Loading...
R17-071 1 RESOLUTION NO. R17-071 2 3 4 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 5 FLORIDA ADOPTING A REVISED SCHEDULE, OF 6 ENGINEERING DIVISION FEES AND PROVIDING AN 7 EFFECTIVE DATE. 8 9 WHEREAS, as a result of a newly awarded contract for survey and mapping, 10 specifically the plat review, an update to the City's Engineering Division Fees to match the 11 negotiated set fees for plat review services is required; and 12 WHEREAS,the City Commission finds the fees as established herein to be necessary to 13 fully fund for efficient administrative functions of City staff 14 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 15 THE CITY OF BOYNTON BEACH,FLORIDA THAT: 16 SECTION 1.- The foregoing "WHEREAS" clauses are hereby ratified and 17 confirmed as being true and correct and or hereby incorporated herein. 18 SECTION 2. The City Commission adopts and directs the implementation of 19 the fee schedule attached as Exhibit"A". 20 SECTION 3. This Resolution and the adjusted fees described herein shall 21 become effective immediately upon its passage and adoption. 22 1 23 PASSED AND ADOPTED this /3-44day of Af yil..S , 2017. 24 CITY OF BOYNTON BEACH, FLORIDA 25 26 YES , NO 27 28 Mayor— Steven B. Grant 29 30 Vice Mayor—Justin Katz 31 32 Commissioner—Mack McCray 33 34 Commissioner—Christina L. Romelus 35 36 Commissioner—Joe Casello 37 38 39 VOTE .D 40 41 ATTEST: 42 43 44 45 Jug r h A. Pyle, CMC- 4 6 0.ty Clerk 47 „ rh� 4849 ra,rz 50 (Corporate Seal) K A'WV 2 ' >\1 _ O \ G�C% O0 ,. CITY OF BOYNTON BEACH ; PUBLIC WORKS DEPARTMENT I ENGINEERING DIVISION .0, '.a' 100 East Boynton Beach Boulevard • Boynton Beach, FL 33435• (561)742-6980• Fax(561)742-6357 k sir" r 'tip, www.boynton-beach.org ENGINEERING DIVISION FEES (Resolution #17- , Adopted 08/15/17) L PRIMARY FEES: (A) Land Development Plan Review Fee: The plan review fee will be credited against the actual cost of the land development permit at the time of permit issuance. If a permit is not issued for any reason subsequent to plan review, the City will retain the plan review fee (non-refundable). (1) Minimum fee $75.00, or (2) Plan Review Fee Rate On Construction Value: 1.00% $0 -$100,000, plus 0.30% $100,001 -$500,000, plus 0.10% over$500,001 (B) Land Development Permit Fee: (1) Minimum fee $75.00, or (2) 2.3% of the construction value, whichever is greater 2.3% (i) Surety in the amount of 110% of the Engineer's opinion of probable cost will be required per Part III, Chapter 2, Article III, Section 2.C.2.c and Section 6.B. (C) Platting Fee: (1) Preliminary Plat Fee $1,000.00 (i) The preliminary plat review fee will be credited against the City review fee if final plat process is commenced within ninety (90) days of preliminary plat process. (2) City Review Fee $2,000.00 (3) Surveyor Fees (i) Plat Dedication Sheet Initial Review $300/150.00 per Sheet (ii) Plat Map Sheet Initial Review $500.00 per Sheet (iii) Resubmission Each Review $150.00 per Hour (iv) Verify P.R.M. in Field $384400.00 (4) Request for Plat Waiver $200.00 (5) Plat Recording Fee (per P.B.C. fee schedule) II. RIGHT OF WAY FEES: (A) Right of Way Permit Fee: (1) Minimum fee $75.00, or • (2) 2.3% of the construction value, whichever is greater 2.3% (i) Construction value shall include but not limited to all restoration costs plus related landscaping, irrigation, paving, grading, and drainage improvements. (H) Liability insurance will be required per Part III, Chapter 2, Article III, Section 4.B.4. (iii) Surety in the amount of 110% of the Engineer's opinion of probable cost will be required per Part III, Chapter 2, Article III, Section 4.B.5; if deemed necessary by City Engineer. III. ADMINISTRATIVE FEES: (A) Engineering Division Waiver: (1) Sidewalk $7.00/SF (2) Administrative $200.00 (B) Land Development Permit and Right of Way Permit Extension Fee: (Requests must be made within thirty(30) days prior to expiration) (1) Minimum fee $75.00, or (2) 25%of permit fee as calculated at time of reinstatement, whichever is greater 25.0% ENGINEERING DIVISION FEES Page 1 of 2 (C) Professional Services: ($75.00/hour or portion thereof) $75.00 per Hour (i.e. Permit research, due diligence reports, community acknowledgement forms, etc.) (D) Replacement Document Fee: (1) Permit card $30.00 (2) Permitted plans ($30.00 plus printing costs) $30.00 plus printing costs IV. INSPECTION FEES: (A) Inspection fees associated with Land Development Permits and Right of Way Permits are included in the base permit fee as noted in Section I & II above. (B) Advisory, Special Inspection, or Inspections During Off-Duty Hours• $75.00 per Hour (Minimum of two (2) hours) (BASED ON AVAILABILITY) V. OTHER DEPARTMENTAL & AGENCY FEES: (A) Planning &Zoning Division Fees: (In addition to primary permit fees) (1) See Part III, Land Development Regulations, Chapter 2. Article II, Section 1. (F) (B) City Parks and Recreation Facilities Impact Fee: (In addition to primary permit fees) (1) See Part III, Land Development Regulations, Chapter II. Article VI. Section 2. (C) Water and Sewer Capital Facilities Charges: (In addition to primary permit fees) (1) See Code of Ordinances, Part II, Chapter 26, Article II, Division 2, Section 26-34 VI. NOTES: (A) All required improvements shall be completed within one (1) year of the date of issuance of the Land Development Permit. (B) Right-of-way permits shall be valid for a period not to exceed six (6) months from the date of issuance. (C) All fees are non-refundable. (D) Fee estimates upon request. (E) Annexations are administrated by the Planning and Zoning Division. See Planning and Zoning Division fee schedule for application fees. (F) Abandonments (easements and right of ways) are administrated by the Planning and Zoning Division. See Planning and Zoning Division fee schedule for application fees. S:\Engineering\Fee Schedules\Fee_Schedule_Engineering_Division.docx (Previous R16-074 and current format Engineering Division fee schedule change history by Resolution—RI 7-.......) ENGINEERING DIVISION FEES Page 2 of 2