R92-214 J z I J . AMENDMENT #4 AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES - WEST WATER TREATMENT PLANT This amendment amends the Consultant Agreement for Construction Management Servic~ between th~ City of Boynton Beach, hereinafter referred to as "the CITY", and Stanley Consultants, Inc., hereinafter referred to as "the CONSULTANT" in consideration of the mutual benefits, terms, and conditions herein- after specified. * The general terms and conditions of the agreement remain unchanged. * In EXHIBIT A of the agreement the PROJECT SCOPE shall be revised to include Item 1.11 and the BASIC SERVICES DURING CONSTRUCTION PHASE shall be revised to include Items 2.27 through 2.27.5, Items 2.28 through 2.28.5, Items 2.29 through 2.29.1, and Items 2.30 through 2.30.9. * The Construction Managers Compensation shall be revised as per Exhibit B which shall replace Exhibit B of Amendment #3. * In EXHIBIT C of the agreement the CITY'S RESPONSIBILITIES shall be revised to include Items 2.16 through 2.17. The written agreement, dated March 5, 1992, is hereby amended to include Additional Services as stated in the Amendment #4 together with the attachments. Dated this /0- day of 63L~1992. City of Boynton Beach Stanley Consultants, Inc. Mayor D~vic~ V~. Ground( -- Vice President Florida Branch Manager Attest/Authenticated Attest/Authenticated Offic~ of the City Attorney Secretary 1.11 2.27 2.27.1 2.27.2 2.27.3 2.27.4 2.27.5 2.28 2.28.1 EXHIBIT A The additional work for the Master Pump Station Modifications at Boynton Beach Boulevard and Lawrence Road includes the restoration of Pump Station//801 to the original design specifications and concrete wet well rehabilitation. The work shall involve preliminary design, final design, bid administration, and construction management of the pump station modifications. During the Preliminary Design Phase of Modifications to Pump Station//801, the CONSUL- TANT shalt, using its best efforts, provide the following basic services for the additional work: Interview management and operations personnel to obtain information on management philosophy and operations procedures and to discuss any problems which may have occurred in the system in the past. Visit the Lawrence Road Master Pump Station to observe facilities and operations. Coordinate, and with the help of the City of Boynton Beach Utilities Department, gather data on the existing system including pump station and force main record drawings, available original design data, and pump curves; obtain operational data, such as flow and/or pressure re~ords, operation and maintenance problems, and reported equipment breakdown. Develop a recommended plan for replacing/repairing the existing pumps to conform to original design requirements, required piping, concrete wet well rehabilitation, and operational bypass piping during construction. This does not include analysis of modifications to or the pessible future installation of bypass piping at the downstream pump station (Lift Station 317). Prepare a preliminary cost estimate of the recommended improvements for the City of Boynton Beach Utilities Department. During the Final Design Phase of Modifications to Pump Station #801, the CONSULTANT shall, using its best efforts, provide the following basic services for the additional work: Design and preparation of the Construction Drawings to include the following items: ao Replacemant/repair of the existing pumps, in kind. Revised site piping and valves. Electrical and instrumentation for new pumps. Concrete wet well rehabilitation. Miscellaneous details. Demolition. Temporary piping for operation during construction. Temporary electrical and instrumentation for operation during construc- tion. Prepare final cost estimate. Obtain Palm Beach County Health Department permit. 2.28.2 2.28.3 2.28.4 2.28.5 2.29 2.29.1 2.30 2.30.1 2.30.2 2.30.3 2.30.4 2.30.5 Analyze the existing electrical system and the adjustable frequency drive to ensure that the adjustable frequency drive can remain and not require re-design. Re-design of the adjustable frequency drive is not included as part of these services. Writing and preparation of the General and Technical Specifications for the furnishing and installation of the equipment and piping and for the rehabilitation of the wet well. Meeting with CITY staff to review the design and specifications. Preparation of the bid documents including, Plans, Specifications, and Contract Documents. During the Bid Administration Phase of Modifications to Pump Station/1801, the CONSULTANT shall, using its best efforts, provide-the following basic services for the additional work: Assist the CITY during the Bidding Phase by responding to contractor generated questions, conducting a pre-bid meeting~ attending bid opening, tabulating and analyzing bid proposals and making a recommendation for award. Upon award, furnish conformed project documents for execution by the CITY and the Contractor. During the Construction Management Phase of Modifications to Pump Station //801, the CONSULTANT shall, using its best efforts, provide the following basic services for the additional work: This work is proposed to coincide with the construction of the West Water Treatment Plant and while we have a construction engineering staff at that site, a large portion of these construction management services wouid be covered by that staff. Upon completion of the contract, meet with the Contractor to secure their proposed construction schedule showing milestone events, sequence of operations, duration, interdependencies, and a schedule of submittals of samples and shop drawings. Schedule and conduct a pre-construction meeting with the CITY and the Contractor. Schedule and conduct progress meetings during the construction period to review the progress, procedures, problems, and scheduling. Review shop drawings, samples, and any other submittals. Manage and administer the Construction Contract, Consult with and advise the CITY in regard to progress and quality of construction through the Construction Phase. Conduct periodic observations and inspections at the site of the construction to determine in general if construction is proceeding in accordance with the Contract Documents, endeavoring to achieve satisfactory performance from the Contractor. Notify the CITY of all permanent work which does not conform to the Contract Documents. Prepare and submit a written report describing any apparent non-cenforming permanent work, and make recommendations to the CITY for its correction. When authorized by the CITY, instruct the Contractor to carry out the acceptable corrective measures. 2.30.6 2.30.7 2.30.8 2.30.9 Maintain detailed records oft. he work inclUding Daily logs of the aetivities on the site and construction photos to document constructiOn progress. Review the Contractor's payment requests for work completed and make recom- mendatiOns to the CITY. Schedul6 and conduct a final inspection with the CITY and the Contractor to determine if the project is fully completed in accordance with the Contract Documents. Deliver to the CITY all records and documents required at the completion of the Construction Phase including a set of reproducible Record Drawings showing those changes made during construction. EXHIBIT B 1.1 CONSTRUCTION MANAGEMENT COMPENSATION _Comvensation for Basic Servicox The CITY will compensate CM in accordance with the terms and conditions of this AGREE- MENT as follows: 1.1.1 For the Basic Services provided by the CM as set out in Exhibit A, the CM shall be paid as Total Basic Compensation, an amount not to exceed $1,358,580.00. This amount includes a Lump Sum of $1,140,580.00. 1.1.2 The CM's lump sum fee shall be earned and paid in accordance with the following: _At the comvletion of: Obtaining Permit to Construct and Permit to Operate Award of General Construction Contract Mobilization of Construction Management Team On Site Operation and Maintenance Manuals Record Drawing Review Operator Training Contract Closeout Phase I DACS, Study Phase The followin~ lumo sum will be invoicen: $11,090 28,990 13,020 56,830 19,420 43,3O0 13,560 55,000 East Water Treatment Plant Tracts I & 2 Paving & Drainage Plan Submittal: Research & Data Collection Preliminary Design Final Design Landscape Architectural, Planning & Irrigation Design Services: Research & Prepare Conceptual Master Plan Preliminary Design Irrigation Design Final Design Presentation to Development Board & City Commission Field Work & Landscape Coordination Master Pump Station #801 Modifications Design Phase Bid Administration Phase Construction Management Phase 4,500 4,750 8,450 2,100 5,400 1,200 3,800 900 1,850 12,300 2,000 5,000 2.16 2.17 EXHIBIT C The CITY shall provide record drawings and original design specifications and requirements for the Master Pump Station #801. The CITY shall make available and schedule the appropriate personnel to participate in the construction phase of the pump station modifications to administer and coordinate on the shut-downs of the station. EXHIBIT E STANLEY CONSULTANTS Hourly Fees United States Office-Based Members Fiscal Year 1992-93 Classification SC-1 SC-2 SC-3 SC-4 SC-5 SC-6 SC-7 Hourly Rates ......................... $ 19.50 .......................... 23.80 .......................... 27.60 .......................... 31.65 .......................... 35.85 .......................... 39.65 .......................... 44,00 SC-8 .......................... 48.30 SC-9 .......................... 53.40 SC-lO SC-11 SC-12 SC-13 SC-14 SC-15 SC-16 SC-17 SC-18 SC-19 ......................... 58.40 ......................... 63.50 .... '-..~ ................. 68.50 ......................... 74.30 ......................... 80.00 ......................... 88.00 .................. ... ...... 99.00 ........................ 110.00 ........................ 128.00 ........................ 155.00 These rates are for office-based members in the contiguous United States and are subject to change on or after April 3, 1993.