R20-139 1 RESOLUTION R20-139 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, APPROVING THE CERTIFICATE REGARDING 5 SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE 6 FOR THE FIRE STATION#1 CONSTRUCTED AS PART OF THE 7 TOWN SQUARE PROJECT AND AUTHORIZING THE MAYOR 8 TO SIGN THE CERTIFICATE REGARDING SUBSTANTIAL 9 COMPLETION AND FINAL ACCEPTANCE AND RELATED 10 DOCUMENTS WITH RESPECT TO THE FIRE STATION #1; 11 AND PROVIDING AN EFFECTIVE DATE. 12 13 WHEREAS, the agreement with CFP Boynton Beach Town Square, LLC for the 14 Fire Station#1 construction requires the City to approve a Certificate Regarding Substantial 15 Completion and Final Acceptance Notice of Final Completion to finalize the construction 16 of the project; and 17 WHEREAS, all of the buildings have received the final Certificate of Occupancy 18 and Final Approval by staff and are fully operational. 19 NOW,THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 20 THE CITY OF BOYNTON BEACH,FLORIDA,THAT: 21 Section 1. The foregoing"Whereas" clauses are hereby ratified and confirmed as 22 being true and correct and are hereby made a specific part of this Resolution upon adoption 23 hereof. 24 Section 2. The City Commission of the City of Boynton Beach, Florida does 25 hereby approve the Certificate Regarding Substantial Completion and Final Acceptance for 26 the Fire Station #1 project constructed as part of the Town Square Project and authorize the 27 Mayor to sign the Certificate Regarding Substantial Completion and Final Acceptance with respect to the 28 Fire Station#1 project. A copy of the Certificate Regarding Substantial Completion and Final Acceptance 29 and related documents regarding the Fire Station#1 project is artarhed hereto and incorporated herein as S:\CA\RESO\Certificate Of Substatntial Completiion And Final Acceptance Fire Station Town Square Project-Reso.Docx 30 Exhibit"A". 31 Section 3. This Resolution will become effective immediately upon passage. 32 PASSED AND ADOPTED this 15 day of December, 2020 33 CITY OF BOYNTON BEACH, FLORIDA 34 YES NO 35 36 Mayor— Steven B. Grant 37 38 Vice-Mayor—Ty Penserga 39 40 Commissioner—Justin Katz 41 42 Commissioner—Woodrow L. Hay \/ 43 44 Commissioner—Christina L. Romelus ✓ 45 46 VOTE y —0 47 ATTEST: 48 71 49 50 C tal Gibson, MMC 51 City Clerk 52 53 54 (Corporate Seal) '0 .. lJt{o • �— •O • s A - ' • `. per;• o,•�^, s S.\CA\RESO\Certificate Of Substatntial Completiion And Final Acceptance Fire Station Town Square Project-Reso.Docx DocuSign Envelope ID:A7888CCB-59C2-4065-BBD4-ECC9A38E7B76 -R 0 .44 A E2L _, ;ter iY,r REAL ESTATE ': �} SOLUTIONS. LLC December 8`h, 2020 Attn: Colin Groff, P.E. Assistant City Manager, City of Boynton Beach 100 E. Ocean Ave., Boynton Beach, Florida 33435 RE: REQUEST FOR FINAL ACCEPTANCE—CLOSE OUT PACKAGE FIRE STATION #1 FOR SIGNATURE Dear Colin Groff, This letter is to transmit the close out package prior to final payment regarding Fire Station #1 project. Included herein is the Final Acceptance Form, for City signature, prior to CFP final signoff. E2L along with City representatives, has reviewed all handover documents, currently on box. Copies of printed plans have been provided by design builder, along with attic stock, as coordinated with City staff. E2L will also be providing additional external hard drive storage with digital copy of all handover documents once final payments have been made and final documents are obtained for records to ensure compliance with all sunshine laws. This is the first of the CFP buildings in the Town Square Projects to be completed and expect to submit similar close out packages for the remaining buildings very soon. Package Contents (attachments): EXHIBITS Bond Forms—Certificates: 1. Certificate Regarding Substantial Completion and Final Acceptance(City&CFP)—FOR SIGNATURE 2. Notice of Completion (City& CFP)—Previously Signed and Recorded Proiect Certificates (Obtained): 3. Certificate of Substantial Completion 4. Certificate of Occupancy 5. Final Satisfaction of Punchlist sign-off 6. Final Completion (Project Team) 1400 W. Fairbanks Ave, Suite 201, Winter Park, Florida 32789 1 of 2 DocuSign Envelope ID:A7888CCB-59C2-4065-BBD4-ECC9A38E7B76 DocuSigned by: ?math Date 12/8/2020 483F2D5E078E47C_. Mark Hefferin President- E2L Real Estate Solutions, LLC. CC:Steve Collins—CFP Antonio Balestrieri-E2L 1400 W. Fairbanks Ave, Suite 201, Winter Park, Florida 32789 2 of 2 EXHIBIT 1 Bond Form - Certificate: Certificate Regarding Substantial Completion and Final Acceptance (For Signature) Certificate Regarding Substantial Completion And Final Acceptance Of Boynton Beach Fire Station Project U.S. Bank National Association Global Corporate Trust Services 550 West Cypress Creek Road, Suite 380 Fort Lauderdale, FL 33309 Attn: Robert Hedgecock Re: Public Finance Authority $69,990,000 Capital Improvement Revenue Building, Series 2018 (City of Boynton Beach, Florida Municipal Improvement Project) U.S. Bank National Association, as corporate trustee (the "Trustee") with respect to the bonds described above (the "Bonds") which were issued pursuant to an Indenture of Trust, dated as of August 1, 2018 (the "Indenture") between the Public Finance Authority (the "Issuer") and the Trustee, the proceeds of which were used to make a loan to CFP Boynton Beach Town Square, LLC ("CFP")pursuant to a Loan and Security Agreement, dated as of August 1, 2018 (the "Loan Agreement")between the Issuer and CFP. Pursuant to the Indenture and Loan Agreement, CFP agreed to undertake the Fire Station Project, to be designed, constructed and equipped in accordance with the requirements of a Facilities Lease Agreement, dated as of August 1,2018,between CFP,as landlord,and the City of Boynton Beach, Florida(the "City"), as Tenant, for the Fire Station Facilities (the "Fire Station Lease"), and CFP entered into a Development Agreement, dated as of August 1, 2018, between CFP and E2L Real Estate Solutions, LLC ("E2L"), for the Fire Station Facilities (the "Fire Station Development Agreement") under which E2L has agreed to provide certain services to CFP to oversee and manage the construction of the Fire Station Project. Capitalized terms not otherwise defined herein shall have the meanings set forth in the Indenture, the Loan Agreement, the Fire Station Lease or the Fire Station Development Agreement. Section 1.51 and Section 9.12 of the Fire Station Lease contain certain provisions regarding the substantial completion of the Fire Station Project, and Section 12.1 of the Fire Station Development Agreement provides certain events that CFP and the City must agree shall have occurred in order to establish the substantial completion of the Fire Station Project. In connection with the foregoing, CFP hereby certifies and represents as follows: i. In accordance with Section 1.51(a)of the Fire Station Lease and Section 12.1(a) of the Fire Station Development Agreement, the Design Builder has provided CFP 1 and the City a notice in writing that the Fire Station Project will be substantially complete on or about May 8, 2020. ii. In accordance with Section 1.51(b)of the Fire Station Lease and Section 12.1(b)of the Fire Station Development Agreement, the City has issued a temporary or final certificate of occupancy for the Fire Station Project and the City's Fire Department has also issued its approval for occupancy. iii. In accordance with Section 1.51(c)of the Fire Station Lease and Section 12.1(c) of the Fire Station Development Agreement, each Contractor has issued its "Certificate of Substantial Completion" together with its "Affidavit of Payment of Debts and Claims", together with partial waivers and releases of lien for work performed, in form satisfactory to CFP with Tenant's (City's) concurrence. iv. CFP,with Tenant's(City's)concurrence,hereby accents the Fire Station Project as substantially complete, subject to completion of Punch List Items. v. CFP has caused a Notice of Completion with respect to the Fire Station Project to be recorded. In addition to the foregoing, Section 1.24 and Section 9.13 of the Fire Station Lease contain certain provisions regarding the Final Acceptance of the Fire Station Project and Section 12.4 of the Fire Station Development Agreement provides certain events that CFP and the City must agree shall have occurred in order to establish the Final Acceptance of the Fire Station Project. In connection with the foregoing, CFP hereby certifies and represent as follows: vi. In accordance with Section 1.24(a) of the Fire Station Lease and Section 12.4(a)of the Fire Station Development Agreement, the City has issued all certificates of occupancy for the Fire Station Project. vii. In accordance with Section 1.24(b)of the Fire Station Lease and Section 12.4(b)of the Fire Station Development Agreement, each Contractor has issued its "Certificate of Substantial Completion", together with its "Affidavit of Payment of Debts and Claims", together with final waivers and releases of liens. viii. All Punch List items for the Fire Station Project have been completed or have had 150%of the estimated costs hereof have been withheld by the Trustee in the Project Fund in accordance with Section 12.4(c) of the Fire Station Development Agreement. ix. The Design Builder and E2L have submitted the application for final payment for the Fire Station Project. 2 x. In accordance with Section 1.24(e) of the Fire Station Lease and Section 12.4(e)of the Fire Station Development Agreement, the period for filing construction liens for the Fire Station Project has expired and none has been filed, or releases or discharges of construction liens have been obtained. xi. The Architect has issued its "Certificate of Final Completion" for the Fire Station Project, and CFP has received the certificate of any other architect or engineer reasonably requested by CFP. xii. The Design Builder has issued a certificate that(i)the Fire Station Project has been finally completed in accordance with the Contract Documents and (ii) no Hazardous Substances were incorporated in the structure of the Fire Station Project. xiii. CFP has received a written report from E2L and the Design Builder showing the allocation of Fire Station Project costs among the categories of the Fire Station Project Budget and the remaining specified dollar amount of the Fire Station Project contingency and the undisbursed portion of the Fire Station Project Development Fee. xiv. CFP has received endorsements to its Title Policy with respect to the Fire Station Project, meeting the requirements of Section 1.24(i) of the Fire Station Lease and Section 12.4(i) of the Fire Station Development Agreement. [Excluded — Provision Waived by City] xv. E2L and the Design Builder have obtained and submitted to CFP and the City the items required by Section 14.1 As-Built Plans, 14.2 Manuals, 14.3 Warranties, 14.4 Permits and Licenses, 14.5 As-Built Survey of the Fire Station Development Agreement. 3 The undersigned, on behalf of CFP, has executed this Certificate Regarding Substantial Completion of Boynton Beach Fire Station Project this day of , 2020. CFP BOYNTON BEACH TOWN SQUARE, LLC By: Steve Collins -President 4 Concurrence and Approval of City The undersigned, on behalf of the City of Boynton Beach,Florida,as Tenant under the Fire Station Lease, hereby concurs with and approves the foregoing Certificate Regarding Substantial Completion of the Boynton Beach Fire Station Project this day of , 2020. CITY OF BOYNTON BEACH, FLORIDA By: Lori LaVerriere—City Manager 6099205_1 5 EXHIBIT 2 Bond Form - Certificate: Notice of Completion (No action) - Previously Signed and Recorded {Po - cVi WHEN RECORDED RETURN TO: Best& Flanagan LLP Daniel R.Nelson, Esq. 60 South Sixth Street, Suite 2700 Minneapolis,MN 55402 SPACE ABOVE THIS LINE RESERVED FOR RECORDER'S USE Assessor's Parcel No. 08-43-45-28-48-008-0000 Notice of Completion with respect to Boynton Beach Fire Station Project Pursuant to Section 9.12 and Scction 1.51 of that certain Facilities Lease Agreement between CFP Boynton Beach Town Square,LLC,a Florida limited liability company,as Landlord (the "Landlord") and the City of Boynton Beach, Florida, as Tenant (the "Tenant") dated as of August 1,2018,City of Boynton Beach Town Squire Redevelopment Fire Station Project, for the Fire Station Facilities (the "Fire Station Lease"), this Notice of Completion is dated as of ^ . 4 2020,and is made and entered into by Landlord for purposes of recordation only and to provide constructive notice with respect to the rights of the Landlord and Tenant under the Fire Station Lease to all third parties that the substantial completion and final acceptance of the Fire Station Project have occurred. This Notice of Completion does not set forth all of the terms and conditions set forth in the Fire Station Lease. In the event there is any conflict between the terms and conditions of the Fire Station Lease and this Notice of Completion,the Fire Station Lease shall control. {00388030.3 306-9905263} 1 [Signature Page to the Notice of Completion of the Boynton Beach Fire Station Project] Signed, sealed and delivered in the CFP BOYNTON BEACH TOWN LLC, a presence of: Florida limited liability company By: ( Steve Collins, President Printed Name: DATE: L!/ i 7 26) Signed sealed and delivered in the presec:of: • Printed NameA14CIAN) STATE OF _;y„c4o}�_ COUNTY OF ►4,��ap:H The foregoing instrument was acknowledged before me by means ofphysical presence or_ online notarization this Nth day of gip+. , 2020, by Steve Collins as President of CFP Boynton Beach Town Square, LLC, a Florida limited liability company, who swore or affirmed that he is authorized to execute this Notice of Completion of the Boynton Beach Fire Station Project and to bind CFP Boynton Beach Town Square, LLC, a Florida limited liability company. He — is personally known to me or /has produced a driver's license as identification. � i v J sv.t.& • ' ANDRUDASV8004 Notary Public MinnesVIDotaO Printed Name My Commission Expires Jan 31, 2024 My Commission Expires: o/.3/. Zcg.o My Commission Number t0C05S3oG_L 34 100388430.3 306-990332631 2 [Signature Page to the Notice of Completion of the Boynton Beach Fire Station Project] Signed, sealed and delivered in the CITY OF BOYNTON BEACH,FLORIDA presence of the following witnesses: By: den-- Signature of Witness Its: t" 0'100.4.c Co,r Luc Printed Name of Witness ,� DATE: (-)°\, ) \ CX`A /a) ) Signed, sealed and delivered in the presencer� of the following witnesses: 0- Ltit.�J)Aj1u i�h j✓`{L%t Signature of Witness 0a4rrtne C".h rr\/ Printed Name of Witness ATTEST: • By: ,��. / �.�!_.! til �! ' C±. •R City Clerk James A. Cl(10 of,ity • ttorney STATE OF FLORIDA COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me b),means of Y, physical presence or online notarization this 41-Cj'' day of 2020, by L e is , (Name) as -L;.1 h►\kwa( (Title) of the City of Boynton Beach,Florida,who swore or affirmed that he/she is authorized to execute this Notice of Completion of the Boynton Fire Station Project and to bind the City of Boynton Beach, Florida. He/she_is personally known to me or has produced a driver's license as identification. FKr vuB� SHAYLA S.ELLIS S H AY LA t1LI SMy commiSStoN#GG 031774 1s•�� wr dia- 'fir EXPIRES:September Printed Name 'oFs Bonded lhNBudget Hoa7Ses`Ams My Commission Expires: � 1 o)U )L My Commission Number: C.6 Orff ' 6099677_1 {00358430.3 306-9905263) 3 EXHIBIT A LEGAL DESCRIPTION OF THE FIRE STATION PROPERTY PARCEL 8, BOYNTON BEACH TOWN SQUARE, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 127, PAGES 1-5, OF THE PUBLIC RECORDS OF PALM BEACH COUNTY. FLORIDA. N03984303306-9909263) 4 EXHIBIT 3 Project Certificate: Certificate of Substantial Completion DBIA Certificate of Substantial Completion For Use with DBIA Document No. 525, Standard Form of Agreement Between Owner and Design-Builder—Lump Sum (2010 Edition)and DBIA Document No. 530, Standard Form of Agreement Between Owner and Design-Builder— Cost Plus Fee with an Option for A Guaranteed Maximum Price(2010 Edition) Date of Substantial Completion: June 2 ,2020 Project: City of Boynton Beach Fire Station Design Builder's Project No: Date of Agreement: 06/29/2018 Owner: CFP Boynton Beach Town Square LLC Design-Builder: H. J. High Construction This Certificate of Substantial Completion applies to all Work as defined in DBIA Document No. 535, Standard Form of General Conditions of Contract Between Owner and Design-Builder, (2010 Edition) or to the following portion of the Work only: Owner and Design-Builder have jointly inspected the Work and have verified that the Work identified above was substantially complete in accordance with the requirements of the Contract Documents on the above-stated Date of Substantial Completion. The following items of Work remain to be completed prior to final payment (if necessary, attach list): See Attached Owner's and Design-Builder's responsibilities pending final payment, if not otherwise stated in the Contract Documents, are as follows: Owner Desi•n-Builder Security Security Maintenance Maintenance Utilities Utilities Insurance Insurance Except as noted below, warranties related to the Work identified above to which this Certificate of Substantial Completion applies, commence to run on the date of Substantial Completion: Issued by OWNER: r J Accepted by DESI N-:UI �P (Signature): r (Signature): _./alitif Printed Name: li coLL-/r✓S Printed Name: I oft t niN( Title: � �i/ / Title: t�tL�tlI Date: c0/240� Date: ' Ao DBIA Document No.500D4-Certificate of Substantial Completion 02001 Design-Build Institute of America EXHIBIT 4 Project Certificate: Certificate of Occupancy CITY OF BOYNTON BEACH P 0 BOX 310 BOYNTON BEACH FL 33425 CERTIFICATE OF OCCUPANCY Issue Date 6/02/20 Parcel Number 08-43-45-28-06-000-9999 Property Address . . . 200 NE 1ST ST FS1 BOYNTON BEACH FL 33435 Subdivision Name . . . . BOYNTON CENTER IN Legal Description . . . Property Zoning PUBLIC USAGE Owner CITY OF BOYNTON BEACH 100 E BOYNTON BEACH BLVD BOYNTON BEACH FL 33435 Contractor H J HIGH CONSTRUCTION COMPANY Application Number. . . 18-00004195 000 000 Description of Work . . COMM BUILDING, NEW Construction Type . . . TYPE II B CONSTR Occupancy Type . . . . RESIDENTIAL GROUP R-2 Flood Zone X FLOOD ZONE/ 0 . 2% CHANCE OCCUPANCY LOAD : 70 . 00 AUTOMATIC SPRINKLER SYSTE Y EDITION OF CODE 2017 SPECIAL CONDITIONS . . . Additional Mixed Use : Occupancy Type S-2 Approved: /cat(/' Fire Marshal For buildings and structures in flood hazard areas, documentation of the as-built lowest floor elevation has been provided and is retained in the records of the Building Division. Building Official Shane Kittendorf Approved °6 ,0 °26 Building Official VOID UNLESS SIGNED BY BUILDING OFFICIAL EXHIBIT 5 Project Certificate: Final Satisfaction of Punch list sign-off (No action) - Previously Signed SUBSTANTIAL PUNCH LIST DATE: 05/17/20 (Closed out 11/12/20) PAGE: 1 OF 17 PROJECT: Boynton Beach Fire station#1 PROJECT NO: CONTRACTOR: Hj High Construction INSPECTED BY: COBB- 5/14/20 Accepted Item Location Action Required By Date Please note that this punch list is incomplete as there were areas where work was incomplete and not fully inspected. Additional comments may be forthcoming. General 1 General cleaning required throughout—floors, walls, vinyl AWS 6/2/20 base, etc. Remove paint at floors, vinyl base, ceiling/wall mounted devices, etc. If paint cannlot be properly removed from vinyl base, then vinyl base shall be replaced. 2 Provide caulking at joints/gaps/around door/window AWS 6/2/20 frames, ceiling grid/walls, casework, tilework to gyp. Bd. Walls, etc. for a cleaner/sharper look.(typical throughout building) Check all door hardwawre for proper function and check 8/13/20 that all hardware componenets have been install per AWS contract documents, including doorsilencers. Finalize keying requirements with owners. 4 Signage installation incomplete AWS 6/2/20 5 Grout at all tile flooring/walls, especially at restrooms AWS 8/13/20 shall be thoroughly cleaned. Current installation is inconsistent in color and finish. If cleaning does not address inconsistency in appearance, then all grouting shall be replaced. 6 Corner guards installation incomplete—typical throughout AWS 6/2/20 building. 7 Area around floor drains in concrete floors are not AWS 6/2/20 properly finished. Repair/refinish. 8 Caulk all gaps between ceiling grid and walls, casework, AWS 6/2/20 fire extinguisher cabinets, wall mounted devices/covers, etc. —typical throughout. PAGE 1 OF 18 (8.11) FORM 318 Accepted Item Location Action Required By Date 9 .Verify that all fire extinguishers/cabinets have been AWS 8/13/20 installed per code requirements Verify that design professionals (Architect&Engineers) 10 have conducted site walk thru to verify/confirmed that AWS 6/2/20 project has been constructed in accordance with design intent/documents. Provide copy of A/E team's punch out of project for substantial completeion. Provide "close-out"documentation-as-builts, extra AWS 11/12/20 materials, demonstration & training, etc. per contract documents. 12 Provide final test and balace reports for review once all AWS 6/2/20 adjustments ahave been made to the mechanical system to meet design requirements. South Elevation 1 Touch up painting required—multiple areas. AWS 6/2/20 2 Exhaust fan wall cap to be cleaned/painted to match AWS 6/2/20 adjacent wall color 3 Window glazing to be cleaned AWS 6/2/20 4 Caulking required at reveal joints trim for a cleaner look. AWS 6/2/20 (Typical) 5 Concrete walkway to be cleaned. Concrete finish AWS 6/2/20 apperance is inconsistent. 6 Overspray paint at walls, storefront frames to be AWS 8/13/20 refinished and repainted.. 7 Storefront frame at patio (base) has dents. Cover cap AWS 6/2/20 needs to be replaced and caulking required at joints for a cleaner/finshed look. 8 Shunt trip "Emergency Push Botton (kill switch)"to be AWS 6/2/20 relocated. West Elevation 1 Exterior building signage, address not installed as yet. AWS 8/13/20 Installed but to be corrected. 2 Touch up painting required—multiple areas. AWS 6/2/20 3 Patch/repair ding at wall and repaint. 4 Caulking required at reveal joints trim for a cleaner look. AWS 6/2/20 (Typical). Caulking also required at storefront door frame.-all joints. 5 Overspray paint at walls, storefront frames to be AWS 8/13/20 refinished and repainted. 6 Apparatus concrete apron to be cleaned. Includes rust AWS 6/2/20 spots at curbing. PAGE 2 OF 18 Accepted Item Location Action Required By Date Louvers at apparatus bays to be cleaned—repaint if AWS necessary. Clean overspay painting at the frames of the apparatus AWS 6/2/20 bay doors, doors and canopies. Caulking required at gaps/joints around wall mounted AWS 6/2/20 devices, door frames, etc. Concrete installation finish at flag pole area is AWS 8/13/20 unacceptable-this may be a Haskell problem North Elevation Paint color on this elevatiuonis not consistant(looks AW; blotchy) entire wall needs to be repainted. Stucco/plaster work appears to be inconsistent in a few AWS areas. This needs to be addressed Overspray paint at walls, storefront frames to be AWS 6/2/20 refinished and repainted. Gaps around electrical panel needs to be filled/sealed.. AWS 6/2/20 Caulking required at reveal joints trim for a cleaner look. AWS 6/2/20 (Typical). Caulking also required at storefront door frame.-all joints. East Elevation Touch up painting required—multiple areas. AWS 6/2/20 Clean overspay painting at the frames of the apparatus AWS 6/2/20 bay doors, doors and canopies. Caulking required at gaps/joints around wall mounted AWS 6/2/20 devices, door frames, etc. Apparatus concrete apron to be cleaned. Includes AWS 6/2/20 curbing. Caulking required at reveal joints trim for a cleaner look. AWS 6/2/20 (Typical). Caulking also required at storefront door frame.-all joints. Dumpster couch up painting required—all sides/elevations AWS 8/13/20 Doors to rusting. Address rust with rust inhibitor and AWS 6/2/20 repaint doors Refinish areas with paint overspray and repaint. AWS 6/2/20 Roof Roof is very dirty-needs to be cleaned/scrubbed(typ.) AWS 8/13/20 Remove debris, ladder, blocks, etc. AWS 8/13/20 PAGE 3 OF 18 Accepted Item Location Action Required By Date Loose wires on roof—currently serviing temporary AWS 8/13/20 security camera shall be removed after completion of project. Sealant joints at coping cap installation not acceptable. AWS 8/13/20 Remove/replace with proper installation (typ.) There are a few areas on roof which feels like the tapered AWS 8/13/20 rooing insulation was not installed properly or properly aligned-maily at sloped areas to the drains. Feels like you are stepping into a hole in some areas. Roofing installer/manufacturer's representative to inspect, verify and propose recommendation for a fix. (typical) Roofing installer/manufacturer's representative to verify/ AWS 8/13/20 confirm that coping cap installation covering expansion joint betweeeen Fire Station &DES, is appropriately installed to accommodate expansion between buildings. Roof hatch and safety cage/railing needs to be cleaned. AWS 8/13/20 INTERIOR—1ST FLOOR Lobby Room # 100 General cleaning AWS 6/2/20 Touch up painting at walls. AWS 6/2/20 Remove paint from devices. AWS 6/2/20 Painting to be trimmed out properly at vinyl base, AWS 6/2/20 storefront, etc. Wall mounted Fire Logo not installed. AWS 6/2/20 Triage Office Room # 100A 1 General cleaning. AWS 6/2/20 2 Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout/tile flooring. 3 Repair dings in walls, refinish and repaint. AWS 6/2/20 Touch up painting. AWS 6/2/20 Rest Room#101 General cleaning required AWS 6/2120 Installation of toilet accessories incomplete. AWS 6/2/20 Joints between tilework and gyp. Bd. Wall(corners) to be AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout/tile flooring. PAGE 4 OF 18 Accepted Item Location Action Required By Date Wall with wall tile istalled to floor does not match design 6/2/. drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Provide caulking at joints/gaps/around frames for a AWS 8/13/20 cleaner/sharper look.(typical) Walls to be refished and repainted. Touch-up paint at AWS 6/2/20 walls. Room signage to be installed(typ. For all of 1st. floor). AWS 6/2/20 Corridor# 102 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting AWS 6/2/20 Provide caulking at joints/gaps/around frames, ceiling AWS 8/13/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical Refinish/repaint wall at area around outlet for ice maker. 4 VIC' 6/2/20 Janitor's closet Room # 103 1 General cleaning AWS 6/2/20 2 Touch up painting walls, frames, etc. AWS 6/2/20 3 Room signage to be installed AWS 6/2/20 Air Lock# 104 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, frames, etc. AWS 6/2/20 Replace incorrect screws at wall corner guard with the AWS 6/2120 correct type. Room signage to be installed AWS 6/2/20 Report Writing Room# 105 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, frames, glazing stops, etc.. AWS 6/2/20 Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical Provide/insall grommets at work surface as necessary to AWS 6/2/20 access outlets below. Room signage to be installed AWS 6/2/20 Physical Agility Room # 106 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. PAGE 5 OF 18 Accepted Item Location Action Required By Date Touch up painting walls, door frame, etc. AWS 6/2/20 One of the joints between mirrors seems a bit off(image AWS 6/2/20 a little distorted), Adjust/align mirror for better image reflection. Trim cap at top of mirror to be properly installed. Touch up paint reqired at VAV box at exposed ceiling. AWS 8/13/20 Room signage to be installed AWS 6/2/20 Turnout Gear Room # 107 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Touch up paint required AWS 6/2120 Room signage to be installed AWS 6/2/20 SCBA Storage Room # 108 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Touch up painting AWS 6/2/20 Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Room signage to be installed EMS Storage Room # 109 General cleaning. Pay special attention to areas around 1 frames and vynil base. AWS 6/2/20 2 Touch up painting AWS 6/2/20 3 Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. 4 Clean up glue at interior of upper cabinets AWS 6/2/20 Provide/insall grommets at work surface as necessary fo 5 access outlets below. AWS 6/2/20 6 Remove excess paint from floor, casework, etc. AWS 6/2/20 7 Room signage to be installed AWS 6/2/20 Hose Storage Room # 110 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Touch up painting AWS 6/2/20 PAGE 6 OF 18 Accepted Item Location Action Required By Date 3 Cracks at floor. Cracks may have to be routed out, epoxy AWS 8/13/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. 4 Remove stickers from lint trap cover plate AWS 8/13/20 5 Room signage to be installed AWS 6/2/20 Decontamination Room # 111 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Touch up painting AWS 6/2/20 Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Concrete floor around floor drain needs to be refinished AWS 6/2/20 and repainted Rest Room # 111B General cleaning AWS 6/2/20 installation of toilet accessories incomplete. AWS 6/2/20 Walls to be refished and repainted. Touch-up paint at AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to be AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout/tile flooring. Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Door silencers not installed AWS 6/2/20 Patch/refinish opening around cover plate at wall. AWS 6/2/20 Air Lock # 112 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, frames, etc. AWS 6/2/20 Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Replace damaged/soiled ceiling tiles AWS 6/2/20 Caulking at floor joints required for cleaner/finished AWS 8/13/20 look IT/Data Room # 113 General cleaning. PAGE 7 OF 18 Accepted Item Location Action Required By Date Touch up painting- walls, frames, etc. AWS 6/2/20 Cracks at floor. Cracks may have to be routed out, epoxy AWS 8/13/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Caulking at floor joints required for cleaner/finished AWS 8/13/20 look Electrical Room# 114 General cleaning. AWS 8/13/20 Touch up painting- walls, frames, door, etc. AWS 6/2/20 Caulking at floor joints required for cleaner/finished AWS 8/13/20 look Covered Patio# 115 Storefront frame at patio (base) has dents. Cover cap AWS 6/2/20 needs to be replaced and caulking required at frame joints for a cleaner/finshed look. Concrete walkway to be cleaned. AWS 6/2/20 Art work application to storefront windows not installed as AWS 6/2/20 yet. Spider cracks at concrete patio floor. Cracks/concrete A WS 6/2/20 may have to be sealed. Coordinate/consult with structural engineer for proposed fix/direction on addressing cracks. Mechanical Room # 116 i General cleaning. AWS 6/2/20 2 Touch up painting- walls, frames, doors, etc. AWS 6/2/20 3 Door threshold missing/not installed. AWS 6/2/20 4 Door binding on frame. Adjust as necessary for proper fit. AWS 8/13/20 5 Cracks at floor. Cracks may have to be routed out, epoxy AWS 6/2/20 grouted and resealed/painted. Coordinate/consult with structural engineer for specific direction. Fire caulk wall penetrations/openings in wall. AWS 8/13/20 Apparatus Bays # 118 General Cleaning AWS 6/2/20 Door bottom seal at doors to airlock areas to be adjusted AWS 6/2/20 for better fit. Caulking required around pipe penetrations through AWS 6/2/20 walls. PAGE 8 OF 18 Accepted Item Location Action Required By Date Doors/frames to be cleaned/refinished and painted AWS 8/13/20 Mann doors from apparatus bay not opening properly. AWS 8/13/20 Adjust as necessary and check all hardware for proper function. Multiple cracks at floor. Cracks may have to be routed AWS 6/2/20 out, epoxy grouted and resealed/painted. Coordinate/ consult with structural engineer for specific direction. Touch up painting—multiple areas. AWS 6/2/20 Install cover plat of wall opening for plumbing "clean out'. AWS 8/13/20 Stair# 001 General cleaning AWS 8/13/20 Floor transition from 2nd floor lobby—concrete needs to AWS 8/13/20 be cleaned up/fethered out(refinish/painted) for a smoother/better transition. Concrete cracking at stair landings. Structural engineer AWS 8/13/20 to inspect and recommend fix. Cracks may have to be routed out, epoxy grouted and resealed. Verify/confirm with engineer. Welds joints at railings are unacceptable. Joints shall be AWS 8/13/20 properly ground, sanded and refinished/painted. Concrete at window jamb spoiling(intermediate landing). AWS 8/13/20 Structural engineer to inspect and provide recommended fix. Repair gouges in concreyte floor and refinish/repaint. AWS 8/13/20 Storage items to be removed from stairwell. AWS 8/13/20 Stair# 002 General cleaning AWS 8/13/20 Floor transition from 2nd floor lobby—concrete needs to AWS 8/13/20 be cleaned up/fethered out(refinish/painted) for a smoother/better transition. Concrete cracking at stair landings. Structural engineer AWS 6/2/20 to inspect and recommend fix. Cracks may have to be routed out, epoxy grouted and resealed. Verify/confirm with engineer Welds joints at railings are unacceptable. Joints shall be AWS 6/2/20 properly ground, sanded and refinished/painted Fire Riser#004 Work incomplete AWS 8/13/20 Door sill not sitting flush at concrete—may have to vbe AWS 8/13/20 caulked. Door sill also shows signs of rusting-needs to be addressed Hole at door below door handle needs to be fixed, AWS 8/13/20 refinished and repainted. PAGE 9 OF 18 Accepted Item Location Action Required By Date INTERIOR—2ND FLOOR Elevator Lobby Room #200 General cleaning required. AWS 6/2/20 Ceiling tile not sitting properly in grid.Adjust grid/tile as AWS 6/2/20 necessary for proper fit. 3 Remove stickers at door/frames AWS 6/2/20 4 Repair dings in walls, refinish and repaint. AWS 6/2/20 5 Touch up painting required at a number of areas wall, AWS 6/2/20 frames, etc. Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, etc. for a cleaner/sharper look.(typical) Rest Room#201 General cleaning AWS 6/2/20 Installation of toilet accessories incomplete. AWS 6/2/20 Walls to be refished and repainted. Touch-up paint at AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to be AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout/tile flooring. Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Mech./ HWH Room #202 General cleaning AWS Corridor#203 (Bunk Rooms) General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, door frame, etc. AWS 6/2/20 Walls to be refinished and repainted—areas above vinyl AWS 8/13/20 base, corners, etc. Replace soiled/damaged ceiling tiles—multiple areas. AWS 6/2/20 Some tiles, diffusers not sitting properly in ceiling grid. AWS 6/2/20 Adjust ceiling grid/tile/diffuers, etc as necessary for proper fitting. Thre are gouges in the floor finish at a few areas—floor AWS 8/13/20 tile to be replaced at these areas. (east end of corridor) Corner guards not installed.(typical) AWS 6/2/20 PAGE 10 OF 18 Accepted Item Location Action Required By Date Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, etc. for a cleaner/sharper look.(typical) Bunk 1 Room# 204 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected. 3 Touch up painting walls, door frame, etc. AWS 6/2/20 4 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting. Drywall around TV box, cover plates, etc. to be cleaned 5 up/refinished. AWS 6/2/20 Caulk gaps between ceiling grid and walls 6/2/20 Bunk 2 Room# 205 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected. Touch up painting walls, door frame, etc AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting. Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls AWS 6/2/20 Bunk 3 Room# 206 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. 2 Installation to be corrected AWS 6/2/20 3 Touch up painting walls, door frame, etc AWS 6/2/20 4 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting. Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls AWS 6/2/20 Bunk 4 Room # 207 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected Touch up painting walls, door frame, etc AWS 6/2/20 PAGE 11 OF 18 Accepted Item Location Action Required By Date Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls 6/2/20 Bunk 5 Room# 208 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected Touch up painting walls, door frame, etc AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls AWS 6/2/20 Bunk 6 Room # 209 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected Touch up painting walls, door frame, etc AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls AWS 6/2/20 Bunk 7 Room # 210 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected 3 Touch up painting walls, door frame, etc AWS 6/2/20 4 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting 5 Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished 6 Caulk gaps between ceiling grid and walls AWS 6/2/20 Bunk 8 Room# 211 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vynil base. PAGE 12 OF 18 Accepted Item Location Action Required By Date Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected Touch up painting walls, door frame, etc AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Caulk gaps between ceiling grid and walls AWS 6/2/20 Rest Room #212 General cleaning AWS 6/2/20 Installation of toilet accessories incomplete. AWS 6/2/20 Walls to be refished and repainted. Touch-up paint a( AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to Ix AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout/tile flooring. Tiles with holes are to be replaced. AWS 6/2/20 Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Rest Room #213 General cleaning AWS 6/2/20 Installation of toilet accessories incomplete. AWS 6/2/20 Walls to be refished and repainted. Touch-up paint at AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to be AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 6/2/20 comment on grout tile flooring. Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Corridor#214 General cleaning. Pay special attention to areas around AWS 6/2120 frames and vinyl base. Patch/refinish and repaint damaged walls. Touch up AWS 6/2/20 paint at walls, frames, etc. Corner guards not installed.(typical) AWS 6/2/20 Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, etc. for a cleaner/sharper look.(typical) 5 Replace base adjacent to door entering into Day room. AWS 6/2/20 6 Replace soiled/damaged ceiling tiles—multiple areas. AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for7 AWS 6/2/20 proper fitting PAGE 13 OF 18 Accepted Item Location Action Required By Date Laundry/Jan. # 215 General cleaning AWS 6/2/20 Laundry sink needs to be propeyly secured. Sink AWS 8/13/20 unstable. Needs to be properly secured at legs and wall. Srews w/washers at walls are unacceptable.and bolts at leg are too long—neds to be properly tightend. Patch/repair and refisish walls below cabinet and around/ AWS under/behind laundry tub. Touch-up paint at walls, frames, etc. including walls4 AWS 6/2/20 around roof hatch access. Exposed plywood support at casework counter needs to 5be cut back so it's not so visible. AWS 8/13/20 Exposed screws at casework cabinets to be covered with AWS 6/2/20 buttons Cover plate missing at electrical outlet adjacent to door. AWS 6/2/20 Access ladder to roof shall be painted. AWS 6/2/20 Install door stop to prevent door from hitting roof access AWS 8/13/20 ladder. Day Room. # 216 Pay special attention to areas around frames and AWS 6/2/20 General cleaning vinyl base. Patch/refinish and repaint damaged walls around door/ AWS 6/2/20 window frames. Door franes with overspray paint to be refinished/repainted. Touch up paint at walls, frames, etc. Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical Ceiling tile not sitting in grid properly. Adjust grid for AWS 6/2/20 proper fitting Exposed screws at cabinets to be capped. AWS 6/2/20 Exposed electrical/data boxes at casework to be AWS 6/2/20 covered. Complete ceiling grid/tile and window shade installation AWS 6/2/20 along corridor from datroom to Kitchen. Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Closet Room. # 217 General cleaning AWS 6/2/20 LT Office. #218 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, door frame, etc AWS 6/2/20 Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical PAGE 14 OF 18 Accepted Item Location Action Required By Date Door silencer's missing AWS 6/2/20 Paint overspray on door frame needs to be refinished and AWS 6/2/20 repainted. Drywall around TV box, cover plates, etc. to be cleaned AWS 6/2/20 up/refinished Repair ding in wall and refinish AWS 8/13/20 Corridor#220 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. Touch up painting walls, door frame, etc AWS 6/2/20 Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical) Signage installation at room#221 is crooked. Remove AWS 6/2/20 and re-install. LT Bunk 1 Room #221 General cleaning. Pay special attention to areas around 6/2/20 frames and vinyl base. AWS Touch up painting walls, door frame, etc AWS 6/2/20 Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected Caulk gaps between ceiling grid and walls, at door AWS 6/2/20 frames, etc. LT Rest Room # 221A General cleaning AWS 6/2/20 Installation of toilet accessories incomplete. AWS 6/2/20 Walls to be refished and repainted. Touch-up paint at AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to be AWS 8/13/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 8/13/20 comment on grout/tile flooring. Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. LT Bunk 2 Room #222 1 General cleaning. Pay special attention to areas around AWS 6/2/20 frames and vinyl base. 2 Touch up painting walls, door frame, etc AWS 6/2/20 3 Door silencers stips not properly/completely installed. AWS 6/2/20 Installation to be corrected 4 Caulk gaps between ceiling grid and walls, at door AWS 6/2/20 frames, etc. PAGE 15 OF 18 Accepted Item Location Action Required By Date LT Rest Room # 222A General cleaning AWS 6/2/20 Installation of toilet accessories incomplete. AWS 6/2/20 Walls to be relished and repainted. Touch-up paint at AWS 6/2/20 walls, frames, etc. Joints between tilework and gyp. Bd. Wall(corners) to be AWS 6/2/20 trimed out properly for a cleaner look. Grout at tile flooring inconsistent color—see general AWS 8/13/20 comment on grout/tile flooring. Tilework installation on one wall as base tile meets the AWS 8/13/20 floor is unacceptable. Wall base to be removed/replaced for a proper fit/installation Wall with wall tile istalled to floor does not match design AWS 6/2/20 drawings. Remove portion of wall tile necessary to accommodate base tile per design drawings. Kitchen Room #223 & Adjacent Corridor General cleaning. Pay special attention to base and area AWS 6/2/20 around base. Wall/base along corridor wavy in a number of places. AWS 6/2/20 Maake corrective adjustments necessary for a proper installation.. 3 Refinish walls, window sills, etc and repaint. AWS 6/2/20 4 Install missing ceiling tile AWS 6/2/20 5 Pot rack not installed as yet. AWS 6/2/20 6 Foot rest at kitchen counter not installed as yet. AWS 6/2/20 Ceiling tile not sitting in grid properly. Adjust grid for7 AWS 6/2/20 proper fitting 8 Ice machine installation incomplete AWS 6/2/20 Scratches on stainless steel counter top to be buffed out 9 or replaced. AWS 6/2/20 Casework doors at sink needs to be adjusted(doors 10 hitting each other). AWS 6/2/20 Emergency shut off button at gas range to be installed. AWS 6/2/20 12 Tile base needs to be installed behind range. Current AWS 6/2/20 installation is unacceptable. Touch up paint at walls above base adjacent to range. AWS 6/2/20 Walls to be refinished/repainted. Provide caulking at joints/gaps/around frames, ceiling AWS 6/2/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical) Solid surface cap adjacent to kitchen sink is not propely AWS 6/2/20 installed(crooked). Needs to be replaced. PAGE 16 OF 18 Accepted Item Location Action Required By Date Soffit header above kitchen counter(west) to be AWS 6/2/2 repainted and trimmed out properly—edge whee two paint colors meet looks odd. One paint color will continue around soffit and terminate at ceiling and adjacent wall instead of trying to terminat paint colors at edge of soffit. Sink faucet(gooseneck) feels unstable and appears to be AWS 6/13/20 inadequate for the intended use—gooseneck is too low/ flat-should have a higher arc/throw. Pantry Room # 224 General Cleaning AWS 6/2/20 Refinish wall and touch up paint AWS 6/2120 Pantry Room # 225 General Cleaning AWS 6/2/20 Refinish wall and touch up paint AWS 6/2/20 Pantry Room # 226 General cleaning AWS 6/2/20 Refinish wall and touch up paint AWS 8/13/20 Dining Room # 227 General Cleaning AWS 6/2/20 Floor tile adjacent to door leading to patio area needs to AWS 6/2/20 be removed/replaced(not installed properly). Replace dented refrigerator door. AWS 8/13/20 Adjustable shelf at closet missing AWS 8/13/20 Provide caulking at joints/gaps/around frames, ceiling AWS 8/13/20 grid/walls, fire extinguisher cabinets, etc. for a cleaner/ sharper look.(typical) Drywall around TV box, cover plates, etc. to be cleaned up/refinished AWS 6/2/20 Floor mounted electrical/data box projects too high AWS 6/2/20 above floor—needs a transition cover. Storage Room # 228 General Cleaning AWS 6/2/20 Remove sticker from doorRe AWS 6/2/20 PAGE 17 OF 18 Accepted Item Location Action Required By Date Scrateches at door frame to be refinished and repainted. AWS 6/2/20 Covered Patio# 300 General cleaning AWS 6/2/20 Touch up painting required AWS 8/13/20 Edge condition at wall adjacent to railing to be refinished AWS 8/13/20 and repainted—current condition is unacceptable. Remove paint at light fixture trim. AWS 6/2/20 Caulking required at storefront framing, including gap AWS 6/2/20 between frame afnd floor. Coverplate on back of storefront door(for power AWS connection) to be properly installed. PAGE 18 OF 18 EXHIBIT 6 Project Certificate: Certificate of Final Completion (No action) - Previously Signed DocuSign Envelope ID 40F7C957-11 E5-470A-AB91-8EC223C5D675 DBIA DESIGN-E3UIl_D CERTIFICATE OF FINAL COMPLETION PROJECT: OWNER: (Name and location) (Name and address) City of Boynton Beach Fire Station 1 CFP Boynton Beach Town Square, LLC Attention: Steve Collins 18336 Minnetonka Blvd, #C Deephaven, Minnesota 55391 DATE OF FINAL COMPLETION: DESIGN-BUILDER: (Name and address) September 25, 2020 H. J. High Construction 1015 W. Amelia St. Orlando, Florida 32805 Description of Work (or Designated Area) Being Certified for Final Completion: Fire Station I 200 1sT ST Boynton Beach, Florida 33435 The above-described Work has been reviewed and found to be complete in accordance with the Construction Documents,except as noted below: No exceptions Article 1 Affidavit and Release 1.1 The undersigned on behalf of Design-Builder, after being duly sworn upon his/her oath, swears that there are no claims, obligations or liens outstanding or unsatisfied for labor, services, material, equipment, taxes or other items performed, furnished or incurred for or in connection with the Work which will in any way affect Owner's interests. DocuSign Envelope ID:40F7C957-11 E5-470A-AB91-8EC223C5D675 1.2 Design-Builder agrees that upon receipt of final payment to Design-Builder, it waives and releases all claims against Owner, except those claims previously made in writing to Owner and which remaining unsettled at the time of final payment. For clarity, Design-Builder identifies those unsettled claims as follows: None Article 2 Certification 2.1 Design-Builder certifies that it has achieved Final Completion of all Work described in this Certificate of Final Completion and no hazardous substances were incorporated into the structure of the Fire Station Project. 2.2 Design-Builder represents that it has: .1 furnished to Owner a consent of Design-Builder's surety, if any, to final payment; .2 provided Owner with all operating manuals, warranties and other deliverables required by the Contract Documents;and .3 furnished Owner with certificates of insurance confirming that required coverages will remain in effect consistent with the requirements of the Contract Documents. .4 2.3 The undersigned is authorized to make this affidavit, release and certificatioj-e 6 -half of Design- Builder. Notary: Design-13 it:er: Sworn to me and subscribed in my presence this _ 9' day of �5op 4,6v r , 2Q;ki. Sig ature if. uK v pr 1ntptive Signature of Notary for State of 4jrN►<ja-- • Printed name---?(2 /- v�� 4/#-1, 4 • Aiii Title 7 r My Commission Expires: & KryStalA, �e q .af.Ao 7 a •• •t-yp (NOTE:users should check the -: '�; 1►"` b�TE OF LORIDA sr E �• om(l# e corn•lance with a..livable state 1:Y;,; ;'•' GG •7621 4 Article 3 Acceptance 3.1 The Owner agrees that Final Completion of the above-described Work has been achieved as of the date stated above. Signing of this Certificate of Final Completion by the Owner in no way alters the responsibility of the Design-Builder under the Agreement and the Contract Documents including, without limitation, all warranties and guarantees. Owner:,- DocuSigned by: \---93Y14U12173b44y._ --— DBIA Document No 500-D8 Page 2 Certificate of Final Completion ©2013 Design-Build Institute of America DocuSign Envelope ID:40F7C957-11E5-470A-AB91-8EC223C5D675 Signature of authorized representative Printed name Steve Collins Title President Date 11/13/2020 �(k Doug Holmberg - 3.2 Optional Third Party Certification. (NOTE: ll the Agreement between Design-Builder and Owner requires the certification of a third-party for Final Completion, complete this Section. If not, check appropriate box below). o Required it-Not required The above-described Work performed by Design-Builder has been reviewed and found, to the best of the undersigned's knowledge,information and belief,to be complete,subject to any exceptions noted herein. By: 4,e7 ature Printed name Sc. ipc c{ Tette /AD6— Titie Date Caution: You should sign an original DBIA document which has this caution printed In blue. An original assures that changes will not be obscured as may occur when documents are reproduced. E2L: DocuSigned by: —D¢¢S,� By pflask ,:,. Mark Hefferin Date. 11/12/2020 483F2D5E07BE47C.. Antonio Balestrieri CITY OF BOYNTON BEACH r—DocuSigned by: c DS By_ A, artff Colin Groff _ Date. 11/12/2020 QS `—90044BDD71 B84F6... Anderson Slocombe DB IA Document No 500-D8 Page 3 Certificate of Final Completion ©2013 Design-Build Institute of America