R91-181RESOLUTION NO. Rgl-/~/ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, RATIFYING THE SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF OCTOBER 17,1991, AUTHORIZING CHANGE ORDER NO. 3 TO SCE, INC., FOR THE ODOR ABATEMENT SYSTEM - AERATION BASIS, NEW ELECTRICAL SERVICE AND EFFLUENT PUMP STATION EXPANSION; AND PROVIDING AN EFFECTIVE DATE° WHEREAS, the the South Central Regional Wastewater Treatment & Disposal Board at a Special Meeting held on October 17, 1991, authorizing Change Order No. 3 to SCE, Inc., for the Odor Abatement Syste~ Aeration Basis, New Electrical Service and Effluent Pump Station Expansion; and WHEREAS, The South Central Regional Wastewater Treatment & Disposal Board budget now needs to be formally ratified by each respective City being Delray Beach and Boynton Beach; NOW, THEREFORE, BE IT RESOLVED BY TRE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA THAT: Section 1. The City Commission of the City of Boynton Beach, Florida, does hereby approve the action taken by the South Central Regional Wastewater Treatment & Disposal Board on October 17, 1991, authorizing Change Order No. 3 to SCE, Inc., for the Odor Abatement System - Aeraton Basis, New Electrical Service and Effluent Pump Station Expansion. Section 2. upon passage. This Resolution shall take effect immediately PASSED AND ADOPTED this ~f- day of ~ 1991. ATTEST: CITY OF BOYNTON BEACH, FLORIDA Mayor Vice Mayor ~Cof~i s s loner (Corpora~Je ise-al ) s CllWT. RES Chg/~ Oral3 ~ ~t0~28/91 RATIFICATION OF SOUTH CENTRAL REGIONAL WASTEWATER TREATMENT AND DISPOSAL BOARD ACTION OF OCTOBER 17, 1991 WHEREAS, the South Central Regional Wastewater Treatment and Disposal Board did on Octobe~ 17 ,1991, by a Vote of 6-0 author- lze Change Order No. 3 to SCE Inc for the Odor Abatement System - Aeration Basins, New Electrical Service and Effluent Pump Station Expansion and subject to ratification by City of Boynton Beach and City of Delray Beach in independent sessions; and, ~EREAS, costs as submitted in the amount of $25,051.00 are 5o be assessed 50% to the City of Boynton Beach and 50% to the City of Delray Beach; and, ?~EREAS, said Board action requires ratification by the City of Boynton Beach and the City of Delray Beach, NOW, THEREFORE, the CiTy of Boynton Beach and the City of Delray Beach hereby ratify said Board action independently. The above City of Boynton ~-~ vote. action is hereby ratified in open session by the Beach this~ day of /~~ , 1991, by a Witnesses: t/ ( SEAL ~ CITY OF BOYNTON BEACH ~ Mayor Attest[~/;~~~j ~City Clerk Approved as to form: × /~/i~/~ager ~ City Attorney The above action Is hereby City of Delray Beach this ~ ~-O vote. ratified in open session by the day of OeTo~6~ , 1991, by a Witnesses: City ~Clerk u/ ~ Approved as to form: Ci t y M~er AGENDA ITEM E4-d2 Attachment "A" Item Descriptions South Central Regional Wastewater Treatment and ~isposal Board Odor Abatement -Aeration Basins and Effluent Pump Station Expansion CDM Project No. 6171-05 Change Order No. 3 Item NO. - Description: Delete the painting to the interior of the FP&L vault. Purpose: To comply with the advice of FP&L. Cost: <$3,275.00> Credit 2 Description: Furnish and i~stall revisions to the FP&L v~ult ventilation consisting of blockwork, a 6'-0" x 5'-4" louver and diamond mesh screens without cementitious finish. Purpose: To comply with the requirements of FP&L. Cost: $7,499.00 Description: Furnish and install two (2) 30-inch flanged butterfly valves with cradle supports in lieu of wafer valves within the blower suction piping. Delete one (1) 30-inch wafer valve at the eastern end of the blower discharge piping. ~r__~: To facilitate future maintenance of plpework and filter housing. Cost: $5,837.00 Description: Furnish and install blockwork to block up the openings adjacent to the fans in the Blower Building. ~: To provide for more efficient operation ventilation fans. Cost: $1,692.00 Page 2 Description: Furnish ~ install additional pipe and fittings to reroute ~he 36-inch effluent line. ~r~: To adjust elevation of proposed piping to ~0nflict with existing pipes. Cost: $13,336.00 ~aS~ript~on: Delete the effluent.pump witnessed ctory tests; acceptance of certified pump curves. Purpose: To clarify scope of work. Cost: <$4,697.00> Credit Description: Furnish an~ install a retaining wall along the south, east and west sides of Plant B odor control slab. ~: To enhance grading of the area around the ntrol slab. Cost: $4,659.00