RESOLUTION NO. R14 -014
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA, APPROVING
THE UPDATE TO THE BUILDING DIVISION FEE
SCHEDULE; PLAN REVIEW AND CONSTRUCTION
PERMIT FEE SCHEDULE, AND PROVIDING AN
EFFECTIVE DATE
WHEREAS, on October 18, 2011 the City Commission adopted the Economic
Development Initiatives & Implementation Plan; and
WHEREAS, one of the Objectives of the Plan allows for interim relief provisions in
the form of fee reductions, payment options, waivers and rebates and based on this Objective,
the Economic Development Division has requested an amendment to the Building Division
fee schedule to provide sensitivity to project cash flow and incentives to jumpstart stalled or
future projects; and
WHEREAS, the City Commission for the City of Boynton Beach finds that the
adoption of these amendments to the Building Division fee schedule is necessary and is in the
best interest of the health, safety and welfare of the citizens or residents of Boynton Beach.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF BOYNTON BEACH, FLORIDA THAT:
Section 1. The above referenced whereas clauses are incorporated herein by
reference.
Section 2. The Building Division Fees attached hereto as Exhibit "A ",
incorporated herein by reference, are hereby adopted as the fee schedule for those related
activities as indicated on the Fee Schedule. A copy of the Fee Schedule shall be maintained
and made available for public inspection in the City Clerk's office as well as the Development
Department.
\\Apps3.City.Cbb\Auto\Data\206 \Items\ 197\ 2905\ 3616\ Reso_-_ Bui lding_Fee_Schedule_(2014).Doc
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Section 3. This Resolution shall become effective immediately upon its passage
and adoption.
PASSED AND ADOPTED this 18 day of February, 2014.
CITY OF BOYNTON BEACH, FLORIDA
ATTEST:
t M. Prainito, MMC
y Clerk
P Ata-A-31t-tiz
ice -Mayor — Wood
Commissio -r - David T. Mer er
Commissioner — Mi hael M. Fitzpatrick
1
AM_
issioner — Joe Casello
\\Apps3.0 ity. Cbb\Auto\Data\206 \Items\ 197\2905 \3616 \Reso_- _Building_Fee_S chedule_(2014). Doc
CITY OF BOYNTON BEACH
DEVELOPMENT DEPARTMENT I BUILDING DIVISION
100 East Boynton Beach Boulevard • Boynton Beach, FL 33435 • (561)742-6350 • Fax (561)742-6357
www.boynton-beach.orq
BUILDING DIVISION FEES
(Resolution #14-)0(X, Adopted 02/18/14)
I. PRIMARY PERMIT FEES:
(A) Plan Review Fee: The plan review fee will be credited against the actual cost of the building
permit at the time of permit issuance. If a permit is not issued for any reason subsequent to plan
review, the City will retain the plan review fee (non-refundable).
(1) Minimum fee; or $75.00
(2) Plan Review Fee Rate On Construction Value:
1.0% $0 - $1,500,000, plus.
0.5% $1,500,001 - $5,000,000, plus.
0.25% over $5,000,001.
(B) Construction Permit Fee: (All types)
(1) Minimum fee; or $75.00
(2) Low voltage streamline permitting $55.00
(3) Construction Permit Fee Rate On Construction Value:
2.30% $0 - $1,500,000, plus.
1.75% $1,500,001 - $5,000,000, plus.
1.00% over $5,000,001.
(C) Resubmittal Fee: (Paid at time of resubmittal)
(1) First Resubmittal No Charge
(2) Second re-submittal (Rejection for same comments)
(1) Minimum fee; or $50.00
(ii) 10% of original permit fee, whichever is greater 10.0%
(3) Third re-submittal and subsequent re-submittal (Rejection for same comments)
(i) Four times the original permit fee (Charged per 553.80 Florida Statue) 4X
(1) Minimum fee; or $50.00
(2) $10.00 per page; or
$10.00
(D) Revision Fee:
(3) 2.3% of the revision value, whichever is greater 2 3%
(E) Stocking Permit Fee. $200.00
(F) Certificate of Use Fee:
(1) Minimum fee; plus $75.00
(2) $30.00 any additional required inspection $30.00
(G) Department of CommunitY of Affairs (DCA) Fee:
(1) Minimum fee; or $2.00
(2) 1.5% of the permit fee costs; whichever is greater 1.5%
(H) Department Business and Professional Regulation (DBPR) Fee:
(1) Minimum fee; or $2.00
(2) 1.5% of the permit fee costs; whichever is greater 1.5%
(1) Green Building Fee:
(1) 0.011% of the construction value 0.011%
(J) Failure to Obtain Permit Fee (Penalty Fee):
(1) Four (4) times permit fee; subject to review by Building Official 4X
II. ADMINISTRATIVE FEES:
(A) Alternate Method and Material Processing- $150.00
(B) Building Board of Adjustments and Appeals. $250.00
Page 1 of 2
BUILDING DIVISION FEES
(C) Certificate of Occupancy:
(1) 24 hours notice
(2) Less than 24 -hour notice
Change of Contractor and/or Subcontractor Fee
Penalty Fee Waiver:
Early Construction Authorization Fee
Early, Power Release:
FPL Meter Placement Fee
Local Product Approval Fee -
Master Plan Fee: (Floating) (Per Set)
Permit Application Extension Fee: (Maximum of three)
(1) First Extension $50.00
(2) Second Extension $75.00
(3) Third Extension $100.00
(L) Permit Extension Fee: (Prior to expiration)
(1) First Extension $50.00
(2) Second Extension $75.00
(3) Third Extension $100.00
(4) Permit Extension for period beyond 90 days $250.00
Permit Reinstatement Fee: (Subject to approval by Building Official)
Within 180 days of inactive status
After 180 days of inactive status
(i) Minimum Fee; or
(ii) 30% of original permit fee, whichever is greater
(N) Professional Services: ($50.00 /hour or portion thereof)
(i.e. Permit research, due diligence reports, community acknowledgement forms, etc.)
Replacement Document Fee:
(1) Permit Card $30.00
(2) Permitted Plans ($30.00 plus printing costs) $30.00 plus printing costs
Temporary Certificate of Occupancy (TCO) Fee. $450.00
Temporary Certificate of Completion (TCC) Fee. $225.00
TCC or TCO Extension Fee: (Subject to approval by Building Official) $200.00
(D)
(E)
(F)
(G)
(H)
(I)
(J)
(K)
(M)
(0)
(P)
(Q)
(R)
III. INSPECTION FEES:
(A) Re- inspection Fees:
(1) First Re- inspection $50.00
(2) Second Re- inspection $100.00
(3) Third and Subsequent Re- inspection without "Correction" done $200.00
(Charged per 553.80 Florida Statue)
(B) Advisory, Special Inspection, or Inspections During Off -Duty Hours $75.00
($75.00 per hour; minimum of two (2) hours) (BASED ON AVAILABILITY)
IV. NOTES:
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(1)
(2)
No charge
$200.00
$35.00
$35.00
$500.00
$150.00
$50.00
$1,500.00
$500.00
$50.00
All fees are non - refundable.
Planning & Zoning Division fees are in addition to the above fees.
Fire Department fees are in addition to the above fees.
Palm Beach County impact fees are in addition to the above fees.
City Parks and Recreation Fees are in addition to the above fees.
Water and Sewer Capital Facility Charges are in addition to the above fees.
Projects over $250,000 are subject to Art in Public Places Fee in addition to the above fees.
S:\Development\BUILDING \Forms- Templates -Signs \Fee Schedule_Building Division.doc
$75.00
$75.00
30.0%
BUILDING DIVISION FEES Page 2 of 2