R91-181RESOLUTION NO. Rgl-/~/
A RESOLUTION OF THE CITY COMMISSION OF
THE CITY OF BOYNTON BEACH, FLORIDA,
RATIFYING THE SOUTH CENTRAL REGIONAL
WASTEWATER TREATMENT AND DISPOSAL BOARD
ACTION OF OCTOBER 17,1991, AUTHORIZING
CHANGE ORDER NO. 3 TO SCE, INC., FOR THE
ODOR ABATEMENT SYSTEM - AERATION BASIS,
NEW ELECTRICAL SERVICE AND EFFLUENT PUMP
STATION EXPANSION; AND PROVIDING AN
EFFECTIVE DATE°
WHEREAS, the the South Central Regional Wastewater Treatment
& Disposal Board at a Special Meeting held on October 17, 1991,
authorizing Change Order No. 3 to SCE, Inc., for the Odor
Abatement Syste~ Aeration Basis, New Electrical Service and
Effluent Pump Station Expansion; and
WHEREAS, The South Central Regional Wastewater Treatment &
Disposal Board budget now needs to be formally ratified by each
respective City being Delray Beach and Boynton Beach;
NOW, THEREFORE, BE IT RESOLVED BY TRE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA THAT:
Section 1. The City Commission of the City of Boynton
Beach, Florida, does hereby approve the action taken by the South
Central Regional Wastewater Treatment & Disposal Board on October
17, 1991, authorizing Change Order No. 3 to SCE, Inc., for the
Odor Abatement System - Aeraton Basis, New Electrical Service and
Effluent Pump Station Expansion.
Section 2.
upon passage.
This Resolution shall take effect immediately
PASSED AND ADOPTED this ~f- day of ~ 1991.
ATTEST:
CITY OF BOYNTON BEACH, FLORIDA
Mayor
Vice Mayor
~Cof~i s s loner
(Corpora~Je ise-al )
s CllWT. RES
Chg/~ Oral3 ~ ~t0~28/91
RATIFICATION OF SOUTH CENTRAL REGIONAL
WASTEWATER TREATMENT AND DISPOSAL BOARD
ACTION OF OCTOBER 17, 1991
WHEREAS, the South Central Regional Wastewater Treatment and
Disposal Board did on Octobe~ 17 ,1991, by a Vote of 6-0 author-
lze Change Order No. 3 to SCE Inc for the Odor Abatement
System - Aeration Basins, New Electrical Service and Effluent
Pump Station Expansion and subject to ratification by City of
Boynton Beach and City of Delray Beach in independent sessions;
and,
~EREAS, costs as submitted in the amount of $25,051.00 are
5o be assessed 50% to the City of Boynton Beach and 50% to the
City of Delray Beach; and,
?~EREAS, said Board action requires ratification by the City
of Boynton Beach and the City of Delray Beach,
NOW, THEREFORE, the CiTy of Boynton Beach and the City of
Delray Beach hereby ratify said Board action independently.
The above
City of Boynton
~-~ vote.
action is hereby ratified in open session by the
Beach this~ day of /~~ , 1991, by a
Witnesses:
t/
( SEAL ~
CITY OF BOYNTON BEACH
~ Mayor
Attest[~/;~~~j
~City Clerk
Approved as to form:
× /~/i~/~ager
~ City Attorney
The above action Is hereby
City of Delray Beach this ~
~-O vote.
ratified in open session by the
day of OeTo~6~ , 1991, by a
Witnesses:
City ~Clerk u/ ~
Approved as to form:
Ci t y M~er
AGENDA ITEM E4-d2
Attachment "A"
Item Descriptions
South Central Regional Wastewater
Treatment and ~isposal Board
Odor Abatement -Aeration Basins and
Effluent Pump Station Expansion
CDM Project No. 6171-05
Change Order No. 3
Item NO. -
Description: Delete the painting to the interior
of the FP&L vault.
Purpose: To comply with the advice of FP&L.
Cost: <$3,275.00> Credit
2
Description: Furnish and i~stall revisions to the
FP&L v~ult ventilation consisting of blockwork, a
6'-0" x 5'-4" louver and diamond mesh screens
without cementitious finish.
Purpose: To comply with the requirements of FP&L.
Cost: $7,499.00
Description: Furnish and install two (2) 30-inch
flanged butterfly valves with cradle supports in
lieu of wafer valves within the blower suction
piping. Delete one (1) 30-inch wafer valve at the
eastern end of the blower discharge piping.
~r__~: To facilitate future maintenance of
plpework and filter housing.
Cost: $5,837.00
Description: Furnish and install blockwork to
block up the openings adjacent to the fans in the
Blower Building.
~: To provide for more efficient operation
ventilation fans.
Cost: $1,692.00
Page 2
Description: Furnish ~ install additional pipe
and fittings to reroute ~he 36-inch effluent line.
~r~: To adjust elevation of proposed piping to
~0nflict with existing pipes.
Cost: $13,336.00
~aS~ript~on: Delete the effluent.pump witnessed
ctory tests; acceptance of certified pump curves.
Purpose: To clarify scope of work.
Cost: <$4,697.00> Credit
Description: Furnish an~ install a retaining wall
along the south, east and west sides of Plant B
odor control slab.
~: To enhance grading of the area around the
ntrol slab.
Cost: $4,659.00