Loading...
R13-103 1 RESOLUTION NO. R13- /Q3 2 A RESOLUTION OF THE CITY COMMISSION OF THE 3 CITY OF BOYNTON BEACH, FLORIDA, APPROVE 4 AMENDMENT TO THE BUILDING DIVISION FEE 5 SCHEDULE TO ADD A CATEGORY FOR 6 STREAMLINED LOW- VOLTAGE PERMITTING, AND 7 PROVIDING AN EFFECTIVE DATE 8 9 WHEREAS, on June 14, 2013 the Governor approved House Bill 973 "Low Voltage 10 Systems" which becomes effective on October 1, 2013; and 11 WHEREAS, based on the new Florida Statute 553.793, the state legislature instituted 12 a requirement for local jurisdictions to create a streamlined process to issue low voltage 13 permits; known as "Streamlined low - voltage alarm system installation permitting "; and 14 WHEREAS, the City Commission for the City of Boynton Beach finds that the 15 adoption of these amendments to the Building Division fee schedule is necessary and is in the 16 best interest of the health, safety and welfare of the citizens or residents of Boynton Beach. 17 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 18 THE CITY OF BOYNTON BEACH, FLORIDA THAT: 19 Section 1. The above referenced whereas clauses are incorporated herein by 20 reference. 21 Section 2. The Building Division Fees attached hereto as Exhibit "A ", 22 incorporated herein by reference, are hereby adopted as the fee schedule for those related 23 activities as indicated on the Fee Schedule. A copy of the Fee Schedule shall be maintained 24 and made available for public inspection in the City Clerk's office as well as the Planning and 25 Zoning Department. 26 , Section 3. This Resolution shall become effective immediately upon its passage 27 and adoption. Apps3 City Cbb\AutoA Data\ 188\ Items\ 180 \2617 \3421 \Reso_- _I3uildmg_Fee_ Schedule (2013)(Low_Volt) Doc 1 PASSED AND ADOPTED this 1 day of October, 2013. 2 CITY OF BOYNTON BEACH, FLORIDA 3 / _ _ ,._ 7::: f , ( ., )-1 /,/ ‘-_-_-. 5 i Mayo/— Jerry aylor 6 I 1 7 8 / /.%ii �'' � „/"/�/ iir 9 Vice -Mayor — Woodrow L 10 I 11 1 � 12 13 Commissioner — David T. Merker 14 15 16 ,/ 1 7- , 17 Commissioner — Michael M. Fitzpatf 18 19 3 20 by 21 Co missioner — Joe asello 22 23 ATTEST: 24 25 26 �� 1I1. A . _I . 27 Jan: M. Prainito, MMC 28 ' Clerk 29 30 31 G \'C ��. 0? • 32 33 •s • r Sea 34 I' 36 ' A 0 7 N \ \Apps3 City Cbb\AutoA Data \188\ Items \ 180\ 2617 \3421AReso_- _Buildmg_Fee_ Schedule_(2013)(Low_Volt) Doc • CITY OF BOYNTON BEACH DEVELOPMENT DEPARTMENT 1 BUILDING DIVISION 100 East Boynton Beach Boulevard • Boynton Beach, FL 33435 • (561)742 -6350 • Fax (561)742 -6357 www boynton -beach orq BUILDING DIVISION FEES (Resolution #13- , Adopted 10/01/13) I. PRIMARY PERMIT FEES: (A) Plan Review Fee: The plan review fee will be credited against the actual cost of the building permit at the time of permit issuance If a permit is not issued for any reason subsequent to plan review, the City will retain the plan review fee (non - refundable) (1) Minimum fee, or $75 00 (2) 1 0% of the construction value, whichever is greater 1 0% (B) Construction Permit Fee: (All types) (1) Minimum fee, or $75 00 (2) 2 3% of the construction value, whichever is greater 2 3% (3) Low voltage streamline permitting.. ... • ...... .....$55,00 (C) Resubmittal Fee: (Paid at time of resubmittal) (1) First Resubmittal No Charge (2) Second re- submittal (Rejection for same comments) (1) Minimum fee, or $50 00 (ii) 10% of original permit fee, whichever is greater 10 0% (3) Third re- submittal and subsequent re- submittal (Rejection for same comments) (i) Four times the original permit fee (Charged per 553 80 Florida Statue) 4X (D) Revision Fee: (1) Minimum fee, or $50 00 (2) $10 00 per page, or $10 00 (3) 2 3% of the revision value, whichever is greater 2 3% (E) Stocking Permit Fee: $200 00 (F) Certificate of Use Fee: (1) Minimum fee; plus $75 00 (2) $30 00 any additional required inspection $30 00 (G) Department of Community of Affairs (DCA) Fee: (1) Minimum fee, or $2 00 (2) 1 5% of the permit fee costs, whichever is greater 1 5% (H) Department Business and Professional Regulation (DBPR) Fee: (1) Minimum fee, or $2 00 (2) 1 5% of the permit fee costs, whichever is greater 1 5% (1) Green Building Fee: (1) 0 011% of the construction value 0 011% (J) Failure to Obtain Permit Fee (Penalty Fee): (1) Four (4) times permit fee, subject to review by Building Official 4X II. ADMINISTRATIVE FEES: (A) Alternate Method and Material Processing: $150 00 (B) Building Board of Adjustments and Appeals: $250 00 (C) Certificate of Occupancy: (1) 24 hours notice No charge (2) Less than 24 -hour notice $200 00 BUILDING DIVISION FEES Page 1 of 2 , , ,,,, (D) Change of Contractor and /or Subcontractor Fee: $35 00 (E) Penalty Fee Waiver: $35 00 (F) Early Construction Authorization Fee: $500.00 (G) Early Power Release: $ 150 00 (H) FPL Meter Placement Fee: $50 00 (1) Local Product Approval Fee: $1,500 00 (J) Permit Application Extension Fee: (Maximum of three) (I) First Extension $50 00 (2) Second Extension $75 00 (3) Third Extension $100 00 (K) Permit Extension Fee: (Prior to expiration) (1) First Extension $50 00 (2) Second Extension $75 00 (3) Third Extension $ 100 00 (4) Permit Extension for period beyond 90 days $250 00 (L) Permit Reinstatement Fee: (Subject to approval by Building Official) (1) Within 180 days of inactive status $75 00 (2) After 180 days of inactive status (i) Minimum Fee, or $75 00 (ii) 30% of original permit fee, whichever is greater 30 0% (M) Professional Services: ($50.00 /hour or portion thereof) $50 00 (i e Permit research, due diligence reports, community acknowledgement forms, etc ) (N) Replacement Document Fee: (1) Permit Card $30 00 (2) Permitted Plans ($30 00 plus panting costs) $30 00 plus printing costs (0) Temporary Certificate of Occupancy (TCO) Fee: $450 00 (P) Temporary Certificate of Completion (TCC) Fee: $225 00 (Q) TCC or TCO Extension Fee: (Subject to approval by Building Official) $200 00 III. INSPECTION FEES: (A) Re- inspection Fees: (1) First Re- inspection $50 00 (2) Second Re- inspection $ 100 . 00 (3) Third and Subsequent Re- inspection without "Correction" done $200 00 (Charged per 553 80 Florida Statue) (B) Advisory, Special Inspection, or Inspections During Off-Duty Hours: $75 00 ($75.00 per hour; minimum of two (2) hours) (BASED ON AVAILABILITY) IV. NOTES: (A) All fees are non - refundable (B) Planning & Zoning Division fees are in addition to the above fees (C) Fire Department fees are in addition to the above fees (D) Palm Beach County impact fees are in addition to the above fees (E) City Parks and Recreation Fees are in addition to the above fees (F) Water and Sewer Capital Facility Charges are in addition to the above fees (G) Projects over $250,000 are subject to Art in Public Places Fee in addition to the above fees S \ Development \BUILDING \Forms- Templates -Signs \Fee Schedule_ Building Division doc BUILDING DIVISION FEES Page 2 of 2