R01-220 RESOLUTION NO. R01- A RESOLUTION OF THE CITY COMMISSION OF TI-IE CiTY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDERS NO. 1 AND NO. 2 BETWEEN THE CITY OF BOYNTON BEACH AND WIDELL, INC., TOTALING $16,136 FOR EMERGENCY REPLACEMENT FOR EXISTING PI;PES FOR MASTER LIFT STATION NO. 317 AND 319; AND ~PROVIDING AN EFFECTIVE DATE. WHEREAS, the work performed by Widell, Inc., is in addition to current Bid ~ro. 094-2821-00. CJI), 315, 317, 319 and 356, Master Lift Station Rehabihtation; and WHEREAS, Lift Station 317 experienced a pump failure and the Utilities Department purchased a new 75 hp Flygt pump ro be installed by the C~ntracror; and ! WHEREAS, During the design stage of Lift Station 319, mbdifications to the clischarge header pipe were not anticipated, but will be required; NOW, TI-W, REFORE, BE IT RESOLVED BY TWE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton ]~each, Florida does 1 aereby authorize and direct the Mayor and City Clerk to approve aad execute Change Drders No. 1 and 2 with Widell, Inc., totaling $16,136 for emergency services related to Master Lift Station 317 and 319, which Change Orders are attached hereto and made a ~art hereof. Section 2. This Resolution shall become effective in,mediately upon ~assage. 1)ASSED AND ADOPTED this I '/ day of July, 2001. ~TTEST: ~le~k~ B'' /~,~ommissioner Commissioner MEMORANDUM TO: FROM: DATE: RE: BARB CONBOY, UTILITIES JANET PRAINITO, CITY CLERK JULY 30, 2001 Attached please find a copy of the above mentioned resolution and two partially signed agreements that were approved at the City Commission meeting held on July 17, 2001. After the agreements have been signed, please return o~ae sigaed a. greemant to me for Central Files. Thank you. j :Xshrdata\cc\wp Xraemo s\b arb conboy.doc WIDELL, INC. .~wage Treatment Works ~ W~ater Treatment Works Substructure Construction Via UPS TO: City of Boynton Beach 124 E. Woolbright Road Boyraon Beach, Florida 33435 954-587-0520 DATE: Attn: Anthony J. Lombardi FAX: 954-587-6653 5365 Stirling Road Ft. Lauderdale, FL 33314 June 5, 2001 Master Lift Station Rehabilitation Lif~ Stations 316, 317, 319 & 356 City of Boynton Beach, Florida CH2M Hill Widell, Inc. Job #654 Submittal No. WE ENCLOSE THE FOLLOWING: Documents NO. COPIES DWG NO. DESCRIPTION 1 Orit~inal Contract~Modification No 1 & No. 2 Signed by the Contractor SUBMITTED BY: Widell, Inc. FOR: ~ APPROVAL ~] CORRECTION & RESUBMISSION ~[ FINAL APPROVAL ~] APPROVED AS NOTED, PROCEED [-'-[ APPROVED, PROCEED [~1 USE NOTE: IN ORDER TO MEET CONTRACT SCItEDUI~, THESE DRAWINGS MUST BE RETURNED NO LATER THAN REMARKS: Please return one fully executed copy. FILE W/l BY: FIELD CHRONO VERY TRULY YOURS, WIDELL, INC. E. } OmtS f Project Manager ~ CONTRA CT MODIFICATION CH2MHILL ~'] CHANGE ORDER [] WRITTEN AMENDMENT TO CONTRACTOR: Widell, Inc. Mor31FI~ATIC)N NO1: 1 PROJECT: City 0f Boynton Beach Master Lift Station Rehabilitation PROJECT NO: 152734.SC.01 OWNER: City of Boynton Beach ENGINEER: CH2MHILL Installation of one (1) owner furnished dM-pit submersible pump at LS 317. The CONTRACTOR shall provide and install new pipe and fittings, new thermal overlaod heaters, and new concrete supports. Owner will supply materials as shown on the attached FLYGT proposal. Emergency replacement for existing pumps. Proposal Number One by Widell, Inc. Widell, Inc. also reserves the right to apply for a contract extension if the work performed will exceed the contract deadline. Contract Amount or Price Contract Times (Calculate Days) Original $1,547,000 Original Duration 330 _ Days Previous Contract Previous Contract Modification(s) Modification(s) (Add/Deduct) $ (Add/Deduct) Days This Contract Modificrafion This Contract Modification (Add/Deduct) $11,804.00 (Add/Deduct) 0 Days Revised Contract Amount $1,558,804 Revised Contract Time 330 Days The Revised Contract Completion Date is: December 13 ,20 01 1 Number ail Modifications consecutively. 2 Recommendation necessary for Change Orders. B-3 Copisa:Owner Field File REV 10/95 FORM 273 WIDELL,, INC. te Cert;fied No. CG CA45308 Page Treatment Works -vvd er Treatment WorKs Substructure Construction 5365 STIRLING ROAD mT LAUDERDALE FL 33314 May 16, 2001 Via Facsimile and Mail CH2M Hill 800 Fairway Drive, Suite 350 Deerfield Beach, Florida 33441 Mtn: Mr, Jason P.F. Parrillo, P.E. Gentlemen: The City of Boynton Beach Master Lift Station Rehabilitation Lift Stations Nos. 316, 317 319 and 356 Bid #094-2821-00/CJD, WI Job ¢/854 Proposal Number One We are in receipt of your Request for Quotation No. I dated Apdl 17, 2001, to install one Owner furnished submersible dry-pit pump at Lift Station 317 ~, .We are pleased to provide you with the following proposal: Remove the Existing Pump and Install New Owner Furnished Pump and Revise Piping ......................... $11,804.00 Please review the attached breakdown. We request you write a Contract Change Order for the increased amount of $11,804.00 with additional time to be determined. The full extent and impact to the project is not known, therefore, additional time and compensation may be appropriate. We believe the pump and revised piping can fit between the existing suction and discharge isolation plug valves. We have not included any by-pass pumping. If you have any questions, please do not hesitate to call. Very truly yours, WIDELL, INC. Robert E. Hodge~ Project Manager REH:lkdkoroposa ~-e54 cc: File, Field, Chrono SAFETY PAYS AN EQUAL OPPORTUNITY EMPLOYER PN #1 Master Lift Station Rehabilitation 05/15/2001 Replacement of Owner Furnished Pump Lift Stations 316, 317, 319 & 356 at Lift Station 317 C~ of Boynton Beach, Florida Page I of 1. MATERIALii 2. s.c. 3. E.R. 5_ LABOR IIDESCRIPT]ON ti QTY UN m U.P. t PRICE II M.P. I AMOUNT NO' t 4' OTHER II Demord~on Remove Base Elbow & Pump I Job -- sg0 $3201 Support $250 Remove Pump & Piping I Job -- $100 $220 Install Owner Furnished Pump 1 Job ~ Owner $100 $5801 Electrical __ $550 , (Energy Efficient Proposal Attached) Pine and Fiffinos 16"x 12" Fig Ecc. Reducer 1 Ea 503.41 $503 -- - 12,,x 10,, Fig Conc. Reducer 1 Ea 376.25 $378 -- 12', Flange Filler 5/8" Lg 1 Ea 463.651 $46Zl -- 12" Flange Filler 1 1/8" Lg 1 Ea 463.65: $464 -- 12" Expansion Joint Single F'dled 1 Ea 786.00 $78~ - Arch 10" Expansion Joint I Ea 1201.22 $1,201 -- Teflon Bellows SS Drop in Lin~ 16" Fig Acceesofies I Ea 25.26 $25 -- 12" Ftg Acceasories 7 Ea 15.14' $10~ -- 10,' FIg Accessoriea 2 Ea 13.79~ $28 ~ -- Form & Pour Purn~ Supbort Base Eli Support 5 CF 30.00 $15n $70 20.00 $10n Pump Support 14 CF 30.00 $42n -- 20.00 $280 Pipe Support 1 Ea $20n -- $10n Anchor Bolts 12 Ea 15.00 i $1 Non Shrink Grout 1 CF 30.00 $31~ -- $150 We are not planning to remove tile SucUon or the Discharge Plug Valves Therefore, No By-Pass Pumping Included. Detail AUached Subtotal $4,933 $1,160 $2,71 n Mat. taxes & labor burden §% $298 43% $t,165 Material $5,229 $1,160 $3,875 Subcont, Equip. Rental or Other, $1 Labor $3,875 Subtota $10,264 Overhead 10% $1,02~ Contractor's fee 5% I $513 Totel ] $11,804 Page Totals II II It II ,l',-onday, May 07, 2001 8:39 AM To: Bob Hodges From: Bill Scott, 56'~-65;5-9661 Page: 2 of 2 Energy Efficient Electric, Inc. 1600 Mercer Ave. Unit 6 W~est Pahn Beach, FL. 33401 Phone (56t) 655-7211 Fax {561) 655-9661 ~obile (561) 722-1383 E-Ma~ Address: bitt(~energye..ff, com May 7, 2001 Change Order No. 1 LS 317 pump replacement We are pleased to provide your firm wtth our scope and proposal for the neces~ry changes as indicated on RFP~ l dated April 23, 200L Included: Furnish and install new overload boaters in th~ existing starter. These heaters ~'ill be sized based on the F.L.A. of tho replacement pump. These overloads need to be ordered Approximately one week Jbr delivery, 2. Provide necessary labor to disconnect and lock off the existing motor starter. 3. Provide necessary labor to connect and terminate the existing motor feeders to the new pump. Provide necessary labor to assist with start, up, Lump Sum $ 550.00 We appreciate the opportuniw to quote )'our organization on this project. If you have any questions. please call me at the office. Thank You Very Kindly, 3 I1 scott Bill Scott Vice President Residea~tial .... Lighting Systems .... Commercial .... Industrial c~ o~ FLORIDA BEACH .~ .-..~ .... T'~: CITY OF BOYNTON BEACH - MAMC LAW March ;29, 2001 ~ BOYNTON BEACH PS 33.7 IREPLACEMENT PUMP Weare p/eased to offer the following equipment: . ONE (1) CT3300/644 75bp 3Pll 460v FlyEr Submersible Pump with 40 of MOtor Cable ~lncludes stand, suction elbOw and special order air freiEht Pump Price per Boca Raton Bid 99-025 S2S.4?O.bO ~ S37.895.00 e- plus taxes. FOB factory.with freight allowable to ]obsite THIS!.~IaROPOSAL WILL EXPIRE IN THIETY (30) DAYS UNLESS EXTENDED IN WRITING BY ELLIS K, PHELPS & COMPANY. WE DO NOT SUPPLY PIPING.VALVES,GUIDE BARS,PRESSURE GUAGES OR SPARE PARTS EXCEPT AS INDICATED, ABOVE. ~*~.RMS: SUBJECT TO CREDIT APPROVAL NET 30 DAYS AFTER DATE OF INVOICE OR 100% · ; PAYABLE BEFORE START-U~ OF EQUIPMENTONHIC~IEVER COME~ IrlR~r.) A _ _ SERVICE CHARGE OF 1.5% PER MONTH WILL BE ADDED TO ALL BALANCES UNPAID 30 DAYS AFTER INVOICE DATE. FAILURE TO PAY IN ACCORDANCE WITH THESE TERMS WILL VOID ALL WARRANTIES. CONDITIONS :1) Price is firm based on our receiving complete approval and release for production four (4) Weeks after drawings have been submitted by Ellis .K. Phelps & Company 2) PARTIAL BILLING WILL BE MADE ON ANY PARTIAL SHIPMENT. We thank)~u for your interest in our equipment and look forward to being of service to you In the near future. A SIGNED FACSIMILE COPY OF THIS PROPOSAL )S ACCEPTABLE'~S A BINDING CONTRACT. COMPANY ACCEPTED BY: COMPANY: STEVE KISS DATE: