Loading...
R18-062 1 RESOLUTION NO. R18-062 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, APPROVING AND AUTHORIZING THE CITY 5 MANAGER TO SIGN TASK ORDER NO. R13-063-12 WITH CH2M 6 HILL FOR TECHNICAL ASSISTANCE IN THE PREPARATION 7 AND APPROVAL OF THE OPERATIONAL PERMIT FOR 8 AQUIFER STORAGE AND RECOVERY WELL #2 (ASR 2) IN 9 THE SUM OF $58,538.24 UTILIZING OUR EXISTING 10 CONTRACT FOR HYDROGEOLOGICAL CONSULTING 11 SERVICES RFQ029-2821-13/DJL; AND PROVIDING AN 12 EFFECTIVE DATE. 13 14 WHEREAS, the City operates two aquifer storage and recovery (ASR) wells, both 15 located at the East Water Treatment Plant; and 16 WHEREAS, this Task Order will provide hydrogeological support in the City's 17 application for the final operational permit for the well now that sufficient data is available in 18 support of the application; and 19 _WHEREAS, staff is recommending that the City Commission approve Task Order 20 R13-063-12 with CH2M HILL for technical assistance in the preparation and approval of the 21 Operational Permit for Aquifer Storage and Recovery Well #2 (ASR 2) in the amount of 22 $58,538.24 utilizing the City's existing contract RFQ 029-2821-13/DJL 23 "HYDROGEOLOGICAL CONSULTING SERVICES". 24 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 25 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 26 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 27 being true and correct and are hereby made a specific part of this Resolution upon adoption 28 hereof. 29 Section 2. The City Commission of the City of Boynton Beach, Florida does C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.lE5\SATNOEVN\CH2M_Hill_Task_Order_R13-063-12__Reso.doc 1 hereby approve and authorize the City Manager to sign Task Order R13-063-12 with CH2M 2 HILL for technical assistance in the preparation and approval of the Operational Permit for 3 Aquifer Storage and Recovery Well #2 (ASR 2) in the amount of $58,538.24 utilizing the 4 City's existing contract RFQ 029-2821-13/DJL "HYDROGEOLOGICAL CONSULTING 5 SERVICES", a copy of which is attached hereto as Exhibit"A". 6 Section 3. This Resolution shall become effective immediately upon passage. 7 PASSED AND ADOPTED this 17th day of April, 2018. 8 CITY OF BOYNTON BEACH, FLORIDA 9 10 YES NO 11 12 Mayor—Steven B. Grant 13 14 Vice Mayor—Christina L. Romelus r 15 16 Commissioner—Mack McCray 17 18 Commissioner—Justin Katz 19 20 Commissioner—Joe Casello / 21 22 23 VOTE 1/'0 24 ATTEST: 25 26 27 � c. ,� l=r 28 Judit A. Pyle, CMC 29 City Clerk 30 31 32 33 (Corporate Seal) 34 35 C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.1E5\SATNOEVN\CH2M Hill_Task_Order_R13-063-12= Reso.doc cod, Task Tank Order No. R13-063-12 Professional Hydrogeologic Services for ASR Well Permitting Background The City operates two aquifer storage and recovery(ASR)wells, both located at the East Water Treatment Plant.The City's first ASR well,ASR-1, has been operating under a letter of authorization since 1992.The City renewed the construction and testing permit for its second well,ASR-2, in 2012, with a 5-year duration (FDEP File#0196693-004-UC),which has subsequently been extended through August 13, 2018.The renewed construction and testing permit for ASR-2 presented the construction and operating characteristics for both ASR wells,and in consideration of the wells' shared storage zone,one well is acknowledged as the defacto monitoring point for the other. CH2M has been requested to provide technical support for the operation permitting of ASR-2,which must be obtained prior to the expiration of the construction and testing permit. B. Scope of Services The scope of services included in this authorization for each of the tasks identified above are as follows: 1. Coordination Meetings a. One teleconference with FDEP prior to submittal of the application b. One meeting at the City to review draft permit application documents Deliverables: Meeting agendas and meeting summaries for both meetings. 2. Application Preparation a. Preparation of FDEP Application Form 62.528.900 (1) b. Background and project description c. Updated location maps d. Review and incorporate operating plan prepared by City; e. Prepare maximum cumulative storage volume calculation; f. Create scaled map and estimate extent of stored water; g. Update area of review(AOR); h. Summarize and graph cycle testing volumes and timeframes; 1 i. Create graphs and evaluate operational water quality data from 2010 to 2018 for the operation of ASR-2 and ASR-1. j. Compilation of all components of the permit application for electronic delivery to FDEP. This Task Order includes one formal or informal Request for Additional Information (RAI) from FDEP for the ASR permit application. Deliverables: One draft PDF application and transmittal letter for City review. Once final PDF application, which will be uploaded for delivery to FDEP. 3. Permit Reviews and Public Meeting a. Review draft permit issued by FDEP b. Attend one public meeting c. Review Notice of Intent to issue permit Deliverables: • Review comments on the draft permit and email correspondence with FDEP to transmit comments at the request of the City. Review comments on the Notice of Intent to Issue and email correspondence with FDEP to transmit comments at the request of the City. 4. Allowance The Allowance will be used for additional City requested assistance with RAI responses beyond the first RAI, data compilation or additional meetings.The scope and fee for additional services will be authorized by the City's project manager prior to commencement of work. C. Assumptions This estimated cost is based on the following assumptions: • A Florida licensed professional engineer from the City Utilities Department will sign and seal the permit application. • The FDEP permit application fee of$750 will be paid by the City. • An operation permit application is being submitted for ASR-2 only. CH2M can assist with additional services if authorized by the City. 2 • The operation permit application for ASR-2 will include some components by reference, such as the certificate of completion, hydrogeologic cross sections, record drawings, Completion Report and data therein. • The operation permit application for ASR-2 does not include preparation of an updated O&M manual. It is assumed that the City has maintained and will continue to comply with the permit requirements for maintaining a current O&M manual at the East Plant. In order to create an electronic(PDF)submittal for FDEP,the City will provide to CH2M the additional equipment O&M data and calibration certificates to supplement the original O&M manual. • The City will advertise the draft permit and notice of intent,as required by FDEP. • The City will provide updated electronic(Excel format)operational and monitoring data to CH2M for the ASR well for the period from January 2016 through March 2018. • The operation permit application for the ASR well will be submitted electronically, consistent with current FDEP guidance. • Additional services not included in this proposal will require an amendment to this Scope of Services. D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement titled Hydrogeological Consulting Services, dated August 19, 2013, between the CITY of Boynton Beach and CH2M Hill Engineers, Inc., and extended most recently by City Commission through August 18, 2018. E. Compensation Please refer to Table 1. For tasks 1-3, compensation by the City to CH2M Hill Engineers, Inc. will be on a lump sum basis in accordance with the above-mentioned Agreement. The compensation for these services is $46,621.32 as shown in Table 1. An allowance (task 4) for $11,916.92 will be provided on a time and materials basis if requested by the City. 3 TABLE 1. TASK HOURS RATE TOTAL 1.Coordination Meetings Office 4 $86.22 $344.88 Sr Technologist 8 $191.87 $1,534.96 Sr Hydrogeologist 8 $155.00 $1,240.00 2.Application Services Office 16 $86.22 $1,379.52 Jr Engineer 160 $90.00 $14,400.00 Sr Technologist 60 $191.87 $11,512.20 Sr Hydrogeologist 60 $155.00 $9,300.00 3. Permit Reviews and Public Meeting Office 4 $86.22 $344.88 Sr Technologist 24 $191.87 $4,604.88 Sr Hydrogeologist 12 $155.00 $1,860.00 Expenses $100.00 SUBTOTAL $46,621.32 4.Allowance Office 16 $86.22 $1,379.52 Jr Engineer 40 $90.00 $3,600.00 Sr Technologist 20 $191.87 . $3,837.40 Sr Hydrogeologist 20 $155.00 $3,100.00 SUBTOTAL,Allowance ' $11,916.92 TOTAL $58,538.24 4 F. Schedule A pre-application teleconference with FDEP will be scheduled at the City's request following authorization and notice to proceed. A review of ASR operations and other requested data will be scheduled within 4 weeks of receiving the compiled data from the City. A draft application package for City review will be completed within 6 weeks of the data review meeting with the City. A final electronic application package will be submitted to FDEP within 2 weeks following receipt of comments from the City and receipt of the signed application form. The first FDEP RAI will be responded to within 2 weeks of receipt and/or receipt of additional data requested from the City to answer the RAI. Permit review comments will be provided within one week of receipt of the draft permit and notice of intent. 5 G. Authorization SUBMI FI ED BY: CH2M HILL Engineers,INC. eit-R/7/ By: Sirpa Hall,PE Senior Business Vice President Dated this 29 day of March,2018 6