R18-108 1 RESOLUTION NO. R18 -108 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, FLORIDA, 4 APPROVING AND AUTHORIZING THE MAYOR TO SIGN ALL 5 DOCUMENTS ASSOCIATED WITH THE HAZARD MITIGATION 6 PROGRAM (HMGP) GRANT APPLICATION; AND PROVIDING AN 7 EFFECTIVE DATE. 8 9 10 WHEREAS, the Federal Emergency Management Agency (FEMA) provides a 11 matching grant (75% Federal, 25% local) through the Hazard Mitigation Grant Program 12 that addresses flooding; and 13 WHEREAS, the Lakeside Gardens community is prone to flooding during high 14 tides and rain events and the need for drainage improvements was identified in the 2013 15 Flood Mitigation Plan; and 16 WHEREAS, implementation of the drainage improvements will provide an 17 improved level of service that reduce nuisance flooding and standing water in the 18 neighborhood. 19 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION 20 OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 21 22 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 23 being true and correct and are hereby made a specific part of this Resolution upon adoption 24 hereof. 25 Section 2. The City Commission approves and authorizes the Mayor to sign all 26 documents associated with the Hazard Mitigation Program (HMGP) grant application 27 requesting $637,500 for the Lakeside Gardens Drainage Improvement project with a 28 $212,500 match from the Boynton Beach Utilities for a total project cost of$850,000. 29 Section 3. This Resolution shall become effective immediately upon passage. C:\Users\Stanzionet\Appdata\Local\Microsoft\Windows\Temporary Internet Files\Content.1E5\SATNOEVN\Approve_Hazard_Mitigation_Program_Grant_Application__Reso.Docx 30 PASSED AND ADOPTED this 7th day of August, 2018. 31 32 33 CITY OF BOYNTON BEACH, FLORIDA 34 35 YES NO 36 37 Mayor—Steven B. Grant 38 39 Vice Mayor—Christina L. Romelus 40 41 Commissioner—Mack McCray 42 43 Commissioner—Justin Katz / 44 45 Commissioner—Joe Casello / 46 47 48 VOTE ,5�0 49 50 ATTEST: 51 52 53 54 Judi A. Pyle, CMC 55 Cit Jerk 56 57 58 59 (Corporate Seal) 60 61 C:\Users\Stanzionet\Appdata\Local\Microsoft\Windows\Temporary Internet Files\Content.IE5\SATNOE VN\Approve_Hazard_Mitigation_Program_Grant_Appl ication_-_Resp.Docx THIS SECTION FOR STATE USE ONLY FEMA- -DR-FL ❑ Standard HMGP 0 5%Initiative Application ❑ Application Complete 0 Initial Submission or 0 Re-Submission Support Documents Eligible Applicant Protect Type(s) ❑ Conforms wl State 409 Plan 0 State or Local Government ❑ Wind ❑ In Declared Area 0 Private Non-Profit(Tax ID Received) 0 Flood ❑ Statewide 0 Recognised Indian Tribe or Tribal Organization 0 Other: Community NFIP Status:(Check all that apply) LMS Ranking: ❑ PartidpatIng Community ID#: County ❑ In Good Standing 0 Non-Participating 0 CRS State Application ID: This application is for all Federal Emergency Management Agency(FEMA Region IV)Hazard Mitigation Grant Program(HMGP) proposals. Please complete ALL sections and provide the documents requested. If you require technical assistance,please contact the Florida Division of Emergency Management at DEM_HazardMitigationGrantProgramQem.mytlorida.com. Section I-Applicant A. Applicant Instruction: Complete all sections that correspond with the type of proposed project Application Sections I-IV: All Applicants must complete these sections Environmental Review: All Applicants must complete these sections Maintenance Agreement: Any Applications involving public property, public ownership, or management of property Flood Control-Drainage Acquisition, Elevation, Dry Flood proofing,Drainage Improvements, Flood Improvement Worksheet: Control Measures, Floodplain and Stream Restoration, and Flood Diversion -one worksheet per structure Generator Worksheet: Permanent,portable generators,and permanent emergency standby pumps Tornado Safe Room New Safe Room, Retrofit of existing structure, Community Safe Room, Worksheet Residential Safe Room Hurricane Safe Room New Safe Room, Retrofit of existing structure Worksheet Wind Retrofit Worksheet: Wind Retrofit projects only-one worksheet per structure Wildfire Worksheet: Defensible Space, Hazardous Fuels Reduction, ignition Resistant Construction, other Drought Worksheet Aquifers,other Request for Public Assistance FEMA Form 90-49(Request for Public Assistance):All applicants must Form: complete, if applicable. Acquisition Forms: If project type Is Acquisition,these forms must be completed. (Only one of the two Notice of Voluntary Interest forms is necessary.) Model Statement of Assurances for Property Acquisition Projects Declaration and Release Notice of Voluntary Interest(Town Hall Version) Notice of Voluntary interest(Single Site Version) Statement of Voluntary Participation FEMA Model Deed Restriction Language Application Completeness All applicants are recommended to complete this checklist and utilize the Guidance/Checklist: guidance for completing the application. 1 [Attach any additional Items and note Section) [Form No.HMOP] B. Applicant Information: FEMA-4337-DR-FL DISASTER NAME: Hurricane Irma Title/Brief Descriptive Project Summary: City of Boynton Beach Lakeside Gardens Drainage Improvements 1. Applicant(Organization):City of Boynton Beach 2. Applicant Type: El State or Local Government 0 Native American Tribe 0 Private Non-Profit 0 Special District 3. County: Palm Beach 4. State Legislative Senate District(s): 31;State Legislative House District(s): IR; Congressional House District(s): a1 House 5. Federal Tax I.D. Number: 59-6000282 6. Data Universal Numbering System(DUNS): 072247133 7. Federal Information Processing Standards(FIPS)Code': 1207875, (''If your FIPS code is not known,see guidance) 8. National Flood Insurance Program(NFIP)Community Identification Number: 120196 (this number can be obtained from the FIRM map for your area) 9. Point of Contact:(Person serving as the coordinator of project) ®Ms. ❑Mr. First Name: Angela Last Name: Prymas Title: Senior Engineer Address: 124 East Wootbright Road City: Boynton Beach State: FL Zip Code: 33435 Telephone: 561-742-6421 Email: Prymasa@bbfl.us 10. Application Prepared by: EMs. ❑Mr. First Name: Angela Last Name: Prymas Title: Senior Engineer Telephone: 561-742-6421 Email: Prymasa@bbfi.us 11. Authorized Applicant Agent(proof of authorization authority required) OMs. ®Mr. First Name: Steven Last Name: Grant Title: Mayor Address: 124 East Wooibright Road City: Boynton Beach State: FL Zip Code: 33435 Telephone: 561-742-6410 Email: GrantS@bbfl.us Signature: 51irrii,.......„ Date: 12. Local Mitigation Strategy(LMS)Compliance a. All proposed projects must be included in the county's Local Mitigation Strategy(LMS)Project List, and on file with FDEM's Mitigation Bureau Planning Unit. Does your jurisdiction have a current FEMA Approved Mitigation Plan and this project is listed? k. Yes 0 No b. Attached is a letter of endorsement for this project from the county's LMS Coordinator. ®Yes 0 No Ensure the LMS endorsement letter contains both the Total Estimated Projects Cost(Section IV.D.),along with the Estimated Federal Share(Section IV. E.1.)allocated to this project. c. The LMS project list and endorsement letter both have an estimated cost column and Federal Share amount that is within$500.00 between the two®Yes 0 No 13. Has this project been submitted under a previous disaster event?® No 0 Yes,please provide the disaster number and project number(as applicable): 2 [Attach any additional items and note Section] Form No.HMP] Section II—Project Description A. Hazards to be Mitigated/Level of Protection 1. Select the type of hazards the proposed project will mitigate: E3 Flood ❑Wind ®Storm surge 0 Wildfire ❑Other(list): 2. Identify the type of proposed project: ❑ Elevation and retrofitting of residential or non-residential structure 0 Acquisition and Relocation 0 Acquisition and Demolition ❑Wind retrofit ®Drainage project that reduces localized flooding ❑Generator ❑Other(please explain) 3. List the total number of persons that will be protected by the proposed project(include Immediate population affected by the project only): 191 4. List how many acres of"Total Impacted Area"is to be protected by the proposed project(include immediate area affected by the project only): 7.11 Acres 5. Fill in the level of protection and the magnitude of event the proposed project will mitigate. (e.g.22 structures protected against the j-year storm event(1%chance) 16 structure(s) protected against the AQ-year storm event(10,25, 50, 100,or 500 year storm event) structure(s)protected against mile per hour(mph)winds 6. Check all item(s)the project may impact: ❑ Wetlands ® Water Quality 0 Previously Undisturbed Soli ® Floodplain ® Coastal Zone 0 Toxic or Hazardous Substances ❑ Historic Resources 0 Fisheries 0 Threatened&Endangered Species ❑ Vegetation Removal ® Public Controversy ❑ Potential for Cumulative Impacts ® Health&Safety 0 Other 7. Engineered protects:If your project has been already designed and engineering Information Is available,please attach to your application ALL calculations, H&H study and design plans(e.g. Drainage Improvement, Erosion Control,or other special project types). Ci No 0 Yes If so, see Attachment#(s) B. Project Description,Scope of Work, and Protection Provided (Must be Completed in Detail) Describe, in detail,the existing problem,the proposed project,and the scope of work. Explain how the proposed project will solve the problem(s)and provide the level(s)of protection described in Part A. Also, if available,attach a vendor's estimate and/or a contractor's bid for the scope of work. Please ensure that each proposed project is mitigation and not maintenance. 3 [Attach any additional Items and note Section] [Form No.HMGP] 1. Describe the existing problems: everal times a year.normal and severe rainfall events andhlgh tides cause localized flooding In the community. Dudna high tides and severs weather eventsmalor floodina occurs on N Lake Drive making the road impassable The flooding shuts down roads causing hardship and disruption to community Eve=and earns becoming a public safety concern to the residents for emergency response.flreand law enforcement services,school district bus service and work attendance. Additionally.the serious deterioration of the roadwayposes a traffic hazard.Residents and elected officials identified flooding as amiority resource man cement concern. The Lakeside Gardens community is located in the City of Boynton Beach.Palm Beach County.on the oast side of U.S.Hlahwav 1.between the Intracoastal Waterway and U.S.Highway 1 in a FEMA Special Flood Hazard Area.The area includes several National Flood Insurance Program NFIP-Community Rating System(CRSI Reoetftive Loss zopertlss(RI-1.The existim pavement and storm inlet_arates on N.Lake Drive are at approximately 2-2.5 ft.NAVD, which is approximately 3.3 ft.above MSL.Spring and Fall tides vary from 3,5 to 3.75 above MSL. Hiah density zoning(condominiums)hasdeveloped immediately north and south of Lakeside Gardens at elevation significantly higher than the aenerallevel of the adjacent roads and_properties.There is no overland flow from this area to the Intracoastal Waterway.If the existing positive dralnaae is filled to capacity.ponding occurs on the road end/or flows to the side of the roadways to pond on adiacent low-lying properties.This situationitas led to severe deterioration of the roadway surface.base and sub-base causing numerous potholes becoming a traffic hazard. )3esed on experience of City's engineers and stormwater field personnel.in the state southeast area problems also cerise when there are continuous rainfall events on a saturated_around.The aroundsabuatton conditionis tvoical in Florid a cou i,= • the c seas 1 Acco L• , • • his •rlcal rel [. • .. an , ral on 1 • Florida can last several months, Lakeside Gardens Is impacted by high sea levels.With coastal development and sea level rise.the around water table is rising and tidal wateris flowing from the intracostal Waterway through the existing storm pipes and Into the streets,and low-ivino areas.Surface water percolation into the around is affected, In recent rainfall events and during the sprinatides the entire community wasinundated by floods and to the most galpal areas with up to 24 inches of water depth.The City's Stormwater unit provided emergency flood relief and cleanisa operations to lessen the resident's hardship.After several hours of continuous offsite discharge using of the Utilities Vac-Trucks the stormwater crew was able to substantially reduce the floodlna extent and water depth. )1 faille this protect Is Implemented.the City has developed a potential temporary solution to reduce flooding in the neighborhood by placing a portable • p at the south end of N.Lake Drive to pump stormwater from the current stormwater collection system. 2. Describe the type(s)of protection that the proposed project will provide: Lakeside Gardens Drainage improvements Protect will provide protection of life.health.safety and property. were flooding is a public safety hazard because emergency medical response,fire and law enforcement services can have difficulties reaching the residents during emergency calls.Standing water poses a health threat from diseases.including those caused by breeding mosquito populations.chemical contaminants and electrocution. Additionally.it causes hardshio and disruption to community access and egress.When the roads and low-lying properties are flooded,residents are unable to maintain a reasonable auallty of life as mobility Issues arise.i.e., residents are unable to walk in their neighborhood,walk their pets.exercise.etc. leveral of the residence's elevations are a few inches higher than the road.The protect will mitlaate the potential for continuous property damage and loss.The protect addresses a repetitive problem that poses a significant risk to public health and safety If not resolved. The drainage Improvements of the Lakeside Gardens roadway system will be implemented to mitigate the flooding s cent and water death and reducina adverse Impacts to the ecosystem of the Lake Worth Lagoon.The drainage system will collect.convey and treat the water in each catch basin before being discharge by pumping or gravity to the Lake Worth Lagoon, 4 [Attach any additional Items and note Section] [Form No.HMGP] 3. Scope of Work(describe in detail what you are planning to do): The protect will provide an uoaraded dralnaae system along Potter Rd.and N Lake Dr.to allow the water to drain faster to the outflow areas and Into the Intracostal Waterway.The outflow pipes will be upsized and will include back- flow prevention valves to prevent tidal waters from flowing back to the roadway, The maior items of the Dialect Involve new roadway drainage.reconstruction.widening and regrading of the roadway with curb and gutter,Including two outfalls where stortrwater discharges Into the Intracostal Waterway.Each discharge will include stormwater treatment. The proDOeed uDuradpd_stormwater system Includes the reconstruction of Potter Rd.and N.Lake Drive with a length of aoproxlmately 1.250 feet.Four existing dralnawstitictures will be replaced and five new drainage structures will be Installed.Including a drainage pump station at the east end of Potter Rd.Both existing outfalls will be redesignedluoslzedincluding back flow Prevention valves,The new carrying storm pipes and outflows will be designed for the proper capacity based on the correspondent drainage study. For budgeting purposes,the following pipe sizes and lengths are estimated: 1.200 ft.of 18"RCP along Potter Rd and N.Lake Dr. 170 ft.of 10"PVC pressure outfall from Dump station 180 ft,of 24"RCP outfall at south side of N.Lake Dr. Swales have not been effective because the existing Bolls mucky with high content of manic materiatand minimal or none infiltration capacity. For water Quality.the drainage structures will be provided with minimum of 12 inches sumps. The new drainage system.roadway widening and regrading including curb and gutters.will promote better surface drainage that leads to greater protection of life and property. The City contracted with WGI topographic survey to gather data necessary for alternatives formulation of Potter Road and N.Lake Drive drainage improvements on City's Right of Way(ROW).Subsequently the City plans to procure engineering services to assist with the design.permitting and construction bidding. 4. Describe any other on-going or proposed projects in the area that may Impact,positively or negatively, the proposed HMGP Project: Casa del Mar-Dimlck Road drainage improvements. 5 [Attach any additional items and note Section] [Form No.HMGP] 5. Describe the purpose and need for the proposed project: The need for the drainage improvements on Lakeside Gardens was Identlfledin the 2013 Flood Mitigation Plan and ite action plan reaulres increase the correction of localized dralnap oroblerns so that Level of Service standards are enhanced. The neighborhood Is located in the City's Repetithce Loss Area 61.intense or_ rolonaed:concentrated rain Is the primary cause of flooding In the repetitive loss areas,Maierlainfall events occur in association with hurricanes.tropical storms.and ihunderetormsass9dated with frontal systems.The overabundance of rainfall creates saturated soli conditions,after which additional rain causes surface ponding or an overflow from the drainage systems.catchment basins and manholes.This can result In street andvard flooding and severed roadway damages. Lakeside Gardens is Impacted by high sea levels.Seeley.'rise Is caused by two factors related to global warming: eaded water from melting Ice sheets and glaciers,and the expansion of seawater as it warms.In Southeast Florida, sea level is predicted to rise 6 to 10 inches by2030 and 14 to 26 Inches by 2060.resulting In the followina Impacts: • Increasing coastal flooding • Increasing Inland floodlna due to impaired stormwater Infrastructure • Decreasing property values and tax base • Increasing insurance costs Boynton Beach and other cities are considering sea level/twin decisions about public Infrastructure and facilities. 13y Increasing the number of storm drainage Inlets and storm pipe capacity.the prolect_arsatly mitigates roadway flooding from severe rainfall,storms and tidal events.Thepfoiect design will include back flow prevention yalves to keep tidal waters out of the storm system andleduce flooding.The proposed dralnaae Improvementawill eliminate Impassable roads.the potential for properly damage and Public safety hazard.for example.drivina through flooded greets can produce a wake that worsens flooding to buildings along the street.additionally,electrical currents can travel through water and cause electrocution. These threatening conditions occur during.and for a period after.a heavy rainfall or high tide.This prolect addresses this freauently occurring problem. In addition to the expected Increase of resident's satisfaction and weilbeina.the community will no longer be exposed to floodlna repercussions.i.e. 1. Unable to accesslegrese dwellings due to water depth.extent of Inundated area and water pondina duration 2. Damage to vegetation and property 3. Soil erosion 4. Hindering school/work attendance 5. Safety concerns 6 [Attach any additional Items and note Section] [Form No.HMCGP] Section III—Project Location (Fully describe the location of the proposed project.) A. Site 1. Describe the physical location of this project, including street numbers(or neighborhoods)and project site zip code(s). Provide precise longitude and latitude coordinates for the site utilizing a hand-held global positioning system(GPS)unit or the equivalent: Location: The protect area Is located in the east side of 33435 including Potter Road. N Lake Drive and DImick Road. Address(s): N Lake Drive-Boynton Beach.FL 33435 GPS coordinates(decimal degree format): Lat:26.551647057 N and Long:80.053542963 W Project Zip Code(s): 33435 2. Title Holder:City of Boynton Bech 3. Is the project site seaward of the Coastal Construction Control Line(CCCL)? ❑Yes® No 4. Provide the number of each structure type(listed below)in the project area that will be affected by the project. Include all structures in project area. ® Residential property: 15 0 Public buildings: 0 Businesses/commercial property: ❑ Schools/hospitals/houses of worship: ® Other. 1 B. Flood Insurance Rate Map (FIRM)Showing Project Site 1. ® Attach one(1)copy of the FIRM map,a copy of the panel information from the FIRM,and, if available, the Floodway Map. FIRM maps are required for this application(if published for your area). Also, all attached maps must have the project site and structures clearly marked on the map. FIRMs are typically available from your local floodplain administrator who may be located in a planning,zoning, or engineering office. Maps can also be ordered from the Map Service Center at 1-800-358-9616. For more information about FIRMs,contact your local agencies or visit the FIRM site on the FEMA Web- page at https://msc.fema.Qovfaortal. 2. Using the FIRM,determine the flood zone(s)of the project site(Check all zones in the project area) . (See FIRM legend for flood zone explenattons)(A Zone must be Identified) ❑ VEorV1-30 ® AEorA1-30 ❑ AO or AH ❑ A(no base flood elevation given) ❑ B or X(shaded) ❑ C or X(unshaded) ❑ Floodway 0 ❑ Coastal Barrier Resource Act(CBRA)Zone (Federal regulations strictly limit Federal funding for projects in this Zone; please coordinate with your state agency before submitting an application for a CBRA Zone project). 3. 0 IF the FIRM Map for your area is not published, please attach a copy of the Flood Hazard Boundary Map(FHBM)for your area,with the project site and structures dearly marked on the map. 4. ❑ Attach a copy of a Special Flood Hazard Area Flood Insurance Assurance(s). C. City or County Map with Project Site and Photographs 1. ►moi Attach a copy of a city or county scale map(large enough to show the entire project area)with the project site and structures marked on the map. 2. ® Attach a USGS 1:24,000 TOPO map with project site clearly marked on the map. 3. ❑ For acquisition or elevation projects, Include copy of Parcel Map(Tax Map, Property identification Map, etc.)showing each property to be acquired or elevated. include the Tax ID numbers for each parcel, and Parcel information—including year built and foundation. 4. ►;i Attach photographs(at a minimum 4 photographs)for each project site per application. The photographs should be representative of the project area, including any relevant streams, creeks, rivers, etc. and drainage areas that affect the project site or will be affected by the project,and labeled. For each structure, please include the following angles:front, back and both sides. 7 [Attach any additional items and note Section] [Form No.HMGP] Section IV- Budget/Costs In this section,provide details of all the estimated costs of the project. As this information is used for the Benefit-Cost Analysis,reasonable cost estimates are essential. Contingency Cost should be included as a line item in the budget section and justified. Recommended range is 1 to 5%. Avoid the use of lump sum costs. A. Materials item Unit Quantity Cost per Unit Cosi Mobilization,Maintenance of Traffic and General Requirements $90,000.00 Stormwater piping and structures $109,000.00 Roadway restoration and widening i 1 } $98250.00 Back-flow prevention valves I $30,000.00 Drainage pump station $50,000.00 Utilities relocation I i $15,000.00 � I Sub-Total $392,250.00 B. Labor Include equipment costs. Please indicate ail'soft'or in-kind matches(s*). Description Hours Rate Cost Mobilization,Maintenance of Traffic and General Requirements i $90,000.00 Stormwater piping and structures $84,000.00 Roadway restoration and widening j _ $88,250.00 Back-flow prevention valves $10,000.00 Drainage pump station ! $50,000.00 Utilities relocation ! $5,000.00 � I Sub-Total $327,250.00 C. Fees Paid Include any other costs associated with the project. Description of Task Hours Rate Sc2 Outreach I $9,500.00 Construction Administration $55,500.00 Contingency 565,500.00 Sub-Total $130,500.00 D. Total Estimated Project Cost $550,000.00 Note:To be eligible for HMGP fundina.pre-award costs must be identified as separate line items in the cost estimate of the application. This must be done in addition to flUlna out the HMGP Pre-Award Cost Reauest Form. submitted with application. Mark each Pre-Award post with an asterisk ft and in-kind services with double asterisk("1:All In-kind match must be identified in the Section IV.B and D— Funding Sources). 8 [Attach any additional Items and note Section] [Form No.HMGP] E. Funding Sources(round figures to the nearest dollar) The maximum FEM4 share for HMGP projects is 75%. The other 25%can be made up of State and Local funds as well as in-ldnd services. HMGP funds may be packaged with other Federal funds, but other Federal funds(except for Federal funds that lose their Federal identity at the State level,such as CDBG, and certain tribal funds)may not be used for the Non- Federal share of the costs. 1. Estimated Federal Share $637,500.00 75% %of Total (Maximum 75%) 2. Non-Federal Share 3. Estimated Local Share $212,500.00 _ 25% %of Total (Cash) 4. %of Total (In-Kind'*) 5. %of Total (Global Match) 6. Other Agency Share %of Total (Identify Non-Federal Agency and availability date) 7 Total Funding sources from above $850,000.00 1.00% Total (Equals 100%) ❑Identify proposed eligible activities drectly related to project to be considered for In-Kind services In Section IV.B.Labor. "'(Separate project applications must be submitted for each Global Match project. Global Match Project Number and Title: F. Project Milestones/Schedule of Work List the major milestones in this project by providing an estimate time-tine for the critical activities not to exceed a period of 3 years of performance. (e.g.Designing,Engineering Permitting,etc.) Milestone(s) Number of Days to Complete Bidding and Construction Contract 150 Submit Projects for Permits 120 Mobilization and Shop Drawings 60 Construction of Drainage System and underground utilities 120 Relocation of electrical poles and communications 90 Construction of Roadway Improvements 120 Project Closeout 60 Total 720 Days S [Attach any additional Items and note Section] [Form No.HMGP) Section V. Environmental Review and Historic Preservation Compliance (NOTE: This application cannot be processed if this section is not completed.) Because the HMGP is a federally funded program, all projects are required to undergo an environmental and historic preservation review as part of the grant application process. Moreover, all projects must comply with the National Environmental Policy Act(NEPA)and associated Federal, State,Tribal, and Local statutes to obtain funding. NO WORK can be done prior to the NEPA review process. If work is done on your proposed project before the NEPA review is completed,It will NOT be eligible for Federal funding. A. The following information is required for the Environmental and Historic Preservation review: All projects must have adequate documentation to determine if the proposed project complies with NEPA and associated statutes. The State Environmental Staff provide comprehensive NEPA technical assistance for Applicants, with their consent, to complete the NEPA review. The type and quantity of NEPA documents required to make this determination varies depending upon the project's size, location, and complexity. However, at a minimum, please provide the applicable documentation from this section to facilitate the NEPA compliance process. 1. ® Detailed project description, scope of work,and budget/costs(Section II and Section IV of this application). 2. ® Project area maps(Section III, part B&C of this application) 3. e Project area/structure photographs(Section III, part C of this application). 4. ® Preliminary project plans. 5. IS Project alternatives description and Impacts(Section V of the application). 6. ® Please complete the applicable project worksheets. Documentation showing dates of construction are required for all structures. 7. ® Environmental Justice—Attach documents regarding evaluation(required)and satisfactory resolution (if necessary)of Environmental Justice issues(Highly Disproportionate,Adverse Impact(effects)on Minority or Low Income Population). Documents can include public meeting records,media reports letters from interested persons and groups, studies on population, ethnic groups,quality of life,housing,economics, transportation, public services,schools,public health,recreation,voting,etc. 8. ® Provide any applicable information or documentation referenced on the information and Documentation Requirements by Project Type below. B. Executive Order 12898; Environmental Justice for Low Income and Minority Population: 1. Are there low income or minority populations in the project area or adjacent to the project area? 0 No®Yes; please describe any disproportionate and adverse effects to these populations: The City of Boynton Beach have several minority communities with 30%of the population being black or African American, 15%Hispanic or Latino,2%Asian and 2%multiracial.Flooding in Lakeside Gardens does not impact these minority neighborhoods west of U.S. 1.Lengthy periods of neighborhood flooding inhibit residents'ability to access public transportation and pose health concerns.Standing water poses a health threat from diseases including the zika from breeding mosaulto populations.chemical contaminants and possible electrocution. 2. To help evaluate the impact of the project, please indicate below any other information you are providing. ® Description of the population affected and the portion of the population that would be disproportionately and adversely affected.Please include specific efforts to address the adverse impacts in your proposal narrative and budget. The Lakeside Gardens neighborhood Is a middle class neighborhood.There is not apparent minorities in the neighborhood that will be disproportionally and adversely affected.Senior residents could be greatly affected if the proiects is not implemented. On November 8.2017.the City conducted a Flood Awareness Workshop in the area after Hurricane Irma and Marla that was well attended by Lakeside Gardens residents.Additionally,the City sent a letter to the residents informing them of the upcoming topographic survey and distributed door hangers about the placement of a temporary pump to reduce flood damages.The City will continue to reach out to the residents to keen them informed of protect status. 10 'Attach,any additional items and note Section] Worm No.HMGPI 3. ® Attached materials or additional comments: Please include pdf documentation from the US Census Quick Facts and American Factfinder's website of the project area(http://www.census.govn The Census.saov attachment shows that 16% of Boynton Beach population lives below the povgrty level and that 30%of the population is black or African American. 15%Hispanic or Latino.2%Asian and 2% jnultiracial., 11 [Math any additional items and note Section] [Form No.HMGPI C. Tribal Consultation (information Required) Section 106 of the National Historic Preservation Act(NHPA)requires federal agencies to take into account the effect of their undertakings on historic properties. The NHPA requires that agencies must complete this process prior to the expenditure of any Federal funds on the undertaking. A Tribal Consultation is required for any project disturbing ground or moving soil,including but not limited to:drainage projects;demolition;construction;elevation;communication towers; tree removal;utility improvements. 1. Describe the current and future use of the project location. A land use map may be provided in lieu of a written description. The current and future use of the project location is a roadway that serves local residents as the only means of i press and egress into and out of their neighborhood and provides access to thepublic ROW easements. 2. Provide information on any known site work or historic uses for project location. There are no historic uses or site work for this project location. Attach a copy of a city or county scale map(large enough to show the entire project area)with the horizontal limits(feet)and vertical depths(square feet)of all anticipated ground disturbance of 3 inches or more. D. Alternative Actions (Information Required) The NEPA process requires that at least two alternative actions be considered that address the same problem/issue as the proposed project. In this section,list two feasible alternative projects to mitigate the hazards faced in the project area. One alternative is the"No Action Alternative'. 1. No Action Alternative Discuss the impacts on the project area if no action is taken. Taking no action to remedy the Lakeside Garden neighborhood drainage issues greatly impacts the area.The challenge of protection life, health._safety and property will only increase with sea level raise and the deteriorating conditions of the roadway and surrounding areas.Most of the time low ivina grassy areas are damp or wet.The roads serves residents and visitors. If no alternative action is taken,the road will need to be replaced twice within the next twenty years at an estimated cost of$500000.00. In addition to continuous increasing flooding, emergency services response time a be negatively impacted threatening life and property. Residents and visitors quality of life will be affected by flooding, road deterioration and the existing insufficient drainage infrastructure. The City's CRA has several economic development initiatives in the area. Constant flooding will hinder economic development and business investment that improve the City's financial status that provide increased lobs and tax base. 2. Other Feasible Alternative Describe a feasible alternative project that would be the next best solution if the primary alternative is not accomplished. This could be an entirely different mitigation method or a significant modification to the design of the current proposed project. Please include a Scope of Work,engineering details(if applicable),estimated budget and the impacts of this alternative. Complete all of parts a-e(below). 12 [Attach any additional Items and note Section] [Form No.HMGP] a. Project Description for the Alternative Describe, in detail, the alternative project, and explain how the alternative project will solve the problem(s) and/or provide protection from the hazard(s). Also, provide pros and cons for this alternative and a reason for why it was not selected. An alternative protect could be for the City to purchase the repetitive loss property located at 2150 N_Lake Drive. demolish the residential structure. build a stormwater retention pond and pump station.Addfbonally,the current proposed drainage project design still need to be implemented as a cost of$850.000.00. According to Palm Beach County Property Appraiser's website._the 2017 messed value of this Droperty is $199.203.which is much lower than the commercial values in the neighborhood. The current owners purchased the property in May 2015 for$292,000. To design and built the stormwater pond with pump station with back- up generator and additional piping and appurtenances will be an estimated one to one and a half million dollar investment.The cost for yearly maintenance will be In the order of 45,000 to 60.000 per year. The alternative project would solve the same problems and provide the same protections from the hazards described in the original project with a higher price and local residential disruption and displacement. The implementation of this alternative protect could take at least three additional years because of the need to include acquisition and added engineering and permitting. It is anticipated that the alternative Droiect will cost$2.600.000 at a minimum. There are many uncertainties and unknowns about the implementation of such proposal, inngina from a willing seller, to cost and other community impacts. b. Project Location of the Alternative(describe briefly, if different from proposed project) 2150 N Lake Drive 0 Attach a map or diagram showing the alternative site in relation to the proposed project site(if different from proposed project) c. Scope of Work for Alternative Project Purchase a private residential property at 2150 N Lake Drive, demolish the residential structure, build a storm water retention pond and pump station. d. Impacts of Alternative Project Discuss the Impact of this alternative on the project area. Include comments on these issues as appropriate: Environmental Justice, Endangered Species,Wetlands, Hydrology(Upstream and Downstream Surface Water Impacts), Floodplain/Floodway, Historic Preservation and Hazardous Materials. The impacts of the alternative protect are similar to the original protect. however, because of the storm water pump, it is anticiPated greater environmental review. regulations,and oversight would apply. e. Estimated Budget/Costs for Alternative Project In this section, provide details of all the estimated costs of the alternative project(round figures to the nearest dollar). A lump sum budget is acceptable. Materials: $1,300,000.00 Labor: $1,300,000.00 Fees: Total Estimated Project Cost: $2,600,000.00 13 [Attach any additional items end note Section) [Form No.HMOP) HMGP ENVIRONMENTAL REVIEW Information and Documentation Requirements by Project Type Retrofits to Existing Facilities/Structures I Elevations Acquisitions with Demolition ✓ Dates of Construction ✓ Ground disturbance map for projects with 3 inches or more of ground disturbance ✓ Structure photographs Drainage Improvements ✓ Engineering plans/drawings ✓ Permit or Exemption letter to address any modifications to water bodies and wetlands o Department of Environmental Protection o Water Management District o U.S.Army Corps of Engineers ✓ Ground disturbance map for projects with 3 Inches or more of ground disturbance. ✓ Concurrence from U.S.Fish and Wildlife addressing any impacts to wildlife, particularly endangered and threatened species and their habitats. ✓ If the project is in a coastal area,attach a letter from the National Marine Fisheries Service addressing impacts to marine resources. • Concurrence from Natural Resource Conservation Service if project is located outside city limits and may Impact prime or unique farmland. ✓ Concurrence from your Local Floodplain Manager—If project Is located In a floodplain. Note: This is a genera!guideline for most projects. However, there will be exceptions. Consult with state environmental staff on project types not listed. 14 HMGP Application Completeness Guidance/Checklist This guidance/checklist contains an explanation, example and/or reference for information requested in the application. Please use this list to assure your application is complete and Includes the required information for HMGP projects. The appropriate documentation must also be attached. It is important to note that this list is similar to the form that will be used during the application sufficiency review by the HMGP staff. Project Title: City of Boynton Beach Lakeside Gardens Drainage Improvements Applicant: City of Boynton Beach Application Explanation of Information Required Information q Section l B.Applicant Information FEMA -DR-FL Type in the four digit number FEMA assigned to the disaster that this application is being submitted under.(Example:4337,4283) DISASTER NAME Type in the Disaster name.(Example: Hurricane Irma,Tropical Storm Fay) ®� Title/Brief Descriptive The project title should include: 1)Name of Applicant,2)Name of Project,3)Type of Project Summary Project. (Example:City of Tallahassee, City Hall Building,Wind Retrofit) 1. Applicant Name of organization applying. Must be an eligible applicant. 2. Applicant Type State or local government, recognized Native American tribe,or private non-profit organization. if private non-profit, please attach documentation showing legal status as a 501(C).(Example: IRS letter,Tax Exempt Certificate) 3. County indicate county in which the project is located. 4. State Legislative Specify the appropriate State Senate, House and Congressional District code for the and project site. For multiple sites, please list codes for each site. Congressional http://www.mvfloridahouse.qov/sections/reoresentatives/mvreoresentative.aspx District(s) 5. Federal Tax I.D. List the Federal Employer's Identification Number(FEIN)number,also known as Number Federal Tax Identification number, 9-digit code. May be obtained from your finance/accounting department. 6. DUNS Number Include Data Universal Numbering Standard (DUNS)number in appropriate location on application. If none, please refer to HMGP FAQ's In Application Reference Material for instructions on obtaining a DUNS number. www.usasoending ov 7. FIPS Code List the Federal Information Processing Standard (FIPS)Code. May be obtained from your finance/accounting/grants department. If none,please submit FEMA Form 90-49. 8. NFIP ID Number List the National Flood Insurance Program (NFIP)number. You must be a participating NFIP member to be eligible for HMGP funding. Please make sure that the number Is the same as the panel number on the FIRM provided with the application. 9. Point of Contact Please provide all pertinent information for the point of contact.This person serves as the coordinator of the project. if this Information changes once the application is submitted, please contact the HMGP staff immediately. 10. Application Please provide the preparer information. May be different from the point of contact Prepared By (line 9)and/or the applicant's agent(line 11). 11. Authorized An authorized agent must sign the application. Applicant Agent `An authorized agent is the chef elected official of a local government who has signature authority,so for a county it would be the Chairman of the Board of County Commissioners and for a municipality it would be the Mayor(the exact title sometimes varies). Any local government may delegate this authority to a subordinate official(like a City or County Manager)by resolution of the governing body(the Board of County Commissioners or Board of City Commissioners). if a local government delegates signature authority,a copy of the resolution by the governing body authorizing the signature authority for the individual signing must be provided." 12. LMS Compliance a) LMS Project List: 16 Section VI—Maintenance Agreement All applicants whose proposed project involves the retrofit or modification of existing public property or whose proposed project would result in the public ownership or management of property, structures, or facilities, must first sign the following agreement prior to submitting the application to FEMA. (NOTE: Those applicants whose project only involves the retrofitting, elevation, or other modification to private property where the ownership will remain private after project completion DO NOT have to complete this form.) The City of Boynton Beach , State of Florida, hereby agrees that if it receives any Federal aid as a result of the attached project application, it will accept responsibility,at its own expense if necessary,for the routine maintenance of any real property, structures, or facilities acquired or constructed as a result of such Federal aid. Routine maintenance shall include,but not be limited to,such responsibilities as keeping vacant land clear of debris,garbage, and vermin; keeping stream channels,culverts, and storm drains clear of obstructions and debris;and keeping detention ponds free of debris,trees, and woody growth. The purpose of this agreement is to make clear the Sub-recipient's maintenance responsibilities following project award and to show the Sub-recipients acceptance of these responsibilities.It does not replace, supersede, or add to any other maintenance responsibilities imposed by Federal law or regulation and which are in force on the date of project award. Signed by teven Grant the duly authorized representative (printed or typed name of signing official) Mayor (title) This_ (day)of (month), (year). Signature* agefi// *Please Note:The above signature must be by an individual with legal signing authority for the respective local government or county(e.g.,the Chairperson,Board of County Commissioners or the County Manager,etc.) 15 All proposed projects must be Included in the county's Local Mitigation Strategy (LMS)Project List and must be on file with FDEM's Mitigation Bureau Planning Unit. b) LMS Endorsement Letter All proposed projects must include an endorsement letter from the county's Local Mitigation Strategy Coordinator.You may use 1 letter as long as it includes every proposed project. c) Estimated Costs&Application Costs: The LMS Project List must Include an Estimated Cost column and each HMGP project application must be within$500.00 of that Project List's estimated cost. Also ensure that the Federal Cost Share indicated on the LMS Coordinator's Endorsement Letter exactly matches the Federal Cost Share indicated within the application. Ensure the LMS endorsement letter contains both the Total Estimated Projects Cost(Section IV. D.),along with the Estimated Federal Share (Section IV. E.1.)allocated to this project. A letter of endorsement for the project and its priority number from the Local Mitigation Strategy must be included. Refer to Sample LMS Letter. Applications without a letter of endorsement will not be processed. (44 CFR 201.6 Local Mitigation Plans) 13. Previous tf the project has been previously submitted under another disaster, provide the Submittal disaster number,the project number,and the title of the project. Section II-Proiect Descriation A. Hazards to be Mitigated/Level of Protection 1. Type of Hazards Type of Hazards the Proposed Project will Mitigate:Identify the hazard(s)that the proposed project will mitigate. More than one hazard may be selected. 2. Identify the Type Identify the Type of Proposed Project:Describe the mitigation project being of Project proposed. (Example:drainage,wind retrofit,generator etc.) 3. Number of Explain how many people will be protected by or benefit from the proposed project. Persons (Example:A drainage project Improving a residential area of 23 homes,with an Protected average household of 2 people=46 people) 4. Total Impacted Explain how many acres will be impacted from the proposed project: Area Drainage/Berm/Pond/Culverts/Flood hazard projects:combination of the area to be protected and ground disturbance must not exceed 25 acres. 5. Level of Specify the level of protection and magnitude of the event the proposed project will El Protection mitigate. Attach support documentation that verifies the stated level of protection. (Example: In a wind retrofit project, it will be the design wind speed to comply with the Florida Building Code requirements. In a drainage project, it will be the implemented design level,e.g. a 25-year FDOT design standard for culvert.) 6. Project Impact Identify all the items the project may impact or are within the project area. 7. Engineered include available engineering calculations, studies,and designs for the proposed Projects(e.g. project showing results from applied Recurrence Interval scenarios before and after Drainage) mitigation. (Number of structures, building replacement value,depth of the water, structural damages, content damages, displacement, road closures, etc.) B. Project Description, Scope of Work,and Protection Provided(Must be Completed in Detail) 1. Exdsting Problem Describe the existing problem, location,source of the hazard, and the history and extent of the damage. Include newspaper articles, insurance documentation, photographs, etc. If this project Is eligible for PA(406)mitigation activities, please describe the 406 activities. 2. Type of Protection Determine how the funding will solve the existing problem and provide protection. 3. Scope of Work: What the Project Proposes to Do: Determine the work to be done. The scope of work must meet eligibility based on HMGP regulations and guidance. Explain how the proposed problem will be solved. (NOTE:The proposed project must be a mitigation action, not maintenance.) Does the proposed project solve a problem independently or constitute a functional part of a solution where there is assurance that the project as a whole will be completed(44 CFR 206.434(44D? Does the proposed project address a problem that has been repetitive or that poses a 17 i significant risk to public health and safety if left unresoWed(44 CFR 206.434(cJ(5J(fJ)? Protects that merely identify or analyze hazards or problems are not eligible. See Sample Scope of Work Language in HMGP Application Reference Material. Generators should not be included in the scope of work unless said generator only powers the mitigation element or is for a critical facility. 4. On-Going or Determine if other projects, zoning changes, etc.are planned(particularly in the Proposed same watershed if flooding is being addressed)that may negatively or positively Projects in the impact the proposed project. If there is a drainage project or downstream issue Area elsewhere, it may eliminate the current flooding issue, erasing the need for the proposed project. Response applies to drainage and acquisition projects. N/A is appropriate in wind retrofit shutter projects only. If this project is also being considered under the Public Assistance Program(408), please describe in detail the 408 mitigation activities and/or services. Do not include project costs associated with the above referenced HMGP application. 5. Purpose/Need Describe the purpose and need for the proposed project. Section III-Prosect Location A. Site 1. Physical Location 4 List the physical location of the project site(s)including the street number(s),zip code(s)and GPS coordinates(latitude/longitude, in decimal degrees). The physical address must correspond with the address locations specified on maps submitted with the application. 2. Title Holder Provide the titleholder's name. /1 3. Project Seaward Determine if the project site is located seaward of the Coastal Construction Control ►-1 of the CCCL? Line. https://lioridadep.00v/water/Coastal-construction-control-line 4. Number and Specify the number and type of properties affected by the project. Types of (Example: Drainage project that affects 100 homes, 15 businesses and 2 schools.) Structures What does the project protect? Should have a number next to the box that is Affected , checked. (See Section II, Item A.4—detail of these totals) B. Flood Insurance Rate Map(FIRM)Showing Project Site 1. Copies of FIRM Attach a copy(or copies)of the FIRM and clearly identify the project site. The FIRM El Panel number must be induded. To obtain a FIRM map,go to hlt�psalmsc.fema. avi arta. See instructions on How to make a FIRMette. 2. Flood Zone - - Specify the flood zone(s)of the project site(s). If project Is located In a Special • Determination Flood Hazard Area, proof of flood insurance will need to be provided. Amount of coverage must be equal to or greater than the amount of Federal mitigation funding obligated to the project. 3. Flood Hazard i Not required if a copy of the FIRM is attached. Boundary Map (FHBM) C. City or County Map with Project Site and Photographs 1. City/County Map The project site and staging location(if applicable)should be clearly marked on a El I with Project Site I legible City/County map. The map should be large enough to show the project site. More than one map may be required. 2. USGS TOPO with The project site should be clearly marked on a legible USGS 1:24,000 TOPO map. ZI Project Site To obtain a TOPO map,go to http://www.Dialtal-Topo-Maris.com 3. Parcel/Tax Map A Parcel,Tax or Property Identification map is required only for acquisition and elevation projects. The location of the structure must be dearly identified. 4. Site Photographs At least four photographs are required that clearly identify the project site. The photos must be representative of the project area, Including any relevant streams, creeks, rivers,etc.,and drainage areas that affect the project site or will be affected by the project. The front, back and both side angles are required for each structure. For acquisition and elevation projects,a photo taken away from the structure(in front toward the street, and In back toward backyard)to show the area along with photographs of specific elements of the structure affected by the project(windows for shutters or window replacements)should also be provided. Please label photographs appropriately. In addition, CDs may be submitted. 18 Section N-Budget/Costs Please make sure all calculations are correct Provide a breakdown of materials, labor and fees paid for the proposed project. Support documentation must be attached, i.e. vendor's quote, professional estimate (from engineer, architect, local building official,etc.). The proposed budget line Items should represent allowable costs associated with the scope of work. Contingency Cost should be included as a line item in the budget section, and justified. Recommended range is 1 to 5%. It is required to complete this section; It will be used for the Benefit-Cost Analysis(BCA). Costs should be accurate, complete and reasonable compared to industry standards. Make sure the total cost is correct on the entire application. A. Materials Describe the cost of materials. Provide breakdown. B. Labor Provide a breakdown of description, hours, rate, and cost or lump sum labor cost. Can use in-kind contribution as part of the 25%match. (Attach support documentation for in-kind match to detail wages and salaries charged for any in-kind contribution. No overtime wages can be used to satisfy in-kind match contributions). C. Fees Paid Provide a breakdown of associated fees i.e., consultants,studies,engineering, permits,and project management. Maintenance is not an allowable cost under HMGP. Pre-award costs may be requested(See Pre-award Costs guidance). D. Total Estimated Please make sure all calculations are correct. This figure should be the same as the Project Cost _figure for total funding. E. Funding Sources(round figures to the nearest dollar) The proposed sources of non-federal matching funds must meet eligibility requirements. (Except as provided by Federal statute,a cost-sharing or matching requirement may not be met by costs borne by another Federal grant.) 44 CFR 13.24(bx1). 1. Estimated Federal The estimated Federal share is generally 75%. If the Federal share is not 75%, El Share assure actual amount is entered. It could be 50.1234%or 35.1234%, etc.of the total dollar amount of project depending on county LMS allocation and priority. This figure cannot exceed 75%. 2. Non-Federal Share + May include all 3 sources, i.e. cash, in-kind and global match,as long as the total is a minimum of 25%. Match cannot be derived from a federal agency except Federal funds that lose their federal identity(e.g.,CDBG funding and certain tribal funding). 3. Cash Cash-Local funding will be utilized forthe non-federal share. Enter amount of cash 0 and percentage of total that amount represents. 4. Total In-Kind May use materials, personnel, equipment, and supplies owned,controlled and E operated from within governing jurisdiction as an in-kind match. Third party in-kind contributions would be volunteer services, employee services from other organizations furnished free of charge,donated supplies,and loaned equipment or space. The value placed on these resources must be at a fair market value and must be documented. If in-kind is claimed from outside the applicant jurisdiction,It must be cash only. **Identify proposed eligible activities in Section IV B. and C.as a separate line with In-kind written as a part of the description. 5. Total Project Project(global)match must 1)meet all the eligibility requirements of HMGP;and 2) ❑ (Global)Match begin after FEMA's approval of the match project A separate HMGP application must be submitted for global match projects. Indicate which project(s)will be matched. The global match is not required to be an identical project Projects submitted as global match for another project must meet the same period of performance time constraints as the HMGP. 6. Other Agency Identify Non-Federal Agency and availability date; provide the documentation from 0 Share the agency.(e.g.,CDBG funding, and certain tribal funding) 7. Total Funding Total must represent(100%)of the total estimated project cost. Ensure that percentages match corresponding cost-shares and the total matches the Budget(in Section IV. D. -Total Estimated Project Costs). F. Project Milestones/Schedule of Work 1. Milestones Identify the major milestones in the proposed project and provide an estimated time- E (Schedule) line(e.g. Designing, Engineering—3 months, Permitting—6 months, Procurement— 30 days, Installation—6 months, Contracting— 1 month,Delays, Project Implementation, Inspections, Closeout, etc. See Typical Project Milestones for estimated time-frames)for the critical activities not to exceed a period of 3 years for performance. Milestones should not be grouped together but listed individually. Please allot for the appropriate amount of time. 19 Section V-Environmental Review&Historic Preservation Compliance A. No work can begin prior to the completion of the environmental (NEPA) review. In order for the Environmental staff to conduct the NEPA review, all sections listed below must be completed. —1. Description,SOW Detailed Project Description,Scope of Work&Budget/Costs &Budget Complete Sections II& IV of the application. 2. Area Maps Project area Maps-Attach a copy of the maps and clearly mark the project site,and place the specific project structure(s)on map(s). Complete Section iII, part B&C of the application. 3. Project Complete Section HI part C of the application. Area/Structure Photographs 4. Preliminary Project For shutters see the scope of work and for drainage&elevation see engineering Plans drawings. 5. Protect Complete Section V part D. of this application. 0 Alternatives 6. Project Dates of construction are required for all structures. See worksheets. Worksheets 7. Documentation Provide any of the required documentation as listed on page 10 in the information 0 Requirements by and Documentation Requirements by Project Type that may have already been Project Type obtained. 8. Information/ Provide any applicable information or documentation. ® , Documentation Requirements by fi 1 Project Type ; ____J B. Executive Order 12898, Environmental Justice for Low Income and Minority Population 1. Documentation of Determine the proportion of the population, in either the project zip code or city, Environmental characterized as having a minority background,and proportion of the population living Justice below poverty level.Go to[fit pJ/ w.census cgovi. If yes, complete Section V, part B. 2. Population List/describe the population affected by this project and the portion of the population ® Affected adversely impacted. List the attached documentation. 3. Attached Materials Attach all backup documentation to this application—Include a table of contents that Eg outlines the Information you are providing DEM I C. information required for Tribal Consultation 1. Documentation for i For all projects with any ground disturbing activities of 3 inches or more,complete 1 l�t� f Tribal Consultation I Section V part C. D. Alternative Actions 1. No Action . Please discuss the impacts on the project area if no action is taken. 0 Alternative 2. Other Feasible It is a FEMA and FDEM requirement for any Application Review.A narrative ! Z Alternative Action discussion of at least three project alternatives(from No Action to the most effective, practical solution)and their impacts, both beneficial and detrimental is required. It is expected that the jurisdiction has completed sufficient analysis to determine the proposed project can be constructed as submitted and it supports the goals and objectives of the FEMA approved hazard mitigation plan. Has the proposed project been determined to be the most practical, effective and environmentally sound i alternative after consideration of a range of options? (44 CFR 206.434[c][5][iiil) a. Project It is very important and a requirement that an Alternative project is submitted. Description NEPA requires that at least three alternatives must be presented to mitigate the f ! problem. In addition to the proposed action and no action,one other feasible i I) alternative must be provided. b. Project Location of Describe the surrounding environment. Include information regarding both natural the Alternative (i.e.,fish,wildlife, streams,soils, plant life)and built(i.e., public services, utilities, land/shoreline use, population density)environments. c. Scope of Work— Describe how the alternative project will solve the problem and provide protection Alternative Project I from the hazard. Provide enough detail to describe the project for the evaluation panel to decide the best course of action for the state. Include any appropriate ��. 20 diagrams, sketch maps, amount of materials and equipment,dimensions of project, amount of time required to complete, etc. d. Impacts of the Alternative Project e. Estimated Total cost is required. Budget/Costs for the Alternative Project _ Materials,Labor, The details line items are not required. Just enter a total amount. and Fees Paid Total Estimated Total cost is required. Vendor quote is not required. A lump sum budget may be El Project Costs submitted as Justification to why this alternative was not chosen. Section VI—Maintenance Agreement 1. Maintenance Please complete,sign and date the maintenance agreement. The maintenance Agreement agreement must be signed by an Individual with signature authority, preferably the authorized agent. Other Required Documentation 1. MAPS All maps must be included with the application. 2. FFATA Form During contracting with the state, please complete,sign and date the FFATA Project 0 File Form. Instructions are provided for your convenience in the document provided. This Is not required at the time of application submittal. 3. SFHA Required for all projects in the Special Flood Hazard Area. Read and sign the SFHA ❑ Acknowledgement Acknowledgement of Conditions document. This form must be notarized, signed by of Conditions _the local jurisdiction and the property owner. 4. Pre-award Cost if pre-award costs are being requested with your project, please be sure to identify all u Form pre-award costs in the application budget per instructions. The pre-award cost form must be completed and submitted with your application. 5. Request for Public Applicable if no FIPS number is assigned to applicant/recipient. fl Assistance Form 6. Model Statement For Acquisition projects only. El of Assurances for Property Acquisition Projects 7. Declaration and For Acquisition projects only. Must be signed by all persons whose names are on the Release property deed. 8. Notice of For Acquisition projects only. Two forms are included for your convenience. Please E Voluntary Interest use the form that is most appropriate to your situation. Must be signed by all persons whose names are on the property deed. 9. Statement of For Acquisition projects only. Must be signed by all persons whose names are on the Voluntary property deed. Participation for Acquisition of Property for Purpose of Open Space 10. Worksheets The appropriate worksheet(s)must be completed and submitted with the application. a. Flood Control—Drainage Improvement b. Generator c. Tornado Safe Room d. Hurricane Safe Room e. Wind Retrofit f. Wildfire g. Drought *Submit 1 original (signed) and 2 full copies of the entire application and backup documentation. Include a full copy of the submittal and all documentation on CD. 21