdocsIBOARD MEETI NGSIRATIFICATIONSI2011- 20121Boynton Beach Ratification 08 -16 -2012 docx AGENDA ITEM J3a South Central Regional Wastewater Treatment & Disposal Board Executive Summary F/Y 2012 -2013 WASTEWATER BUDGET The Operations and Maintenance (O &M) budget for 2012/2013 is $5,762,002 which is $2,573 lower than last year's budget. The flat rate /decrease in the budget over the past few years has been a direct result of Board staff reviewing all process control related activities to increase plant efficiency while maintaining and decreasing the cost to the Board where possible In addition, lower influent flows have caused a decrease in revenue that has made it increasingly difficult to keep the user rate flat to the Cities of Boynton Beach and Delray Beach While attempting to be sensitive to the financial situation that both cities are currently experiencing, it would be difficult to assume the Board will be able to continue to absorb cost increases while not passing them onto the cities We are requesting a rate of $1.1806 for O &M and R &R Reserves ($.0005 below the rate of 2011/2012). A review of the past five fiscal years shows a reduction to the budget of $355,656 and the user rate has been lowered 1.4% (2008/2009 approved rate was $1.19717/1000 gallons) APPROVED BUDGET $6,00,00.00 56,Z ,0OO 00 $6,000400.00 $00,0.00 $5100000400 c sP ,se A five year look at the major line items related to the O &M Budget (over $500,000) is provided below Wages: Line Item No. 1212 Note: Budgeted wages 1990/1991 were $925,000. EPA minimal recommended staffing level in 1979 was 21 full -time employees (28 optimal). Currently we have 21 full -time employees. owes $0.4000.00 si**0000 • r $' o ,,„ i = i °rs $ } „ , t 1 \!!. t . �/ South Central Regional Wastewater Treatment & Disposal Board Pelletization Fees: Line Item No. 3409 PELLETIZATION FEES $1,200,000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 — PELLETIZATION FEES $200,000.00 $- t iS 6 04 NI* Ay, act 4) iv iv ios' 44. 4* Note: Full time startup occurred August 2009. The tipping fee has steadily increased. The total annual cost has remained fairly consistent due to the lower influent flows. We are producing a lower amount of biosolids. Electricity: Line Item No. 4300 $34004006 • $ 00 $400*,.00 $200,000.00 ,0 0 s. 1 Note: Reduction achieved through a review of all plant equipment and utilizing automation where possible. A conscientious effort to utilize equipment during non peak FPL hours has resulted in lower energy cost. South Central Regional Wastewater Treatment & Disposal Board Injection Well Process: Line Item No. 4304 f lftRtCTIOttWELL PROCESS $64000.00 ss20:40.00 5 .00 -- - INJECTION WELL $!s «00 itlESs Note: Full time startup occurred in April 2009 /Outfall closed. Dry conditions have caused a drop in usage. Chemicals: Line Item No. 5210 21 C r $yA q l F vu ....arreNEMICALS e ° .40 ao- 1, i Note: Slight reduction in chemical cost and automation of plant equipment South Central Regional Wastewater Treatment & Disposal Board O &M SUMMARY In 2008/2009 the Board completed two environmental friendly capital projects, the Pelletization Facility and Deep Injection Well. The positive environmental impact of these projects is that we no longer dispose of our effluent to the ocean and the ocean outfall has been closed; and our biosolids are no longer land- applied but recycled into Class AA biosolid pellets and sold to local fertilizer companies to be distributed commercially Due to these projects the public image of the Board is now one of a leader in environmental stewardship. The Board has implemented these changes well ahead of other utilities As with most environmentally friendly projects there is a cost that has to be incurred. These two line items now account for approximately $1.5 million of the O &M budget. In 2007/2008 the Board's approved O &M budget was $5.207 million. Our requested budget this year is set at $5.762 million approximately $550,000 over the 2007/2008 budget year This indicates the Board has absorbed the operating costs of these two projects with only one third of the increase being funded by the O &M user rate The other two thirds of the cost increase were absorbed through difficult budget cuts. We are currently estimating that this current budget year 2011/2012 will have excess revenues over expenditures of approximately $400,000 to $500,000. Over the past five years the Board has returned approximately $3,000,000 in excess revenue over expenditures to The Cities of Boynton Beach and Delray Beach. Board employees are scheduled to receive a merit increase of 4% in this upcoming fiscal year. The employees have not received an increase to their salaries in two of the past three budget years By Board rules, employees are eligible for a merit increase of up to 6% annually RECLAIM USER RATE /BUDGET The Reclaim O &M budget for 2012/2013 $1,118,585 Our User Rate for wholesale reclaim will remain at $0 18643/1,000 This rate is for Delray Beach and Boynton Beach. The revenue generated from the five original golf course participants in the Board reclaim program remains at $0 20/1000 gal. This is due to a cost formula outlined in their original contract agreements with the Board that stipulates their rate cannot drop below that threshold WASTEWATER RESERVE FOR REPAIR AND REPLACEMENT It is estimated as of 06/30/2012 we will have $2,785,483 in the Wastewater Reserve Account for Repair & Replacement, of that approximately $1,755,204 is un- committed We anticipate committed expenditures of $ 1,500,000± of this year's budget for various projects including the replacement of the "B" plant clarifier mechanisms and other miscellaneous plant and reclaim equipment repairs The rate for Repair & Replacement of $0.1940/1,000 gallons will generate $1,132,960 at minimum flow We have not included the deep injection well and reclaim expansion, as the mechanical parts are starting on their third year after a one -year warranty These facilities will have to be factored in upcoming budgets POTENTIAL CAPITAL PROJECTS None are planned at this time AGENDA ITEM J3b South Central Regional Wastewater Treatment & Disposal Board Salient Budget Changes 2012/2013 Projected Budget Increase) 2011/2012 Budget 2011 /2012 2012/2013 (decrease) (PERSONNEL SERVICES - TOTAL 1 $ 1,528,700 $ 1,532,342 1 $ 1,564,990 $ 32,648 1212 Regular Wages $ 978,000 $ 967,532 $ 961,190 $ (6,342) 4% Increase for Board Employees /Increased % to Reclaim Wages. 12121 -1224 Sick /Overtime $ 99,000 $ 99,000 $ 116,000 $ 17,000 Adjusted to account for Maintenance and Lab Overtime Increases. 1221 Social Security /FICA $ 96,000 $ 97,110 $ 105,000 $ 7,890 Adjusted due to wage increase. 1223 Health Insurance $ 155,000 $ 160,000 $ 169,000 $ 9,000 Adjusted Due To City of Boynton Beach estimated 15% increase. 1224 Workers Compensation Ins $ 33,000 $ 40,000 $ 37,000 $ (3,000) Estimated decrease per insurer (Zenith) based on past claims. (SERVICES - TOTAL ( $ 1,503,200 ` $ 1,542,000 1 $ 1,486,000 I $ (56,000)1 3110 Legal $ 30,000 $ 40,000 $ 40,000 $ - No Adjustment. 3120 Services (Gen & Admin) $ 17,500 $ 22,500 $ 22,500 $ - No Adjustment. 3409 Pelletization Fees - SWA $ 948,000 $ 950,000 $ 925,000 $ (25,000) Adjusted Slightly downward to represent actual Sludge Production and Potential Rate Decrease in end of Year Reconciliation. 3410 Sludge Hauling $ 211,000 $ 245,000 $ 195,000 $ (50,000) Contract with H &H Sludge Hauling reduced due to bidding. 3411 Grit Hauling $ 157,000 $ 143,000 $ 160,000 $ 17,000 Adjusted upward due to increase in Cities of Delray Bch & Boynton Bch Lift stations and Street Sweepings. Plant screenings also. 3412 Trash Removal $ 3,000 $ 3,000 $ 3,000 $ - No adjustment. 3500 Services (Maintenance Serv) $ 60,000 $ 61,500 $ 63,500 $ 2,000 Increase due to number of cuts for lawn service. OPERATIONS /MAINTENANCE - TOTAL I $ 1,919,000 I $ 1,938,733 1 $ 1,881,512 1 $ (57,221)1 40000 Vehicle /Machinery Fuel $ 16,000 $ 13,000 $ 21,500 $ 8,500 Fluctuation in gas prices, travel to drop off & pick up parts /equipment. 4100 Telephone, IT $ 16,000 $ 15,000 $ 14,000 $ (1,000) Land lines, mobile control Outfall Valve, restricted WIFI, Internet, etc. 4300 Electricity $ 850,000 $ 900,000 $ 850,000 $ (50,000) Usage based on twenty -four month historical, control of process to save energy, FPL does not anticipate significant rate increase. 4303 Injection Well Process $ 691,000 $ 612,423 $ 583,602 $ (28,821) Retail users higher rate including 4 storage charges reflected in Reclaim. 4630 M & R Grounds $ 7,500 $ 5,000 $ 10,000 $ 5,000 Page 1 AGENDA ITEM J3b Increased contracted number of cuts for lawn + additional ground care. 4902 License & Permits $ 17,000 $ 15,300 $ 16,400 $ 1,100 Operators license renewals. Additional permits for Lab certification. 5400 Membership Dues & Subscriptions $ 9,500 $ 7,000 $ 10,000 $ 3,000 FWEA monitoring of legislative changes has increased dues. 5410 Technical Training $ 12,500 $ 12,000 $ 15,000 $ 3,000 Operators CEU's for license renewals. Required regulatory training. !CHEMICAL/SUPPLIES -TOTAL 1 $ 682,700 I $ 696,500 I $ 699,500 I $ 3,000 CHEMICALS $ 606,500 $ 624,000 $ 619,000 $ (5,000) Continued automation and monitoring of Plant equipment allowing better control of Chemical usage. SUPPLIES - Operating, Maint & Lab $ 29,200 $ 23,500 $ 30,000 $ 6,500 FL State contract for Lab supplies 30% increase 5220 Oil & Lubricants $ 7,000 $ 5,000 $ 7,500 $ 2,500 Synthetic oil requried for new equipment. OPERATING ASSETS I $19,217 I $5,000 , $ 20,000 I $ 15,000 I As required for Plant Operations /Maintenance. (ENGINEERING I 65,000 I $ 50,000 I $ 110,000 I $ 60,000 I Deep Well study required by FL DEP. CONTINGENCY /INTEREST FEES 4,000 - - $ - Do not budget for. I TOTAL BUDGET =I $5,721,817 I $5,764,575 I $5,762,002 I ($2,573)I Page 2 South Central Regional Wastewater Treatment & Disposal Board 4 FY 2012/2013 OPERATING BUDGETS OPERATIONS AND MAINTENANCE REPAIR AND REPLACEMENT RECLAIM Prepared for the Board by Dennis L. Coates, Executive Director 1801 N. Congress Avenue Delray Beach, Florida 33445 561- 272 -7061 AGENDA ITEM Jac SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD RECLAIM WATER OPERATIONS & MAINTENANCE BUDGET F/Y 2012 -2013 ACCOUNT NO. DESCRIPTION 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 ACTUAL ACTUAL PROJECTED BUDGET BUDGET R 1212 REGULAR WAGES $119,372 $158,316 $170,000 $170,000 $240,000 R 31101 LEGAL 0 0 0 2,000 2,000 R 31502 ENGINEERING 0 0 0 50,000 10,000 R 32001 AUDIT 8,000 5,000 5,000 5,000 5,000 R 3402 TESTING 50,694 34,623 40,000 57,285 92,285 R 3406 METER CALIBRATION 2,145 2,213 3,000 3,000 3,000 R 4630 SERVICES (LAWN MAINT) 7,474 6,953 7,500 7,000 10,000 R 43000 FUEL FOR VEHICLES 998 1,000 1,000 1,000 1,000 R 4300 ELECTRICITY 430,799 384,219 442,000 500,000 425,000 R 45001 INSURANCE 32,000 32,000 32,000 32,000 32,000 R 46014 M & R EQUIPMENT 6,724 10,681 8,000 8,000 8,000 R 4640 M & R BUILDING 631 1,132 1,700 1,000 1,000 R 4902 LICENSES & PERMITS 0 0 0 0 0 R 5204 SUPPLIES LAB 1,207 1,346 10,000 10,000 17,000 R 52103 CHEMICALS 204,184 242,677 260,000 272,300 272,300 TOTAL BUDGET: $864,228 $880,160 $980,200 $1,118,585 $1,118,585 acct detad ty 2012 -2013 agenda Page 1 of 1 7/7/2012 10 19 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD RECLAIM WATER OPERATIONS & MAINTENANCE BUDGET F/Y 2012 -2013 ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET R 1212 REGULAR WAGES Reclaim charged (20 %) $240,000 work related to reclaim R 31101 LEGAL Attorney fees associated with 2,000 reclaim R 31502 ENGINEERING Engineering fees associated 10,000 with reclaim R 32001 AUDIT Audit fees for reclaim 5,000 R 3402 TESTING Costs associated for lab fee 92,285 ($35k MIT Deepwell Testing Permit Required) R 3406 METER CALIBRATION Calibration of transmitters, 3,000 totallizers, recorders as required R 4630 SERVICES - Ground Cost incurred for maintenance 10,000 of grounds associated with reclaim R 40003 FUEL FOR VEHICLES Fuel for monitoring of reclaim 1,000 & Golf Course service /meter reading R 4300 ELECTRICITY 5,700,000 kwh * .075 /kwh 425,000 (kwh $.075 avg) R 45001 INSURANCE Property liability package for 32,000 reclaim covered under plant policy R 46014 M & R EQUIPMENT Annual repair items for reclaim 8,000 pumps & equipment in -plant R 4640 M & R BUILDINGS Cost incurred for repair of reclaim 1,000 buildings R 4902 LICENSE & PERMITS Cost for State & local reclaim 0 permits R 5204 LAB SUPPLIES Lab supplies consumed for 17,000 testing required by FLDEP & NELAC Specific for Reclaim R 52103 CHEMICALS Sodium Hypochlorite - 272,300 est salt 1,050 tons @ $106 per ton 111,300 est $36,000 water for production 36,000 est electric for production 1,650,000kw 125,000 TOTAL BUDGET: $1,118,585 (16.5 mgd est) approx. 6000 mg annual = rate 0 18643 Prior F/Y 2011 -2012 0.18643 6000 MGY 0 acct detail fy 2012 -2013 agenda Page 1 of 1 7/7/201210 19 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 PERSONNEL ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 1212 REGULAR WAGES Base wages - 21 Regular Employees, 1 part-time 1,201,190 4 Administrative Reclaim (240,000) 3 Lab & pretreatment Wastewater $961,190 9 Operators(including Chief) + Holiday reg 5 Matntenance(including Chief) 1 Part-time $240,000 for Reclaim (20% man hours) 12121 SICK PAY REDUCTION Employees 96 hours sick pay 30,000 12122 VACA PAY REDUCTION Vacation up to 80 hours 25,000 1214 OVERTIME Shift coverage as required for plant operations Employees working over 40 hours per week (excluding sick hours) are paid at time and a half 12141 Hurricane Watch 3,000 12142 Maintenance 5,000 12143 Shift 1 Coverage 12,000 12144 Shift 2 Coverage 6,000 12145 Shift 3 Coverage 12,000 12146 Training 1,000 12148 Holiday Coverage 18,000 12149 Lab /Pretreatment 3,000 12150 Special Projects 1,000 61,000 12151 EMPLOYEE ASSISTANCE Board cost $2 75 per employee per 1,000 PROGRAM month Provides family counseling and referral services to employees and their families Legal and financial consulting 1221 SOCIAL SECURITY/ Employer's estimated cost 7 65% 105,000 MEDICARE Social Security - 6 2% Medicare - 1 45% 1223 CIGNA Board cost per employee [21] is estimated @ 169,000 HEALTH INSURANCE $667 00 monthly (@ 15% inc est) + $40 @ emp /mth to BB 12231 DENTAL INSURANCE Board cost per employee [21] est @ $38 00 monthly 9,000 F \docs\Budget\fy201 2- 2 01 31acct detail ty 2012 -2013 agenda Page 1 of 9 7/7/2012 9 02 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD FIY 2012 -2013 PERSONNEL (cont.l ACCT. NO. DESCRIPTION BUDGET 12232 DISABILITY INSURANCE Long term disability insurance provided 6,000 by the Board at approximately on 40 hour base pay per employee 12233 LIFE INSURANCE Board provides term life insurance 1,200 12234 VISION CARE Employee vision plan $6 @ emp mthly 1,600 1224 WORKERS' COMPENSATION Cost per employee based on a 40 hour 37,000 base pay and claims rating -1+ annual audit 1225 UNEMPLOYMENT Paid on a reimbursable basis according 2,000 to claims received 1236 PENSION Defined Board contribution based on 40 125,000 hours base pay for participants plus administrative fees 1237 DEF COMP SUPPLEMENT Deferred comp 30,000 1240 PAYROLL CONTINGENCY 1,000 TOTAL PERSONNEL $1,564,990 F \dots \Budget\fy2012- 20131acct detail fy 2012 -2013 agenda Page 2 of 9 7/7/2012 9 02 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 SERVICES ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 3100 MEDICAL SERVICES Employee physicals, drug screens & immunizations $1,500 3110 LEGAL SERVICES Attorney fees 31101 Admin - Saberson $35,000 31103 Pension - Gray Robinson 5,000 40,000 3120 SERVICES 31201 Accounting & Bookkeeping 1,000 General & Administrative 31202 Computer Consultant & S/W Lic renewals 11,000 31205 Insurance Review 7,500 31206 Copier Maint Contract 2,000 31207 Appraisal Fee (done 2010) 0 31208 Others 1,000 22,500 3200 AUDIT FEES 32001 Annual Audit - GASB & Standards 32,500 (total $37,500 - Reclaim = $5,000) 3300 LAB PERMIT TESTING Outside Lab Testing Services 35,000 3406 METER CALIBRATION Calibration of transmitters, totalizers, 8,000 FLORIDA SERVICE recorders, and flowmeter pump as required 3409 SLUDGE PELLETIZATION 18,500 Wet ton per year * est $50 00 925,000 Any additional related costs 3410 SLUDGE HAULING Haul to SWA Pelletization 18,500 tons * $10 00 195,000 transportation re -route when required 3411 GRIT HAULING 85 trips @ $1,477, 27 trips @ $1,272 160,000 3412 TRASH AND HAULING Tipping fee for trash hauling Regular trash container 3,000 3500 SERVICES 35001 Centrifuge 10,000 Operations, Maintenance & 35002 Air Scrubbers Balancing - vibration testing 2,000 Professional 35003 Generators [3 units] 10,000 35004 Lawn Maintenance 14,000 35005 Admin Building Cleaning 6,000 35006 Lab Equipment - Calibration 2,000 35007 Sodium Generators 2,500 35008 Other 1,000 35009 Water Softener 1,000 35011 Lab Compliance Consultant 15,000 63,500 TOTAL SERVICES $1,486,000 F \dots \Budgei\ty2012- 2013\acct detail ty 2012 -2013 agenda Page 3 Of 9 7!712012 902 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 OPERATING EXPENSES: SERVICES; MAINTENANCE; CHEMICALS & SUPPLIES OPERATIONS /MAINTENANCE ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 4000 VEHICLE EXPENSE Mileage reimbursement @ $0 555 /mile (FED rate), Fuel for company vehicles golf carts, and gas powered equipment (Due to the fluctuating cost of fuel, we are estimating fuel) 40002 Mileage Reimbursement 500 40003 Fuel for Vehicles /Equip 5,250 gal $4 00 21,000 $21,500 4020 BOARD CONTINGENCY Public relations, good will tours, floral arrangements or fruit baskets, cards for illnesses or funerals, and miscellaneous business expenses 40201 Board Expense. Appreciation 1,000 40202 Board Expense* Meals 2,000 40204 Board Expense Travel, Lodging 1,000 4,000 4100 TELEPHONE EXPENSE Monthly base fees and long- distance usage 14,000 including Fax,cellular phones and E- mail /Internet/website 4102 POSTAGE U S Mail - Rate $ 45 first class /Equipment lease 3,000 4300 ELECTRICITY 11,300,000 kw* 075 /kw 850,000 Plant avg 16 0 mgd 4302 WATER CONSUMPTION Consumption of plant avg $4,000 @ mth * 25% 12,000 ( 75 est for reclaim portion = $36,000) 4304 INJECTION WELL PROCESS Anticipate 8.6 mg @ day @ $0 18643/1000 = 3,130 mgy 583,602 4303 IRR /PROCESS REUSE WATER Irrigation water cost 2 m gal /day @ $ 18643/1000 13,000 4400 EQUIPMENT RENTAL Cranes, various equipment, and instru- 2,000 ments as required in maintenance and operations 4500 INSURANCE EXPENSE 45001 General Professional Liability 55,000 45003 Employment Practices 1,600 45004 Fiduciary 2,000 45006 Petroleum Storage Tank 2,100 45007 Pollution Liability (3 yr policy 2009 - 2012) 14,210 45008 Commercial Property 184,000 45011 Employee Dishonesty 6,100 265,010 F \docs\Budget\fy2012- 2013\acct detail fy 2012 -2013 agenda Page 4 of 9 7/7/2012 9 02 AM AGENDA ITEM 13c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 OPERATIONS/MAINTENANCE ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 4600 M & R EQUIPMENT Annual repair items for pumps and plant equipment 46001 Influent Building 1,000 46002 Aerators 1,000 46003 Blower Building 3,000 46004 Scrubbers 2,000 46005 Clarifier 1,000 46006 Return Budding 1,000 46007 Solids Handling Budding 4,000 46008 Hypochlorite 2,000 46009 EQ Budding 1,000 46010 Effluent Building 1,000 46011 Shop Building 1,000 46012 Office Budding 1,000 46013 Dechlonnation 1,000 46014 Miscellaneous (GMS) 10,000 46015 Operators Office 1,000 0 $31,000 Annual repairs for vehicles 4620 M & R VEHICLES 46200 Company Vehicles 2,000 46201 Tractor 1,000 46202 Ottawa - Off road trailer 1,000 46203 Service Carts 1,000 46204 Boom Lift 1,000 46205 Other 1,000 7,000 4630 M & R GROUNDS Landscaping, sprinkler systems, retention 10,000 ponds, piping, fertilizer, etc 4640 M & R BUILDINGS Painting, Repair or replacement of doors, 15,000 screens, locks, windows, ceding tiles, bulbs electncal, plumbing, and lighting 4650 M & R UNSPECIFIED Funds for emergency or unidentified 5,000 equipment deficiencies that require upgrade or improvement in operation 4900 ADVERTISING Advertisement and legal ad allowance 3,000 related to plant operation or bids and public notices F \dots \Budget \fy2 01 2- 2 01 31acct detail fy 2012 -2013 agenda Page 5 of 9 7/7/2012 9 02 AM AGENDA ITEM Jac SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD FIY 2012 -2013 OPERATIONS/MAINTENANCE ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 4902 LICENSES AND PERMITS 16,400 STATE Professional & Operators license & renewal 4/2013 2,000 Operating Permit 7,500 Storage Tank 50 NELAC - Lab (pd through 2012) 2,000 11,550 PALM BEACH COUNTY Air Pollution Licenses 1,000 Wellfield Permit 75 Storm Water 500 Tags on Trucks 100 Wastewater 2,150 3,825 CITY & SPECIAL DISTRICT Solid Waste Assessment/Lake Worth Drainage 0 Special District Fee 175 Other 850 1,025 5400 MEMBERSHIP DUES AND Dues - Professional organizations 10,000 SUBSCRIPTIONS Professional Registration and licenses, journals and subscriptions FWEA = $7,500 - 8,000 5410 TECHNICAL TRAINING CPEs required for lic renewal per FLDEP Lab Technical, and Quality Assurance Short Schools, Personnel Seminars and technical conferences, computer classes 54101 Conferences 5,000 54102 Meals 1,000 54103 Travel & Lodging 4,000 54104 CEU courses 5,000 15,000 5420 EDUCATIONAL EXPENSES Classes, books & fees 1,000 TOTAL OPERATIONS /MAINT. $1,881,512 F \dons 1Budget\fy2012- 20131acct detail y 2012 -2013 agenda Page 6 of 9 7/7/2012 902 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 OPERATING EXPENSES: SERVICES; MAINTENANCE; CHEMICALS & SUPPLIES CHEMICALS AND SUPPLIES ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 5100 OFFICE SUPPLIES Copier paper, stationery, printer Ink cartridges 8,000 business cards, check printing, general office supplies, & necessities 5201 SAFETY SUPPLIES Gloves, protective glasses, face shields, 6,000 hearing protection, overboots, ear - plugs, muffs, emergency eye wash, cartndge respirators, gas cartridge, sterile storage bags for resp- irators, disinfection systems for respirators, fit test ampoules, respirator storage cabinets, disposal respirators, chemical spill absorb- ents, oil sorbent, liquid chemical neutralizers, barricade tape, hazardous materials response kit, salvage drum, diffusion detector tubes, signs, labels, tags, first aid supplies, fire extinguishers and accessories, hazardous area lights, emergency small tools, safety charts, books 5202 GENERAL OPERATING Operating supplies, raingear, hard -hats, 10,000 SUPPLIES boots, drager tubes, gloves, hoses, fire hoses, chart pens, charts, DO meters, sludge jugs, flags, coffee supplies, water cooler supplies, batteries, hurricane supplies, and other miscellaneous supplies 5203 JANITORIAL SUPPLIES Mops, brooms, paper goods, brushes, all 3,000 necessary janitorial cleaning supplies 5204 LABORATORY SUPPLIES Laboratory upgrades and replacements 17,000 Reagents, glassware, replacement of equip- ment, apparatus Lab supplies consumed by Process testing done in house Plus NELAC 5210 CHEMICALS 52101 Polymer 455,000 Ibs @ 98 lb 446,000 52103 c12 Sodium Hypo 12% @ $.825 Gal 32,000 26,000 52105 Misc Chemicals - Bisulfite, Sulfuric etc 10,000 52106 Caustic 40,000 gal @$2 50 @ gal 100,000 52108 Salt 1,400 tons @ $106 00 * 25 % ** 37,000 * *Plant = $106 00 * 350 tons 619,000 F \docs%Budget \fy2012- 2013 tacct detail fy 2012 -2013 agenda Page 7 of 9 7(7/2012 9 02 AM AGENDA ITEM Jac SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD FN 2012 -2013 CHEMICALS AND SUPPLIES (cont.) ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 5220 OIL, GAS, GREASE, AND Misc gas, grease, oil and lubricants for pumps 7,500 LUBRICANTS and mowers 5225 DIESEL FUEL Diesel fuel for generator 15,000 5230 CONSTRUCTION MATERIAL Walkways, signs, fencing, rails, platforms, 1,000 small shelters, concrete, etc Additional office and storage units 5240 UNIFORMS Provides five (5) new sets of uniforms for 8,000 employee per year Basis cost of $200 00 each Approved protective safety shoes $100 ($200) employee per year (potential of two pairs due to environment) 5250 SMALL TOOLS AND Hand tools, delis, bits, files, small toolboxes, 2,000 EQUIPMENT PURCHASE electrical equipment, and small maintenance tools < $750 00 value 5251 OFFICE EQUIPMENT Filing cabinets, chairs, calculators, adding 1,000 machines, office mats, shelves, printers, tables < $750 00 value 5252 LAB EQUIPMENT Small equipment <$750 00 2,000 5255 PLANT EQUIPMENT Equipment used to maintain grounds /buildings 0 TOTAL CHEMICALS AND $699,500 SUPPLIES F \docs\BudgetVy2012- 2013 \acct detail fy 2012 -2013 agenda Page 8 of 9 7/7/2012 902 AM AGENDA ITEM J3c SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD F/Y 2012 -2013 OPERATING CONTINGENCY ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 4990 OPERATING CONTINGENCY To be utilized as a supplement for any line $0 items which are exceeded during the budget year Status of this Fund to be reported to Board OPERATING ASSETS ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 6400 OPERATING ASSETS To be utilized for Plant Operations /Maintenance $20,000 ENGINEERING ACCT. NO. ACCOUNT TITLE DESCRIPTION BUDGET 3150 GENERAL 31501 General /Permit Assistance $110,000 (Deep well study) 3162 PRE - TREATMENT FLDEP Permit (Mathews Consulting) $0 3163 THERMAL SCREENING Scan every 2 years $0 [Performed 2011 -2012 through insurance carrier) TOTAL ENGINEERING $110,000 GRAND TOTAL BUDGET: $5,762,002 rate = $ 0 9866 Min flow = 16 00000 L/Y budget = $5,764,575 ($2,573) F \docs\Budge9fy2012- 2013 tacct detail fy 2012 -2013 agenda Page 9 of 9 7/7/2012 902 AM South Central Regional Wastewater Treatment & Disposal Board AGENDA ITEM 13c WASTEWATER OPERATIONS & MAINTENANCE BUDGETS 2009 -2013 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET SUMMARY TOTALS PERSONNEL SERVICES $1,544,928 $1,533,679 $1,528,700 $1,532,342 $1,564,990 OPERATING EXPENSES 3,945,142 3,827,864 4,104,900 4,177,233 4,067,012 SERVICES (Legal,hauling,contracts) 1,449,989 1,414,234 1,503,200 1,542,000 1,486,000 OPERATIONS /MAINTENANCE 1,849,200 1,765,324 1,919,000 1,938,733 1,881,512 CHEMICALS /SUPPLIES 645,953 648,305 682,700 696,500 699,500 TOTAL PERSONNEL AND OPERATING EXPENSES 5,490,070 5,361,543 5,633,600 5,709,575 5,632,002 OPERATING CONTINGENCY 4,013 4,502 4,000 0 0 OPERATING ASSETS 11,029 0 19,217 5,000 20,000 ENGINEERING 59,018 83,598 65,000 50,000 110,000 TOTAL BUDGET $5,564,130 $5,449,643 $5,721,817 $5,764,575 $5,762,002 F/Y 2011 -2012 rate = 0 09871 F/Y 12 -13 rate = $ 0.09866 Min flow mgd = 16.0000 avg flow mgd = 16 5000 PERSONNEL ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 1212 REGULAR WAGES $ 996,270 $ 983,491 $978,000 $967,532 $961,190 12121 SICKNACATION REDUCTIONS 55,739 54,952 45,000 45,000 55,000 1214 OVERTIME 63,262 53,991 54,000 54,000 61,000 12151 EMPLOYEE ASSIST PROG 866 701 1,000 1,000 1,000 1221 SOCIAL SECURITY 91,061 92,772 96,000 97,110 105,000 1223 HEALTH INSURANCE 130,844 150,195 155,000 160,000 169,000 12231 DENTAL INSURANCE 6,581 7,696 8,000 8,000 9,000 12232 DISABILITY INSURANCE 5,274 5,051 6,000 6,000 6,000 12233 LIFE INSURANCE 620 602 1,200 1,200 1,200 12234 VISION CARE 1,076 969 1,500 1,500 1,600 1224 WORKERS' COMPENSATION 31,389 23,886 33,000 40,000 37,000 1225 UNEMPLOYMENT 2,664 0 2,000 2,000 2,000 1236 PENSION 124,947 124,688 122,000 123,000 125,000 1237 DEF COMP SUP 33,396 34,463 25,000 25,000 30,000 1240 PAYROLL CONTINGENCY 939 223 1,000 1,000 1,000 TOTAL PERSONNEL SERVICES $1,544,928 $1,533,679 $1,528,700 $1,532,342 $1,$64,990 Page 1 acct detail fy 2012 -2013 agenda South Central Regional Wastewater Treatment & Disposal Board AGENDA ITEM 13c WASTEWATER OPERATIONS & MAINTENANCE BUDGETS 2009 -2013 SERVICES ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 3100 MEDICAL SERVICES $795 $766 $1,500 $1,500 $1,500 3110 LEGAL (GENERAL & ADMIN) 48,035 27,277 30,000 40,000 40,000 3120 SERVICES (G & A) 19,921 16,686 17,500 22,500 22,500 3200 AUDITING 38,768 29,123 35,200 32,500 32,500 3300 LAB PERMIT TESTING 31,065 32,205 32,000 35,000 35,000 3400 PRETREATMENT 0 0 0 3402 TOXICITY TESTING 0 0 0 3404 CHEMICAL ANALYSIS 0 0 0 3406 METER CALIBRATION 8,022 7,440 8,000 8,000 8,000 3409 PELLETIZATION FEES - SWA 875,529 825,705 948,000 950,000 925,000 " see note for actual 3410 SLUDGE HAULING 260,127 251,176 211,000 245,000 195,000 3411 GRIT HAULING 121,925 160,209 157,000 143,000 160,000 3412 TRASH HAULING 2,128 4,232 3,000 3,000 3,000 3500 SERVICES (Ops, Maint & Prof) 43,674 59,415 60,000 61,500 63,500 TOTAL SERVICES $1,449,989 $1,414,234 $1,503,200 $1,542,000 $1,486,000 ** SWA Cost Rebate 0212010 $92,247.06 SWA Cost Rebate 021201 $0,263432 SWA Cost Rebate 02/2012 S40:000.19 Page 2 acct detail fy 2012 -2013 agenda South Central Regional Wastewater Treatment & Disposal Board AGENDA ITEM J3c WASTEWATER OPERATIONS & MAINTENANCE BUDGETS 2009 -2013 OPERATIONS/MAINTENANCE ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 4000 VEHICLE EXPENSE $ 8,716 $ 14,069 $16,000 $13,000 $21,500 4020 BOARD CONTINGENCY 2,270 2,462 3,000 4,000 4,000 4100 TELEPHONE 14,650 16,222 16,000 15,000 14,000 4102 POSTAGE 3,197 3,407 3,000 3,000 3,000 4300 ELECTRICITY 805,994 836,810 850,000 900,000 850,000 ** see note for actual 4302 WATER 14,331 9,147 11,000 12,000 12,000 4303 IRR/PROCESS RECLAIM WATER 6,255 7,058 11,000 13,000 13,000 4304 INJECTION WELL PROCESS 643,857 523,906 691,000 612,423 583,602 4400 EQUIPMENT RENTAL 2,495 854 2,000 2,000 2,000 4500 INSURANCE 234,410 242,293 211,000 265,010 265,010 4600 M & R EQUIPMENT 36,847 23,156 29,000 29,000 31,000 4620 M & R VEHICLES 6,992 6,716 8,000 7,000 7,000 4630 M & R GROUNDS 8,463 9,724 7,500 5,000 10,000 4640 M & R BUILDINGS 10,805 12,507 15,000 15,000 15,000 4650 M & R UNSPECIFIED 9,867 5,194 3,000 5,000 5,000 4900 ADVERTISING 3,222 2,064 2,000 3,000 3,000 4902 LICENSE & PERMITS 21,175 13,957 17,000 15,300 16,400 5400 MEMBERSHIP DUES & SUBSCRIPTIOI 6,148 9,191 9,500 7,000 10,000 5410 TECHNICAL TRAINING 9,506 7,365 12,500 12,000 15,000 5420 EDUCATIONAL EXPENSES - 6 1,500 1,000 1,000 6400 CAPITAL ASSETS - 19,217 0 0 0 TOTAL OPERATIONS /MAINT. $1,849,200 $1,765,324 $1,919,000 $1,938,733 $1,881,512 NOTE FPL issued our "fuel credit" on 01/2010 billing in the amount of $85,861 66. Page 3 acct detail fy 2012 -2013 agenda South Central Regional Wastewater Treatment & Disposal Board AGENDA ITEM 13c WASTEWATER OPERATIONS & MAINTENANCE BUDGETS 2009 -2013 CHEMICALS /SUPPLIES ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 5100 OFFICE SUPPLIES $ 8,221 $ 7,275 $8,000 $8,000 $8,000 5201 SAFETY SUPPLIES 3,845 5,074 6,000 6,000 6,000 5202 GENERAL OPERATING 9,935 8,833 12,000 10,000 10,000 5203 JANITORIAL SUPPLIES 1,218 1,120 3,000 4,000 3,000 5204 LABORATORY SUPPLIES 13,704 15,286 14,000 10,500 17,000 5210 CHEMICALS 586,371 567,080 606,500 624,000 619,000 5220 OIL, FUEL, LUBRICANTS 4,539 4,745 7,000 5,000 7,500 5225 DIESEL 1,575 28,637 12,000 15,000 15,000 5230 CONSTRUCTION MATERIALS 2,316 1,755 1,100 1,000 1,000 5240 UNIFORMS 7,356 7,524 8,000 8,000 8,000 5250 SMALL TOOLS < $500 3,264 613 2,100 2,000 2,000 5251 OFFICE EQUIPMENT < $500 935 334 1,000 1,000 1,000 5252 LAB EQUIPMENT < $500 2,674 30 2,000 2,000 2,000 5255 PLANT EQUIPMENT - - 0 0 0 TOTAL CHEMICALS /SUPPLIES $645,953 $648,305 $682,700 $696,500 $699,500 OPERATING EXPENSES (SUMMARY) SERVICES $1,449,989 $1,414,234 $1,503,200 $1,542,000 $1,486,000 OPERATIONS /MAINTENANCE $1,849,200 $1,765,324 $1,919,000 $1,938,733 $1,881,512 CHEMICALS & SUPPLIES $ 645,953 $ 648,305 $ 682,700 $ 696,500 $ 699,500 TOTAL OPERATING EXPENSES $3,945,142 $3,827,864 $4,104,900 $4,177,233 $4,067,012 Page 4 acct detail fy 2012 -2013 agenda South Central Regional Wastewater Treatment & Disposal Board AGENDA ITEM J3c WASTEWATER OPERATIONS & MAINTENANCE BUDGETS 2009 -2013 OPERATING CONTINGENCY ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 4990 OPERATING CONTINGENCY $0 $0 $0 $0 $0 4992 INTEREST /FEES /PENALTIES 4,013 4,502 4,000 $0 $0 TOTAL OPERATING $4,013 $4,502 $4,000 $0 $0 CONTINGENCY OPERATING ASSETS ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 6400 OPERATING ASSETS $11,029 $0 $19,217 $5,000 $20,000 TOTAL OPERATING $11,029 $0 $19,217 $5,000 $20,000 CONTINGENCY ENGINEERING ACCOUNT 2009 -2010 2010 -2011 2011 -2012 2011 -2012 2012 -2013 NO. DESCRIPTION ACTUAL ACTUAL PROJECTED BUDGET BUDGET 3150 GENERAL $ 58,810 $ 73,598 $60,000 $50,000 $110,000 3160 BIOTOXICITY 0 0 0 0 0 3162 PRETREATMENT 208 10,000 5,000 0 0 3163 THERMAL SCREENING 0 0 0 0 0 TOTAL ENGINEERING $59,018 $83,598 $65,000 $50,000 $110,000 GRAND TOTAL BUDGET: $5,564,130 $5,449,643 $5,721,817 $5,764,575 $5,762,002 Extraordinary credits received $98,109 $ 59,264 $ 40,090 Actual expenditures = $5,662,239 $5,508,907 $5,761,907 Page 5 acct detail fy 2012 -2013 agenda P � PS itiWATEA � Fy O � C7 Y g .cn 0 '1'?os odd° RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF AUGUST 16, 2012 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on August 16, 2012, by a vote of 7 -0, gave AUTHORIZATION TO ESTABLISH USER RATE (O &M AT $0.9866/1,000 GAL AND R &R RESERVERS AT $0.1940/1,000 GAL) TO DELRAY BEACH AND BOYNTON BEACH FOR FISCAL YEAR 2012/2013:. 1.1806/1,000 GAL WHEREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach. NOW, THEREFORE, the City of Boynton Beach hereby ratifies said Board action independently The above action is hereby ratified in open session by the City of Boynton Beach this '7 day of Sept , d.0Ia , by a 'l vote CITY OF BOYNTON BEACH By: G AT Y .p Mayor / ger Attest: t in - z Ci Clerk ;'trio N 6' Approved as to m• City orney F IdocsIBOARD MEETINGSIRATIFICATIONS12011- 20121Boynton Beach Ratification 08 -16 -2012 docx AGENDA ITEM J4 South Central Regional Wastewater Treatment & Disposal Board WASTEWATER OPERATIONS REPAIR & REPLACEMENT RESERVES FUND USER RATE & PROJECTED REVENUES F/Y 2012 -2013 RATE 1 O &M Budget $5,762,002 $0.9866/1,000/gaI 0 & M $0.1940/1,000/gal Reserves $1.1806/1,000/gal Total + • + + + • F/Y 2012 -2013 Rate OPERATIONS & MAINTENANCE PROJECTED FLOW RATE INCOME MINIMUM 16.0 mgd $0.9866/1,000/gal I ( $5,762,002 AVERAGE 16.5 mgd $0.9866/1,000/gal $5,941,799 MAXIMUM 17.0 mgd $0.9866/1,000/gal $6,121,853 RESERVES FOR REPAIRS & REPLACEMENT PROJECTED FLOW RATE INCOME MINIMUM 16.0 mgd $0.1940/1,000/gal I I $1,132,960 I AVERAGE 16.5 mgd $0.1940/1,000/gal $1,168,365 MAXIMUM 17.0 mgd $0.1940/1,000/gal $1,203,770 F \dots \Budget \fy2012 - 2013 \acct detail fy 2012 -2013 agenda Page 1 of 1 .. P° WATER " 2 it O - ,_ 10 t1C.*4 CO RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF AUGUST 16, 2012 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on August 16, 2012, by a vote of 7 -0, gave AUTHORIZATION TO ESTABLISH RECLAIM USER RATE AT $0.18643/1,000 GAL TO CONSUMERS DELRAY BEACH, BOYNTON BEACH AND SOUTH CENTRAL REGIONAL FOR FISCAL YEAR 2012/2013. WHEREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach NOW, THEREFORE, the City of Boynton Beach hereby ratifies said Board action independently The above action is hereby ratified in open session by the City of Boynton Beach this 4 day of Se.pr. , cziD /a, , by a 4 -a vote CITY OF BOYNTON BEACH By: / i , Mayor /City Manage r 0 } °4 Attest: OA - A _ er . Clerk , r9 N Approved as to ' , . d i w City " orney . F IdocsIBOARD MEETI NGSIRAT IFICATIONS12011- 20121Boynton Beach Ratification 08 -16 -2012 docx AGENDA ITEM J5 South Central Regional Wastewater Treatment and Disposal Board RECLAIM USER RATE OPERATION & MAINTENANCE FN 2012 -2013 Original Retail Customers (1.5 billion gal /year) City of Boynton Beach (est 110 million gal /year - .3 mgd * 365) City of Delray Beach (750 million gal /year) [Delray Muni,Hamlet,Delaire,Lakeview, Misc] SCRWWTP (Deep Well = 3467.5 million gal /year) (process = 73 million gal /year) Total = 6000.0 mg annual (16.5 mgd est average flow) (using 1,3,5,7 and 10 year influent averages) Projected budget Reclaim O &M = $1,118,585 Total flow through reclaim facility MG 6000.00 I F/Y 2012 -2013 Rate = $0.18643 User Flows RATE Revenue Original Retail Customers 1.5 billion gal /year 0.20/1000 gal $ 300,000 80% of use storage tank at SCR 1.2 billion gal /year (4 courses $.08 surcharge) $ 96,000 City of Boynton Beach 110 million gal /year 0.186431000 gal $ 20,507 City of Delray Beach 750 million gal /year 0.186431000 gal $ 104,867 SCRWWTP Deep Well 3467.5 million gal /year 0.186431000 gal C $ 583,602 Process @ .2 mgd 73 million gal /year 0.186431000 gal $ 13,609 $ 1,118, 585 * Due to higher rate to retail customers (including storage charge) SCR anticipated $0 well flow of 9.5 mgd - adjusted to 8.57 mgd to balance budget Exp (over) /under Rev F ldocs\Budgetlfy2012- 20131acct detail fy 2012 -2013 agenda Page 1 of 1 7/7/2012 9 30 AM P „ TR � F 0 ` 2 - O (C 8 = J _ o iii Yy0 doh ^ago as od RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF AUGUST 16, 2012 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on August 16, 2012, by a vote of 7 -0, ACCEPTED THE 2012/2013 ORGANIZATIONAL CHART AND SALARY RANGES. WHEREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach. NOW, THEREFORE, the City of Boynton Beach hereby ratifies said Board action independently The above action is hereby ratified in open session by the City of Boynton Beach this 4 _ day of Sep . , a0la , by a y -O vote. CITY OF BOYNTON BEACH By: - --. Mayor /City Man- • - al r Attest C' Clerk ' 4 ON , Approved as to ,,,,,ill i , City 17 orney F IdocslBOARD MEETI NGSIRAT IFICATIONS12011- 20121Boynton Beach Ratification 08 -16 -2012 docx it; E , --1 .--1 as u1 M . -i N + -I W N Q O ce Z u I- (.9 Q E w O Q Q ; � ~ 6 '��z a Z = w z Q O J 2 w m r,x v J >°41(n<1.7) u W DQ ► -WZZ H [I] J O 1- Q cc zaa Q ~ O xaa a .a 0 '.. F- wOf a a Q z (1) _ Ai r=I M O Z G M o a" 06 to ce 1-1 Z '. HO z W N a � a M U) w '. L Q ri , Z p Z 0 a W Ny w Z 0 z -o GC 0 1.4 u z "' 0 W =� z E ° I- r , N Q 4 5 z t o ft V) W i . N W �o Q m a Z H z ° s w �7= > Q ° W "' Q E re V '" = u a J W to 0 J w Q N F a o Z t .-, u O r., 0 W a V ' , c _ w co tu m C 0 CD Q 1- to U Q a ' a (.0 - f r o riZ O p 1 4 Q oo (o w Z O co r CO N Cr) n- E- Q O) l C O f� (o Q W c6 u) O (O O O 0 L 1 I I 1 I I I Z w W rn M m o v (0 o Q W 11) co 00 L() , co a N M M c) Tr Tr O CI Ce Q CO J W O O O O O O O co co cu co d' �() O co O co O a = I I 1 1 1 1 I a Z Z 0 °O_ °O 0 0 0 0 0 0 °o °O °O °O °O a 0,5 N M M M u CL Z co >- 2N a 1- --- a Q N W O Z 0 O O O O O O • N Z ~ 0 O O O O O O I Z CL co Q W M Tr 1 0 t10 co N ( (00 H0 C I I I I I I I t Z C O O O O O O O W ° � � N M M M Tr Tr Lo N cv J Q N Y Ill CO Z Z Z 0 W 0 I- W W W !L' Z Z CU m Z Q Q I-- I__ CL Z co r W O Z O o ,-- Q Z " W 1 Z d E I- W Z fn N J J _ — U Q> H w p 1- I- o Q F_ W ....... W c t Q - Z i Z ill C O Et - O Z z N Z CO Z Ce W ¢ V O W W J 0 LU W -H � Q 5 X z a w 0_ a g w a u- W v U U' .e v I o � W W W 0 0 O w= W m Q Z v 0 2 0 V 0 U w- � ? a o , F- g 0 0 2 ti w w 0 0 ° - > > > o 9 a 3) � P s iewATE8 Tp 14.1 W �.ue Z ‘',4,,,, JO b 0J o RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF AUGUST 16, 2012 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on August 16, 2012, by a vote of 7 -0, gave AUTHORIZATION TO APPROVE THE SECOND AMENDMENT TO THE INTERLOCAL GOVERNMENT AGREEMENT FOR BIOSOLIDS PROCESSING AND RECYCLING BETWEEN THE SOLID WASTE AUTHORITY AND SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD. AMENDMENT TO CLOSEOUT PROJECT INCREASES CONTRACT BY THE AMOUNT OF $673,964 FOR A FINAL CONTRACT AMOUNT OF $7,370, 799. WHEREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach NOW, THEREFORE, the City of Boynton Beach hereby ratifies said Board action independently. The above action is hereby ratified in open session by the City of Boynton Beach this 4 day of Scar • , ___ , by a 4 -0 vote CITY OF BOYNTON BEACH G`" QIC By: /./w•z-°r'cJZ./P6 , Mayor /City Manager / a1 0 W U Attest: � ' Clerk r o N a Approved as to f di, , City A'orney , F IdocsIBOARD MEETINGSIRATIFICATIONS 12011- 20121Boynton Beach Ratification 08 -16 -2012 docx AGENDA ITEM J7 at SWA SOLID WASTE AUTHORITY YOUR PARTNER FOR SOLID WASTE SOLUTIONS May 23, 2012 Mr. Dennis L. Coates Executive Director South Central Regional Wastewater Treatment Plant and Disposal Board 1801 North Congress Avenue Delray Beach, FL 33445 RE: Interlocal Government Agreement for Biosolids Processing and Recycling Second Amendment Dear Mr. Coates: Enclosed for your approval and signature, please find three (3) copies of the subject Amendment providing for the reconciliation of the final costs associated with the development, permitting, design, construction, and commissioning of the Biosolids Processing Facility. As detailed in Exhibit —I of the Amendment, the Total Net Capital Cost of the project is $33,888,730 of which your share is $7,370,799. Our records indicate that you have paid $6,696,835 to date leaving a remaining balance of $673,964. Please return all executed copies of the Amendment to my attention at your earliest convenience. We will return one fully executed copy to you within ten (10) days of receipt. Should you have any questions or require any additional information, please contact me at your convenience. Sincer 'Raymond H. Schauer Director, Engineering & Public Works RHS /kal Enc. 7501 North Jog Road, West Palm Beach, Florida 33412 (561) 640 -4000 FAX (561) 640 -3400 Recycled Paper SECOND AMENDMENT TO INTERLOCAL GOVERNMENT AGREEMENT FOR BIOSOLIDS PROCESSING AND RECYCLING (South Central Regional) THIS AMENDMENT, hereinafter called the "Amendment -2 ", is made and entered into this dayof 2012 by and between SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD, an independent special district of the State of Florida, hereinafter called the "Utility ", and the SOLID WASTE AUTHORITY OF PALM BEACH COUNTY, a dependent special district created pursuant to Chapter 75 -473, Laws of Florida, as amended, hereinafter called the "Authority ". WITNESSETH WHEREAS, the Utility and the Authority have previously entered into an Interlocal Government Agreement for Biosolids Processing and Recycling dated June 7, 2005 (the "Agreement ") for the development, construction operation and maintenance of a Biosolids Processing Facility (BPF) to produce Biosolids Beneficial Reuse Products for use in the commercial fertilizer industry; and WHEREAS, the Utility and the Authority entered into an Amendment to Interlocal Government Agreement for Biosolids Processing and Recycling dated July 20, 2006 (hereinafter called the "Amendment -1 "); and WHEREAS, the Utility and the Authority, together with other utilities, have agreed to a final adjustment to the Capital Costs set out in the Agreement and agree to Total Net Capital Costs set forth herein, and have therefore agreed to this Amendment -2. NOW, THEREFORE, in consideration of the mutual promises contained herein, the Utility and the Authority agree as follows: 1. The recitals set out above are true and are hereby incorporated herein. 2. Amended Exhibit I (A &B) attached to Amendment -1 is hereby deleted in its entirety and replaced by Second Amended Exhibit I (A&B) attached to this Amendment -2. Exhibit I (A &B) attached to the Agreement remain deleted from the Agreement. 3. Notwithstanding anything contained in: the Agreement, the Amendment -1,and this Amendment -2 (all the foregoing collectively referred to herein as "Amended Agreement ") the following shall control: the Authority agrees that upon Utility making its final payment to the Authority in the amount shown on the attached Second Amended Exhibit I (A) as the "Final Closeout Due" that the Utility shall be deemed to have paid the Authority in full for the Utility's share of the 1 BPF's capacity referred to in Section 2.2 of the Agreement and referred to in the attached Second Amended Exhibit I (B). 4. Except as amended by this Amendment -2, the other provisions of the Agreement and Amendment -1 remain unchanged and in full force and effect. IN WITNESS WHEREOF, the SOLID WASTE AUTHORITY OF PALM BEACH COUNTY, at a regular meeting thereof, by action of the Authority Board authorizing and directing the foregoing to be adopted, has caused these presents to be signed by its Executive Director, and its seal to be hereto affixed, and the SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD has authorized and caused the execution of this Agreement, all as of the day, month, and year first above written. SOLID WASTE AUTHORITY OF WITNESSES: PALM BEACH COUNTY: By: Print name: Mark Hammond Executive Director Print name: Approved as to Form and Legal Sufficiency: By: Counsel to the Authority SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD: By: Attest: Chair Clerk Approved as to Form and Approved as to Terms and Conditions: Legal Sufficiency: By: By: Board Attorney Department Director Approved by Authority Board on , 2012, Item Approved by the Utility on , 2012, Item 2 SECOND AMENDED EXHIBIT -I (South Central Regional) A) SUMARY OF CAPITAL COSTS B) LIST OF PARTICIPANTS AND SHARES A) SUMARY OF CAPITAL COSTS Project Development: Right -of -Way Abandonment 25,305 Preliminary Design & Permitting 934,239 RFQ/RFP 498,000 Grant Funding 290,867 Infrastructure Design & Construction 3,059,073 Sub Total: 4,807,484 Project Capital Cost: Facility Construction 29,199,968 Technical Services During Construction 3,054,778 Sub Total: 32,254,746 Total Development & Capital: 37,062,230 Less Grant Funding: Original Grant (3,225,000) Less Federal Admin Chrg. 51,500 Net Grant: (3,173,500) SubTotal: 33,888,730 Contingency - - -0 - -- Total Net Capital Cost 33,888,730 UTILITY share = 21.75% $7,370,799 Less Prepaid (156,000) Net Total Due for UTILITY $7,214,799 Final Closeout Due $673,964 3 SECOND AMENDED EXHIBIT -I (South Central Regional) B) LIST OF ORIGINAL PARTICIPANTS AND SHARES Min. Comt. = Minimum Commitment based on delivery six days per week. 1) Palm Beach County Water Utilities Department P.O. Box 16097 West Palm Beach, FL 33416 -6097 27.5% share Cap. Cost $9,319,400. Min. Comt. 58 WTD 18,000 WTY 2) South Central Regional Wastewater Treatment and Disposal Board 1801 North Congress Ave Delray Beach, FL 33445 21.75% share Cap. Cost $7,370,799. Min. Comt. 61 WTD 19,000 WTY 3) City Of Boca Raton Utilities Department 201 West Palmetto Park Rd Boca Raton, FL 33432 -3795 19.5% share Cap. Cost $$6,608,303. Min. Comt 58 WTD 18,250 WTY 4) Loxahatchee River Environmental Control District 2500 Jupiter Park Dr Jupiter, FL 33458 -8964 10.50% share Cap. Cost $3,558,317. Min. Comt. 30 WTD 9490 WTY 5) Solid Waste Authority /Seacoast 7501 North Jog Road West Palm Beach, FL 33412 20.75% share Cap. Cost $$7,031,911. Min. Comt. 56 WTD 17,520 WTY 4