Loading...
R01-196RESOLUTION NO. ROD lq~, A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO TASK ORDER NO. 1 BETWEEN THE CITY OF BOYNTON BEACH AND CH2M HILL IN THE AMOUNT OF $11,960.00 FOR ADDITIONAL DESIGN WORK AND SURVEY SERVICES RELATED TO THE SOUTH SEACREST ESTATES WATER MAIN AND SWALES IMPROVEMENT PROJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS. this design and survey work includes an additional 1,300 feet of water hain on South Seacrest Blvd, from SE 3P' Avenue to SE 28t~ Avenue; and WHEREAS, this will eliminate/replace an older unlined cast iron pipe and associated service connection with improved water quality and fire service, as well as providing design and survey services for swale improvement in this neighborhood; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA. THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the Mayor and City Clerk ro approve and execute Amendment No, 1 to Task Order No. I with CH2M Hill in the amount of $11,960.00, for additional design work ant] survey services related to the South Seacrest Estates Water Main and Swales Improvement Project. Section 2. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this S day of June, 2001. ATTEST: Vice Mayor CITY O~BOY~pN/~ACH, FLOREDA Task Order 1 - Amendment 1 April 20, 2001 Additional Services for Technical Services for Design, Bidding and Construction Phase for the Replacement of Small Diameter Water Mains and Swale Improvements in the Seacrest Estates Area, to Include Areas not Included in the Original Agreement A. Background In 1989, the City of Boynton Beach (CITY) completed a Water and Wastewater Master Plan that identified major capital improvements in the CITY's utility system through the year 2000. The projects identified in the plan related to the water system included improvements to the CITY's drinking, water facilities to improve operations and increase water production capacity as well as improvements to the water transmission system. Several Of the identified improvements related to areas where water mains smaller than 6- inches in:diameter are located and areas where the water mains were located behind residential p~operties in a utility easement. The Seacrest Estates Area contains small diameter water mains (2 to 4-inches in diameter) many of which are also located behind residences in the utility easements. The existing water mains in this area are mostly aging, galvanized or unlined, cast iron pipes. There have been ongoing complaints of low pressure and poor water quality in this area. Maintaining the water mains inthe utility easement has been problematic since many of the residents have built on the easements. There have also been incidents with dogs and the residents, don't appreciate having utility workers in their backyards. Replacement of the small diameter water mains with minimum 6-inch diameter water mares and looping-the system ,,viii increase area pressures, improve water quality, and p. rovide a more reliable system, particularly for fire service. Moving.the location of the water ma~.. to the roadways will eliminate the problems associated with the backyard easements and improve meter reading efficiency. CITY staff has been actively replacing the small diameter water mains throughout the CITY; however, the:breadth of the work required has taxed the tZl'l'Y's resources. The CIYY has evaluated their ability to perform all of the work required within the desired time schedule and has decided 'co contract out some of the small diameter water main replacement work. The improvements proposed for the Seaerest Estates Area under this Task Order shall be performed by a private contractor, therefore requiring biddable construction documents. The CITY is interested in replacing the old mains with new 6-inch diameter water mains. The pipe will most Hkely be C-900 PVC installed by conventional method, however directional drilling wend other materials will be considered for applicability. In addition to the small diameter water main replacement work, an approximately 2,100-foot section of the 6-inch diameter water main on Seacrest Boulevard from roughly Mission Hill to SE 36 Avenue is old unlined cast izon pipe. Poor water quality has also been reported in this area. This section of water main requires replacement and upsizing to a larger size compatible with service needs. The work will be developed for inclusion in the bid documents, however the CITY may choose to perform this work with CITY personnel. DFB/TO1AM£NO1 .DOC To minimize disruption to neighborhoods, the City will continue implementation of it's swale improvement program on streets receiving water main improvements. On these streets, the project will incorporate drainage improvements including swale, driveway and sidewalk reconstruction commensurate with the water main work and bid in the same construction contract. It is understood that there will be future projects throughout the City consisting of water main replacements and swale improvements. Therefore, construction documents such as specifications and standard details will be developed in a manner that will make them easily reusable on subsequent projects. The CITY has requested engineering services from CH2M I-IILL (CONSULTANT) to implement the Seacrest Estates Area improvements for the small diameter lines and swales in the general ~rea bounded by Seaczest Boulevard, Southeast 31 Avenue, Southeast 21 Avenue, and the railroad tracks at Dixie Highway. Items included in this Task Order provide for the preparation of biddable drawings and specifications, bid and construction phase services. B. Scope of Services This Amendment to the original task order adds additional area to the scope of the project, specifically: · Replacement of the water main on Seacrest Boulevard from SE 31s~ Ave. north to just beyond SE 28~ Ave. (approx. 1300 LF). · Provide survey services on Seacrest Boulevard (west side) to facilitate replacement of the water service connections from SE 34~ Ave. north to just beyond SE 28~ Ave. · Swale improvements (survey and design) on SE 1*t St. between SE 23~a Ave. and SE 27~ Ave. The specific services to be provided by the CONSULTANT are as follows: Task 1 - Engineering Design Services Additional field survey and engineering design services are required to accomplish the following improvements:: · For Seacrest Boulevard: The existing main will be replaced for the 1300 LF from SE 31" Ave to just north of SE 28~ Ave. The scope of services for this work will be the same as described in Task 1 of the original task order. There is no swale work in this area, only water main and services. This additional task will add 2 sheets to the drawing set. · Also for Seac~est Boulevard: The service laterals on the west side of the street will be shown on the drawings and replaced by directional drilling as part of the construction project. The extent of this work is SE 28m Ave. south to SE 34~ Ave. The work in this task will be incorporated into existing drawings. · For SE 1~t St.: Additional drawings willbe added to the project for the reconstruction of the drainage swales between SE 23~ Ave. and SE 27~ Ave. There are no water main replacements on this street but it makes sense to complete the drainage work in the area at the same time. This task will add 1 sheet to the drawing set. Task 2 - Permitting Services There are no changes to the Task 2 services. DFB~TOI'AMENDI .DOG Task 3 - Bid Phase Services There are no changes to the Task $ services. Task 4 - Services During Construction There are no changes to the Task 4 services. C. Additional Services The CONSULTANT will provide additional services beyond the scope as attthorizecl by a separate task order or an amendment to this task order. Additional services may include, but are not limited to, the following: · Additional site visits, public meetings or additional project scope · Claims, litigation or other controversy in connection with th~s project. D. Assumptions · Unless indicated otherwise in this Amendment, all assumptions contained in the original Task Order 1 will remain in effect. E. Obligations of the CITY Unless indicated otherwise in this Amendment, ali obligations of the CITY in the original Task Order 1 will remain in effect. F. Compensation Compensatiort by the CITY to the CONSULTANT will be on a lump sum in accordance with the Agreement. The estimated compensation for the services described in this Amendment No. 1 to Task Order No. 1 is $11,960.00. The table below summarizes the es[-imated costs anticipated for this task. Survey services are included in expenses and are not shown as part of the labor time or cost. Amendment No. 1 Cost Estimate Task 1-Additional Design Services Labor Labor Days Costs Expenses Total 7.2 $5,210 $6,750 $11,960 G. Schedule The services to be provided under this Task Order will be included in the normal progress of the project described in the original task order. No additional time will be required beyond what is necessary for the surveyors to complete the additional field work. APPROVED BY: Gerald Br'oening, Mayor Dated this 5_ day of ~.JO,,13 ~ ,2001. DFE/T01 AMEND1 .DOC 3 SUBM1TI'ED BY: CH2M HILL, INC. Vice President, Af~aV .Manager Dated this 8 day of fVto,x~ ,2001. DF~D'01A~ENOl .DO(~ CH2MHILL CH2M HILL Hillsboro Executive Center North 800 Fairway Ddve. Suite 350 Deerfield Beach. FL 33441-1831 Tel 954.426.4008 Fax 954.698.6010 May 3. 200l 161317.WM.10 Robert Kenyon City of Boynton Beach 124 East Woolbright Road Boynton Beach, FL 33435 Subject: Seacrest Estates Area Water Main and Swale Improvements Task Order 1 Dear Mr. Kenyon Please find attached, 3 original, signed copies of Amendment No. 1 to Task Order No. L relative to the additional work required to complete the construction documents for the above referenced project. The additional w~rk was developed during discussions with City staff as the project design was being completed and reflects the desire to complete as many of the anticipated improvements in the affected area as possible at one time, so as to reduce the impact of multiple construction projects on the residents in the neighborhood. The original project was envisioned to replace water mains located behind the houses in the 5eacrest Estates area, in accordance with the overall water main replacement program being carried out by the City. It was combin~ ed With espects'of the City-wide stormwater improvemenm program, in that swale improvements were to be made On streets where the water mains were to be constructed. A third program being implemented by the City is the systematic replacement of sub-standard water service connections. This amendment extends those improvement~ to include swale improvements on all streets in the neighborhood even if there are no new water mains and to replace services in areas where the water mains do not need to be replaced. It also replaces a portion of the Seacrest Boulevard water main adjacent to the project area. This Amendment to the original task order adds the following additional items to the scope of the project, specifically: Replacement of the water main on Seacrest Boulevard from SE 31st Ave. north to just beyond SE 28th Ave. (approx. 1300 Lb'). · Provide survey ~erwces on Seacrest Boulevard (west side) to facilitate replacement of the water service connections from SE 34~ Ave. north to just beyond SE 28th Ave. · Swale improvements (survey and design) on SE 1st St. between SE 23rd Ave. and SE 27th Ave. Sincerely, CH2M HILI~ Walt Schwarz, P.E. Project Manager CH2MHILL TRANSMITTAL To: City of Boynton Beach 1.2z[ East Woolbright Road Boynton Beach, FL 33435 Attn: Robert Kenyon Re: Seacrest Estates Project We Are Sending You: Attached Shop Drawings Prints Copy of letter From: Walt Schwarz, P.E. Date: Apdl 24, 2001 Under separate cover via Documents Specifications Other: Tracings Catalogs Quantity Description 3 Amendment No. 1 to Task Order No. I If material received is not as listed, please notify us at once Remarks: The attached amendment accounts for the following 3 changes to the project: The addition of swale improvements (where there are no water mains) on SE lSt Street Survey on the west side of Seacrest to replace the services Survey and design for the Seacrest Boulevard water main replacement north of where the record information we were g~ven and where the original task order said was to be replaced. As you know, the survey and the SE 1= Street design has been completed. Please contact me if you have any questions. DF~BOBTRA4.DOC 161317,WM,10 To minimize disruption to neighborhoods, the City will continue implementation of it's swale rmprovement program on streets receiving water main improvements. On these streets, the project will incorporate drainage improvements including swale, driveway and sidewalk reconstruction commensurate with the water main work and bid in the same construction contract. It is understood that there will be future projects throughout the City consisting of water main replacements end swale improvements. Therefore, construction d .oc,um. ents such,as sp?c~fications and standard detmls will be developed m a manner that w~ll make them easily reUSable on subsequent projects. · ~ne Crr~ ~s~requested en~ineerin§ services from CH2M HILL (~0NSULTANT) to. implement the:Seacrest Estates Area improvements for the small diameter line~ end swales in the general '. Items included in this Task Oraer provide for the preparation bid and construction phase services. B. Scope of Services X'nis Amendment to the original task order adds additional area to the scope of the project, specificall~n · Replacement of the water main on Seac~est Bonlevard from SE $1" Ave. north t0 just b~yond SE 28~ Ave. (approx. 1300 LF).· · P~gvide survey services on Seac~est Boulevard (west side) to facilitate replacement of the water service connections from SE 34~ Ave. north to just beyond SE 28~ Aye. · Swale improvements (survey and design) on SE 1 ~ St. between SE 23~ Ave. and SE 27~ Ave. The .specific services to be provided by the CONSULTANT are as follows: Task I. Engineering Design Services Additional field survey and engineering design services are required to accomplish the following improvements:: · For Seacrest Boulevard: The existing main willbe replaced for the 1300 LF from SE 31" Ave to just north of SE 28a' Ave. The scope of services for this work will be the same as ~ in Task 1 of the original task order. There is no swale work in th~s area, only water main and services. This additional task will add 2 sheets to the drawing set. · Also for Seacrest Boulevard: The service laterals on the west side of the street willbe shown or~ the drawings and replaced by directional drilllrtg as part of the construction project. The extent of this work is SE 28~ Ave~ south to SE 34~ Ave. The workin this task will be incorporated into existing drawings. · For SE 1" St.: Additional drawings will be added to the project for the reconstruction of the drainage swales between SE 23~ Ave. and SE 27~ Ave, There are no water main replacements on this street but it makes sense to complete the drainage work in the area at the same time. This task will add 1 sheet to the drawing set. Task 2 · Permitting Services There are no Changes to the Task 2 services. DFB/TO1AMENO1.DOC 2 SUBMi't-rED BY: CH2M HILL, INC. By: Vice President, Area Manager Dated this ~ day of /v~ ,2001. ~O1A~END1.DOC 4